Automatic Fire Sprinkler System Checklist



Similar documents
SPRINKLER SYSTEM PLANS AND CALCULATIONS CHECK LIST

Automatic Fire Sprinkler Submittal Requirements

MERCER ISLAND FIRE DEPARTMENT FIRE COMMERCIAL SPRINKLER STANDARDS

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST RESIDENTIAL FIRE SPRINKLERS NFPA 13R

EXETER TOWNSHIP DRY OR WET CHEMICAL FIRE SUPPRESSION SYSTEMS

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST RESIDENTIAL FIRE SPRINKLERS NFPA 13D

FIVE YEAR CERTIFICATION REPORT

Clark County Fire Prevention

Commercial Fire Inspections

city of edmonds development information

NFPA FAQs. 3. Can plastic pipe be used on a sprinkler system complying with NFPA 13?

AON SPRINKLER CERTIFICATION

LOUISVILLE FIRE PROTECTION DISTRICT 895 West Via Appia, Louisville, Colorado

PLAN SUBMITTAL REQUIREMENTS FOR SPRAY BOOTHS AND SPRAYING ROOMS EXTINGUISHING SYSTEMS

General Fire Code Requirements Within Commercial Tenant Spaces

CHAPTER. Standpipes and Hose Systems OVERVIEW. Standpipe and Hose Systems Defined

Bold items are particular to the City of Euless

SPECIFICATIONS FOR THE INSTALLATION OF FIRE ALARM SYSTEMS, SPRINKLER SYSTEMS, AND MASTER BOXES IN THE POQUONNOCK BRIDGE FIRE DISTRICT

Fire Sprinkler System Maintenance and Testing Page 1 MAINTENANCE AND TESTING OF FIRE SPRINKLER SYSTEMS

C I T Y O F S E L M A F I R E D E P A R T M E N T

Maintaining Fire Protection Systems

OREGON FIRE CODE Interpretations and Technical Advisories

Fire Pump Plan Review March 2010

Chapter 19 - FIRE SPRINKLER SYSTEM INSPECTIONS

Inspection and Testing of Water-Based Systems

EXHIBIT A SCOPE OF WORK

Denver Fire Department Idle Pallet Storage Guidelines Per NFPA 13_Chpt 12

MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION

I. Introduction. 10 minutes

Fire Alarm and Detection Systems And Central Station Monitoring Plan Submittal Guidelines

Roland Garcia Pearland Fire Department

2014 Limited Plan Submittal Checklist

MAINTENANCE AND SERVICE OF AUTOMATIC FIRE EXTINGUISHING SYSTEMS

Application for the Construction or Installation of Aboveground Storage Tank (AST) Systems or Associated Underground or Over-water Piping Systems

2010 Residential Water Heater Replacement Check List

SELF-INSPECTION PROGRAM FOR FIRE PROTECTION EQUIPMENT

REGULATIONS for INSTALLATION, MAINTENANCE, and TESTING APPLICATION PACKET

PLAN SUBMITTAL REQUIREMENTS FOR KITCHEN HOOD AND DUCT EXTINGUISHING SYSTEMS

Fire Alarm System Standpipes Sprinkler Systems Fire Drills Commercial Cooking Hood and more

Design Options (Tradeoffs) Allowed by the 2012 Building Codes for Properties with Sprinkler Systems. April 2013

Building Permit Application

OCFRD TENT STANDARD This Standard operates under the authority of Orange County, Florida Ordinance and State Statutes.

PART II: New Construction Inspections and Acceptance Testing Procedures

C. Conform to requirements of Americans with Disabilities Act (ADA).

MECHANICAL PLAN REVIEW REQUIREMENTS

SECTION FIRE AND SMOKE ALARM SYSTEM. City of San Diego, CWP Guidelines

ALBERTA FIRE CODE SAFETY EQUIPMENT MAINTENANCE REQUIREMENTS

Model F822 thru F834 Mulsifyre Directional Spray Nozzles, Open, High Velocity General Description

Required Certification Documentation. Contractor's installation certification for range hood fire suppression systems.

Fire Alarm System Plans Review Checklist Property location Date of Review

COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES

TECHNICAL DATA 2. LISTINGS AND APPROVALS. Spray Nozzle 11. December 20, 2013

ELECTRICAL CONTRACTORS THE UNIVERSITY OF TENNESSEE KNOXVILLE, TENNESSEE SECTION PAGE 1

FIRE AND LIFE SAFETY REQUIREMENTS FOR CONVENTIONS, TRADE SHOWS AND EXHIBITS November 2011

Fire Alarm System Plans Submittal Guidelines For New and Existing Systems

PRE APPLICATION CONFERENCE - INTRODUCTION

TAMARAC FIRE RESCUE INSTRUCTIONS FOR FIRE ALARM PRE-SUBMITTAL CHECKLIST

Riverside County Fire Protection Planning

FLAMMABLE AND COMBUSTIBLE LIQUIDS

KODAK VERSAMARK, INC.

Fire Alarm Submittal Requirements and Acceptance Testing

FIRE ALARM SYSTEM PLAN SUBMITTAL CHECKLIST

Winnipeg Fire Department Fire Prevention Branch

HERNANDO COUNTY FIRE ALARM GUIDELINES

HATFIELD TOWNSHIP. FLAMMABLE and COMBUSTIBLE LIQUIDS PERMIT APPLICATION PROCEDURES

Depending on your facility and the equipment contained within, all or part of the checklists/logs can be printed for use.

NMSU FIRE DEPARTMENT Commercial Kitchen Fire Suppression Worksheet

Stored Palletized, Solid Piled, Bin Boxes, or Shelf Storage (12.2)

SARATOGA FIRE DISTRICT EARLY WARNING FIRE ALARM SYSTEM STANDARDS AND REQUIRMENTS CONTENTS

Suffolk County Department of Health Services. Division of Environmental Quality

SECTION 5 DRAFTING STANDARDS

FIRE ALARM SYSTEMS PERMIT APPLICATION, PLAN SUBMITTAL, DESIGN, INSTALLATION AND INSPECTION REQUIREMENTS Effective Date: January, 2011

Rancho Cucamonga Fire Protection District Prevention Bureau Standard

Transformer Deluge Systems

Fighting Fire in Sprinklered Buildings. Student Guide

Risk Control Bulletin Inspection, Testing & Maintenance (ITM) of Water-Based Fire Protection Systems

Automatic fire-extinguishing systems for commercial cooking

BUILDING DEPARTMENT 8748 W. 82 nd Place - Justice, IL Phone: (708) Fax: (708)

FIRE ALARM SYSTEM SUBMITTAL CHECKLIST AND APPLICATION

Finance and Administration Department 907 Billy Mitchell Blvd. P: (210) Fire Alarm Permit Application

BELMONT FIRE DEPARTMENT FIRE ALARM SYSTEM REQUIREMENTS BFD-OFM

FIRE ALARM SYSTEM. A. Shop drawings shall be submitted as follows: 1. Manufacturer's published literature. for aspproval.

Commercial Fire Alarm Standards July 1, 2010 Edition Page 1 of 14

Does Wall Township require an inspection by the building department on resale of a home?

#506 New Multi-Family Buildings & Additions Plan Intake Submittal Checklist

INSTRUCTIONS FOR BUILDINGS WITH FIRE PROTECTION EQUIPMENT

PLAN REVIEW GUIDE FOR FIRE ALARM

CLARK COUNTY FIRE DEPARTMENT Fire Hazard & Prevention Services

FIRE PROTECTION SYSTEMS ACCEPTANCE INSPECTION AND TESTING PROCEDURE

WHITE PLAINS PLUMBING CODE PART 1. GENERAL REQUIREMENTS

ELECTRIC/DIESEL FIRE PUMP CHECK LIST

This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances.

CHAPTER 69A-46 FIRE PROTECTION SYSTEM CONTRACTORS AND SYSTEMS

Arapahoe County Residential Water Heater Installation and Inspection Guide

Transcription:

Fire Prevention rd Location: 701 E. 3 Avenue Mail to: P.O. Box 1579 Moses Lake, WA 98837 (509) 765-2204 www.ci.moses-lake.wa.us Automatic Fire Sprinkler System Checklist Please print in Black or Blue ink only Scope This checklist pertains to the installation of automatic fire sprinkler systems in light, ordinary and extra hazard occupancies and for storage occupancies where the commodity is stored up to 12 feet high. For warehouses and speculative use buildings see high piled and rack storage section of this handout. NOTE: A fire department permit is required for the installation and / or modification of any sprinkler system within the jurisdiction. Permit applications and the fee schedule may be downloaded at www.ci.moses-lake.wa.us/240.html. A separate fire department permit is required for the underground portion of the system if the scope of work is split between two or more contractors between the above ground and below ground portions of the system. Minimum Requirements for Construction Drawings Plans which do not contain the minimum information required will not be accepted for plan check. Plans shall be of sufficient clarity to indicate the location, nature and extent of the work proposed and show that it will conform to the provisions of the adopted International Codes and local ordinances. Three (3) copies of plans (24" x 36", or 30" x 42") must be submitted for review. All plans must bear a valid Washington State Level III Certificate of Competency holders stamp. Underground Installers shall be required to present proof of Washington State Level U certification at the time of permit application. Copies shall all be the same size. Working Drawings -scale to 1/8 = 1. Shall be drawn in indelible ink. Sheets that are cut and pasted, taped, or that have been altered by any means (pen, pencil, marking pen, etc.) will not be accepted for plan check. Site Plans scale to 1 = 20 or 1 = 40 Washington State law requires that any registered professional who prepares or supervises the preparation of drawings and construction documents stamp and sign such documents.

Project Name: Other Checklists/Permits that may be Required #Fire Department New Construction Permit # Fire Pump Checklist General Yes/No GG Is there a construction permit application on this project? GG Owner s name, address and telephone number. GG Contractor s name, address, telephone and fax numbers and Washington State Contractor s license number. How many heads are you replacing? How many new? For systems with 20 or fewer new heads, as built drawings will be required. For systems with 21 or more new heads, drawings & calculations are required, and review is required prior to construction. Documentation One Set The design information to be included on the hydraulic data name plate is: Pipe schedule/ hydraulic calculations. A summary sheet for the hydraulic calculations, including: GDate GLocation GName of owner or occupant GBuilding identifier GDescription of hazard GSystem design criteria GDesign density GArea of discharge GTotal water requirements including: GHose streams allowance. G Water supply information, source and data. G Detailed worksheets or computer printouts containing the following:

GSheet number. GSprinkler head description and discharge constant (K-Factor). GHydraulic reference points up to and including the point of connection. GFlow in gallons per minute. G Pipe size. G Pipe lengths, center-to center, of fittings. GEquivalent pipe lengths for fittings and devices. GFriction loss in psi per foot of pipe. GTotal friction loss between reference points. GIn-rack sprinkler demand, if applicable. G Elevation head loss in psi between reference points. GRequired pressure in psi at each reference point. GSmall hose stream demand GOther sources of supply, with quantity, pressure and elevation. GSway brace calculations for each type of brace used. Working Drawings Floor Plans GCompass direction and clearly marked scale. GCeiling construction. GFull-height cross section. GLocation of area and/or occupancy separation walls, partitions and stairway enclosures. GLocation and size of concealed spaces and closets. G Any questionable enclosures in which no sprinklers are to be installed. G Key Plan (Location within existing structure, if applicable). Pipe, Valves, Fittings G Size of municipal or private water main and whether dead-end or looped. If dead-end, direction and distance to nearest circulating main. GNominal pipe size and cut lengths of pipe or center-to-center dimensions. GLocation and size of riser nipples. GType of fittings and joints. GType and location of hangers GType, size and location of bracing, including calculations and fasteners. G All control valves, check valves, drains and test pipes. G Total area protected by each system on each floor. GMake, type, model and size of alarm, dry-pipe valve, preaction, or deluge valve. G Pipe type and schedule of wall thickness.

Fire Sprinklers GMake, type and nominal orifice size of sprinklers. G Temperature rating and location of high temperature sprinklers. Miscellaneous Information GSize and location of all hand-held hose, hose outlets and related equipment. GHydraulically most remote area(s). G Hydraulic reference points (nodes). GWhen a fire pump is employed, provide submittal per NFPA 20. GMoses Lake Municipal Code requires remotely located Fire Department Connections. NO on building FDC s will be approved or accepted. GLocation and type of fire department hose connection for supply (FDC s shall be located at a location approved by the Fire Marshal s Office, that complies with the provisions of the Moses Lake Municipal Code and the International Fire Code.) GFire Department Connection caps shall be Knox locking type ONLY. Knox order forms are available by calling Kerri Fenner at 509-765-2204. GLocation and type of backflow prevention device. GFire department connections shall be painted red, and equipped with a minimum of a 1" wide reflective stripe. Automatic Sprinklers Over Cooking Surfaces GLocation and type of cooking appliances and char-broilers. GType, location and configuration of duct, plenum and surface nozzles. G Type, size and configuration of sprinkler piping. G Clearance of surface nozzles over cooking surface. GMake, type and nominal orifice size of sprinklers. G Cross-sectional view of sprinklers in hood and duct. G Location of pendent sprinklers and frames in relation to deep fat fryers. G Provision for water run-off control. G Location of indicating-type control valve, test connection and water flow switch. G Means of limiting sprinkler flow to thirty (30) psi. Flammable/Combustible Liquids G Provide calculation for 20 minutes of flow (number of heads in room/area p K-Factor 20 minutes) plus single largest container. G Provide details and description of storage arrangement per IFC.

High Piled, Rack Storage and Speculative Use Occupancies This section applies to storage occupancies with top of storage at 12 or more and speculative use buildings. It is applicable whether or not material is store in racks or on the floor. For speculative use buildings assume Class IV commodity, nonencapsulated, double row racks. For so-called 24 feet clear space warehouses, assume 19 feet to top of storage. For taller building design to protect available rack storage height. G Accurate description and classification of the commodity to be stored, including its height, array, packaging, encapsulation, banding, or other storage method. State which sprinkler system design curve was utilized for design criteria. G Show draft curtains, smoke vent, with temperature ratings, and skylights on working plans. G Show designated storage areas of idle pallets. State wood or plastic. Testing & Acceptance: REQUESTS FOR INSPECTION: All requests for inspection should be addressed to Kerri Fenner at (509) 765-2204. Same day inspection requests cannot be accommodated. Please plan accordingly. Visual Inspections: Underground: All joints and connections on the fire service main shall remain uncovered until inspected by an Inspector of the Moses Lake Fire Department. Thrust blocks, mega-lugs, or threaded rods shall be uncovered and available for inspection by an inspector of the Moses Lake Fire Department. Hydrostatic Inspections: Hydrostatic inspections are required to be completed in the presence of an Inspector from the Moses Lake Fire Department. Pumps shall be disconnected from the system for the duration of the hydrostatic inspection. Underground: 200 psi x 2 hours Aboveground: 200 psi x 2 hours Flushing: The underground fire service main shall be flushed in the presence of an Inspector from the Moses Lake Fire Department. Flushing shall consist of a minimum of two, 2.5 inch sections (one section for small systems that have a single hose port on the Fire Department Connection) of fire hose that are secured to an

immovable object. Each hose shall have a burlap sack wired to the discharge end. A flush at full system pressure shall be conducted until such time that the Inspector is satisfied that any foreign debris is removed from the pipe. Acceptance Testing: Acceptance testing for the above ground portions of the sprinkler system will not be conducted unless alarm system is fully operational and is ready for acceptance testing at the same time as the sprinkler system. Test orifice: Testing shall be conducted through a sprinkler orifice representative of the sprinkler heads installed on the system. Please read the information below and sign before submitting your application Your application shall be deemed complete only if this checklist is completed and submitted along with the submittal package. Submittals not accompanied by a checklist will not be accepted. Accuracy of the submittal package, including this checklist, is the responsibility of the applicant. Failure to submit an accurate submittal package will be considered an incomplete application by the Plan Reviewer. An incomplete submittal will result in a HOLD. A Resubmittal (new submittal package) will be required and always results in a delay. I have checked the applicable boxes and have included those requirements in my submittal. Further, I understand that inspections must be scheduled in advance and in most cases same day inspection requests cannot be accommodated. Print Name Signature Contact Phone Number: Email: