Site Induction Presentation



Similar documents
This document must be read in conjunction with the Permit to Work and Service Interruption Notice policy.

1.1. EMERGENCY PROCEDURE On discovering a fire or being informed of an emergency;

Health and Safety Induction For Smaller Construction Companies

Employee Health and Safety Induction Training Record

SBR FIRE RISK ASSESSMENT

Waterloo Campus Directorate of Estates & Facilities - Document No. HS14 V4.1 Dated January 2015

Construction and Civil Work Management

Health & Safety Policy For Locations Hosting Film Production Companies

BSH Exhibition Sample Risk Assessment for exhibitors / contractors

Safety Systems Review Facilities Management Guidance and specification Version

A: SIGNIFICANT RISKS Initial Risk Rating H/M/L B: KEY CONTROL MEASURES ACTION

Safety and Health Office WORKPLACE SAFETY CHECKLIST

1. GENERAL STATEMENT OF COMPANY HEALTH, SAFETY AND ENVIRONMENTAL POLICY

2. Permit to Establish or Alter a Memorial or Place of Interment

Strand Campus London Directorate of Estates & Facilities - Document No. HS13 V4 Dated January 2014

Fire Risk Assessment Safety Checklist

No. Name of Legislation Applicable Issues and Requirements Demonstration of Compliance 1. Health and Safety at Work Act 1974

Safety and Environmental Information for External Companies

Health and Safety at Work Policy

Health and Safety Policy

SITE CONTRACTOR PROCEDURES

HEALTH AND SAFETY POLICY LEWIS & RABY ENGINEERS LTD

BRITISH SCHOOL OF GENEVA HEALTH AND SAFETY POLICY

Safe Driver. Information Sheet

Safety and Environmental Information for External Companies Koehler Oberkirch

Safety and Environmental Information for External Companies

Construction Site Set Up Requirements

Fire Safety Risk Assessment

HARTLEY CIVIL ENGINEERING LTD

TEMPLATE -PRINCIPAL CONTRACTOR CONSTRUCTION SAFETY & ENVIRONMENT MANAGEMENT PLAN

CONTRACTOR SAFETY MANAGEMENT PROCEDURE

Health & Safety Policy. The Insurance Institute of Manchester Barlow House, Minshull Street, Manchester, M1 3DZ

Guide for Contractors and Project Supervisors

Event Management Guidelines. Month Event Management Guidelines (Month, 2011)

Document ref: MG(M)201 Version no: 01 Page no: 1 / 12. Contractor rules

Guidance to Prevent Slips, Trips & Falls

CSC-DIVISION 1-MASTER SECTIONS Description

Fire Safety Risk Assessment Checklist for Residential Care Premises

Health & Safety Policy DH Associates Limited

Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF)

EMERGENCY ACTION AND FIRE PREVENTION PLAN

Event Planning Guidance Notes EVENT PLANNING GUIDANCE NOTES

Discharging of Scrap

STCC Contractor/Vendor Rules and Regulations

SUPPLY CHAIN PREQUALIFICATION PACKAGE

EVENT SAFETY MANAGEMENT PLAN. A Small/ Medium Scale Event

ASA HEALTH AND SAFETY POLICY

Independent Contractor Policy

Logo here. TRAFFIC MANAGEMENT PLAN Ref : xxxx Dated xxxxxx. Enter details. Delivery Address: Enter details

WHS Policies and Procedures Package

Introduction Management Tenancy terms Applying Licence agreement Payment of fees Insurance Moving in...

Working at Height. Procedure

Code of Conduct January 2011

FIRE RISK ASSESSMENT WORKED EXAMPLE

GOODS LIFT BOOKING, LOADING DOCK PROCEDURES & MANAGEMENT SERVICES PARKING

HEALTH, SAFETY AND WELFARE POLICY HSM010

Health and safety policy

cairn HMO Tenant Information Property Address: Letting: Maintenance:

School of Engineering University of Glasgow

This document is meant to be a starting point for any company wanting to implement the safety passport scheme for their contractors on site.

SAFETY AND ENVIRONMENTAL INFORMATION FOR EXTERNAL COMPANIES. Koehler Kehl

CATERING CONTRACTORS General Code of Safety Practice

HOW TO DO RISK ASSESSMENT

Contractor Code of Practice

1.0 APPOINTMENTS 2.0 FIRE RISK ASSESSMENTS

Health and Safety Policy Introduction

GHD EPCM Standard operating procedure Working at height May 2013 v1

Fire Policy and Procedures. Cañada Blanch Spanish School

ISLE OF MAN FIRE & RESCUE SERVICE FIRE PRECAUTIONS LOGBOOK. Website

CONTRACTOR INDUCTION HANDBOOK

SPECIFIC SAFETY OBLIGATIONS FOR CONTRACTORS ENGAGED WITH THE CITY OF BUNBURY.

FLA S FIRE SAFETY INITIATIVE

Kidd Mine Barricade Standards

THE PONY CLUB RISK ASSESSMENT CHECK LIST - SUMMER CAMP

City of Belmont Contractor Induction Program

STONEBRIDGE COMMUNITY FUNDAY

FIRE SAFETY RISK ASSESSMENT

Risk Management Guidelines

BASIC HEALTH AND SAFETY POLICY

Quorn Hall International Centre Visitor Risk Assessment

Unit Title: Unit purpose and aim

Nigel Smith Plumbing & Heating Contractors (Lincoln) Ltd

Safety Training Document for contractors working at the Boehringer Ingelheim sites in Ingelheim, Biberach, Dortmund and Hannover. As at:

Unit Title: Unit purpose and aim

Guidelines for. the employment EXTERNAL COMPANIES

To support residents living in registered residential care lead an independent, healthy, positive and fulfilling life.

CONTRACTOR INDUCTION

CJ s health and Safety Law poster is displayed in the staff lobby.

THE UNIVERSITY OF SHEFFIELD WORK AT HEIGHT POLICY

HEALTH AND SAFETY POLICY

Course of Construction Questionnaire

Room Booking Agreement

Transcription:

ABC Contracting Site Induction Presentation This presentation provides a mock site induction and serves to help those people in the process of preparing and delivering site inductions It is essential that all personnel receive an appropriate site induction before they commence work on any site. The site induction communicates essential information regarding the site, the working methods and health and safety management. All attendees of the site induction are required to sign a register to confirm their attendance and their agreement to abide by the principal contractor s policies, procedures and rules and to follow the agreed method of working.

ABC Contracting Site Induction Presentation Site Working Hours Site operating hours are: Monday--Thursday Friday 8.30am to 5.00pm 8.30am to 4.00pm Anyone wishing to work outside these hours must get permission from the site manager of the principal contractor ABC Construction prior to extended working. All personnel are to sign in and out at the site office everyday -- a swipe card system is also in operation for signing in and signing out. This is compulsory All site visitors are required to sign in/out using the visitors book in reception Be considerate and co-operative at all times

ABC Contracting Site Safety Induction Site Location The Isaac Newton University Building Address ABC Construction Ltd Site office City Centre Square Newtown upon Sea NE1 2SE Telephone 0198 201 2345 Fax 0198 201 5432 This is a confined city centre site -- as shown on the following diagram.

(Example) Plan of the Site City Centre Square Existing University Buildings Offices & canteen facilities (2 storey) Fire assembly point 1 way vehicle & plant route Pedestrian Access only First Aid Station Storage/ facilities (Phase 1)

ABC Contracting Principal Contractor s Site Management Team Andrew Gregson (Site Manager) Eloise Hodder (Site Safety Supervisor) First Aiders: Mark Geoffreys; Garreth Matthews; Muriel Griffiths Please refer to the Site Organisation and Emergency Procedure Chart that has been placed upon the site notice board for further details

Welfare Facilities The following welfare facilities are provided on site: Toilets Washing areas (with hot & cold running water) A Drying Room A Canteen Please remember when using the canteen facilities to place all rubbish into the bins provided. This will greatly assist the cleaner. Please refer to the site layout chart on the notice board for the location of these facilities.

Site Rules The following site rules are to be adhered to at all times: All personnel must receive a site induction prior to commencing work on site. No induction, no work. All site personnel must sign in and out of site -- by use of a swipe card. This should be done individually and never on the behalf of other persons. Appropriate personal protective equipment (PPE) is to be worn by all persons on site at all times. Drugs and alcohol will not be tolerated on his site. Anyone found under the influence will be disciplined and removed from site immediately. No radios or other such musical equipment are permitted on this site.

Site Rules (continued) All food and drink is to be consumed within the prescribed welfare facilities compound. Use the rubbish bins provided and be minded not to leave scraps of food as these could attract vermin. The use of mobile phones is not permitted on this site, except within the site offices and canteen. Anyone found using a mobile phone on site will be disciplined and removed from site immediately. Keep all areas of the site tidy and free from discarded materials. A yellow card/red card scheme is in operation on this site. Ensure mechanical and electrical equipment is stored in the metal site compound containers at the end of each day. Inform site management immediately should you discover any hazardous materials or activity. This is a no smoking site.

Site Rules (continued) Do not interfere with or remove any signage, fencing or dust screens without expressed permission. Do not interfere with existing gas, water or electric services which may become exposed during construction. Do not interfere with any scaffolding or access equipment. Only suitably qualified persons, with expressed written permission are permitted to assemble, alter and dissemble such equipment. Ensure that all materials brought onto the site are handled, stored and disposed of in a safe manner. Only suitable trained employees are permitted to use the plant and equipment on the site. Sub-contractors are to provide their own plant and equipment at all times.

Site Rules (continued) Operatives who are required to erect, alter or dismantle scaffold towers must have suitable training. Persons undertaking inspection and approval of scaffolding must be formally qualified to do so. Evidence of training certificates must be retained on site. Misuse of equipment or unsafe practices will not be tolerated. Anyone found doing this or permitting this will be subject to disciplinary action. No work activities will be permitted to commence until a suitable risk assessment and method statement has been submitted to (and agreed with) the principal contractor.

Site Hazards Significant Hazards Significant hazards on this site currently include: Confined spaces in the basement area Crane lifts The movement of plant Working at height

Site Housekeeping Always ensure that your work area is tidy and free from any rubbish. A waste compound is provide on site for the orderly disposal of waste materials. A site recycling compound is also provided -- please make full use of this facility. This site operates a yellow card/red card scheme -- clean up your work area. Rubbish is a hazard -- contractors not cleaning up during and after their work will be issued with warnings. Any cleaning costs incurred by principal contractors having to tidy up after contractors will be passed on to the offending contractor.

First Aid The appointed first aiders on this site are Adam Arkwright, Ben Bradshaw and Colin Caulderwell Each of these people are suitably trained and possess a current first aid certificate This site has first aid boxes located in the site office and by the stairwell on floor level

Accident Reporting All accidents are to be logged in the accident book The accident book is located in the site office Sub-contractors who posses their own accident book must also enter all accidents into the site accident book Any accidents/incidents that are reportable under RIDDOR are to be reported immediately to the site safety supervisor, Eloise Hodder

Fire Safety Most fires can be prevented with simple precautions. If a fire does occur: Raise the alarm. This site now has a fully automatic alarm Locate an escape route. This site has two escape routes which are the stairwells at either side. These stairwells have fire doors and emergency lighting. It is vital these routes are kept clear at all times Make your way calmly to the designated meeting point, and stay there. This is very important as a full register will be taken to ensure everybody is present This site s fire marshals are Andrew Gregson and Lucy Thomas. If the fire is small and suitable fire fighting equipment is immediately to hand and you decide to tackle the small fire - ensure that you always position yourself between the fire and your escape route

Remember - the wearing of suitable PPE is compulsory at all times

ABC Contracting Thank you Any questions? Please remember to study the notice board. You must successfully complete the brief induction assessment and sign the induction attendance register before commencing work