KMG PROJE ENGINEERING CONSULTING INFORMATION TECHNOLOGIES LTD. CO.
ABOUT US KMG Proje has been established on 2007 for the consultancy services and project studies of ; highways, railways, high speed railways, metro systems, light rail transit systems and also, tunnels, under and over passes, bridges, viaducts, industrial structures, in accordance with national and international standards. Our company has accomplished numerous studies during his period of activity with high performance. KMG Proje has completed many domestic and international works. Our priority object is to; Hold the customers pleasure at maximum without making any concession about quality Complete the works which are under our scope on time Follow the innovations and technology related to our professions and to improve our quality of works in our projects accordingly. Employ the technical persons who have satisfactory technical background and education Prepare the projects in accordance with national and international standards. Considering professional respect and responsibility; obtain same quality of works from our sub contractors. Professional experiences in the construction sector, together with the young and dynamic technical team; with the light of; engineering ethic, science, and responsibility; our aim is to carry the experience within the construction sector towards the far future. Chairman of the Board Kemalettin GÖÇMEN
REFERENCES Preliminary design of 3rd track extension of Gebze Köseköy Railway To increase the number of alignment of the renewed railway between Gebze and Köseköy, alternative alignments will be developed. Within alternative routes, infrastructures will be determined, analysed and reports will be prepared.
Re-Design of Tandogan - Keçiören Municipal Subway Line Station Tandogan - Keçiören Municipality Station Metro Line Project, which will be built according to newly constructed method (Top-Down) preparation of static, architectural, electrical and mechanical projects work
Railway Track Extension Project Between Akçakale and Nusaybin Stations (226 Km) This project contains the application project of the railway between Akçakale and Nusaybin, and the preparation of the documents that related to construction bid of the project. Vocations through this project are listed below. Determining the alternative corridors and alignments. Map and topographical studies Geological and geotechnical, hydraulic and hydrological studies 226km alignment studies Preparation of the EIA report. The project report of the new railway superstructures. Quantity survey, exploration and preparation of documents for construction bid.
Bartin - Amasra - Cide Highway Between Bartin-Çakraz Amasra Junction Road (Including Tunnel ) Within Bartin - Amasra - Cide highway between Bartin-Çakraz Amasra junction road, alignment project, road underpass bridge, tunnel project has been prepared.
Renovation of the existing railroad between Sandıklı- Karakuyu-Dazkırı (115 KM) and Dazkırı-Denizli (90 km) Alignment Projects 205 kilometers of railroad alignment projects were prepared for the renovation of the existing railroad between Afyon-Sandıklı and Denizli. Existing railroad alignment was investigated and possible improvements in the alignment were determined. Among those improvements, feasible ones are selected and the projects are prepared accordingly.
Ordu-Giresun Airport Project Air transportation which is indsipensable for developing city will maintain safe, fast and efficent transportation opportunity for Giresun and Ordu City. For these reasons, airport project which is the first airport built by fillin sea in Turkey is started.
2nd Stage Construction Project of Izmir Light Railway System Within Izmir Light Railway System 2nd Stage Service Construction Completion the tunnel, shaft project of Goztepe, Polygon, and Fahrettin Altay Stations were presented. Polygon and Fahrettin Altay stations are designed according to the method of diaphragm walls and Top-Down. Within the project Project of Railway Station o Excavation-shoring calculations and projects o Project and calculation of static application o Architectural application and detail drawings o Electrical and mechanical project Tunnel Project Shaft Project services are provided.
Kars-Tiflis Railway Project Senger Variant Section o Alignment projects o Two Tunnel projects ( L=2900 m, L=1000m) o Viaduct projects
L=225 m Viaduct
KOSBİ Batıcim Railway Connection Project Engineering Services and Studies o 8 km Alignment projects o Two Tunnel projects ( L=1800 m, L=130m) o Culverts o Underpasses o Hydrological studies and drainage projects.
Samsun Light Rail System Project Engineering Services and Studies o Topographical works of 15.6 km alignment o Preliminary and final Alignment projects o Geological, geotechnical studies, laboratory test and drilling works of alignment and structures o Hydrological studies and drillings o Depot area track projects, warehouse projects o 21 overground station projects on the alignment o Energy supply and substation projects o Three viaduct project (L=230m, L=100m, L=100m);cut-cover projects and retaining structure projects o Track superstructure projects (embedded, rail-sleeper, etc.) o Electrical-mechanical projects application projects were prepared
Viaduct Warehouse Atgrade Station Structure
Alignment Projects and Consultancy of Kadıköy-Kartal System Metro. o 21 Km alignment projects and tunnel plan-profile projects. o Maintenance area alignment and localization projects. o Consultancy services for architectural, statical works and excavation support systems of stations.
Eskişehir - Köseköy Railway Project Engineering Services o Detailed designs and construction tender documents for 158 km double track railway with 250 km/h speed were prepared o Bored Tunnels : 39 tunnels, total length of 39 km o Cut-and-cover tunnel : 2, total length of 1.3 km o Viaducts : 20, total length of 11.4 km o Bridges : 17 o Overpasses : 21 o Underpasses : 37 detailed design projects were prepared. GEBZE İSTASYONU KÖSEKÖY İSTASYONU PART-1 KOSEKOY - VEZİRHAN VEZİRHAN İSTASYONU PART-2 VEZİRHAN-İNÖNÜ ÇUKURHİSAR
Istanbul Metro System 4.Levent and Taksim, Project Engineering studies o Six underground stations o Eight km tunnel detailed design projects were prepared. Istanbul Metro; Taksim - Yenikapı Section Project Engineering studies o Track structures with total length of 5200 m o Stations : 4 (underground) detailed design project were prepared.
Adana Light Rail Transit System - Project Engineering studies o Double track alignment total length of 14000meters o Cut-and-cover tunnel : total length 3520 m o Viaducts : 5330 m o Stations : 13 detailed design project were prepared.
Marmaray CR-1 Depot Areas (Gebze, Halkalı and Maltepe) Project and Engineering studies o Geological and geotechnical surveys o Existing Tunnel clearances and structural system analysis o Infrastructure of depot areas and preliminary projects of workshop buildings
Ankara-Konya (Polatlı-Konya) Railway (200 km) Project Engineering Services and Studies o Totally 212 km railway line s topographical works and alignment projects for 250 km/hr speed were prepared. o Drilling and laboratory tests were done, geotechnical reports were prepared. o One tunnel and other structures (bridges, under-over passes etc.) final projects were prepared. o Tender documents for construction were prepared.
Bodrum Yalıkavak Tourist Settlement Project Engineering Services and Studies o Hotels, villages o Cut-and-cover tunnel, o Infrastructure, o Marine structures detailed design projects were prepared.
Turkmenistan, Türkmenbaşı Farab First Category Highway Bridge Viaduct design and Consultancy Services for Construction Tender
Çan - Biga State Highway Project Engineering Services and studies o Thirty Five kilometers Application Studies, Levelment and road application project services o Four hundred meters drilling and geotechnical surveys o Biga City Crossing Bridges with spans of 30-45 meters Application projects were prepared. Hanlı - Bostankaya Two Lane Railway Second Stage Project Works o Culverts: 91 o Underpasses: 11 o Overpasses: 4 o Railway Bridges: 2. projects were prepared.
Zonguldak - K.Ereğlisi Railway Project Engineering Services and studies o Culverts : 35 o Underpasses : 3 o Overpasses : 2 o Seven Prestressed railway bridges with total length of 510 m o Four Prestressed railway viaducts with total length of 1000 m o Retaining structures Projects were prepared.
CONTACT Official Title: KMG PROJE MÜHENDİSLİK MÜŞAVİRLİK BİLİŞİM TEKNOLOJİLERİ LTD. ŞTİ. Chairman of the Board Kemalettin Göçmen, Head Office: Ankara Phone: 90 312 441 13 84-85 Fax : 90 312 441 13 42 Web Site: www.kmgproje.com.tr E-mail: kmgproje@kmgproje.com.tr Office Addresse : İzci Sk. 24/4 G.O.P. ÇANKAYA / ANKARA TURKEY