1 Health and Safety Induction For Smaller Construction Companies First Printed 2005 Reprinted 2009
2 The slides in this presentation are designed for a short (1/2 to 2 Hour) induction session for operatives arriving on site. Statistics show that that this is often the danger period for workers. Please take a little time to plan what you are going to say. Not all the slides in this presentation will be applicable to your situation and you will have to consider what additional site specific information you will need. Some hints on delivery: Find a good location away from noise and distraction Don t rush it or try to spin it out, set an even pace Make sure that everyone can hear you Make eye contact Grab attention early on Be confident but avoid confrontation Keep to the point and your plan Keep it simple Use suitable humour where possible but beware of trivialising serious points Keep a record of content and attendees
3 Welcome and Introduction To (Company/site name) INDUCTION
4 The commitment of the company to health and safety should be stressed. Describe how the company health and safety policy works and the roles people play. You should stress that while much of the following will cover what a principal contractor will do, there is a legal duty on individuals to contribute to safe working and a safe workplace.
5 Health, Safety and Environmental Policy We are committed to protecting the health and safety of all people working at or visiting our site We plan, manage, conduct and supervise all our work in compliance with legislation and best practice We want to ensure that all workers have a clear understanding of their responsibilities along with that of the company
6 Explain to inductees the importance of site inductions as all sites are different and have a wide range of hazards which will change as the site develops. Explain that this site induction is specific to this site. Ask inductees to pay attention for the next few minutes.
7 Site Inductions You have probably gone through hundreds of site inductions and will probably go through hundreds more The induction is important as all sites are different and have a wide range of hazards which will change as the site develops This site induction is specific to this site and provides you with information on the current hazards of the site and tells you about the site rules Please pay attention for the next few minutes
8 Explain to the inductees the requirement to observe site specific elements appropriate to their own work activities and/or site wide hazards. These may include but not be limited to the following; Open Excavations, Work at Height, Overhead Power Lines, Confined Spaces, Contaminated Land, Excessive Vehicle Movements, Traffic Management Systems, Fire Risks. Ensure that inductees are made aware of specific requirements for the production of risk assessments and method statements where specific hazards are identified. Make inductees aware of areas of work that will require specific authorisation to proceed such as a Permit to Work. Ensure inductees are made aware of restricted areas and the reasons for the control measures in place.
9 Project specific conditions/requirements The project Its History Current stage Future Programme of work Type of construction End use and clients requirements Location of statutory notices
10 Describe the type of situations that you might expect to require evacuation for your site. Have a site layout plan available. Ensure that inductees know what the alarm sounds like on the site and how to raise it. Ensure that they know the different routes (KEEP THEM CLEAR) that they may have to use to leave the site and where they should assemble for a role call. Ensure that they know where fire fighting equipment is situated, that they are trained to use any fire equipment and that they should only attempt to fight small fires, have a clear escape route and only after the alarm has been raised. Stress prevention and give examples of ignition sources. Information sources: Construction Fire Safety (CIS51).
11 Emergency Evacuation & Fire The Alarm Exit Routes Assembly points Fire points Fire Prevention No smoking and be aware of other possible ignition sources Keep the site tidy - less material to burn Hot work permits
12 Clients and main contractors are required to ensure that those on site are competent. Increasingly the evidence needed is a card from a recognised registration scheme. More information on the schemes available can be found on: (CPCS-Plant operation, FASET-Safety Nets, CISRS-Scaffolding) (A wide range of building and civil engineering occupations from unskilled to management levels) (Engineering construction) There are also recognised training qualifications which may be required over and above occupational registration schemes e.g. IPAF- Powered access (scissors and boom lifts) PASMA- Alloy tower systems NRSW- New Roads and Streetworks Supervisor and operative card For some activities it may be that there is not a scheme but evidence of training is required e.g. abrasive wheels.
13 Can you provide evidence of your skills? A current registration card e.g. CSCS, CSCS Affiliated Schemes (or equivalent) If not why not?
14 Ensure that workers know who to contact and how to reach them. Amend list as required. Ask the workers to write down the information on this list or provide a printed sheet.
15 Your site staff are: Site Contracts Manager: Engineers: Supervisors: Safety Representative: Safety Officer: First aiders: Fire Marshal: Your site contact telephone number is:
16 Ensure that all inductees are made fully aware of the site procedure for recording who is on site at any given time. Explain to them that the main purpose of this is to ensure that all persons are accounted for in the event of an emergency situation, not as a timekeeping tool. Explain that any person not accounted for in an emergency will be treated as missing and may put emergency workers at risk by looking for someone who isn t there. Explain that failure to comply with this requirement may result in disciplinary action being taken against offenders.
17 Who s on site Please ensure you sign in and out of the site - if you do not, we will not know you are here for security and emergency purposes
18 Show where facilities are on site plan. Reinforce that while management have the responsibility to provide suitable and sufficient welfare facilities (HSE Construction Information Sheets No 18 and No 46) workers have a responsibility to look after facilities and report any damage or vandalism. Leave toilets and canteens as you would wish to find them. Be aware of first aid procedures for the site and who to contact/where to go for help.
19 Welfare on site TOILETS CANTEEN FIRST AID Find out where these facilities are located
20 Stress the importance of good housekeeping to prevent slips, trips and falls and remove material that could fuel fires. A high number of accidents occur on construction sites due to workers tripping over rubbish and waste. Failing to ensure a tidy workplace is as unsafe and could cause the site to be closed down. Cover any waste management requirements i.e. location of skips, disposal requirements. Discuss any environmental issues for the site e.g. chemicals, smoke, noise or even wildlife.
21 Always clear up your own rubbish A Clean site is a safe site
22 All waste should be disposed of in the correct skips. Under no circumstances shall liquid waste, such as paints or solvents, be allowed to soak into the ground or be poured down drains. This is hazardous waste and should be disposed of in line with current legislation. Bonfires shall not be conducted on site.
23 Environment & Waste Disposal All waste should be disposed of in the correct skips Under no circumstances shall liquid waste, such as paints or solvents, be allowed to soak into the ground or be poured down drains. This is hazardous waste and should be disposed of in line with current legislation. Bonfires shall not be conducted on site
24 Points to reinforce: Basic hygiene - hand washing before eating. Is food properly stored and cooked. Carefully dispose of leftovers so as not to attract vermin which may carry Weil s disease.
25 Standard site rules No food or drink to be taken on site you must consume these in your canteen
26 Ensure that inductees are made aware of the different types of signage, their colour codings and meanings. Give examples where appropriate: Red Prohibitive (Must not do) No Smoking, No unauthorised entry, Do not touch, No vehicles, etc. Blue Mandatory (Must do) Wear hard hat, Wear eye protection, Wear hearing protection, Sound horn, etc. Yellow Caution (Hazard warning) Fragile roof, High voltage, Asbestos, Fork lift trucks, Low headroom, etc. Green Safe Condition (The Safe Way) First aid, Escape route, Assembly Point, Eye wash, Emergency phone, etc. Explain to inductees that all signs will have a pictogram as well as text indicating the condition required. Explain that some signs may contain a combination of two or more conditions for example; Danger LPG (yellow) No smoking (Red). Please note that fire precautions equipment may also be depicted by a red sign.
27 Signs on Site Always comply with safety signage Read the labels on containers before using any substances Use any safety precautions required
28 Explain to inductees the importance of reporting for work in a fit state. It is not only their safety that is at risk but those around them who could be affected by what they do. Explain that any person reporting for duty under the influence will be treated very harshly and that removal from site is not just a threat. Make inductees aware of the Company Drug and Alcohol policy (if appropriate) and inform them of the procedures for testing and counselling. Ask the inductees if any of them are on medication for a specific medical condition which may impair their performance to make this known to their manager so that appropriate measures can be put in place.
29 Drugs and Alcohol Any persons caught in possession of or under the influence of drugs or alcohol will be removed from site If you are on drugs for any medical reason, please inform your supervisor at once
30
31 These may be a hazard if someone is trying to shout for your attention
32 Stress that horseplay on site will not be tolerated and could lead to dismissal and the incident being reported to the police or HSE as this could be seen as assault. Example: On one site a worker flicked a lit match at a colleague as a joke. Unfortunately the man s overalls had inflammable liquid spilled on them and he ended up with serious burns. Stress the need for common sense!!
33 No horseplay Someone could get hurt
34 PPE means all equipment (including clothing affording protection against the weather) which is intended to be worn or held by a person at work and which protects him against one or more risks to his health or safety. PPE should be regarded as a last resort when considering control measures. Other methods should be considered and used that will reduce or eliminate risk to injury. However, where PPE is the only effective means of controlling the risks of injury or ill health, then employers must ensure that PPE is available. Employers must assess the work being undertaken and the environment his employees will operate in when determining the appropriate PPE to be worn. Example: - A typical construction/building site may require workers to wear a Hard Hat, Coveralls, Safety Footwear, Gloves, Eye Protection and High Visibility Vest. These must be provided free of any charge to the employee. Main Contractors must check that all subcontractors are conforming by providing PPE for all their employees (those who are self-employed for tax reasons, but who otherwise work in an employee employer relationship are also entitled to receive PPE) free of charge. Risk Assessments must also highlight any additional PPE requirement from the above example depending on the particular hazards so that appropriate PPE is issued. This also must be provided free of charge. Employees should be made aware of their responsibility to wear the PPE appropriately, take care of equipment and report any defects. They should also be informed that if they do not wear or misuse any PPE that has been appropriately issued that this could lead to disciplinary action. This equipment is provided for their protection.
35 Personal Protective Equipment Look after your P.P.E. and always wear it when required Please ask your supervisor to supply these items as and when required
36 You will only be allowed to use plant and equipment where trained and authorised to do so. Stress that equipment must be fit for use and should be subject to an inspection process and that any defects must be reported. Consider the hazards from: electricity moving parts / sharp edges fuels noise vibration dust / flying debris heat / cold
37 Plant and Equipment You are required to work safely and use plant and equipment correctly they are YOUR responsibility
38 Stress working at height is the biggest single cause of construction fatalities each year with 40-50% of the total each year. Describe the kind of height work on the site and the controls required using the following slides to stress main points.
39 Working at height Use secure platforms with proper edge protection Protect holes, leading edges and fragile materials Consider weather conditions If in doubt - speak to your supervisor
40 Explain that those who are to erect or alter scaffolding and towers should ensure that the site office has a copy of their training records and those persons should be authorised by the site accordingly. Discuss the issues of working at low levels and the use of trestles, joiners stools and hopups etc. Confirm the site s policy on the use of these.
41 Working at height Only trained operatives are allowed to erect alter or dismantle scaffolding or mobile towers Always ensure alloy towers and system scaffolds are erected to the manufacturers build guide
42 Fall arrest equipment includes: Safety nets Crash Decks Air bags Bean bags Harnesses Arrester blocks Shock absorbing lanyards All of these systems depend on being used properly, regularly inspected and any defects being reported to the right person. They should only be used where working platforms are not practical. Those working in cherry pickers and other forms of powered access equipment should wear a harness and short restraint harness lanyard. Note: it may be site policy to wear a harness when in a scissor lift. Improper use and non-use of fall arrest will result in disciplinary action. Note: emphasise the need for rescue procedures to be documented and where possible tested. It is not appropriate to rely on the Fire and Rescue Service.
43 Working at height Where the risk assessment requires the use of fall arrest equipment it must be used in accordance with a safe system of work including emergency rescue procedures
44 Ladders and Stepladders should be used for access or as places of work ONLY when there is no reasonably practicable alternative and it is safe to do so.
45 Working at height Use the safest access equipment for the job, (not the most convenient) Ladders and stepladders must be located on a firm level base and only used for short duration light duty Keep your knees below the top tread when working on a stepladder
46 Explain to inductees that manual handling injuries cause more lost time at work than any other single work related cause. These are normally back injuries but also include muscle strains and sprains, hand and foot injuries. Explain to inductees that there are a number of mechanical aids available to reduce the amount of manual handling on site. These should be used wherever practicable. Explain the site policy on handling blocks weighing more than 20Kg and bagged products of more than 25Kg. For ground works contractors explain the need to use mechanical aids for kerbs and manhole covers and rings. Explain that no person should attempt to lift any object that they are not comfortable with. Explain that loads that are bulky, heavy, unwieldy, or are to be carried over a long distance require an assessment to be carried out and precautions put in place to minimise the risk of injuries. Where possible larger loads should be broken down into smaller loads and/or team lifting should be considered, but with caution.
47 Manual Handling DO NOT attempt to carry or lift anything that is too big or too heavy Inform your supervisor and ask for assistance
48 Ensure that inductees are made fully aware of the requirement, that only trained, certificated and authorised personnel will be permitted to operate driver operated plant. This may include but not be limited to; Dumper Trucks, Cherry Pickers, Scissor Platforms, Excavators, Road Rollers, etc. State that all plant operators will be required to produce evidence of their training before being given authorisation to operate any given item of plant. This may include the production of a CPCS or IPAF card or suitable equivalent. Ensure that inductees have suitable evidence of competence and are aware of the site requirements/hazards e.g. traffic route, dangerous slopes, high voltage cables. Avoid reversing on site or use trained banksmen and ensure that loads are properly slung/secured. Don t take passengers. Ensure that where vehicles are provided with seat-belts they are used properly.
49 Plant Operation Only trained and authorised personnel can operate driver operated plant e.g. dump trucks
50 Keep to designated pedestrian routes on site plan. Be aware of vehicles turning or slewing. Highlight Traffic Management Plan and explain what it currently contains and advise that this will be updated regularly. Explain that parking is only allowed in designated areas on site in order to keep site roads clear for construction plant and emergency vehicles. If you can t see the operator - he can t see you!
51 Vehicles on site Only use identified walkways Be aware of plant operating near you A Traffic Management Plan is displayed in the site office Parking is only allowed in designated areas
52 Ensure that inductees are made aware if this site has a particular asbestos risk and what procedures are currently in place to deal with it. If asbestos is a risk factor on site, explain to operatives that they will receive specific information and further inductions in respect of this risk. In the meantime inform inductees that if they discover any material which they suspect may contain asbestos, that they should STOP WORK and report the situation immediately to their supervisor or manager. Confirm the need for certain workers to have asbestos awareness training.
53 Asbestos Asbestos IS/IS NOT present on this site You will be given specific information on any areas or activities which may expose you to asbestos If you are in any doubt - consult your supervisor
54 Explain the Company s policy on HAVS and how it manages the risk. Discuss the need for job rotation if required and the need to select and use the correct tool.
55 Vibration Hand Arm Vibration Syndrome (HAVS) and Vibration White Finger (VWF) are very debilitating You need to protect yourself from excessive usage of vibrating tools such as breakers and drills
56 The High 5 is a HSE led campaign on construction health and safety to reduce risk on site.
57 HSE - High Five Tidy sites and decent welfare Falls from height Manual Handling Transport Asbestos Plan and organise what you do Make sure that you are trained and competent and know the special risks of your trade Raise problems with your supervisor or safety rep
58 Ensure operatives are made fully aware that it is a legal requirement to report all accidents irrespective of how trivial they may seem at the time. Explain that accident reporting is necessary to ensure that a proper investigation is undertaken so that lessons can be learned to prevent a recurrence. Ensure inductees are made fully aware of the procedure for reporting accidents and what documents need to be completed. Inform them that there may also be a requirement to make an entry in the Principal Contractor s or Client s accident book. Inform inductees that certain accidents are reportable to the enforcing authorities, these include most fractures and accidents where a person has more than three days off work. Inform inductees that failure to report an accident correctly may result in disciplinary action and could jeopardise their chances of a compensation claim at a later date.
59 Accident Reporting Please report any on-site accidents or dangerous occurrence to your supervisor or first aider. It is for your benefit as well as others. For any accident you will need to make an entry in the accident book. If you require time off work due to any injury,you must inform your site supervisor.
60
61 Please feel free to ask any questions you may have, before you sign your induction form Thank you for your time and co-operation
62
63 Site Safe Scotland would like to thank all those who have supported this project Images on slides / pages 21, 23, 25, 26 are Crown Copyright. Courtesy of the Health and Safety Executive (HSE)
THE UNIVERSITY OF SHEFFIELD WORK AT HEIGHT POLICY
THE UNIVERSITY OF SHEFFIELD WORK AT HEIGHT POLICY CONTENTS Page No 1 INTRODUCTION 2 2 LEGISLATION 2 3 HIERARCHY OF CONTROL 2 4 WORK AT HEIGHT POLICY 3 5 ROLES AND RESPONSIBILITIES 3 6 RISK ASSESSMENTS
Site Induction Presentation
ABC Contracting Site Induction Presentation This presentation provides a mock site induction and serves to help those people in the process of preparing and delivering site inductions It is essential that
Level 1 Award in Health and Safety in a Construction Environment
Level 1 Award in Health and Safety in a Construction Environment Student notes (sample) www.britsafe.org Membership Training Qualifications Audit and Consultancy Audit and Policy Consultancy and Opinion
Safety Systems Review Facilities Management Guidance and specification Version 1 2014
Safety Systems Review Facilities Management Guidance and specification Version 1 2014 Membership Training Qualifications Audit and Consultancy Policy and Opinion Awards Contents Page Safety Systems Review
HEALTH & SAFETY HANDBOOK. No Body GetsHurt. Our Safety Slogan is:
HEALTH & SAFETY HANDBOOK Our Safety Slogan is: No Body GetsHurt CONTENTS Page(s) Introduction 1 Health & Safety Policy 2 What happens if you get Injured at work 3 Chemicals 4 Company Vehicles 4 Compressed
This document must be read in conjunction with the Permit to Work and Service Interruption Notice policy.
UNIVERSITY OF HERTFORDSHIRE HIGHER EDUCATION CORPORATION SITE RULES FOR CONTRACTORS The University s Site Rules for Contractors are issued on the authority of the Director of Estates, Hospitality and Contract
Employee Health and Safety Induction Training Record
COMPANY NAME Employee Health and Safety Induction Training Record Employee name Job Title Department Start Date - PBS 2010/2 Employee Health & Safety Induction Training Record Page 1 of 6 INDUCTION TRAINING
Safe Driver. Information Sheet
Workplace Transport Safety Safe Driver Information Sheet To effectively control workplace transport risks, the vehicle, the driver and the working environment must be appropriately managed. This information
SITE CONTRACTOR PROCEDURES
SITE CONTRACTOR PROCEDURES Asset Collection Type B Assets are considered High risk ; the site activities must be in accordance with Graysonline contractor procedures and are to be collected by appointment
No. Name of Legislation Applicable Issues and Requirements Demonstration of Compliance 1. Health and Safety at Work Act 1974
The Police Treatment Centres Health and Safety Legal Compliance Register No. Name of Legislation Applicable Issues and Requirements Demonstration of Compliance 1. Health and Safety at Work Act 1974 2.
CONSTRUCTION SITE HEALTH AND SAFETY SELF AUDIT
www.veritas-consulting.co.uk CONSTRUCTION SITE HEALTH AND SAFETY SELF AUDIT This checklist identifies some of the hazards most commonly found on construction sites. The questions it asks are intended to
SITE SPECIFIC FALL PROTECTION PLAN
1 THIS PLAN IS SPECIFIC TO: PROJECT & ADDRESS 1.1 THIS PLAN IS SPECIFIC TO THE FOLLOWING AREA(S) ON SITE: Parkade level: Typical level: Other: Between G/L: 1.2 THIS PLAN IS APPLICABLE TO THE FOLLOWING
1. GENERAL STATEMENT OF COMPANY HEALTH, SAFETY AND ENVIRONMENTAL POLICY
1. GENERAL STATEMENT OF COMPANY HEALTH, SAFETY AND ENVIRONMENTAL POLICY Dumfries Timber Co. Ltd. is committed to comply with our legal duties in order to provide a safe and healthy working environment
SAFE WORK PROCEDURE SWP 015 WORKING AT HEIGHT SEPTEMBER 2013 DOC. NO. D13/248399
Operation Brief Description of Activity Limitations MORELAND CITY COUNCIL Operations Centre 7-9 Walter Street Hadfield Vic 3046 Tel: 8311 4300 Working at height Approved by the Walter Street OHS committee
Logo here. TRAFFIC MANAGEMENT PLAN Ref : xxxx Dated xxxxxx. Enter details. Delivery Address: Enter details
Logo here Ref : xxxx Dated xxxxxx Mandatory H&S 905 Rev 1: xxxxx Page 1 of 1 Project: Project No: Date: Prepared by: Enter details Enter details Enter details Enter details Delivery Address: Enter details
WORKING AT HEIGHT GUIDELINES. Version II
WORKING AT HEIGHT GUIDELINES Version II 21 st September 2011 WORKING AT HEIGHT GUIDELINES EXECUTIVE SUMMARY Working at height is where an individual is carrying out work in any place in the course of obtaining
Entry Level Award in Workplace Hazard Awareness
Entry Level Award in Workplace Hazard Awareness Student resource sheets www.britsafe.org Membership Training Qualifications Audit and Consultancy Audit and Policy Consultancy and Opinion Policy Awards
WORKSAFE VICTORIA A HEALTH AND SAFETY SELF-ASSESSMENT CHECKLIST FOR SMALL BUSINESS
Aug 2013 WORKSAFE VICTORIA A HEALTH AND SAFETY SELF-ASSESSMENT CHECKLIST FOR SMALL BUSINESS As a small business operator, you need to be aware of your health and safety responsibilities, and identify risks
Event Planning Guidance Notes EVENT PLANNING GUIDANCE NOTES
EVENT PLANNING GUIDANCE NOTES 1 Event Planning Guidance Notes Important issues This documentation is not a full and authoritative statement of the law, statutory guidance or best practice in planning,
Slips, trips & falls Prevention Policy & Procedure 45
Bethany Care Ltd Slips, trips & falls Prevention Policy & Procedure 45 A little slip at work can have a big impact on your life. Date Created 30/06/2008 Date Reviewed 22/10/2014 Document Review Details
SLIPS, TRIPS AND FALLS POLICY
SLIPS, TRIPS AND FALLS POLICY First Issued Issue Version Purpose of issue/description of change Planned Review Date 2 Root cause analysis (RCA), RIDDOR August 2012 and inspection of communal areas referenced
BSH Exhibition Sample Risk Assessment for exhibitors / contractors
BSH Exhibition Sample Risk Assessment for exhibitors / BSH Conferences Ltd have produced this risk assessment for its exhibitors to use as a template if they have not undertaken risk assessment before.
Independent Contractor Policy
Independent Contractor Policy This Policy has been implemented to prevent accidents and personal injuries. It is not intended to be entirely inclusive. It is the responsibility of the Independent Contractor
EMERGENCY PREPAREDNESS & RESPONSE PROCEDURE
1 of 12 DOCUMENT REVISION HISTORY Revision No. Date DESCRIPTION OF CHANGES Pages Affected By 00 01/07/2003 Draft Issued For Comment All HSEQ Dept. 01 01/09/2003 Total Change First Approved Issue All HSEQ
Document ref: MG(M)201 Version no: 01 Page no: 1 / 12. Contractor rules
Page no: 1 / 12 Contractor rules Table of Contents Purpose... 2 Scope... 2 1. Responsibilities... 2 2. Planning Stage... 3 3. Site induction, emergency procedures and documentation... 3 4. Risk Assessment
Generic Risk Assessment: Working on Roofs (FMRA 0006)
Generic Risk Assessment: Working on Roofs (FMRA 0006) Only staff and contractors who are Authorised by Facilities Management are allowed to access roof areas. Those who need access who are not Authorised
Example risk assessment for a motor vehicle mechanical repair workshop
Example risk assessment for a motor vehicle mechanical repair workshop Setting the scene The garage manager did the risk assessment. The business employed 12 mechanics, including two apprentices who carried
Health & Safety Policy For Locations Hosting Film Production Companies
Health & Safety Policy For Locations Hosting Film Production Companies Throughout this document, the location will be referred to as The Venue and the film production company as The Contractor. The following
Safety in Offices and other General Areas
Safety in Offices and other General Areas 1. INTRODUCTION This document covers health and safety in offices and other 'general areas' including corridors, stairs, entrances, small kitchens and rest areas.
WHS Contractor Management Procedure
Procedure Approved: 09/07/2013 Next Review: 09/07/2015 1. Overview The District council of Mount Remarkable Council is committed to engaging quality Contractors who have a sound understanding and commitment
How To Prevent Accidents At Work
2 Preventing vehicle accidents Construction work is considered to be one of the most hazardous industrial activities in the EU. The rate of injury in the construction industry is higher than in other industries.
A: SIGNIFICANT RISKS Initial Risk Rating H/M/L B: KEY CONTROL MEASURES ACTION
ELECTRICAL CONTRACTOR RISK ASSESSMENT AND KEY CONTROL MEASURES CONTRACTOR NAME: AEC Automation Ltd. NAME OF CONTRACT: A: SIGNIFICANT RISKS Initial Risk Rating H/M/L Slips, trips and falls. Manual handling.
Safety Training Needs Assessment
Safety Needs Assessment Form Instructions: Please review each question and either check YES or NO. If a question is checked YES you will be required to complete the training topic before initial assignment
Working at height A brief guide
Working at height A brief guide Introduction This brief guide describes what you, as an employer, need to do to protect your employees from falls from height. It will also be useful to employees and their
Guidance to Prevent Slips, Trips & Falls
Guidance to Prevent Slips, Trips & Falls Published June 2005 CONTENTS 1. Scope of this guidance 2. New plant/ installations 3. Maintenance 4. Housekeeping 1. Scope of this guidance Slips, trips and falls
TEMPORARY EMPLOYEES SAFETY PROCEDURES
TEMPORARY EMPLOYEES SAFETY PROCEDURES Temporary Agencies will ensure that any temporary employee sent to work at Modern will have received and understand the General Safety Rules. GENERAL SAFETY RULES
Workplace Transport Safety Reversing Vehicles Information Sheet What are the dangers associated with reversing vehicles? Why is reversing a problem?
Workplace Transport Safety Reversing Vehicles Information Sheet This information sheet aims to raise awareness of the dangers caused by reversing vehicles in the workplace. It provides basic information,
Health and Safety at Work Policy
Health and Safety at Work Policy Introduction Management of health and safety issues is an integral part of our business and is given the highest priority. Compliance with Health and Safety legislation
SAFETY TRAINING CLASSES & SERVICES LIST
SAFETY TRAINING CLASSES & SERVICES LIST CUSTOM CLASS ROOM TRAINING AVAILABLE, BACKED WITH ON-SITE SUPPORT SAFETY, TRAINING COURSES OFFERED BY OUR CERTIFIED ELITE RISK CONTROL TEAM: EM 385-1-1 (Military)
School of Engineering University of Glasgow
School of Engineering University of Glasgow Electronics Workshops Rankine Building 319A (2 Technicians) 510 (1 Technician) 712A (4 Technicians, 1 Modern Apprentice) James Watt South 619 (2 Technicians)
The Royal Environmental Health Institute of Scotland
The Royal Environmental Health Institute of Scotland Introduction to Health and Safety Course Syllabus Minimum teaching time 3 hours The Royal Environmental Health Institute of Scotland is a registered
Charity and Voluntary Organisations
Charity and Voluntary Organisations A health and safety guide Crown copyright 2013 First published 2013 You may re-use this document/publication (not including logos) free of charge in any format or medium,
WORK AT HEIGHT UNIT 4
WORK AT HEIGHT UNIT 4 WHAT IS WORKING AT HEIGHT? The Working At Height Regulations 2005 define working at height as:- Any work above or below ground level where a fall would result in personal injury.
Contractor s Safe Working Agreement
Contractor s Safe Working Agreement This statement provides details on how I/we, the Trade Contractor will manage the health and safety hazards associated with my/our work. ASSESSING WORKPLACE HEALTH AND
SPECIFIC SAFETY OBLIGATIONS FOR CONTRACTORS ENGAGED WITH THE CITY OF BUNBURY.
SPECIFIC SAFETY OBLIGATIONS FOR CONTRACTORS ENGAGED WITH THE CITY OF BUNBURY. The City of Bunbury acknowledges that it has a Duty of Care obligation under the Occupational Safety and Health Act 1984 (Section
WHS Induction Series. 36 Toolbox Talks. Contents
36 Toolbox Talks 3-5 minute toolbox talks for induction or refresher safety training. Having regular training programs that educate your workers about workplace issues has never been easier than now with
How To Ensure Safety On A Caravan Site
EAST CAMBRIDGESHIRE DISTRICT COUNCIL A Site Operators Guide to Health and Safety Introduction The Health and Safety at Work Etc. Act 1974 places a duty on all persons having control of a caravan site to
Scaffold Standard (Standard to Managing and Appointing Scaffolding Contractors on University College London (UCL) Projects) Management Standard
Scaffold Standard (Standard to Managing and Appointing Scaffolding Contractors on University College London (UCL) Projects) Management Standard UNIVERSITY COLLEGE LONDON Engineering, Maintenance & Infrastructure
CONTRACTOR INDUCTION HANDBOOK
CONTRACTOR INDUCTION HANDBOOK POLICY The health and safety of all school employees and contractor employees is a vital concern at the school. Contract personnel will be treated in a manner consistent with
Health and Safety Policy
Health & Safety Policy 1.Introduction Health and safety is the concern of everyone within Escape Community Arts (Escape). This policy is intended to provide a practical framework for the implementation
BRITISH SCHOOL OF GENEVA HEALTH AND SAFETY POLICY
BRITISH SCHOOL OF GENEVA HEALTH AND SAFETY POLICY The Health and Safety Policy of the British School of Geneva aims to safeguard the health and safety of all its pupils and employees as well as visitors
Corporate Health and Safety Policy Issue 9
Corporate Health and Safety Policy Issue 9 July 2011 1 Contents Foreword by the Chief Executive 3 1. General health and safety policy statement 4 a Our responsibilities 5 b Health and safety management
Procedural Guidance for Roof Access/Roof Work
University of Central Lancashire Safety, Health & Environment Section Procedural Guidance for Roof Access/Roof Work Document Number: FM/HSE 001 Revision Number: 2 Review Date: August 2005 Reviewed by:
E3902 Seeing Accidents Before They Happen Leader s Guide
E3902 Seeing Accidents Before They Happen Leader s Guide ERI PRODUCTIONS INC. SEEING ACCIDENTS BEFORE THEY HAPPEN This easy-to-use Leader s Guide is provided to assist in conducting a successful presentation.
ASA HEALTH AND SAFETY POLICY
ASA HEALTH AND SAFETY POLICY Policy statement The ASA places great importance on the health and safety of all its employees, visitors and the general public. Temporary staff, contractors and visitors will
Health & Safety Policy DH Associates Limited
General Statement of Policy Health & Safety Policy DH Associates Limited It is the policy of DH Associates Ltd to comply with the terms of the Health and Safety at Work etc Act 1974 and subsequent legislation
Traffic Management Issue 1.0 Revision: v2 October 2014
Disclaimer IMPORTANT: The information in this guide is of a general nature, and should not be relied upon as individual professional advice. If necessary, legal advice should be obtained from a legal practitioner
Working Safely on Substations
A practical guide to Working Safely on Substations W.S. ON SUBSTATIONS.indd 1 6/12/07 12:03:36 A practical guide to Working Safely on Substations National Grid Eakring Technical Training Centre Kirklington
Contractor Environment, Health and Safety Management Plan
EHSMS10 Contractor and Supplier EHS Management Contractor Environment, Health and Safety Management Plan Purpose Guidelines Record Keeping This template provides an example to Santos Contractors of the
This guide is prepared by the Occupational Safety and Health Branch, Labour Department. This edition March 2010
This guide is prepared by the Occupational Safety and Health Branch, Labour Department This edition March 2010 This guide is issued free of charge and can be obtained from offices of the Occupational Safety
Skanska Sweden s General Conduct and Safety Rules. Content
1 (8) Note In case of issues regarding interpretation of this document, the Swedish original document prevails. Content Our work environment 2 Risks at work 2 Safe behaviour 3 Information and qualifications
Slip, Trip & Fall Prevention Handbook
Slip, Trip & Fall Prevention Handbook This prevention handbook provides you with a basic understanding of what causes a slip, trip or fall and gives you some ideas on what you can do to stop these incidents
Safety and Environmental Information for External Companies Koehler Oberkirch
and al and at Work 1. Delivery, Notice, Signature After receiving the following information sheets, the team leader from every external company is required to read through them, explain them to their employees,
Working at Height. Procedure
Procedure *All Forth Valley College Health, Safety and Welfare Procedures are covered under the overarching Health, Safety and Welfare Policy. Status: Date of version: Reviewed by: Author/Contact Person;
Slips, Trips and Falls
Slips, Trips and Falls Introduction o Slips, trips and falls cause: The majority of general industry accidents 15 percent of all accidental deaths (~12,000/yr) More fatalities than all other causes but
Section 2 Hazard Assessment and Risk Control Table of Contents
Section 2 Hazard Assessment and Risk Control Table of Contents 2.1 INTRODUCTION... 2 Class A Hazard... 3 Class B Hazard... 3 Class C Hazard... 3 Class D Hazard... 3 2.2 HAZARD ASSESSMENT... 4 2.2.1 Hazard
Fact Sheet: Slips, trips and falls
Fact Sheet: Slips, trips and falls Slips, Trips & Falls Slips, Trips and Falls are one of the highest causes of workplace injuries. They include those, which occur on the same level as a result of uneven
PITTSBURG TANK AND TOWER CO., INC.
PITTSBURG TANK AND TOWER CO., INC. HEALTH, SAFETY & ENVIROMENTAL PROGRAM INDEX 1.SAFETY POLICY & MANAGEMENT RESPONSIBILITIES - Safety Policy - Administrative Duties * Top Management * Safety Director *
Pollution Incident Response Management Plan
Pollution Incident Response Management Plan POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN 1. Introduction This Pollution Incident Response Management Plan (PIRMP) has been prepared to describe the processes
EMERGENCY PLANS FACT SHEET
EMERGENCY PLANS FACT SHEET Overview This fact sheet provides general guidance for persons conducting a business or undertaking (PCBUs) and workers on preparing and maintaining general emergency plans for
68 Metal Industry Guidelines for Safe Work
3 68 Metal Industry Guidelines for Safe Work section 3 high-risk 3 activities Metal Industry Guidelines for Safe Work 69 section 3 high risk activities 3.1 working at heights Falls from heights have been
Workshop Self Inspection Checklist WORK01
Workshop Self Inspection Checklist WORK01 General Mechanical Workshops Location Assessor Date This core checklist is provided by the Health and Safety Department as a template, which provides a basic framework
Event Management Guidelines. Month 2011. 1 Event Management Guidelines (Month, 2011)
Month 2011 1 (Month, 2011) Table of Contents Executive Summary... 2 More information... 2 Event Risk Assessment... 3 Event Checklist... 4 Event Details... 8 Event Contact List... 10 Event Task List...
MD 52 WASTE MANAGEMENT AUTHORITY CORPORATE HEALTH AND SAFETY PROGRAM
UNSAFE ACTS AND CONDITIONS All accidents are the result of an unsafe act, an unsafe condition or a combination of both. Unsafe acts account for approximately 80% of all incidents/accidents, while unsafe
Good Practice Guide. The Selection of Access Methods to Install and Dismantle Safety Netting
Good Practice Guide The Selection of Access Methods to Install and Dismantle Safety Netting FASET is the trade association for the safety net rigging and temporary safety systems industry. This document
How to manage health and safety in small businesses
How to manage health and safety in small businesses Do I need to read this? Are you a self-employed person? Do you own a business and employ staff or contractors? Do you want some influence over your ACC
OAKPARK SECURITY SYSTEMS LIMITED. Health & Safety Policy. Requests or suggestions for amendment to this procedure
OAKPARK SECURITY SYSTEMS LIMITED Requests or suggestions for amendment to this procedure should be submitted to the owner of the process PROCESS OWNER: MANAGEMENT TEAM Current version: PREVIOUS VERSION
The Work at Height Regulations 2005 (as amended) A brief guide
The Work at Height Regulations 2005 (as amended) A brief guide Off work sick and worried about your job? Steps you can take to help your return to work Health and Safety The Work at Height Regulations
Injury Prevention for the Construction Industry
Injury Prevention for the Workers in the construction industry encounter a variety of hazards, some of which can lead to serious injuries and fatalities. This fact sheet: Increases awareness of the primary
Health and Safety Policy
Health and Safety Policy 1.0 INDEX OF CONTENTS Page 1.0 INDEX OF CONTENTS 2 2.0 DOCUMENT CONTROL 2 a Amendment Record 2 b Approval for Issue 2 3.0 HEALTH AND SAFETY POLICY STATEMENT 3 4.0 POLICY OBJECTIVES
Generic Risk Assessment
HAZARD IDENTIFIED: What are the hazards? Exceeding the event capacity Who might be harmed and how? Event attendees and participants What are you already doing aiming to achieve? Event capacity established
Mechanical Engineering
RISK ASSESSMENT Mechanical Engineering January 2011 Mark Hoare Health and Safety Manager The University of Birmingham Course Content Introduction to health and safety How heath and safety is managed at
Preventing slips and trips at work A brief guide
Preventing slips and trips at work A brief guide What is this leaflet about? Slips and trips are the most common cause of injury at work. On average, they cause 40 per cent of all reported major injuries
Health and Safety Management in Healthcare
Health and Safety Management in Healthcare Information Sheet Nov 2010 This information sheet gives guidance on the key elements of health and safety management in healthcare. It is intended for small employers
WORKING IN CONFINED SPACES GUIDELINES
WORKING IN CONFINED SPACES GUIDELINES Contents 1 Introduction... 2 2 Scope... 2 3 Definitions... 2 4 Responsibilities... 3 4.1 Permit Authoriser... 3 4.2 Permit Receiver... 3 4.3 Responsible UOW Officer...
Life Saving Rules. Working Safely at EPCOR
Life Saving Rules Working Safely at EPCOR 1 Our Health and Safety Beliefs We believe: All incidents are preventable. HSE is integral to our work and the way we conduct business. HSE is serious and a shared
Safety Training Document for contractors working at the Boehringer Ingelheim sites in Ingelheim, Biberach, Dortmund and Hannover. As at: 01.03.
Safety Training Document for contractors working at the Boehringer Ingelheim sites in Ingelheim, Biberach, Dortmund and Hannover As at: 01.03.2014 Tables of contents The company The sites in Ingelheim,
FLA S FIRE SAFETY INITIATIVE
Improving Workers Lives Worldwide FLA S FIRE SAFETY INITIATIVE Preventing fires and saving lives by empowering workers and factory managers SCENARIO 1 OCCURS AT FACTORY ABC, WHICH HAS NOT IMPLEMENTED NECESSARY
Information. on Workplace Health and Safety. Information. for Workers
Information on Workplace Health and Safety Information for Workers This guide is designed to provide basic information about workplace health and safety as required by the Occupational Health and Safety
Information Sheet. What is a Workplace Transport Risk Assessment?
Workplace Transport Safety Risk Assessment Information Sheet This information sheet provides basic information on conducting a workplace transport risk assessment. The information is aimed at employers,
The Tomato Plant Company Ltd. Method Statement and Risk Assessment Loads requiring lifting
The Tomato Plant Company Ltd Method Statement and Risk Assessment Loads requiring lifting Generic method statement & risk assessment for the removal of portable accommodation units and/or shipping containers
Procedure. Working at Heights. 1. Purpose. 2. Scope. 3. Definitions. 4. Planning. 4.1. QUT risk check. 4.2. Work at Height permit
Procedure Working at Heights 1. Purpose The purpose of this procedure is to establish compliance requirements and specify precautions to be taken during the conduct of work at height within QUT to prevent
Risk Assessment / Safety Checklist
Risk Assessment / Safety Checklist For Events USC has a duty to provide a safe and healthy environment for those visiting USC to the extent that it is reasonably practical. To ensure USC provides a safe
Golden Safety Rules booklet. No one gets hurt, no incidents
Golden Safety Rules booklet No one gets hurt, no incidents The Golden Safety Rules exist to keep you safe There s nothing more important than your safety and that of your workmates. That s why we ve adopted
Five steps to risk assessment
This leaflet aims to help you assess health and safety risks in the workplace A risk assessment is an important step in protecting your workers and your business, as well as complying with the law. It
CATERING CONTRACTORS General Code of Safety Practice
Residential & Business Services Director s Office CATERING CONTRACTORS General Code of Safety Practice CONTENTS 1 Introduction 2 2 Commencement of Work 3 3 Vehicles 3 4 Temperature control 3 5 Food hygiene
Qualification Specification HABC Level 1 Award in Principles of Health and Safety in the Workplace (QCF)
www.highfieldabc.com Qualification Specification HABC Level 1 Award in Principles of Health and Safety in the Workplace (QCF) Qualification Number: 600/6789/5 Highfield House Heavens Walk Lakeside Doncaster
Site inspection: Workplace transport checklist
Site inspection: Workplace transport checklist The following checklist is a guide to what employers should consider when assessing the risk from vehicles in the workplace. It may not be comprehensive for
City of Belmont Contractor Induction Program
City of Belmont Contractor Induction Program Page 1 of 17 14 March 2011 Source: OSH Date: 13/12/2013 City of Belmont Contractor Induction Program Table of Contents TABLE OF CONTENTS... 1 INTRODUCTION...