ABOUT CWB CERTIFICATION/ QUALIFICATION The work CWB does on behalf of our clients can be divided into five main categories:
|
|
- Corey Peregrine Smith
- 7 years ago
- Views:
Transcription
1
2 CWB CERTIFICATION/ CWB CERTIFICATION/ QUALIFICATION QUALIFICATION SERVICES SERVICES CANADIAN WELDING CERTIFICATION AN OVERVIEW Canada, like many countries around the world, has specific rules and regulations governing the construction of buildings and their related structural components. In Canada, companies doing such work are governed by the National or Provincial Building Code(s) and CSA Standard S16 Design of Steel Structures. These codes and standards are mandatory and apply to all Canadian welding, fabricating or erection companies, as well as US or International companies, working with or providing applicable structural welded products for use within Canada. In addition to the above, there are also several additional product and safety codes that include requirements for CWB Certification. For over 60 years, the CWB, as the administrators of the relevant CSA standards in support of the above, has been providing valuable assistance and guidance for companies seeking certification and welder qualification. ABOUT CWB CERTIFICATION/ QUALIFICATION The work CWB does on behalf of our clients can be divided into five main categories: 1 Certification Services for Welding Professionals and Welding Companies, comprising of: 1 CWB Company Certification: Welder, Welding Supervisor, Welding Engineer Qualifications, and CWB Welding Inspector Certification CWB Qualification of Welding Procedures CWB Certification of Electrodes and Filler Metals Qualification and Certification of Canadian Welding professional and Welding Companies to International requirements (eg. IIW/ ISO 383) CWB Stud base Qualification 1
3 CWB CERTIFICATION/ QUALIFICATION SERVICES CWB COMPANY CERTIFICATION Any company that is CWB Certified has undergone a review and qualification process to ensure that they meet the requirements for welding companies as specified in CSA Standards W7.1, W7.2, W55.3 or W186. Within CSA W7.1 and W7.2, a company may be Certified in one of three Divisions, based on the type of work to be undertaken, and the customer or end user. Within each Division, the CSA Standards provide clear requirements with respect to the personnel, procedures, as well as workmanship, as verified though auditing, that will be required. Under the Standards/ Divisional requirements, each Certified Company is required to employ an adequate number of Welding Supervisors, and Welding Engineers with welding related experience, to control welding operations. Although not mandated by the above noted Standards, there may be an additional requirement (such as under CSA W59, another very common CSA Standard) for Certified Welding Inspectors to be also employed by a CWB Certified company. 2 CWB WELDER, WELDING SUPERVISOR AND WELDING ENGINEER QUALIFICATION Starting at the welder level, all welders working for a CWB Certified company must be qualified by the CWB once every two years. This is a practical test administered by a CWB certification representative that normally takes place at the welder s place of employment, using a test plate provided and evaluated by the CWB. Further, depending on the company s CSA Division, there may be requirements for welders to be designated by their employer as Welding Supervisors. All Welding Supervisors must successfully complete written CWB examinations on welding symbols, weld faults, quality control and inspection methods and the applicable standard(s) and demonstrate relevant experience before they can be qualified. In addition, depending on the scope of work being done, there may be an additional requirement under CSA Standards for a CWB Qualified Welding Engineer. To become a CWB Welding Engineer it requires suitable experience and knowledge and writing and passing examinations on the standards administered by the CWB. To help individuals acquire the required qualification the CWB Institute runs regular online and classroom courses for Welding Supervisors as well as providing self study material for prospective Welding Engineers.
4 CWB CERTIFICATION/ QUALIFICATION SERVICES CWB QUALIFICATION OF WELDING PROCEDURES Under CSA Standard W7.1, W7.2, W186 and W55.3, all CWB Certified Companies are required to submit their welding procedures to CWB for evaluation and approval to ensure they meet the requirements of the governing standard. This must be done before the start of any work, as outlined within the applicable Standard(s). CWB WELDING INSPECTOR CERTIFICATION Mandated by some Canadian Codes and Standards a CWB Certified Welding Inspector is always a valuable asset to any company interested in delivering quality products within a quality management system such as ISO 9001 or ISO 383. All Welding Inspectors are trained in the theory and application of visual inspection with respect to welded assemblies and must pass both a CWB practical and theoretical exam to become certified. Training for Welding Inspectors (Inspector Level 1,2 & 3) is available through the CWB Institute. Beyond visual inspection the CWB Group can also provide training for various Non-destructive Testing methods (NDT) that complement and extend the skill set of CWB Certified Inspectors. CWB CERTIFICATION OF ELECTRODES AND FILLER METALS Certification of welding electrodes and filler metal are required in Canada when welding under CSA Certification Standards. It is also required by certain other codes and standards in Canada, as well as when specified by users as part of their quality requirements. 3
5 CWB CERTIFICATION/ QUALIFICATION SERVICES QUALIFICATION AND CERTIFICATION OF CANADIAN WELDING PROFESSIONAL AND WELDING COMPANIES TO INTERNATIONAL STANDARDS As the Authorized National Body (ANB) for the International Institute of Welding (IIW), the CWB is able to provide several levels of internationally recognized certification and qualification for welding professionals, as well as welding companies. Within the scope of the IIW ANB agreement, the CWB can provide: Training Facility Certification For Canadian trade schools, colleges or other post secondary institution who are looking to grant IIW diplomas, the CWB can grant approval as an Authorized Training Body (ATB). Company Certification For Canadian companies looking to be certified to IS0 383 standards under IIW s internationally recognized Quality Requirements for Welding Standard. Welding Professional Qualification - diplomas in : International Welding Engineer (IWE) International Welding Technologist (IWT) International Welding Specialist (IWS) International Welding Practitioner (IWP) In addition, the CWB can provide inspector code endorsement and qualification relating to: American Bureau of Shipping (ABS) American Society of Mechanical Engineers (ASME) Canadian Standards Association (CSA): Z662 W7.1 W59 American Petroleum Institute (API)
6 CWB CERTIFICATION/ QUALIFICATION SERVICES CWB STUD BASE QUALIFICATION Fabricators performing stud welding under CSA Standard W59 are required to use only qualified studs through CWB qualification program. Studs that are shop or field applied must be qualified by the manufacturer through CWB to the extent of one of the following codes: CSA W59, AWS D1.1, AWS D1.5 or AWS D1.6. Qualification of studs will ensure that the stud manufacturer has successfully met the tests and the quality system requirements as specified in the applicable standard. 5
7 CWB CERTIFICATION/ QUALIFICATION SERVICES WELDED BUILDING COMPONENTS Clipped Double Connection re v. ov N.9 9 Stub-Girder 2 Gerber Girder 15 LEGEND Most of the above components may be welded during fabrication or installation Anchors (wall) for beams or open-web steel joists Anchor rods for structural steel Base plates of steel for steel columns Beams Bearing plates for structural steel Bolts Bracing for steel members or frames Brackets attached to the steel frame Clipped double connection Columns Conveyor structural steel frame work Crane, girders, rails and stops Door frames constituting part of and connected to the steel frame Floor and roof plates (raised pattern or plain), grating, connected to steel frame Gerber girder Girders Girts Grillage beams of steel Headers or trimmers for support of open-web steel joists where such headers or trimmers frame into structural steel members Hollow structural section (HSS) column Light-gauge cold formed steel used to support floor and roofs 22. Lintels attached to steel frame 23. Marquee or canopy (structural frame only) when forming an integral part of the steel frame 2. Monorail beams of standard structural shapes, attached to steel frame. Open-web steel joists, bridging and accessories when supplied with steel joists 26. Purlins 27. Sash angles connected to the steel frame. Separators, angles, tees, clips and other detail fittings essential to the structural steel frame 29. Shear connectors 30. Shelf angles attached to the steel frame 31. Steel cores for composite columns 32. Steel window sills attached to the steel frame 33. Steel stairs and handrails 3. Struts 35. Stub girders 36. Suspended ceiling supports of structural steel shapes 75mm or greater in depth 37. Ties, hangers and sag rods forming part of the structural frame 38. Trusses and brace frames Steel Beams and Column Connections that may be used in Single Family dwellings Structural drawings with an engineer s stamp are required for welded or bolted steel connections, splices and beam framing Reproduced by permission of the Canadian Institute of Steel Construction
Scope of EN 1090-1 Clarification Document
Scope of EN 1090-1 Clarification Document This document has been submitted to the European Commission as the UK view on the scope of EN 1090-1. After discussions, including with the European Technical
More information1.02 SYSTEM DESCRIPTION
1 OF 7 MODULAR MEZZANINES GUIDE SPECIFICATIONS FOR PART 1 - GENERAL 1.01 RELATED WORK A. SECTION 03 30 00: Cast in Place Concrete (and Concrete Finishing) 1. The area where mezzanine is installed shall
More informationACCREDITATION CRITERIA FOR INSPECTION PROGRAMS FOR MANUFACTURERS OF METAL BUILDING SYSTEMS AC472
ACCREDITATION CRITERIA FOR INSPECTION PROGRAMS FOR MANUFACTURERS OF METAL BUILDING SYSTEMS AC472 August 2012 (Effective September 1, 2012) (Editorially revised September 4, 2013) (Editorially revised February
More informationSTATEMENT OF WORK (SOW) On-Call Certified Welding Inspections and Nondestructive Testing
1.0 INTRODUCTION Colorado Springs Utilities (UTILITIES) is seeking qualified firms to provide verification welding inspection services, nondestructive testing services, and technical reporting to Colorado
More informationSTRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM
Chapter 9 STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM 9.1 BACKGROUND Steel is widely used in the construction of multi-storey buildings. However, steel construction is seldom used and is traditionally
More information4. ANCHOR BOLTS AND STRAPS a. ½" anchor bolts shall be embedded 7" into concrete a maximum of 6' on center and 12" from corners and ends of plates.
GENERAL CODE REQUIREMENTS (BASEMENTS) 1. FOOTINGS a. Footings shall be below frost line depth (42"). b. For an 8" foundation wall, footings shall be no less than 8" deep and 16" wide. c. Steel reinforcement
More informationINSTALLATION. General. Important Note. Design. Transport
General The roof trusses you are about to install have been manufactured to precise engineering standards. To ensure that the trusses perform as designed, it is essential that they be handled, erected
More informationACCREDITATION CRITERIA FOR FABRICATOR INSPECTION PROGRAMS FOR STRUCTURAL STEEL. AC172 February 2015 (Effective April 1, 2015)
ACCREDITATION CRITERIA FOR FABRICATOR INSPECTION PROGRAMS FOR STRUCTURAL STEEL AC172 February 2015 (Effective April 1, 2015) Requirements related to the Designated Accreditation Representative (DAR) and
More informationStructural Failures Cost Lives and Time
Structural Failures Cost Lives and Time Recent failures of storage bins, silos and other structures highlight the need to increase awareness of hazards associated with these structures. Since 2010, one
More informationSTEEL fabrication quality SySTEmS guideline
STEEL fabrication quality systems guideline Copyright 2002 by Canadian Institute of Steel Construction All rights reserved. This book or any part therof must not be reproduced in any form without written
More informationContents. APA Construction Details. Full fill cavity walls 2-13. Partial fill cavity walls 14-25. Solid externally insulated walls 26-37
Contents Pages Full fill cavity walls 2-13 Partial fill cavity walls 14-25 Solid externally insulated walls 26-37 Appendix (BRE confirmation of Ψ and y-values) 38-40 Page 1 of 40 APA Construction Details
More informationResidential Deck Safety, Construction, and Repair
Juneau Permit Center, 4 th Floor Marine View Center, (907)586-0770 This handout is designed to help you build your deck to comply with the 2006 International Residential Building code as modified by the
More informationMark Cramer Inspection Services, Inc.
Mark Cramer Inspection Services, Inc. 492 Twentieth Avenue, Indian Rocks Beach, FL 34635-2970 (727) 595-4211 Fax (727) 596-7583 Certified Member #12085 American Society of Home Inspectors Construction
More informationINTERNATIONAL EDUCATION, QUALIFICATION AND CERTIFICATION SYSTEMS IN WELDING
L.Quintino a R.Ferraz b I. Fernandes c a TU Lisbon (Portugal), EWF-IAB/IIW Chief Executive b ISQ (Portugal), IAB Chief Executive c ISQ (Portugal), EWF-IAB/IIW System Manager ABSTRACT Welding technology
More informationMaterials. Estimating Steel. Players. Materials. Shop Drawings. Detailing Process. Standard shapes. Fabricated members, Built-up sections
Materials Standard shapes W sections, C channels, Structural T, Angles, Pipes, Tubes, Rods and Plates Fabricated members, Built-up sections Adding plates to beam flanges, Stiffeners to beam webs Built
More informationGeorgia Association of Home Inspectors
Georgia Association of Home Inspectors Standards of Practice for Framing Inspections OVERVIEW The purpose of the GAHI (Georgia Association of Home Inspectors) Standards of Practice for Framing Inspections
More informationCode of Standard Practice for Steel Buildings and Bridges
AISC 303-05 Code of Standard Practice for Steel Buildings and Bridges March 18, 2005 Supersedes the March 7, 2000 AISC Code of Standard Practice for Steel Buildings and Bridges and all previous versions.
More informationCSA S16-09 Design of Steel Structures Canada
CSA S16-09 Design of Steel Structures Canada Ed Whalen, P.Eng CISC President CSA S16-09 1 CSA Standard S16-09 Standard, Design of Steel Structures. Sets out minimum requirements used by engineers in the
More informationDesign of Steel Structures Prof. S.R.Satish Kumar and Prof. A.R.Santha Kumar. Fig. 7.21 some of the trusses that are used in steel bridges
7.7 Truss bridges Fig. 7.21 some of the trusses that are used in steel bridges Truss Girders, lattice girders or open web girders are efficient and economical structural systems, since the members experience
More informationPOST AND FRAME STRUCTURES (Pole Barns)
POST AND FRAME STRUCTURES (Pole Barns) Post and frame structures. The following requirements serve as minimum standards for post and frame structures within all of the following structural limitations:
More informationDIY ALL STEEL SHED FRAMES
DIY ALL STEEL SHED FRAMES FAST FIT FRAMES & CONNECTOR PRICES BELOW THE BEST BUILDINGS START WITH A STEEL BUILDING FRAME ALLOW 10-21 WORKING DAYS FROM DATE ORDERED FOR PRODUCTION & SHIPMENT READY PRICES
More informationSection A Roof Truss
Section A Roof Truss Truss Types Wisconsin Truss, Inc. can build a variety of truss types, pictured below are some common examples. Common Bobtail Scissor Mono Studio Dual Slope Cathedral Tray Vault Parallel
More informationWELDING TECHNOLOGY DEGREES AND CERTIFICATES. Welding Technology Degree. Shielded Metal Arc Plate and Pipe (270 hours) Certificate
Area: Technical Education Dean: Dr. Trish Caldwell Phone: (916) 484-8354 Counseling: (916) 484-8572 www.arc.losrios.edu/~welding/ The American Welding Society (AWS) nationally accredits American River
More informationMETAL BUILDING SYSTEMS
BUILDING SYSTEMS The Brand of Choice METAL BUILDING SYSTEMS www.nucorbuildingsystems.com Building Systems The Brand of Choice Nucor Building Systems, a division of Nucor Corporation, is one of the most
More informationSECTION 26 05 49 VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS
SECTION 26 05 49 VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes seismic restraints and other earthquake-damage-reduction measures for electrical
More informationTechnical Assignment 2 TABLE OF CONTENTS
2 TABLE OF CONTENTS Executive Summary...3 Introduction..5 Gravity Loads......6 Design Codes......7 Materials..8 Existing Structural System.. 10 Existing Floor System 15 Alternate Floor Framing Systems...17
More informationMEZZANINE SPECIFICATIONS PART 1 GENERAL 1.1 SCOPE 1.2 APPROVED MANUFACTURER 1.3 REGULATORY ORGANIZATIONS AND GROUPS 1.4 QUALITY ASSURANCE
MEZZANINE SPECIFICATIONS PART 1 GENERAL 1.1 SCOPE This specification is intended to describe the general requirements applicable to a proper structural mezzanine design. In addition, it is to serve as
More informationPDmB, Inc. Definitions
Page 1 of 11 Definitions S Satisfactory Meets industry standards for proper material and installation NP Not Present Condition or item was not present at time of inspection NI Not Inspected Condition or
More informationSECTION 05 42 16 COLD-FORMED METAL DECK FRAMING Elevations Steel Deck Framing by Trex
(Specifier Note: The purpose of this guide specification is to assist the specifier in correctly specifying cold-formed metal deck framing products and execution. The specifier needs to edit the guide
More informationEAST LYME HIGH SCHOOL
Overview: 1971 N 1966 GYM 1966 CLASSROOM WING 1966 AUD. 1971 GYM 1998 1998 POOL EAST LYME HIGH SCHOOL Original 1966 Building: The original East Lyme High School was constructed in 1966 and was composed
More informationPost and Beam Construction
Post and Beam Construction A Presentation By the Canadian Wood Council Canadian Conseil Wood canadien Council du bois Early settlers introduced the concept of post and beam construction in North America
More informationRESIDENTIAL FRAMING TECHNICIAN
RESIDENTIAL FRAMING TECHNICIAN Occupation Description A is a person who builds the concrete formwork, constructs the frame or supporting structure of single and multi-family buildings, encloses the building,
More informationPatio Covers / Carports
Patio Covers / Carports Building Guides for Homeowners Why Do I need a Permit? D I D Y O U K N O W? As owner-builder you are the responsible party of record on such a permit. If your work is being performed
More informationDavid C. Barrow Elementary School 100 Pinecrest Drive, Athens, GA 30605
David C. Barrow Elementary School 100 Pinecrest Drive, Athens, GA 30605 Winner of the 2014 Cold-Formed Steel Engineers Institute (CFSEI) Design Excellence Award May 2014 The David C. Barrow Elementary
More informationContractor s Statement of Responsibility for Seismic-Force-Resisting Systems This form is to be filled out by the contractor.
SPECIAL INSPECTION PROCEDURE IBC CHAPTER 17 2012 EDITION When Required All projects that require a SC licensed Architect or Engineer per SC Architectural and Engineering registration law. Overview The
More informationDiscussion on Products under the Scope of EN 1090-1 and proposed CEN/TR to clarify the scope
CEN/TC 135 N 686 European Committee for Standardization Comité Européen de Normalisation Europäisches Komitee für Normung CEN/TC 135 Execution of steel structures and aluminium structures N 686 Secretariat:
More informationAlternative Steel Materials to BS 5950
BC 1: 2008 Design Guide on Use of Alternative Steel Materials to BS 5950 BCA Sustainable Construction Series 3 The education and research arm of the Building and Construction Authority 200 Braddell Road
More informationCalvert USA, Inc. Attic Stairs
Calvert USA, Inc. Attic Stairs Instructions for installation of vertical opening access stairs Model numbers: 7035 through 7047 Calvert USA, Inc., P.O. Box 841, Solomons, MD 20688, Tel. (410) 286-1430,
More informationChapter 3 Pre-Installation, Foundations and Piers
Chapter 3 Pre-Installation, Foundations and Piers 3-1 Pre-Installation Establishes the minimum requirements for the siting, design, materials, access, and installation of manufactured dwellings, accessory
More informationUncovered Decks & Porches
Uncovered Decks & Porches Building Guides for Homeowners Why Do I need a Permit? D I D Y O U K N O W? As owner-builder you are the responsible party of record on such a permit. If your work is being performed
More information9. QUALITY CONTROL/QUALITY ASSURANCE
Interim Guidelines: Chapter 9 - Quality Control/Quality Assurance 9. QUALITY CONTROL/QUALITY ASSURANCE Quality control is principally the responsibility of the contractor, while Quality Assurance is performed
More informationNational Council of Examiners for Engineering and Surveying. Principles and Practice of Engineering Structural Examination
Structural Effective Beginning with the April 2011 The structural engineering exam is a breadth and exam examination offered in two components on successive days. The 8-hour Vertical Forces (Gravity/Other)
More informationTARIFF CODE and updates standard
TARIFF CODE and updates standard No HS CODE AHTN CODE PRODUCT DESCRIPTION PRODUCT TYPE STANDARDS IDENTIFIED 7207 Semi finished products of iron or non alloy steel Containing by weight less than 0.25% of
More informationResidential Prototype III. Multi-Story. The Multi-Story. Your connection to ideas + answers. Prepared by: AISC Steel Solutions Center
Multi-Story Residential Prototype III The Multi-Story Residential Prototype III Prepared by: AISC Steel Solutions Center What s this? This package tells the story of a fictitious project with an imaginary
More information8/18/14. Introduction to. Framing. Terminology and Concepts
8/18/14 Introduction to Framing Terminology and Concepts Terminology: Framing Level Two points on exactly the same horizontal plane. Square Intersecting lines or faces that form an exact 90 angle. Plumb
More informationTable of contents. What is new in Advance Steel 2011
Table of contents WELCOME TO ADVANCE STEEL 2011, PART OF THE GRAITEC BIM SOLUTION... 5 NEW COMMON INSTALLATION PROCESS... 6 GRAITEC ADVANCE MANAGER... 7 Easy to use GUI to customize settings...7 Settings...8
More informationPage & Turnbull imagining change in historic environments through design, research, and technology
DCI+SDE STRUCTURAL EVALUATIONS OFFICE BUILDING, TOOL SHED & WATER TANK, AND BLACKSMITH & MACHINE SHOP BUILDINGS SAN FRANCISCO, CALIFORNIA [14290] PRIMARY PROJECT CONTACT: H. Ruth Todd, FAIA, AICP, LEED
More informationJWES Activities of Education and Certification System for Welding Engineers in Asian Countries
JWES Activities of Education and Certification System for Welding Engineers in Asian Countries H. Harasawa 1) & T. Ohji 2) 1) Technical advisor, The Japan Welding Engineering Society 2) Professor Emeritus
More informationATLANTA MODEL SPECIFICATIONS
ATLANTA MODEL 50 SPECIFICATIONS Dimensions: Roof Dimensions (point to point) 50-0 Column Dimensions (out to out of columns) 44-0 Eave Height 8-0 Roof Height @ Peak ±21-8⅞ Hip Roof 6:12 pitch Square Feet
More informationFCA CARPENTRY & JOINERY THEORY. 10 SIMPLE ROOF CONSTRUCTION Part 2
CARPENTRY & JOINERY FCA CARPENTRY & JOINERY THEORY 10 SIMPLE ROOF Double Roofs A double roof is a roof whose rafters are of such a length that they require an intermediate support. This support is usually
More informationCOMMERCIAL PLAN SUBMISSION FOR NEW CONSTRUCTION AND/OR RENOVATIONS
COMMERCIAL PLAN SUBMISSION FOR NEW CONSTRUCTION AND/OR RENOVATIONS Permit applicants shall submit three (3) COMPLETE SETS of plans and specifications with each application for a permit. Plans and specifications
More informationANCHOR: Metal securing device embedded or driven into masonry, concrete, steel or wood.
CONSTRUCTION TERMINOLOGY ANCHOR: Metal securing device embedded or driven into masonry, concrete, steel or wood. ANCHOR BOLT: Heavy, threaded bolt embedded in the foundation to secure sill to foundation
More information11. NONDESTRUCTIVE TESTING
11. NONDESTRUCTIVE TESTING Nondestructive testing includes magnetic particle testing (MT), Liquid Dye Penetrant testing (PT), Radiographic Testing (RT) and Ultrasonic Testing (UT). The purpose of nondestructive
More information1. Preassembled steel stairs with concrete-filled treads. 2. Handrails attached to walls adjacent to metal stairs.
SECTION 05511 - METAL STAIRS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections,
More informationScheduling Estimating Module
Scheduling Estimating Module INDEX 2 SCHEDULING AND ESTIMATING MODULE 2.1 Overview 43 Scheduling 2.2 Introduction to Scheduling 43 2.3 Project Delivery Participants and Coordination 44 2.4 Project Phases
More informationSection 8.1 Volume I QUALITY ASSURANCE PROGRAM OF PRECAST PRESTRESSED CONCRETE PRODUCTS
Section 8.1 Volume I QUALITY ASSURANCE PROGRAM OF PRECAST PRESTRESSED CONCRETE PRODUCTS 8.1.1 PURPOSE This procedure provides guidelines related to the implementation of quality control and quality assurance
More informationCode of Standard Practice for Timber Frame Structures
TFEC 2-2013 Code of Standard Practice for Timber Frame Structures August 2013 Preface This Code is intended to represent a reasonable consensus of what constitutes ordinary and acceptable practice within
More informationACCREDITATION CRITERIA FOR INSPECTION PRACTICES OF METAL BUILDING ASSEMBLERS AC478
ACCREDITATION CRITERIA FOR INSPECTION PRACTICES OF METAL BUILDING ASSEMBLERS AC478 February 2015 (Effective July 1, 2015) () PREFACE The attached accreditation criteria has been issued to provide all interested
More informationTOP RUNNING SINGLE GIRDER BRIDGE CRANE
SECTION 14630 TOP RUNNING SINGLE GIRDER BRIDGE CRANE 1.01 SUMMARY PART 1- GENERAL A. The work required under this section shall include the designing, manufacturing, shipping, installing and field testing
More informationSECTION 11014 WINDOW WASHING SYSTEMS
SECTION 11014 WINDOW WASHING SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section includes, but is not limited to, design and furnishing portable davits, davit sleeves, dvit bases, four (4) removable outriggers,
More informationBeginning on Friday, Jan 22, and on subsequent investigations, the following issues were identified:
Date: 2/15/2016 Project: To: Middleton Public Library Roof Repair Pamela K. Westby Library Director Middleton Public Library 7425 Hubbard Avenue Middleton WI 53562 Pamela, Strategic Structural Design,
More informationCPA Steel Stud Framing Page 1 of 11
CPA Steel Stud Framing Page 1 of 11 STEEL STUD FRAMING General Requirements City of Palo Alto (CPA) Building Inspection Division 285 Hamilton Ave. Inspection Request: 650 329-2496 Building Division IVR#
More informationFORM DESIGN. easy to work with, and generally available.
Forms play a major role in concrete construction. They give the plastic concrete its shape and hold it until it hardens. Forms protect the concrete, assist in curing it, and support any reinforcing rods
More informationSECTION 14 20 10 - FREIGHT & PARKING GARAGE ELEVATORS PART I - GENERAL
SECTION 14 20 10 - FREIGHT & PARKING GARAGE PART I - GENERAL 1.1 SECTION INCLUDES [NOTE to AE: The following lists requirements that are specific to freight elevators. These requirements are in addition
More informationwww.klmtechgroup.com TABLE OF CONTENT
Page : 1 of 45 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia TABLE OF CONTENT 1.0 SCOPE 2 2.0 CONFLICTS
More informationMAT 75 STRUCTURAL SUPPORT SYSTEM
MAT 75 STRUCTURAL SUPPORT SYSTEM A GROUP COMPANY Structural Support Applications About the Mat 75 System For decades, Mabey Bridge & Shore has served the international construction community by providing
More informationHamilton Form Company, Ltd Custom Designs, Flexible Solutions
Hamilton Form Company, Ltd Custom Designs, Flexible Solutions 1 IFC 2 CUSTOM DESIGNS, FLEXIBLE SOLUTIONS Hamilton Form has been designing and building custom steel forms for the precast industry since
More informationBasic Requirements for Residential Plan Review _
Basic Requirements for Residential Plan Review _ Below you will find the basic requirements for your plan submittal. General: Drawn to scale Plan Size minimum: 9 x 12 Designer, Engineer, or Architect name,
More informationPreformed Metal Roofing and Siding
Page -1-1. GENERAL 1.1. Description This specification along with the drawings covers the furnishing of all material, products, equipment, accessories, tools, services, transportation, labor and supervision
More informationIF YOU NEED A POLE BARN OR DIY KIT CALL NOW AND LETS MAKE A DEAL
IF YOU NEED A POLE BARN OR DIY KIT CALL NOW AND LETS MAKE A DEAL Check out our Affordable Selection of DIY Pole Barn kit sizes and prices below. We offer a complete DIY pole barn kit plus independent experienced
More informationOTTAWA CIVIC CENTRE & NORTH SIDE STANDS LANSDOWNE PARK FRANK CLAIR STADIUM STRUCTURAL ADEQUACY REPORT 2007
OTTAWA CIVIC CENTRE & NORTH SIDE STANDS at LANSDOWNE PARK FRANK CLAIR STADIUM STRUCTURAL ADEQUACY REPORT 2007 for CITY OF OTTAWA REAL PROPERTY ASSET MANAGEMENT prepared by ADJELEIAN ALLEN RUBELI LIMITED
More informationDetailCAD. AutoCAD Based Steel Detailing Software THE VERSATILE PROGRAM THAT FITS ALL YOUR NEEDS. Visit our web site at detailcad.com today!
DetailCAD AutoCAD Based Steel Detailing Software THE VERSATILE PROGRAM THAT FITS ALL YOUR NEEDS Visit our web site at detailcad.com today! DetailCAD AutoCAD Based Steel Detailing Software The easiest,
More informationPRODUCT AND ENGINEERING MANUAL
TABLE OF CONTENTS Table of Contents... 1 General Mezzanine Information and Specifications... 2 SM0010PE Mezzanine Plan Information... 3 Information Required for Mezzanine Structures... 4 Floor And/Or Mezzanine
More informationSERVING THE NATIONS LEADING COMPANIES
SERVING THE NATIONS LEADING COMPANIES Amerada Hess BP Chemical BP Refining & Pipeline Citgo Petroleum Corporation Colonial Pipeline Conoco Phillips Pipeline Enbridge Energy Company, Inc. Equistar Chemical
More informationCOLORADO MODEL. 35 x 65 SPECIFICATIONS
COLORADO MODEL 35 x 65 SPECIFICATIONS Dimensions: Roof Dimensions 35-0 x 65-0 Column Dimensions (center to center) 31-0 x 30-6 Minimum Clearance 14-0 Roof Height @ Peak ±18-8 Curved Roof ±42-6 radius Square
More informationDOCUMENT CS/1: SCHEME DESCRIPTION AND BENEFITS
WELDING FABRICATOR CERTIFICATION SCHEME DOCUMENT CS/1: SCHEME DESCRIPTION AND BENEFITS 6 th Edition July 2012 Issued under the authority of the Governing Board for Certification All correspondence should
More informationSample Drawing Package for One and Two Family Dwelling Applications
Sample Drawing Package for One and Two Family Dwelling Applications For a full list of submission requirements, refer to the relevant checklist for your application found on our website: http://vancouver.ca/home-property-development/application-forms-and-checklists.aspx
More informationGood Craftsmanship Guide. Carpentry and Joinery- Carcassing
Good Craftsmanship Guide Carpentry and Joinery- Carcassing Introduction This Good Craftsmanship Guide highlights key problems with the major elements of Carpentry and Joinery - Carcassing, and gives guidance
More informationQUALIFICATION OF PROCEDURE AND WELDER. (19 February 2014)
QUALIFICATION OF PROCEDURE AND WELDER (19 February 2014) QUALIFICATION OF PROCEDURE AND WELDER The most important tasks prior production welding Welding qualifications are statements by which the welding
More informationJoist. Reinforcement. Draft 12/7/02
Joist Reinforcement Draft 12/7/02 1 JOIST REINFORCING The purpose of this CSD Design Aid is to provide procedures and suggested details for the reinforcement of open web steel joists. There are three basic
More informationModule 3.7. Thermal bridging
Module 3.7 Thermal bridging Learning Outcomes On successful completion of this module learners will be able to - Describe construction details which influence thermal bridging. 2 Introduction to thermal
More information2. Division 05 Structural Steel Framing for steel framework requirements
SECTION 131200 - CLIMBING WALLS PART 1 GENERAL 1.1 SUMMARY A. This section includes the following: 1. GFRC Rock Realistic Climbing Wall System B. Related Sections 1. Division 04 Unit Masonry 2. Division
More informationEARTHQUAKE DESIGN OF BUILDINGS
GAP.2.0.9 A Publication of Global Asset Protection Services LLC EARTHQUAKE DESIGN OF BUILDINGS INTRODUCTION Buildings in many areas of the world are susceptible to damage from moderate to severe earthquakes.
More informationDOCUMENT CAESAS/1: SCHEME DESCRIPTION AND BENEFITS
CONFORMITY ASSESSMENT FOR THE EXECUTION OF STEEL & ALUMINIUM STRUCTURES DOCUMENT CAESAS/1: SCHEME DESCRIPTION AND BENEFITS 2nd Edition July 2012 Issued under the authority of the Governing Board for Certification
More informationBuilding Construction. Lightweight construction. Conventional Construction
Ventilation 53 Building Construction The firefighter s ability to safely and efficiently ventilate a building through its roof will depend to some degree on the firefighter s understanding of roof construction.
More informationWisconsin Building Products Evaluation
Safety & Buildings Division 201 West Washington Avenue P.O. Box 2658 Madison, WI 53701-2658 Evaluation # 200813-O Wisconsin Building Products Evaluation Material Best Management Standards for Foundation
More informationDENVER MODEL 30 X 30 SPECIFICATIONS
DENVER MODEL 30 X 30 SPECIFICATIONS Dimensions: Roof Dimensions 30-0 x 30-0 (4) Columns (Center to Center) 25-6½ x 25-6½ Minimum Clearance 8-0 Roof Height @ Peak Dependent on Col. Ht. Hip Roof 4:12 pitch
More informationChapter 6 ROOF-CEILING SYSTEMS
Chapter 6 ROOF-CEILING SYSTEMS Woodframe roof-ceiling systems are the focus of this chapter. Cold-formed steel framing for a roof-ceiling system also is permitted by the IRC but will not be discussed;
More informationCOMPANY ESTIMATOR BID DAY PHONE NO.
COMPANY ESTIMATOR BID DAY PHONE NO. Work Package: Structural Steel Fabrication & Erection The work in each bid package shall include but shall not be limited to all labor, burden, fringe benefits, materials,
More informationIRISH BUILDING CONTROL INSTITUTE HOTEL COURT HOTEL BALLYCONNELL CO CAVAN. 26 th MARCH 2009 TIMBER FRAME CONSTRUCTION
IRISH BUILDING CONTROL INSTITUTE HOTEL COURT HOTEL BALLYCONNELL CO CAVAN 26 th MARCH 2009 TIMBER FRAME CONSTRUCTION Bill Robinson BSc. C. Eng. M. I. Struct. E. Timber Design Services 1 IS440 Timber frame
More informationA. Structural steel framing members, support members, and struts. B. Baseplates, shear stud connectors, and expansion joint plates.
DIVISION 5 - METALS Section 05120: Structural Steel...4 Section 05125: Miscellaneous Steel and Metal Fabrications...3 Section 05311: Steel Roof Deck...3 Section 05400: Cold-Formed Metal Framing...7 Section
More informationFig. 2 WALL-TO-WALL PANEL CONNECTIONS CORNER WALL CONNECTION
SIPS SCREWS WITH MINIMUM 1" PENETRATION IN WOOD MEMBER IN SIP WALL PANEL CONNECTED TO @ 24" O.C. MAXIMUM OUTSIDE SKIN EACH SIDE OF FRAMING TYP. AS RECOMMENDED BY FOAM CORE AS EACH SIDE OF FRAMING TYP.
More informationVALOR STEEL BUILDINGS STANDARD SPECIFICATIONS
VALOR STEEL BUILDINGS STANDARD SPECIFICATIONS For Rigid/I- Beam Construction as designed, engineered, and fabricated by Valor Steel Buildings. General 1.1) Valor shall use standards, specifications, recommendations,
More informationSCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM
Shepherd University Board of Governors June 9, 2005 Agenda Item No. 9 SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM In 1994 construction began on the Byrd Science and
More informationPART 1 GENERAL 1.1 SECTION INCLUDES
J-1 Section 09110 Long Form Specification INTERIOR METAL STUD FRAMING This section includes lightweight, usually 0.036 inch (0.9 mm) thick or lighter, non-axial load bearing metal stud framing including
More informationREQUIREMENTS FOR SUBMITTING PLANS FOR NEW CONSTRUCTION
RESIDENTIAL: REQUIREMENTS FOR SUBMITTING PLANS FOR NEW CONSTRUCTION 2 COMPLETE SETS OF PRINTS WITH ENGINEERS STAMP ON FOUNDATION PLAN INCLUDING ELECTRICAL, PLUMBING, ETC. SITE PLAN SHOWING HOUSE LOCATION
More informationWhat is Seismic Retrofitting?
What is Seismic Retrofitting? SEISMIC RETROFITTING A Seismic Retrofit provides existing structures with more resistance to seismic activity due to earthquakes. In buildings, this process typically includes
More informationCONSTRUCTION DETAILS & LOAD DESIGN CHARTS
Office and Production 126 New Pace Rd., PO Box 279 Newcomerstown, OH 43832 1-800-446-2188, Fax: 740-498-4184 www.buildwithsips.com CONSTRUCTION DETAILS & LOAD DESIGN CHARTS Table of Contents Description
More informationSteel joists and joist girders are
THE STEEL CONFERENCE Hints on Using Joists Efficiently By Tim Holtermann, S.E., P.E.; Drew Potts, P.E.; Bob Sellers, P.E.; and Walt Worthley, P.E. Proper coordination between structural engineers and joist
More informationAAA SUPPORTS PVT. LTD.
AAA SUPPORTS PVT. LTD. HEAD OFFICE & WORKS: 262, POR RAMANGAMDI, GIDC ESTATE, VADODARA, GUJARAT, INDIA PH: +91 265 2830444/ 2830445 / 2830446, FAX:+91 265 2830445 E Mail: sales@aaasupports.com salesaaaspl@gmail.com
More information