(SOCIAL) COST-BENEFIT ANALYSIS IN A NUTSHELL



Similar documents
benefit is 2, paid if the policyholder dies within the year, and probability of death within the year is ).

An Alternative Way to Measure Private Equity Performance

Hedging Interest-Rate Risk with Duration

1. Measuring association using correlation and regression

Staff Paper. Farm Savings Accounts: Examining Income Variability, Eligibility, and Benefits. Brent Gloy, Eddy LaDue, and Charles Cuykendall

Lecture 3: Annuity. Study annuities whose payments form a geometric progression or a arithmetic progression.

THE DISTRIBUTION OF LOAN PORTFOLIO VALUE * Oldrich Alfons Vasicek

Calculation of Sampling Weights

How To Calculate The Accountng Perod Of Nequalty

Section 5.4 Annuities, Present Value, and Amortization

Institute of Informatics, Faculty of Business and Management, Brno University of Technology,Czech Republic

The OC Curve of Attribute Acceptance Plans

Analysis of Premium Liabilities for Australian Lines of Business

Number of Levels Cumulative Annual operating Income per year construction costs costs ($) ($) ($) 1 600,000 35, , ,200,000 60, ,000

Stress test for measuring insurance risks in non-life insurance

DEFINING %COMPLETE IN MICROSOFT PROJECT

Time Value of Money. Types of Interest. Compounding and Discounting Single Sums. Page 1. Ch. 6 - The Time Value of Money. The Time Value of Money

Answer: A). There is a flatter IS curve in the high MPC economy. Original LM LM after increase in M. IS curve for low MPC economy

Lecture 3: Force of Interest, Real Interest Rate, Annuity

Vasicek s Model of Distribution of Losses in a Large, Homogeneous Portfolio

FINANCIAL MATHEMATICS. A Practical Guide for Actuaries. and other Business Professionals

Interest Rate Forwards and Swaps

HOUSEHOLDS DEBT BURDEN: AN ANALYSIS BASED ON MICROECONOMIC DATA*

Marginal Benefit Incidence Analysis Using a Single Cross-section of Data. Mohamed Ihsan Ajwad and Quentin Wodon 1. World Bank.

Traffic-light a stress test for life insurance provisions

What is Candidate Sampling

Addendum to: Importing Skill-Biased Technology

Implied (risk neutral) probabilities, betting odds and prediction markets

Kiel Institute for World Economics Duesternbrooker Weg Kiel (Germany) Kiel Working Paper No. 1120

Finite Math Chapter 10: Study Guide and Solution to Problems

Portfolio Loss Distribution

Recurrence. 1 Definitions and main statements

Texas Instruments 30X IIS Calculator

Module 2 LOSSLESS IMAGE COMPRESSION SYSTEMS. Version 2 ECE IIT, Kharagpur

THE METHOD OF LEAST SQUARES THE METHOD OF LEAST SQUARES

Criminal Justice System on Crime *

Mean Molecular Weight

CHOLESTEROL REFERENCE METHOD LABORATORY NETWORK. Sample Stability Protocol

Financial Mathemetics

Simple Interest Loans (Section 5.1) :

SPEE Recommended Evaluation Practice #6 Definition of Decline Curve Parameters Background:

PSYCHOLOGICAL RESEARCH (PYC 304-C) Lecture 12

Time Value of Money Module

ANALYZING THE RELATIONSHIPS BETWEEN QUALITY, TIME, AND COST IN PROJECT MANAGEMENT DECISION MAKING

Extending Probabilistic Dynamic Epistemic Logic

Performance Analysis of Energy Consumption of Smartphone Running Mobile Hotspot Application

Risk Model of Long-Term Production Scheduling in Open Pit Gold Mining

Chapter 15: Debt and Taxes

Using Series to Analyze Financial Situations: Present Value

Return decomposing of absolute-performance multi-asset class portfolios. Working Paper - Nummer: 16

Luby s Alg. for Maximal Independent Sets using Pairwise Independence

7.5. Present Value of an Annuity. Investigate

Risk-based Fatigue Estimate of Deep Water Risers -- Course Project for EM388F: Fracture Mechanics, Spring 2008

Intra-year Cash Flow Patterns: A Simple Solution for an Unnecessary Appraisal Error

CHAPTER 14 MORE ABOUT REGRESSION

Traffic-light extended with stress test for insurance and expense risks in life insurance

Forecasting the Direction and Strength of Stock Market Movement

An Overview of Financial Mathematics

1 Example 1: Axis-aligned rectangles

LIFETIME INCOME OPTIONS

DEFINING AND MEASURING FAIRNESS IN FINANCIAL CONTRIBUTION TO THE HEALTH SYSTEM 1

1. Math 210 Finite Mathematics

ECONOMICS OF PLANT ENERGY SAVINGS PROJECTS IN A CHANGING MARKET Douglas C White Emerson Process Management

Fixed income risk attribution

IDENTIFICATION AND CORRECTION OF A COMMON ERROR IN GENERAL ANNUITY CALCULATIONS

Fragility Based Rehabilitation Decision Analysis

Joe Pimbley, unpublished, Yield Curve Calculations

Lecture 2: Single Layer Perceptrons Kevin Swingler

Causal, Explanatory Forecasting. Analysis. Regression Analysis. Simple Linear Regression. Which is Independent? Forecasting

When Talk is Free : The Effect of Tariff Structure on Usage under Two- and Three-Part Tariffs

Quantization Effects in Digital Filters

Construction Rules for Morningstar Canada Target Dividend Index SM

CHAPTER 5 RELATIONSHIPS BETWEEN QUANTITATIVE VARIABLES

Problem Set 3. a) We are asked how people will react, if the interest rate i on bonds is negative.

A DYNAMIC CRASHING METHOD FOR PROJECT MANAGEMENT USING SIMULATION-BASED OPTIMIZATION. Michael E. Kuhl Radhamés A. Tolentino-Peña

BERNSTEIN POLYNOMIALS

The Application of Fractional Brownian Motion in Option Pricing

On the Optimal Control of a Cascade of Hydro-Electric Power Stations

SIMPLE LINEAR CORRELATION

SUPPLIER FINANCING AND STOCK MANAGEMENT. A JOINT VIEW.

An Evaluation of the Extended Logistic, Simple Logistic, and Gompertz Models for Forecasting Short Lifecycle Products and Services

Section 5.3 Annuities, Future Value, and Sinking Funds

PRIVATE SCHOOL CHOICE: THE EFFECTS OF RELIGIOUS AFFILIATION AND PARTICIPATION

Calibration and Linear Regression Analysis: A Self-Guided Tutorial

Multiple-Period Attribution: Residuals and Compounding

A Probabilistic Theory of Coherence

Introduction to Statistical Physics (2SP)

Chapter 15 Debt and Taxes

Statistical algorithms in Review Manager 5

Lecture 14: Implementing CAPM

What should (public) health insurance cover?

FINANCIAL MATHEMATICS

Transcription:

(SOCIAL) COST-BENEFIT ANALYSIS IN A NUTSHELL RUFUS POLLOCK EMMANUEL COLLEGE, UNIVERSITY OF CAMBRIDGE 1. Introducton Cost-beneft analyss s a process for evaluatng the merts of a partcular project or course of acton n a systematc and rgorous way. Socal cost-beneft analyss refers to cases where the project has a broad mpact across socety and, as such, s usually carred out by the government. Whle the cost and benefts may relate to goods and servces that have a smple and transparent measure n a convenent unt (e.g. ther prce n money), ths s frequently not so, especally n the socal case. It should therefore be emphaszed that the costs and benefts consdered by (socal) cost-beneft analyss are not lmted to easly quantfable changes n materal goods, but should be construed n ther wdest sense, measurng changes n ndvdual utlty and total socal welfare (though economsts frequently express those measures n money-metrc terms). In ts essence cost-beneft analyss s extremely, ndeed trvally, smple: evaluate costs C and benefts B for the project under consderaton and proceed wth t f, and only f, benefts match or exeed the costs. That s: }{{} B }{{} C Benefts Costs So what makes thngs more complex? There are a varety of factors: Benefts and costs may accrue to dfferent sets of people. If ths s so we need some way to aggregate and compare dfferent benefts and costs across people. Benefts and costs may occur at dfferent ponts n tme. In ths case we need to compare the value of outcomes at dfferent ponts n tme.? Emal: rufus [at] rufus [dot] pollock [dot] org. Ths paper s lcensed under Creatve Commons attrbuton (by) lcense v3. 1

2 RUFUS POLLOCK EMMANUEL COLLEGE, UNIVERSITY OF CAMBRIDGE Benefts and costs may relate to dfferent types of goods and t may be dffcult to compare ther relatve values. Ths usually occurs when one of the goods does not have an obvous and agreed upon prce. For example, we may be spendng standard captal goods today n order to obtan envronmental benefts tomorrow. Benefts and costs may be uncertan. Benefts and costs may be dffcult to calculate and, as a result, there may be wdely dfferng vews about ther szes. One mght thnk ths could be subsumed under uncertanty, however the two ponts are rather dfferent: two people agreeng that an outcome follows some probablty dstrbuton s dfferent from them argung about ts mean and varance. Usually, n real-world cases the domnant ssue s usually the last one: the basc job of calculatng estmates for the project s costs and benefts. Ths especally true n the socal case where the projects under consderaton may nvolve costs and benefts that very dffcult to quantfy what s the beneft of the natonal securty derved from mltary spendng, how large are the benefts from educaton, etc etc. Necessarly ths quantfcaton only makes sense on a case-by-case bass. Here we are concerned wth general prncples and we therefore focus only on the precedng four tems and look at how they can be ncorporated nto the analyss n a general way. 2. The Basc Model We are consderng a project wth known (though perhaps uncertan) beneft B and cost C. Our task s to decde whether t s worthwhle. As already dscussed, f B and C were denomnated n exactly the same terms (.e. the same good, at the same tme) for a sngle person and wth no uncertanty thngs would be straghtforward: check whether B C. However, ths s unlkely to be the case so we wll need to do more work. All of ths work, n ts essence nvolves convertng benefts and costs nto values that can be easly compared. Equvalently we need to have benefts and costs denomnated n terms of some standard good or measure of value. We shall term ths good or measure of value the numerare. In theory, ths numerare could be anythng: apples, years of lfe, acres of ranforest etc. However, gven that many (though by no means all) goods are already denomnated n

(SOCIAL) COST-BENEFIT ANALYSIS IN A NUTSHELL 3 terms of money, t s often natural to use a numerare that s money-metrc. We also need to specfy money n whose hands (for example, 1 n the hands of someone on breadlne s lkely of dfferent value to 1 n the hands of a bllonare). For the purposes of socal cost beneft analyss a very natural numerare s (uncommtted) government funds, that s money the government has but s not yet allocated to any gven project. Ths s a natural numerare snce t s lkely to be government funds whch are used n payng for the project beng consdered. We wll also assume, to make our lves straghtforward, that, unless specfed otherwse, the cost of a gven project s exactly one unt of government funds today. Ths allows us to focus only on the benefts whch makes thngs smpler whle sacrfcng no real generalty. We begn, n the secton that follows, by focusng solely on the dstrbutonal ssues and gnorng temporal and uncertanty. We then ntroduce temporal consderatons and dscountng and conclude by dscussng uncertanty. 3. Dstrbutonal Concerns Let us suppose there are N people or groups. The beneft to group from the project under consderaton s b of ncome/consumpton. 1 Income/consumpton s construed broadly here to nclude not only normal traded goods such as food or dgtal musc players but also thngs lke securty, a stable bosphere etc. Indvduals exstng ncome/consumpton s denoted by x. Those operatng the project (the government) have a utltaran welfare functon: 2 W = u(x ) The change n welfare (assumng away any changes n behavour) arsng from the ndvdual benefts s: W = u(x + b ) u(x ) If the gans are small relatve to exstng ncome we may approxmate the change n ndvdual welfare usng the dervatve: u(x + b ) u(x ) = u (x )b. Defnng, w = u (x ) we then have a set of dstrbutonal weghts, that s weghtngs for ndvduals such that 1 We won t dstngush between ncome and consumpton here snce t wll not matter for our purposes. 2 We could avod any reference to ndvdual utlty here by postng a socal welfare functon defned drectly n terms of the outcomes beng affected be that money, educaton, securty etc.

4 RUFUS POLLOCK EMMANUEL COLLEGE, UNIVERSITY OF CAMBRIDGE the total (welfare) beneft s just the sum of the weghts tmes the ndvdual benefts: W = w b One last step remans: we need to convert utlty back nto our numerare (government funds) va multplcaton by some constant θ the overall beneft B wll then be θ W. To specfy ths constant we choose a benchmark project and then defne ts beneft B to exactly one unt of the numerare snce costs are also 1 ths mples ths project s just worthwhle. The standard approach s for the benchmark to be a project whch generates benefts equvalent to one unt equally dvded equally among all groups,.e. b = 1/N. 3 Ths mples that: θ w 1 N 1 θ = N w Note that f ncome were already equally dstrbuted so x = x and utlty (whch s only defned up to a constant) were normalzed so that that the margnal utlty of ncome at the reference ncome x were exactly one we would have w = w = 1 θ = 1. To summarze: N = Number of benefcares b = Benefts to group x = Income of group w = Weghts = Margnal Utlty of group W = Welfare beneft = w b θ = Converson factor from SW to Numerare B = Beneft = θ w b 3.1. Calculatng the Converson Factor θ. Wth a few assumptons on the form of the utlty functon and knowledge of the dstrbuton of ncome we can calculate an actual 3 Clearly the choce of the benchmark project s mportant. Why then choose ths project? The answer s that equally dstrbuted s what standard government projects lke provson of free educaton or free healthcare actually amount to. As such such ths equal dstrbuton project s defntely ncluded n the government portfolo and furthermore no worse project should be worthwhle because we could reallocate from that project to the equal dstrbuton and mprove well-beng.

(SOCIAL) COST-BENEFIT ANALYSIS IN A NUTSHELL 5 fgure for θ. Assume that utlty takes CES form: u(x) = x1 α 1 1 α Thus, the weghts (equal to margnal utlty) are w = x α and hence θ 1 = E(x α ). At ths pont, t s useful to move to contnuous rather than dscrete varables so: 1 θ = w (x)df (x) = x α df (x) = E(x α ) Now, the dstrbuton of ncome x s (approxmately) log-normal LN(ν, σ) n whch case usng the formula for the moment generatng functon of the normal we have: E(x α ) = e αµ+ α2 σ 2 2 3.2. Example 1: Benefts n Proporton to Income. Suppose the project generates value V whch s then dstrbuted n proporton to ncome. Let λ be the rato of ndvdual beneft to ncome so b = λx. Now b = V λ = V/ x. Thus usng our formula from above the total beneft n terms of the numerare s: B = θ w b = θλ w x = θ NV 1 x w x N Usng a CES utlty functon so w x = x 1 α and usng expectatons we have: B = V E(x1 α ) E(x α )E(x) Usng a log-normal dstrbuton for ncome and the expresson for the MGF as before ths further reduces to B = e ασ2. For log-utlty, α = 1, and a reasonable estmate of σ s 0.47 (Newbery 2008) whch mples B = 0.8V. Thus each pound/euro/dollar dstrbuted generates a beneft n terms of the numerare of 0.8 and, f the project s to be worthwhle, t must have a drect yeld of at least 25% (= 1/0.8). 3.3. Dscountng. We now come to the tme factor: benefts of effort or expendture today may not be realsed untl tomorrow. In the sprt of keepng thngs smple let

6 RUFUS POLLOCK EMMANUEL COLLEGE, UNIVERSITY OF CAMBRIDGE us fx everythng about the problem except the temporal aspect. In partcular, gnore dstrbutonal ssues, uncertanty and varatons n the types of goods nvolved. Assume that by gvng up one unt of expendture today we gan V unts at tme T. Let expendture today be x and at tme T (n the absence of the project) x T. There s a utlty functon u whch converts expendture nto contemporaraneous utlty (.e. utlty n that perod). Let the numerare be present perod utlty normalzed so that the margnal utlty today equals 1,.e. u (x) = 1. Thus there are two major factors to take nto account. Frst, how to convert utlty from perod T to now. Humans tend to prefer thngs sooner rather than later. Hence, even wth all else equal, utlty today s preferred to utlty tomorrow. The measure of ths s termed the level of pure tme-preference and we wll denote t by ρ(t). Second, the reference stuaton tomorrow (n terms of resources, consumpton etc) may not be the same as today and margnal utlty from ganng or losng a unt wll dffer across tme, qute apart from tme-preference. Assumng changes n expendture are relatvely small we can approxmate utlty changes usng dervatves we have: C = Cost = u (x) = 1 b = Beneft at T = V u (x T ) B = Beneft n today s utlty = ρ(t )b So the project s worthwhle f: V ρ(t )u (x T ) 1 Ths mplctly defnes a dscount factor δ(t ) = ρ(t )u (x T ) wth the payoff of V at tme T valued at δ(t )V today. 3.4. Example 2: Dscount Rates and Clmate Change. Suppose we can spend resources (or equvalently forgo consumpton) today to mtgate the effects of clmate n the form of benefts relatve to the do-nothng scenaro, at some pont T n the future. Suppose, n the absence of ths project, the economy would grow at rate g per year so

(SOCIAL) COST-BENEFIT ANALYSIS IN A NUTSHELL 7 consumpton at tme T s e gt tmes consumpton today. Suppose pure tme preference takes an exponental form so ρ(t ) = e ρt and we have CES utlty as before. Then: B = V e ρt e αgt = V e (ρ+αg)t Comparng ths wth a standard exponental dscount rate e δt gves an mpled dscount rate δ = ρ + αg. 4 3.5. Uncertanty. The models dscussed above nvolve no uncertanty: all relevant values, e.g. the project s payoff, future consumpton levels etc, are known wth complete certanty. Ths s clearly unrealstc and t s useful to be able to consder stuatons whch do nvolve (known) uncertanty. The natural approach here s smply to replace costs and benefts wth ther expected values. If those recevng benefts (or bearng costs) are rsk averse as s lkely uncertanty wll act to reduce benefts and ncrease costs (the certanty of 1m s worth more to most people than an evens chance of 0 or 2m). We llustrate by returnng to our clmate change example. 3.6. Example 3: Uncertanty and Clmate Change. Consder our prevous example regardng clmate change. We wll ncorporate uncertanty a lttle ndrectly here by assumng that drect costs and benefts reman certan but that we are uncertan as to the growth rate g n the absence of acton (.e. what the effects of clmate change wll f we do nothng). 5 Uncertanty n the growth rate wll affect our calculaton of benefts because t wll alter the level of consumpton, and hence margnal utlty, at whch benefts n the future are evaluated. Remember, the benefts of mtgaton are greater the more terrble the world when we of dong nothng (.e. n the case of unmtgated clmate change). Formally, suppose the growth rate g follows some probablty dstrbuton gven by G. Then: 4 Note that ths s, not concdentally, the same as the real nterest rate found n the Ramsey Kass Coopmans model. 5 An alternatve formulaton of the clmate change queston would be to change the default scenaro to full mtgaton and the acton scenaro beng do nothng. In ths framework the beneft would be ganed consumpton today whle the cost would be the reducton n consumpton n the future. Ths cost would then be drectly related to the growth rate n our man formulaton of ths problem.

8 RUFUS POLLOCK EMMANUEL COLLEGE, UNIVERSITY OF CAMBRIDGE C = E(u (x)) = 1 B = ρ(t )V E(u (e gt x)) E(u (e gt x)) s expected margnal utlty at tme T. Wth rsk averson ths wll be ncreasng n uncertanty (e.g. a ncrease n the varance of the growth rate that preserved the mean). To say more we need to specfy a functonal form for u and G. Take u as our prevous CES form and suppose growth s normally dstrbuted: g N(µ, σ 2 ). Then, recallng that the moment generatng functon for X, a normal random varable, s E(e tx ) = e tµ+ 1 2 t2 σ 2, we have that: E(u (e gt x)) = E(e αgt )E(x α ) = E(e αgt )E(u (x)) = e αµt + 1 2 α2 T 2 σ 2 Thus under uncertanty the dscount rate s ρ+αµ 1 2 α2 σ 2. Recall that under certanty t was ρ + αg. Takng the case where the growth rate under certanty, g, s equal to the expected growth rate under uncertanty µ, we see that the mpact of uncertanty (n the form of varance n the growth rate) acts to reduce the dscount rate. To llustrate, take as a benchmark case ρ = 0.5, α = 1.0, g/µ = 2.5 so the dscount rate s 3% n the case of certanty over the growth rate. Suppose however we aren t sure how bad (unmtgated) clmate change wll be so we replace our certan growth rate of 2.5% wth a normally dstrbuted one wth the same mean but a standard devaton (σ) of 2%. Ths would reduce the dscount rate to 1%. Moreover, a standard devaton greater than 2.5% would result n an negatve dscount rate n expectaton, consumpton n the future s more valuable than consumpton today (even though on average we expect consumpton to grow at 2.5% per year)! The crucal pont here s that uncertanty acts asymmetrcally because of dmnshng returns (equvalently rsk averson) n the utlty functon. Increasng uncertanty n the growth rate ncreases the chances both of beng n a great world where we are (relatvely) well-off and of beng n a terrble world where we are (relatvely) poor. In the former case our gan from extra consumpton n the future (the result of clmate change mtgaton n ths model) s reduced because we are already n a good stuaton but n the latter case the

(SOCIAL) COST-BENEFIT ANALYSIS IN A NUTSHELL 9 gans are greatly ncreased because we are so badly off. Moreover, thanks to dmnshng returns to consumpton the gans n the bad case greatly outwegh the reducton n benefts n the good case. As a result ncreasng uncertanty ncreases the value of each unt of beneft n the future and thus reduces the dscount rate.