Oil & Gas Regulatory Authority LAYOUT PLANS FOR INSTALLATION OF LPG AUTOGAS STATIONS



Similar documents
Propane Autogas Fleets Safety & Training

FIRE SAFETY GUIDANCE NOTE Risk Assessments for Petrol Filling Stations Required Under Fire Safety Legislation

PROPANE AUTOGAS REPAIR AND MAINTENANCE FACILITY REQUIREMENTS

Installation Guidance: CNG Refueling Stations

Notes. Material 1. Appropriate Flammable Liquids

Pressure Vessels (Air Compressors) and LPG Tanks

MOTOR FUEL DISPENSING SAFETY

Advantages and Disadvantages of the Preferred Alternative Fuels

FLAMMABLE LIQUIDS COMPLIANCE NOTE

What Is a Typical CNG Vehicle?

ADMINISTRATIVE SERVICES MANUAL

The following definitions apply with regard to requirements specified in this document:

Ethanol Vehicle and Infrastructure Codes and Standards Citations

Sample Written Program. For. Flammable Liquids

OPERATIONS & MAINTENANCE (O&M) FOR PROPANE STORAGE FACILITIES

Waste Oil Collection / Storage

OREGON FIRE CODE Interpretations and Technical Advisories

List of Frequently Utilized Storage Tank Standards and Practices

FACILITY FIRE PREVENTION AND EMERGENCY PREPAREDNESS INSPECTION CHECKLIST

September 2008 AFC (2) Page 1 of 5. Maximum Size and Aggregate Capacities of Aboveground Storage Tank Systems at Fuel Dispensing Stations

INFORMATION BULLETIN Bulletin No Bureau of Fire Prevention Date: June 10, 2005 Revised: March 8, 2007

mobile pipeline Bulk transportation and storage of energy gases

Civil Engineering Sector Labour-Management Health and Safety Committee

Fuels Safety Program. Liquid Fuels Handling Code Adoption Document Amendment

COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES

Decree of the Ministry of the Environment. on fire safety of garages

Compressed Gas Cylinder Safety

LOS ANGELES CITY FIRE DEPARTMENT

Costs Associated With Propane Vehicle Fueling Infrastructure

The following definitions apply with regard to requirements specified in this document:

OCFRD TENT STANDARD This Standard operates under the authority of Orange County, Florida Ordinance and State Statutes.

Section 14. Forklift Safety Contents 14.1 Operator Safety

TYPICAL FIRE SAFETY INSPECTION VIOLATIONS

Fire & Explosion Risks in Service Stations

International Maritime Dangerous Goods (IMDG) Special Provision 961 and 962

NFPA FAQs. 3. Can plastic pipe be used on a sprinkler system complying with NFPA 13?

Flammable liquid classes: Combustible Liquid Classes. Class IC. Class II. Class IB F.P. below 22.8 C (73 F), boiling point at or above 37.

Medicine Hat Fire Department. Special Event Requirements. medicinehat.ca/fire. August 2012

CNG IN PAKISTAN. Zafar Shakoor PEESE,

Dry Chemical Systems TWIN AGENT CAPABILITY

Unit 8. Conversion Systems

CNG Station Considerations Trillium USA

DPR DEPARTMENT OF PETROLEUM RESOURCES

Requirements for Hydrogen Storage and Use

TENTS, CANOPIES AND OTHER MEMBRANE STRUCTURES

1.0 Purpose Definitions Hot Work Operations. 5

OSHA Tank Venting DEFINITIONS

FIRE AND LIFE SAFETY REQUIREMENTS FOR CONVENTIONS, TRADE SHOWS AND EXHIBITS November 2011

In accordance with NFPA 30, these containers are not to store Class I flammable liquids.

NFPA : Basic Requirements for Storage Tanks

NOTIFICATION OF PERFORMANCE TESTING FOR GASOLINE DISPENSING FACILITIES (GDFs) NESHAP 40 CFR, Part 63, Subpart CCCCCC (Sections

Saint Paul Public Schools Secondary Course Syllabus. Course Title: Automotive Technology 3 Course Length: Quarter/Semester/Trimester

This document is the property of and contains Proprietary Information owned by Westinghouse Electric Company LLC and/or its subcontractors and

How To Stop A Gas Leak

LIQUEFIED PETROLEUM GASES

EXETER TOWNSHIP DRY OR WET CHEMICAL FIRE SUPPRESSION SYSTEMS

February 2014 Alberta Fire Code Page 1 of 5. Fire Safety and Hand Hygiene in Healthcare Facilities

HSE information sheet. Fire and explosion hazards in offshore gas turbines. Offshore Information Sheet No. 10/2008

MONARCH FIRE PROTECTION DISTRICT

Guide to OSHA Standard Storage and Handling of Liquefied Petroleum Gases 1

Natural Gas for Fleet Vehicles

Site and Storage Conditions for Class 3.1 Flammable Liquids

Case for Business Intelligence Concepts. Vladimir Rajacic Vladimir Vukojevic Aleksandar Kasa Marko Narancic Borko Rakic Ioannis Sdroulias

Excerpts from the Canadian National Building Code (NBC)

Safe Operating Procedure

Alternative Fuel Vehicles (Propane Autogas) Jeff Bush May 5, 2015

International Forum on Pressure Vessels for Hydrogen and Natural Gas Vehicles

INTERNATIONAL FIRE CODE SECTION 3103 TEMPORARY TENTS AND MEMBRANE STRUCTURES

SSE s criteria used for GHG emissions reporting

Orange County Fire Rescue Division Fire Loss Management Bureau 109 East Church Street Lower Level Orlando, Florida

UNIT 1 INTRODUCTION TO AUTOMOBILE ENGINEERING

Compressed Gas Cylinders Safety Policy

APPENDIX O. Spill Prevention and Emergency Response Plan. G3 Terminal Vancouver Port Metro Vancouver Project Permit Application APPENDIX O

MOTOR FUEL-DISPENSING FACILITIES AND REPAIR GARAGES

Originators of the Flexible Water Tube design

STORE HAZARDOUS SUBSTANCES SAFELY. incompatibles gas cylinders

EAST LINDSEY DISTRICT COUNCIL ~ RESIDENTIAL CARAVAN SITES CONDITIONS OF SITE LICENCE

Gas Standards and Safety. Guidance Note GAS INSTALLATIONS SUPPLIED FROM BIOGAS FACILITIES - ACCEPTANCE REQUIREMENTS GAS ACT 2000

IMW IMW Industries Ltd. CNG Primer. and Product Overview. CNG solutions for the real world

THE GAS UTILITIES S AND THE JAPAN GAS ASSOCIATION S EFFORTS TO IMPROVE SAFETY

ŠkodaOctavia Supplement - for vehicles with LPG drive

2.0 Mandatory conditions for importing and marketing petroleum in Kenya: 2.1 Purchase of products from the Kenya Petroleum Refineries Limited:

A smart move. AGL Smart CNG. Cleaner. Cost Effective. Proven.

GET IT ALL - HIGH PERFORMANCE, SUPERIOR ECONOMY AND EXCELLENT ENVIRONMENTAL CREDENTIALS. AND ALL WITHOUT

A Code Review for Emergency Generators and Indoor Use of Portable Generators

TransTech Energy. One of the largest LPG contractors in the country, based out of North Carolina

HELI-DECKS & HELI-PORTS

What is CNG? CNG is compressed natural gas.

PROCEDURES PREVENTION OF ACCIDENTAL IGNITION

Toyota commercialises its first diesel hybrid

Safe Operating Procedure

Boiler & Pressure Vessel Inspection discrepancies and failures

Practical Guidelines for Electrical Area Classification in Combustion Turbine-Generator Power Plants

Residential Driveway Installation Requirements. Table of Contents

Transcription:

Oil & Gas egulatory Authority LAYOUT LANS FO INSTALLATION OF LG AUTOGAS STATIONS

1.0 BACKGOUND & INTODUCTION: The Federal government in a meeting held on 21 st September, 2005 considered the Ministry of etroleum and Natural esources summary and approved in principle the use of LG in motor vehicles, subject to Oil and Gas egulatory Authority (OGA) providing a regulatory frame work ensuring comprehensive safety standards. In this regard, the OGA has devised a regulatory framework to ensure effective regulation, efficient monitoring and public/consumer safety. The egulatory Framework for the use of LG in the Auto sector has become a part of LG (roduction and Distribution) ules 2001 as an Appendix V by an amendment through S..O. 256 (I)/ 2007 Islamabad, the 10th March, 2007. The egulatory Framework provides a general criteria for installation of LG Autogas Stations. Now OGA has prepared a Brochure containing guidelines / layout plans in accordance with the approved egulatory Framework, showing details, including the minimum required inter distances for the equipment, storage tanks/built-up areas etc. under NFA-58. In view of the foregoing, the layout plans were developed, taking into account the following categories: Stand alone LG Autogas station LG Autogas station co-located with CNG, Gasoline & Diesel.

2.0 DISCUSSION ON GULATOY FAMWOK & DVLOD LAYOUTS: 2.1 egulatory Framework The egulatory Framework contains the following criteria to setup LG Autogas Stations: The LG Auto refueling/dispensing station shall only be located on roads/highways having minimum 60 feet width. The LG Auto refueling/dispensing station shall not be located in congested or residential areas nor should any of the adjacent buildings is used for accommodation or public gathering of any sort. The installation of LG refueling station shall conform to the technical standards prescribed in LG (production & distribution) ules, 2001 & NFA 58. For ensuring safety, the storage capacity at an LG auto refueling/dispensing station shall be limited to 10 metric tons (max.). In addition to the requirements of NFA-58, the minimum area for the installation of LG auto refueling / dispensing station shall be in no case is less than 10,000 sq. Feet with a minimum 80 feet frontage and depth. Only brand new equipment shall be installed at the refueling / dispensing station i.e. use of second hand equipment shall not be allowed. Conversion kit and cylinder shall only be installed at licensee approved centers and installed vehicle shall have the respective licensee s seal of compliance to NFA- 58, otherwise it will be considered illegal.

2.2 Layout Criteria As part of development of layouts for LG Autogas stations following criteria has been developed based on NFA-58 (Liquefied etroleum Gas Code). The minimum distance between LG vessels and property lines shall be atleast 50ft as per table 6.3.1. The minimum distance between LG vessels and any combustible material/dry grass shall be atleast 50ft as per table 6.3.1. The minimum distance between LG vessels and property lines shall be atleast 10ft as per section 6.24 (Alternate rovisions for Installation of ASM containers), which requires use of fail-safe product control measures and low emission transfer concepts. The minimum distance between LG vessels and buildings with fire resistant walls shall be atleast 10ft as per section 6.24. The minimum distance between LG vessels and any combustible material/dry grass shall be atleast 10ft as per section 6.4.5.2 and 6.4.5.4. The minimum distance of LG vessels vent and any source of ignition/open flame shall be atleast 10ft and per table 6.3.9. The minimum distance between LG vessels and any above ground petrol/diesel storage shall be atleast 20ft as per section 6.4.5.5.

The minimum distance between LG vessels and auto dispenser shall be atleast 10ft as per table 6.5.3 part (J). The minimum distance between LG vessels and point of transfer/decanting area shall be atleast 10ft as per table section 7.2.3.3. The minimum distance between buildings with fire resistant walls and point of transfer/decanting area shall be atleast 10ft as per table 6.5.3 part (A) and part (F). The minimum distance between source of ignition/open flame and point of transfer/decanting area shall be atleast 25ft as per section 7.2.3.2(B). The minimum distance between source of ignition/open flame and auto dispenser shall be atleast 25ft as per section 7.2.3.2(B). The minimum distance between buildings with non fire resistant walls and point of transfer/decanting area shall be atleast 25ft as per table 6.5.3 part (B). The minimum distance between buildings with non fire resistant walls and auto dispenser shall be atleast 25ft as per table 6.5.3 part (B). The minimum distance between auto dispenser and property line shall be atleast 25ft as per table 6.5.3 part (D). The minimum distance between point of transfer/decanting area and property line shall be atleast 25ft as per table 6.5.3 part (D). Metal cutting/welding shall be done atleast 35ft away from point of transfer / decanting and auto dispenser as per section 7.2.3.2 (C).

ublic way shall be atleast 10ft away from point of transfer/decanting and auto dispenser as per table 6.5.3 part (F). The minimum distance between points of transfer/decanting and auto dispenser shall be 10ft as per table 6.5.3 part (F).

2.3 Developed Layouts The layouts developed of various options prepared are as follows: Layout of LG refueling station: Area required 20,240 sq ft Installation of ASM container as per NFA 58, sec. 6.3 with 04 dispensers (option-i). Layout of LG refueling station: Area required 17,520 sq ft Installation of ASM container as per NFA 58, sec. 6.3 with 02 dispensers (option-ii). Layout of LG refueling station: Area required 10,000 sq ft Alternate provision for installation of ASM container as per NFA 58, sec. 6.24 with 02 dispensers (option-iii). Layout of LG refueling station: Area required 10,000 sq ft Alternate provision for installation of ASM container as per NFA 58, sec. 6.24 with cng, petrol & diesel facilities (option-iv). Minimum separation distances as per NFA 58, table 6.3.1 & table 6.5.3. Minimum separation distances as per NFA 58, sec. 6.24 & table 6.5.3. Typical hazardous area classification of LG refueling station.

OAD 60' OUT 40' 5' IN TUCK SHO TY SHO GASS AA 27' 6' 6' 29' DISNSO 30' DISNSO 130' 22' 11' 25' 25' 13' 7' OFFIC/ CONTOL ST GNATO 5' OFFIC SVIC STATION CONVSION CNT GASS AA BOWZ DCANTING AA 30' 3' 21'-11 3 4" GASS AA 23' 123' GASS AA 7' 107' 10 M TON BUID LG STOAG VSSL

OAD 60' OUT 40' 5' IN TUCK SHO TY SHO GASS AA 27' 6' 6' 29' 22' DISNSO 11' 25' 25' 96' 25' 13' 7' OFFIC/ CONTOL ST GNATO 5' OFFIC SVIC STATION CONVSION CNT GASS AA BOWZ DCANTING AA 30' 3' 21'-11 3 4" GASS AA 23' 123' GASS AA 7' 107' 10 M TON BUID LG STOAG VSSL

OAD 60' 40' OUT IN AY AA TY SHO 125' 2 27' DISNS GASS 2 3 CONVSION CNT ST 5' 125' BOWZ DCANTING AA TUCK SHO 17' 3-11 2" 1 45' SVICS STATION GNATO/ COMSSO 11' OFFIC 6' GASS SAS STO 6' 11' 3' FNCD AA 23' 12' OFFIC/ CONTOL 13' 8' 7' 10 M TON BUID LG STOAG VSSL

OAD 60' 30' 30' 7.5' 5' OUT IN 19' 8' TOL 48' GASS AA DISL TY SHO GASS CNG 3' 19' CNG STOAG & COMSSO 13' 25' 125' 26' LG DISNS 3' BOWZ/LG DCANTING AA DISL DCANTING TOL DCANTING 26' FNCD AA CNT ST COMSSO & GNATO 5' 17' 125' 45' SVICS STATION OFFIC DISL TOL STOAG STOAG SAS STO 5' 6' 11' 17' 3' STOAG AA LG 23' TUCK SHO OFFIC/ CONTOL 8' 7' 10 M TON LG STOAG VSSL

MINIMUM SATION DISTANCS OTY LIN TABL 6.3.1 VNT 50 Table 6.3.1 BUILDING WITH F WALLS 50 LG VSSL SC. 6.4.5.2 & 6.4.5.4 Table 6.3.9 SC. 6.4.5.5 ABOV GOUND TOL / DISL STOAG 20 DY GASS / COMBUSTIBL MATIAL SC. 7.2.3.3 SC. 7.2.3.2(B) SOUC OF IGNITION / ON FLAM TABL 6.5.3 AT (J) O T Y L I N TABL 6.5.3 AT (A) AT F OINT OF TANSF / DCANTING AA MTAL CUTTING / WLDING 35 Table 6.5.3 AT B BUILDING WITH NON- F WALLS 35 AUTO DISNS Table 6.5.3 AT F (1) Table 6.5.3 AT D Table 6.5.3 AT F O T Y L I N SC. 7.2.3.2(C) UBLIC WAY OTY LIN OTY LIN AS NFA 58, TABL 6.3.1 & TABL 6.5.3 FIL: SAF DISTANC FO AUTO FULING STATION AS 6.3.1\090707

MINIMUM SATION DISTANCS OTY LIN Sec. 6.24 VNT Sec. 6.24 BUILDING WITH F WALLS LG VSSL SC. 6.4.5.2 & 6.4.5.4 Table 6.3.9 20 O T Y L I N SC. 6.4.5.5 SC. 7.2.3.3 SC. 7.2.3.2(B) TABL 6.5.3 AT (A) AT F OINT OF TANSF / DCANTING AA MTAL CUTTING / WLDING ABOV GOUND TOL / DISL STOAG 35 SOUC OF IGNITION / ON FLAM Table 6.5.3 AT B BUILDING WITH NON- F WALLS 35 AUTO DISNS DY GASS / COMBUSTIBL MATIAL TABL 6.5.3 AT (J) Table 6.5.3 AT F (1) Table 6.5.3 AT D Table 6.5.3 AT F O T Y L I N UBLIC WAY SC. 7.2.3.2(C) FIL: SAF DISTANC FO AUTO FULING STATION AS 6.3.1\090707 OTY LIN OTY LIN AS NFA 58, SC. 6.24 & TABL 6.5.3 (ALTNAT OVISIONS FO INSTALLATION OF ASM CONTAIN)

OAD 75'-2 1 4" 100'-3" 25'-0 3 4" 37'-7" 37'-7" 25'-04" 3 7.5' 12'-6 1 4" 6'-3 1 4" OUT IN -0 1 4" AA TY SHO 12'-6 1 4" 16'-3 1 2" 6'-3 1 4" 6'-3 1 4" TOL GASS 12'-6 1 4" DISL 6'-3 1 4" GASS CNG 6'-3 1 4" CNG STOAG & COMSSO 43'-10 1 4" 125' 25'-0 4" 3 25'-0 4" 3 25'-0 3 4" 25'-0 3 4" UTO 18" ABOV GOUND LG DISNS BOWZ/LG DCANTING AA DISL DCANTING TOL DCANTING 12'-6 1 4" 12'-6 1 4" FNCD AA CNT ST COMSSO & GNATO TUCK SHO 12'-6 1 4" 6'-3 1 4" 21'-3 4" 3-0 1 4" 125' 56'-4 3 4" 43'-10 1 4" 12'-6 1 4" SVICS STATION OFFIC SAS STO DISL TOL STOAG STOAG 7'-6 1 4" 13'-9 1 2" 12'-62" 1 100'-3" STOAG AA 12'-6 1 4" 12'-6 1 4" LG 28'-9 3 4" OFFIC/ CONTOL 12'-6 1 4" 12'-6 1 4" 8'-9 1 4" 10 M TON LG STOAG VSSL

3.0 CONCLUSION: As per NFA 58 Section 6.3 the area requirements for LG Autogas Station comes to 20,240 sq ft with 04 dispensers and 17,520 sq ft with 02 dispensers. However NFA 58 Section 6.24 provides an alternate whereby the area requirements are reduced to 10,000 sq ft with elaborate safety requirements including the following. The complete requirements are given in NFA 58, Section 6.24: Installation of internal valve with excess flow valve and positive shut-off valve. Automatic closure of all primary valves actuated by fire detection or hose pullaway. emote shutdown stations are within 15 ft and another between 25 ft and 100 ft of the transfer point.