A DYNAMIC CRASHING METHOD FOR PROJECT MANAGEMENT USING SIMULATION-BASED OPTIMIZATION. Michael E. Kuhl Radhamés A. Tolentino-Peña

Size: px
Start display at page:

Download "A DYNAMIC CRASHING METHOD FOR PROJECT MANAGEMENT USING SIMULATION-BASED OPTIMIZATION. Michael E. Kuhl Radhamés A. Tolentino-Peña"

Transcription

1 Proceedngs of the 2008 Wnter Smulaton Conference S. J. Mason, R. R. Hll, L. Mönch, O. Rose, T. Jefferson, J. W. Fowler eds. A DYNAMIC CRASHING METHOD FOR PROJECT MANAGEMENT USING SIMULATION-BASED OPTIMIZATION Mchael E. Kuhl Radhamés A. Tolentno-Peña Industral & Systems Engneerng Department Rochester Insttute of Technology Rochester, NY USA ABSTRACT A dynamc smulaton-based crashng method s ntroduced n ths research to evaluate project networks and determne the optmum crashng confguraton that mnmzes the average project cost due to lateness penaltes and crashng costs. Ths dynamc approach wll let the user evaluate the project network to determne a crashng strategy at the begnnng of the project and also durng the lfe of the project. By reevaluatng the project network possble adjustments to the crashng strategy may be dentfed and mplemented. The output of the method ncludes a dstrbuton of the project completon tme, a dstrbuton of the project total cost, and the project cost savngs. 1 INTRODUCTION Project management s a tool that s used by many companes to help mprove performance and compettveness. Projects and ther executon, n general, requre resources. Project management, whch s characterzed by technques ntended to provde a better use of project resources (Kerzner 2003), can postvely mpact the proftablty of a company. An mportant aspect of project management s rsk management. Dfferent types of rsk are present n any gven project, but the emphass of ths research wll be focused on schedule/tme rsk and assocated costs. The schedule/tme rsk essentally mples not completng project actvtes on tme, resultng n a late completon of the project. Late project completon generally has negatve effects for the company such as penalty costs and customer dssatsfacton. If a project s runnng late project managers mght be able to brng the project back on track by ncorporatng addtonal resources (Esner, 2002). In project management, ths method of mtgatng rsk s known as crashng. Rosenau and Gthens (2005) state crashng s spend[ng] more money on the project n order to speed up accomplshment of scheduled actvtes. Snce crashng a project represents addtonal costs, crashng decsons need to be made n a cost-effectve way. When crashng a project the tradeoff between the crashng cost and the penalty cost needs to be evaluated. A typcal scenaro nvolvng a project that has potental for beng completed late (resultng n a penalty), and may beneft from crashng s llustrated n Fgure 1. As crashng of actvtes s mplemented, the total cost of crashng plus the penalty cost may ntally decrease. As the crashng amount s ncreased, dmnshng returns wll be realzed untl a pont where the total cost may begn to ncrease. The objectve s to determne the optmal crashng pont (ndcated by the arrow) where the total cost wll be mnmzed. The crashng method s focused on reducng the tme of the actvtes on the crtcal path. The crtcal path s the one that can cause a delay of the project because there s no slack on that path. The tradtonal method of crashng CPM/PERT networks only consders average actvty tmes for the calculaton of the crtcal path, gnorng the uncertanty related wth the duraton of the actvtes. Consequently, other paths that may have a hgh probablty of becomng crtcal are gnored. As a way to overcome ths ssue, smulaton can be used to model the stochastc nature of the duratons of the actvtes. Incorporatng stochastc duratons n the crashng process allows the generaton of the project completon tme dstrbuton and enables the analyss of the real effect that a specfc crashng confguraton may have on the project. Several smulaton based crashng methods are descrbed n the lterature (Bssr and Dunbar 1999, Haga and Marold 2004, Haga and Marold 2005). These methods are heurstcs that are developed to return satsfactory solutons but not necessarly an optmal soluton. The goal of ths research s to develop a method that allows project managers to make optmal dynamc, data drven crashng decsons that mnmze the average project /08/$ IEEE 2370

2 cost (the project cost n ths research s the sum of crashng costs and penalty costs). Crash + penalty cost Crashng amount Fgure 1: Relatonshp between crashng amount and the total cost (crash + penalty). 2 RELATED WORK 2.1 Determnng Project Completon Tmes The Crtcal Path Method (CPM) and the Project Evaluaton and Revew Technque (PERT) methods have been used snce the 1950s to estmate the completon tme of a project. CPM s a determnstc approach to calculate the duraton of a project, and PERT s a probablstc approach that enhances CPM by consderng uncertanty n actvty duratons by calculatng the probablty to complete the project by a gven tme (Lee and Ardt 2006). Hller and Leberman (2001) state that even when the orgnal versons of CPM and PERT have some sgnfcant dfferences, wth tme they have been consdered as one technque called CPM/PERT. The PERT method consders the mean and varance of each actvty to descrbe ts duraton and to represent the uncertanty assocated wth t; however, PERT only consders the mean tmes to calculate the crtcal path, gnorng the varances, thus makng a determnstc analyss (Ahuja et al. 1994). The research of Lu and AbouRzk (2000) presents a CPM/PERT smulaton model that ncorporates the dscrete event modelng approach and a smplfed crtcal actvty dentfcaton method. Lee (2005) presents a software tool, SPSS, whch can be used to determne the probablty assocated wth the completon of the project by a target date specfed by the user. Lee and Ardt (2006) descrbe a new smulaton system, S3, whch s an mprovement over SPSS. An advantage of S3 over SPSS s that S3 calculates a confdence nterval for the project mean duraton and also determnes the mnmum number of smulaton runs necessary to have a better estmator of the mean project duraton. Smmons (2002) and Prtsker (1986) also descrbe smulaton models that evaluate project networks. These smulaton models provde a hstogram of the project completon tme dstrbuton, whch can be used to perform rsk analyss. 2.2 Smulaton-based Crashng Methods Bssr and Dunbar (1999) present a method to crash a project network. They suggest the use of smulaton to obtan the average tme of each actvty, the crtcal path, and the near crtcal paths. A near crtcal path n ths model s a path whch length s smaller than the orgnal completon date but t s larger than the target completon date after crashng. After the path nformaton s collected a lnear program s appled to determne the crashng strategy. Haga (1998) along wth Haga and Marold (2004), and Haga and Marold (2005) present a seres of papers nvolvng heurstc crashng methods for project management utlzng smulaton. Haga and Marold (2004), propose a smulaton-based method that deals wth the tme-cost trade-off nvolved wth crashng a project. The authors state that the complete dstrbuton of project completon tme needs to be consdered when crashng. The method that they proposed s a two steps approach. The frst step s to apply the tradtonal PERT method to crash the project, and the second step conssts n testng each actvty that had not been crashed to the upper crashng lmt to determne f crashng that actvty further reduces the average total cost of the project. The authors consdered two sources that can ncrease the cost of the project, whch are crashng costs and overrun costs. Haga and Marold (2005) developed a method to montor and control a project. The output of ths method s a lst of dates at whch the project manager should revew the project to decde f actvtes need to be crashed. These dates are called crashng ponts, and they are determned by a backward run through the project network. The crashng ponts are establshed at the begnnng of the project and they reman fxed durng the entre project lfe. 3 METHODOLOGY The purpose of ths research s to develop a dynamc smulaton-based analyss method capable of evaluatng project networks to answer the followng questons: What actvtes should be crashed n order to mnmze the average project cost? To what extent should the actvtes be crashed? 2371

3 How often should the project network be reevaluated? The overall procedure s presented n two phases. Phase I consders the evaluaton of the project pror to the start of the project. Ths phase wll produce an optmal crashng strategy (wth respect to nformaton avalable pror to the start of the project) as well as recommendatons for reevaluaton durng the Phase II where the dynamc crashng porton of the method s mplemented. Ths procedure s desgned to evaluate the mpact that crashng each actvty (by nteger tme unts) has on the average project cost. The method s ntended to be robust and produce optmum results for analyzng project networks wth only one domnant crtcal path or multple crtcal paths. The output of the method ncludes a dstrbuton of the project completon tme, a dstrbuton of the project total cost, the actvtes to crash and the extent of the crashng, confdence and tolerance ntervals on the project completon tme, and the tme ponts at whch the project network mght be reevaluated. In the next sectons, Phase I and Phase II of the procedure are presented. Although the methods are desgned to be used together to maxmze the beneft of the method, Phase I can be appled ndependently from Phase II at the start of the project wth Phase II beng optonal. 3.1 Phase I: Optmal Crashng Method Appled Pror to the Start of the Project The objectve of Phase I of the procedure s to obtan the optmal crashng confguraton pror to the start of the project that wll mnmze the total project cost wth respect to crashng costs and penalty costs. Phase I nvolves the followng steps: 1. Construct a smulaton model of the project network. 2. Identfy the potental/feasblty of crashng each actvty n the network and the related costs. 3. Utlze a stochastc smulaton optmzaton tool such as Industral Strength COMPASS (ISC) to determne the optmal project crashng confguraton. 4. Proceed to Phase II or mplement the optmal crashng soluton. The smulaton model s used to determne the project duraton and the addtonal project cost (crash + penalty costs). The frst step n usng the smulaton model s to nput the data that descrbes the project network, whch conssts of the probablty dstrbuton functons (PDF) that represent the actvty duratons, the crashng cost per tme unt for each actvty, the predecessors of each actvty, and the target completon tme. Although actvty tmes could follow any probablty dstrbuton f the approprate parameters that defne the PDF are known, usng the beta dstrbuton to represent actvty tmes s common n the feld of project management and we wll keep wth ths conventon n ths paper. The duraton of each actvty s defned by three estmates consstng of the optmstc, most lkely, and pessmstc duraton tmes; these estmates are used to estmate the parameters of the general beta dstrbuton, from whch the actvty duratons are sampled. Once the nformaton that descrbes the project network s defned n the smulaton model the actvty tmes wll be generated, and the startng and completon tmes of each actvty wll be calculated. The startng tme of each actvty wll be equal to the tme at whch all ts predecessors are completed. The completon tme of each actvty s represented by the followng expresson: ct = st + t x, wherect represents the actvty completon tme, st represents the actvty startng tme, t represents the actvty duraton, and x represents the number of tme unts by whch the actvty s crashed. After calculatng the completon tme for each actvty the project duraton s calculated; the project duraton s equal to the longest actvty completon tme. There s a penalty cost assocated wth a late completon of the project, and for some projects there s an addtonal proft assocated wth early completon. It s necessary to ncorporate n the smulaton model the functons that represent the penalty cost or addtonal proft. In ths phase of the research lnear functons are consdered. Fnally, the total cost s calculated, whch s equal to the crashng cost plus the penalty cost. (For the examples presented n ths paper, the smulaton model s developed usng the C++.) The smulaton model s used to generate the dstrbuton of the project cost and project completon tme when no crashng s appled to the project network; the dstrbuton of project cost s the baselne used to determne the level of rsk assocated wth penalty costs. The smulaton model uses nteger decson varables that represent the number of tme unts by whch an actvty s crashed; a partcular set of values for these nteger decson varables represents a crashng confguraton. The smulaton model nteracts wth an optmzaton engne wth the purpose of determnng the crashng confguraton wth the mnmum average total cost. The optmzaton engne used n ths step of the methodology s Industral Strength COMPASS (ISC) (Xu et al. 2007). ISC s a tool whch s derved from the COMPASS framework developed by Hong and Nelson (2006) for locally convergent, dscrete optmzaton-va-smulaton (DOvS). To utlze ISC the C++ smulaton model s ntegrated nto the ISC code. ISC requres nputs such as an n- 2372

4 tal soluton, the range of possble values for each decson varable (crashng amounts), and the confdence level desred for the soluton; these nputs must be provded n a separate text fle from whch ISC reads them. (For a complete lst of the nputs requred to use ISC please refer to Xu et al. 2007). ISC searches the feasble regon defned by the potental actvtes that can be crashed and returns an optmal soluton wthn the specfed tolerance. Next we present an example llustratng the Phase I method. 3.2 Phase I: Example The followng project network, s bases on an example presented by Haga (1998), to llustrate Phase I of the crashng method. Table 1 shows the 36 actvtes n the network along wth the precedence relatonshps. The project network s depcted graphcally n Fgure 2. In ths example, the network contans only 1 possble crtcal path whch wll be the focus of ths example. The actvtes on ths crtcal path each have a potental of crashng up to 3 tme unts. The respectve parameters of the actvty tme dstrbutons and unt crashng costs are shown n Table 2. The target completon tme of the project s tme 180, and the equaton defnng the penalty cost for late completon s 0, P = 10( T 180), f T 180 f T > 180, where T s the resultng completon tme of the project. ISC was used to obtan the optmal crashng confguraton whch s to crash actvty 29 three tme unts. The orgnal project wthout crashng and the project wth the optmal crashng confguraton were each smulated 50,000 tmes to produce the dstrbuton of completon tme (Fgure 3) and the cumulatve dstrbuton of the total project cost (Fgure 4). In addton, Table 3 provdes the average and standard devaton of the project duraton and project cost. The optmal crashng confguraton generated by ISC s consstent wth the one presented by Haga (1998) Table 1: Dependency relatonshps for the project network used for the example. Actvty Predecessors Actvty Predecessors , , , , , , , , , , 22, , , , , 31, , , , , 35 Table 2: Mnmum (a), most lkely (ml), and maxmum (b) duraton and crashng cost for each actvty. Actvty a ml b Crash cost Fgure 2: Project network used for example (based on Haga 1998). 2373

5 Table 3: Summarzed comparson between no crashng and optmal crashng. Duraton Cost Average Std. Dev. Average Std. Dev. Orgnal Optmal Probablty 16% 14% 12% 10% 8% 6% 4% 2% 0% Duraton orgnal optmal Fgure 3: Project completon tmes comparson Orgnal versus Optmal. Cummulatve % 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% Cost orgnal optmal Fgure 4: Project costs comparson Orgnal versus Optmal. 3.3 Phase II: Dynamc Crashng In Phase I, pror to the start of the project an ntal optmal crashng confguraton s obtaned by analyzng the entre project network. Ths ntal optmal crashng confguraton consders the uncertanty assocated wth the duraton of all the actvtes of the project. As actvtes are completed the overall uncertanty about the project completon tme s reduced, and as a result the ntal optmal soluton mght change. In order to take nto account the effect that the uncertanty reducton has on the project completon tme and the crashng confguraton, the Phase II, dynamc crashng method, s used. The purpose of the dynamc method s to determne the optmal crashng confguraton for the remanng actvtes. After the project begns, the followng steps make up the dynamc method. We wll assume that the ntal reevaluaton ponts wll be the crashng ponts dentfed n Phase I. 1. As the project progresses, when the frst actvty that requres crashng as dentfed by Phase I s encountered, begn the reevaluaton process. 2. Determne whch actvtes are completed or n process when the reevaluaton pont s reached. For those n process, estmate the remanng processng tme. 3. Reevaluate the remanng project network usng the smulaton model and ISC as descrbed n Phase I. 4. Implement the project network under the new crashng confguraton and contnue untl ether a) the next actvty that requres crashng s encountered and go to step 2; or b) the project s complete. For each teraton of steps 2-4 of the dynamc crashng procedure, a new crashng confguraton for the remander of the project wll be dentfed that takes nto account the sunk actvty tmes and costs assocated wth the actvtes n progress and the actvtes that have been completed. 3.4 Dynamc Crashng Example (Phases I and II) To llustrate the dynamc crashng method the followng project network shown n Fgure 5 s used. The actvty duratons are represented by beta dstrbutons; the mnmum (a), most lkely (b), and maxmum (b) duraton for each actvty, as well as randomly generated crashng cost are shown n Table 4. The penalty for late completon s equal to 40 cost unts per tme unt. The target completon tme s set to 70 tme unts. The project network s evaluated when no crashng s appled (by runnng 10,000 replcatons), and the average cost s cost unts wth a varance of The optmal crashng confguraton provded by ISC s that actvty 2 should be crashed two tme unts, and actvty 9 should be crashed one tme unt. In ths case the average cost s cost unts, and the varance s To llustrate Phase II, the dynamc crashng nvolvng reevaluaton durng the project, we have conducted 10 trals. Each tral represents a sngle realzaton of the project 2374

6 evaluated wthout crashng, wth Phase I crashng only, and wth the Phase II crashng. The detaled descrpton for Tral 1s as follows. In Tral 1, a realzaton of the project actvty tmes s generated (va smulaton) and applyng the dynamc method algorthm, the frst reevaluaton pont wll be the start tme of actvty 2. By the start tme of actvty 2, actvty 1 s completed, and there are no actvtes n process. The duraton of actvty 1, whch s equal to the start tme of actvty 2, s equal to tme unts. The network s reevaluated assumng the duraton of actvty one as beng determnstc (a sunk cost); the new optmal crashng confguraton s that actvtes 2 and 9 should be crashed two tme unts each. Ths new soluton confrms that actvty 2 should be crashed, and suggests that actvty 9 should also be crashed but by two tme unts nstead of by one tme unt as ntally suggested. The new average cost s wth a varance of After crashng actvty 2, the project proceeds. The next reevaluaton pont s the start tme of actvty 9. Just before the start of actvty 9, actvtes 1 to 4 have been completed and actvty 5 s n process. The network s reevaluated consderng the duraton of actvtes 1 to 5 as determnstc, and crashng actvty 2 two tme unts. The new optmal crashng confguraton ndcates that actvty 9 shouldn t be crashed, nor any other actvty. The average cost s 6 cost unts wth a varance of 0; that cost s the result of crashng actvty 2 twce and resultng n an on-tme project. Smlarly, a total of ten trals of the dynamc method were performed. The results of each tral are shown n Table 5 and Table 6. Over these 10 trals, mplementng Phase I alone provded an average cost savngs of 36% over not crashng at all. The dynamc crashng method provded a cost reducton of 69% over not crashng at all and an addtonal 52% reducton over usng the Phase I crashng method alone. These results demonstrate the types of benefts that can be obtaned when the project network s dynamcally crashed durng the project lfe Fgure 5: Project network used to evaluate the dynamc method. Table 4: Mnmum (a), most lkely (ml), and maxmum (b) duraton and crashng cost for each actvty. Crash Actvty a ml b Cost A A A A A A A A A A A Table 5: Summary of results of the dynamc method mplementaton. Project Cost Tral No Crashng Statc Crashng Dynamc Crashng Average Table 6: Actvtes crashed n each tral of the dynamc method. Crashng Amount Tral A2 A9 A

7 4 CONCLUSION We have presented a smulaton-based methodology to evaluate project networks and determne an optmal crashng strategy. The methodology has two phases: Phase I, crashng appled pror to the start of the project, and Phase II, dynamc crashng appled durng the project lfe to update the crashng strategy. Applyng Phase I to a project network reduces the average cost, and n certan cases the acheved average cost reducton mght be enough for the decson makers; however, when Phase II s appled all the uncertanty that has been elmnated s taken nto account to produce an updated crashng strategy, whch generally yelds lowest project costs. These methods utlze a proven stochastc optmzaton procedure that provdes asymptotcally optmal results whch provdes a sgnfcant contrbuton to the lterature that currently conssts prmarly of heurstc methods. The future research efforts wll be focused on conductng a rgorous expermental performance evaluaton, nvestgatng alternatve methods for determnng reevaluaton ponts for Phase II, and nvestgatng the scalablty of the computatonal methods for large project networks. In addton, we ntend to generalze the approach to nclude alternatve probablty dstrbutons for crashed actvty tmes as opposed to the standard assumpton n the lterature of nteger reductons n actvty tmes for crashed actvtes. REFERENCES Ahuja, H. N., S. P. Dozz, and S. M. AbouRsk Project Management Technques n Plannng and Controllng Constructon Projects. 2nd Ed., Wley, New York. Bssr, Y., and S. Dunbar Resource allocaton model for a fast-tracked project. Internatonal Conference on Intellgent Processng and Manufacturng of Materals, Esner, H Essentals of Project and Systems Engneerng Management. 2nd Ed., Wley, New York. Haga, W. A Crashng PERT networks. Ph.D. Dssertaton, Unversty of Northern Colorado, Colorado. Haga, W. A., and K. A. Marold A smulaton approach to the PERT CPM tme-cost trade-off problem. Project Management Journal, 35(2): Haga, W. A., and K. A. Marold Montorng and control of PERT networks. The Busness Revew, 3(2): Hller, F. S., and G. J. Leberman Introducton to Operatons Research. 7th Ed., McGraw-Hll, New York. Kerzner, H Project management: a systems approach to plannng, schedulng, and controllng. 8th Ed., Wley, Hoboken, NJ. Lee, D Probablty of project completon usng stochastc project schedulng smulaton. Journal of Constructon Engneerng and Management, 131(3): Lee, D., and D. Ardt Automated statstcal analyss n stochastc project schedulng smulaton. Journal of Constructon Engneerng and Management, 132(3): Lu, M., and S. M. AbouRzk Smplfed CPM/PERT smulaton model. Journal of Constructon Engneerng and Management, 126(3): Nelson, L.J. and B. L. Nelson Dscrete optmzaton va smulaton usng COMPASS. Operatons Research, 54: Prtsker, A. A. B Introducton to Smulaton and SLAM II. 3rd Ed., Wley & Sons, Inc, New York. Rosenau, M. D. and G. D. Gthens Successful Project Management : a Step-by-step Approach wth Practcal Examples. 4th Ed., Wley, Hoboken, N.J. Smmons, L. F Project management - crtcal path method (CPM) and PERT smulated wth Process Model. Proceedngs of the 2002 Wnter Smulaton Conference, Dec : Xu, J., B. L. Nelson, and L. J. Hong Industral Strength COMPASS: A Comprehensve Algorthm and Software for Optmzaton va Smulaton. Webste < ~nelsonb/isc/>. AUTHOR BIOGRAPHIES MICHAEL E. KUHL s an Assocate Professor n the Industral and Systems Engneerng Department at Rochester Insttute of Technology. He has a Ph.D. n Industral Engneerng from North Carolna State Unversty (1997). Hs research nterests nclude smulaton modelng and analyss wth applcaton to nput modelng, healthcare, project management, and semconductor manufacturng. He served as Proceedngs Edtor for the 2005 Wnter Smulaton Conference. He s currently presdent of the INFORMS Smulaton Socety, and a member of IIE and ASEE. Hs e-mal address s <Mchael.Kuhl@rt.edu> and hs web address s <people.rt.edu/mekee>. RADHAMÉS A. TOLENTINO-PEÑA s a Master of Scence canddate n Industral Engneerng n the Industral and Systems Engneerng Department at Rochester Insttute of Technology. Hs research nterests nclude the applcaton of smulaton and operatons research methods to the areas of project management and logstcs. He s a member of IIE, APICS, and SHPE. Hs e-mal address s <radhames.tolentno@mal.rt.edu>. 2376

Project Networks With Mixed-Time Constraints

Project Networks With Mixed-Time Constraints Project Networs Wth Mxed-Tme Constrants L Caccetta and B Wattananon Western Australan Centre of Excellence n Industral Optmsaton (WACEIO) Curtn Unversty of Technology GPO Box U1987 Perth Western Australa

More information

ANALYZING THE RELATIONSHIPS BETWEEN QUALITY, TIME, AND COST IN PROJECT MANAGEMENT DECISION MAKING

ANALYZING THE RELATIONSHIPS BETWEEN QUALITY, TIME, AND COST IN PROJECT MANAGEMENT DECISION MAKING ANALYZING THE RELATIONSHIPS BETWEEN QUALITY, TIME, AND COST IN PROJECT MANAGEMENT DECISION MAKING Matthew J. Lberatore, Department of Management and Operatons, Vllanova Unversty, Vllanova, PA 19085, 610-519-4390,

More information

DEFINING %COMPLETE IN MICROSOFT PROJECT

DEFINING %COMPLETE IN MICROSOFT PROJECT CelersSystems DEFINING %COMPLETE IN MICROSOFT PROJECT PREPARED BY James E Aksel, PMP, PMI-SP, MVP For Addtonal Informaton about Earned Value Management Systems and reportng, please contact: CelersSystems,

More information

Activity Scheduling for Cost-Time Investment Optimization in Project Management

Activity Scheduling for Cost-Time Investment Optimization in Project Management PROJECT MANAGEMENT 4 th Internatonal Conference on Industral Engneerng and Industral Management XIV Congreso de Ingenería de Organzacón Donosta- San Sebastán, September 8 th -10 th 010 Actvty Schedulng

More information

benefit is 2, paid if the policyholder dies within the year, and probability of death within the year is ).

benefit is 2, paid if the policyholder dies within the year, and probability of death within the year is ). REVIEW OF RISK MANAGEMENT CONCEPTS LOSS DISTRIBUTIONS AND INSURANCE Loss and nsurance: When someone s subject to the rsk of ncurrng a fnancal loss, the loss s generally modeled usng a random varable or

More information

The Development of Web Log Mining Based on Improve-K-Means Clustering Analysis

The Development of Web Log Mining Based on Improve-K-Means Clustering Analysis The Development of Web Log Mnng Based on Improve-K-Means Clusterng Analyss TngZhong Wang * College of Informaton Technology, Luoyang Normal Unversty, Luoyang, 471022, Chna wangtngzhong2@sna.cn Abstract.

More information

An Alternative Way to Measure Private Equity Performance

An Alternative Way to Measure Private Equity Performance An Alternatve Way to Measure Prvate Equty Performance Peter Todd Parlux Investment Technology LLC Summary Internal Rate of Return (IRR) s probably the most common way to measure the performance of prvate

More information

Module 2 LOSSLESS IMAGE COMPRESSION SYSTEMS. Version 2 ECE IIT, Kharagpur

Module 2 LOSSLESS IMAGE COMPRESSION SYSTEMS. Version 2 ECE IIT, Kharagpur Module LOSSLESS IMAGE COMPRESSION SYSTEMS Lesson 3 Lossless Compresson: Huffman Codng Instructonal Objectves At the end of ths lesson, the students should be able to:. Defne and measure source entropy..

More information

GENETIC ALGORITHM FOR PROJECT SCHEDULING AND RESOURCE ALLOCATION UNDER UNCERTAINTY

GENETIC ALGORITHM FOR PROJECT SCHEDULING AND RESOURCE ALLOCATION UNDER UNCERTAINTY Int. J. Mech. Eng. & Rob. Res. 03 Fady Safwat et al., 03 Research Paper ISS 78 049 www.jmerr.com Vol., o. 3, July 03 03 IJMERR. All Rghts Reserved GEETIC ALGORITHM FOR PROJECT SCHEDULIG AD RESOURCE ALLOCATIO

More information

Power-of-Two Policies for Single- Warehouse Multi-Retailer Inventory Systems with Order Frequency Discounts

Power-of-Two Policies for Single- Warehouse Multi-Retailer Inventory Systems with Order Frequency Discounts Power-of-wo Polces for Sngle- Warehouse Mult-Retaler Inventory Systems wth Order Frequency Dscounts José A. Ventura Pennsylvana State Unversty (USA) Yale. Herer echnon Israel Insttute of echnology (Israel)

More information

NONLINEAR OPTIMIZATION FOR PROJECT SCHEDULING AND RESOURCE ALLOCATION UNDER UNCERTAINTY

NONLINEAR OPTIMIZATION FOR PROJECT SCHEDULING AND RESOURCE ALLOCATION UNDER UNCERTAINTY NONLINEAR OPTIMIZATION FOR PROJECT SCHEDULING AND RESOURCE ALLOCATION UNDER UNCERTAINTY A Dssertaton Presented to the Faculty of the Graduate School of Cornell Unversty In Partal Fulfllment of the Requrements

More information

Allocating Time and Resources in Project Management Under Uncertainty

Allocating Time and Resources in Project Management Under Uncertainty Proceedngs of the 36th Hawa Internatonal Conference on System Scences - 23 Allocatng Tme and Resources n Project Management Under Uncertanty Mark A. Turnqust School of Cvl and Envronmental Eng. Cornell

More information

The OC Curve of Attribute Acceptance Plans

The OC Curve of Attribute Acceptance Plans The OC Curve of Attrbute Acceptance Plans The Operatng Characterstc (OC) curve descrbes the probablty of acceptng a lot as a functon of the lot s qualty. Fgure 1 shows a typcal OC Curve. 10 8 6 4 1 3 4

More information

Robust Design of Public Storage Warehouses. Yeming (Yale) Gong EMLYON Business School

Robust Design of Public Storage Warehouses. Yeming (Yale) Gong EMLYON Business School Robust Desgn of Publc Storage Warehouses Yemng (Yale) Gong EMLYON Busness School Rene de Koster Rotterdam school of management, Erasmus Unversty Abstract We apply robust optmzaton and revenue management

More information

Risk Model of Long-Term Production Scheduling in Open Pit Gold Mining

Risk Model of Long-Term Production Scheduling in Open Pit Gold Mining Rsk Model of Long-Term Producton Schedulng n Open Pt Gold Mnng R Halatchev 1 and P Lever 2 ABSTRACT Open pt gold mnng s an mportant sector of the Australan mnng ndustry. It uses large amounts of nvestments,

More information

Number of Levels Cumulative Annual operating Income per year construction costs costs ($) ($) ($) 1 600,000 35,000 100,000 2 2,200,000 60,000 350,000

Number of Levels Cumulative Annual operating Income per year construction costs costs ($) ($) ($) 1 600,000 35,000 100,000 2 2,200,000 60,000 350,000 Problem Set 5 Solutons 1 MIT s consderng buldng a new car park near Kendall Square. o unversty funds are avalable (overhead rates are under pressure and the new faclty would have to pay for tself from

More information

Credit Limit Optimization (CLO) for Credit Cards

Credit Limit Optimization (CLO) for Credit Cards Credt Lmt Optmzaton (CLO) for Credt Cards Vay S. Desa CSCC IX, Ednburgh September 8, 2005 Copyrght 2003, SAS Insttute Inc. All rghts reserved. SAS Propretary Agenda Background Tradtonal approaches to credt

More information

An MILP model for planning of batch plants operating in a campaign-mode

An MILP model for planning of batch plants operating in a campaign-mode An MILP model for plannng of batch plants operatng n a campagn-mode Yanna Fumero Insttuto de Desarrollo y Dseño CONICET UTN yfumero@santafe-concet.gov.ar Gabrela Corsano Insttuto de Desarrollo y Dseño

More information

THE DISTRIBUTION OF LOAN PORTFOLIO VALUE * Oldrich Alfons Vasicek

THE DISTRIBUTION OF LOAN PORTFOLIO VALUE * Oldrich Alfons Vasicek HE DISRIBUION OF LOAN PORFOLIO VALUE * Oldrch Alfons Vascek he amount of captal necessary to support a portfolo of debt securtes depends on the probablty dstrbuton of the portfolo loss. Consder a portfolo

More information

Preventive Maintenance and Replacement Scheduling: Models and Algorithms

Preventive Maintenance and Replacement Scheduling: Models and Algorithms Preventve Mantenance and Replacement Schedulng: Models and Algorthms By Kamran S. Moghaddam B.S. Unversty of Tehran 200 M.S. Tehran Polytechnc 2003 A Dssertaton Proposal Submtted to the Faculty of the

More information

A Secure Password-Authenticated Key Agreement Using Smart Cards

A Secure Password-Authenticated Key Agreement Using Smart Cards A Secure Password-Authentcated Key Agreement Usng Smart Cards Ka Chan 1, Wen-Chung Kuo 2 and Jn-Chou Cheng 3 1 Department of Computer and Informaton Scence, R.O.C. Mltary Academy, Kaohsung 83059, Tawan,

More information

Multiple-Period Attribution: Residuals and Compounding

Multiple-Period Attribution: Residuals and Compounding Multple-Perod Attrbuton: Resduals and Compoundng Our revewer gave these authors full marks for dealng wth an ssue that performance measurers and vendors often regard as propretary nformaton. In 1994, Dens

More information

Can Auto Liability Insurance Purchases Signal Risk Attitude?

Can Auto Liability Insurance Purchases Signal Risk Attitude? Internatonal Journal of Busness and Economcs, 2011, Vol. 10, No. 2, 159-164 Can Auto Lablty Insurance Purchases Sgnal Rsk Atttude? Chu-Shu L Department of Internatonal Busness, Asa Unversty, Tawan Sheng-Chang

More information

What is Candidate Sampling

What is Candidate Sampling What s Canddate Samplng Say we have a multclass or mult label problem where each tranng example ( x, T ) conssts of a context x a small (mult)set of target classes T out of a large unverse L of possble

More information

Business Process Improvement using Multi-objective Optimisation K. Vergidis 1, A. Tiwari 1 and B. Majeed 2

Business Process Improvement using Multi-objective Optimisation K. Vergidis 1, A. Tiwari 1 and B. Majeed 2 Busness Process Improvement usng Mult-objectve Optmsaton K. Vergds 1, A. Twar 1 and B. Majeed 2 1 Manufacturng Department, School of Industral and Manufacturng Scence, Cranfeld Unversty, Cranfeld, MK43

More information

Efficient Project Portfolio as a tool for Enterprise Risk Management

Efficient Project Portfolio as a tool for Enterprise Risk Management Effcent Proect Portfolo as a tool for Enterprse Rsk Management Valentn O. Nkonov Ural State Techncal Unversty Growth Traectory Consultng Company January 5, 27 Effcent Proect Portfolo as a tool for Enterprse

More information

行 政 院 國 家 科 學 委 員 會 補 助 專 題 研 究 計 畫 成 果 報 告 期 中 進 度 報 告

行 政 院 國 家 科 學 委 員 會 補 助 專 題 研 究 計 畫 成 果 報 告 期 中 進 度 報 告 行 政 院 國 家 科 學 委 員 會 補 助 專 題 研 究 計 畫 成 果 報 告 期 中 進 度 報 告 畫 類 別 : 個 別 型 計 畫 半 導 體 產 業 大 型 廠 房 之 設 施 規 劃 計 畫 編 號 :NSC 96-2628-E-009-026-MY3 執 行 期 間 : 2007 年 8 月 1 日 至 2010 年 7 月 31 日 計 畫 主 持 人 : 巫 木 誠 共 同

More information

CHOLESTEROL REFERENCE METHOD LABORATORY NETWORK. Sample Stability Protocol

CHOLESTEROL REFERENCE METHOD LABORATORY NETWORK. Sample Stability Protocol CHOLESTEROL REFERENCE METHOD LABORATORY NETWORK Sample Stablty Protocol Background The Cholesterol Reference Method Laboratory Network (CRMLN) developed certfcaton protocols for total cholesterol, HDL

More information

7.5. Present Value of an Annuity. Investigate

7.5. Present Value of an Annuity. Investigate 7.5 Present Value of an Annuty Owen and Anna are approachng retrement and are puttng ther fnances n order. They have worked hard and nvested ther earnngs so that they now have a large amount of money on

More information

On the Optimal Control of a Cascade of Hydro-Electric Power Stations

On the Optimal Control of a Cascade of Hydro-Electric Power Stations On the Optmal Control of a Cascade of Hydro-Electrc Power Statons M.C.M. Guedes a, A.F. Rbero a, G.V. Smrnov b and S. Vlela c a Department of Mathematcs, School of Scences, Unversty of Porto, Portugal;

More information

Fragility Based Rehabilitation Decision Analysis

Fragility Based Rehabilitation Decision Analysis .171. Fraglty Based Rehabltaton Decson Analyss Cagdas Kafal Graduate Student, School of Cvl and Envronmental Engneerng, Cornell Unversty Research Supervsor: rcea Grgoru, Professor Summary A method s presented

More information

Durham Research Online

Durham Research Online Durham Research Onlne Deposted n DRO: 9 March 21 Verson of attached le: Accepted Verson Peer-revew status of attached le: Peer-revewed Ctaton for publshed tem: Matthews, P. C. and Coates, G. (27) 'Stochastc

More information

ASSESSING THE AVAILABILITY AND ALLOCATION OF PRODUCTION CAPACITY IN A FABRICATION FACILITY THROUGH SIMULATION MODELING: A CASE STUDY

ASSESSING THE AVAILABILITY AND ALLOCATION OF PRODUCTION CAPACITY IN A FABRICATION FACILITY THROUGH SIMULATION MODELING: A CASE STUDY Internatonal Journal of Industral Engneerng, 15(2), 166-175, 2008. ASSESSING THE AVAILABILITY AND ALLOCATION OF PRODUCTION CAPACITY IN A FABRICATION FACILITY THROUGH SIMULATION MODELING: A CASE STUDY J.H.

More information

Abstract # 015-0399 Working Capital Exposure: A Methodology to Control Economic Performance in Production Environment Projects

Abstract # 015-0399 Working Capital Exposure: A Methodology to Control Economic Performance in Production Environment Projects Abstract # 015-0399 Workng Captal Exposure: A Methodology to Control Economc Performance n Producton Envronment Projects Dego F. Manotas. School of Industral Engneerng and Statstcs, Unversdad del Valle.

More information

Institute of Informatics, Faculty of Business and Management, Brno University of Technology,Czech Republic

Institute of Informatics, Faculty of Business and Management, Brno University of Technology,Czech Republic Lagrange Multplers as Quanttatve Indcators n Economcs Ivan Mezník Insttute of Informatcs, Faculty of Busness and Management, Brno Unversty of TechnologCzech Republc Abstract The quanttatve role of Lagrange

More information

Optimal Bidding Strategies for Generation Companies in a Day-Ahead Electricity Market with Risk Management Taken into Account

Optimal Bidding Strategies for Generation Companies in a Day-Ahead Electricity Market with Risk Management Taken into Account Amercan J. of Engneerng and Appled Scences (): 8-6, 009 ISSN 94-700 009 Scence Publcatons Optmal Bddng Strateges for Generaton Companes n a Day-Ahead Electrcty Market wth Rsk Management Taken nto Account

More information

Research Article A Time Scheduling Model of Logistics Service Supply Chain with Mass Customized Logistics Service

Research Article A Time Scheduling Model of Logistics Service Supply Chain with Mass Customized Logistics Service Hndaw Publshng Corporaton Dscrete Dynamcs n Nature and Socety Volume 01, Artcle ID 48978, 18 pages do:10.1155/01/48978 Research Artcle A Tme Schedulng Model of Logstcs Servce Supply Chan wth Mass Customzed

More information

Politecnico di Torino. Porto Institutional Repository

Politecnico di Torino. Porto Institutional Repository Poltecnco d Torno Porto Insttutonal Repostory [Artcle] A cost-effectve cloud computng framework for acceleratng multmeda communcaton smulatons Orgnal Ctaton: D. Angel, E. Masala (2012). A cost-effectve

More information

AN APPOINTMENT ORDER OUTPATIENT SCHEDULING SYSTEM THAT IMPROVES OUTPATIENT EXPERIENCE

AN APPOINTMENT ORDER OUTPATIENT SCHEDULING SYSTEM THAT IMPROVES OUTPATIENT EXPERIENCE AN APPOINTMENT ORDER OUTPATIENT SCHEDULING SYSTEM THAT IMPROVES OUTPATIENT EXPERIENCE Yu-L Huang Industral Engneerng Department New Mexco State Unversty Las Cruces, New Mexco 88003, U.S.A. Abstract Patent

More information

SIMULATION OPTIMIZATION: APPLICATIONS IN RISK MANAGEMENT

SIMULATION OPTIMIZATION: APPLICATIONS IN RISK MANAGEMENT Internatonal Journal of Informaton Technology & Decson Makng Vol. 7, No. 4 (2008) 571 587 c World Scentfc Publshng Company SIMULATION OPTIMIZATION: APPLICATIONS IN RISK MANAGEMENT MARCO BETTER and FRED

More information

A Novel Methodology of Working Capital Management for Large. Public Constructions by Using Fuzzy S-curve Regression

A Novel Methodology of Working Capital Management for Large. Public Constructions by Using Fuzzy S-curve Regression Novel Methodology of Workng Captal Management for Large Publc Constructons by Usng Fuzzy S-curve Regresson Cheng-Wu Chen, Morrs H. L. Wang and Tng-Ya Hseh Department of Cvl Engneerng, Natonal Central Unversty,

More information

Staff Paper. Farm Savings Accounts: Examining Income Variability, Eligibility, and Benefits. Brent Gloy, Eddy LaDue, and Charles Cuykendall

Staff Paper. Farm Savings Accounts: Examining Income Variability, Eligibility, and Benefits. Brent Gloy, Eddy LaDue, and Charles Cuykendall SP 2005-02 August 2005 Staff Paper Department of Appled Economcs and Management Cornell Unversty, Ithaca, New York 14853-7801 USA Farm Savngs Accounts: Examnng Income Varablty, Elgblty, and Benefts Brent

More information

Exhaustive Regression. An Exploration of Regression-Based Data Mining Techniques Using Super Computation

Exhaustive Regression. An Exploration of Regression-Based Data Mining Techniques Using Super Computation Exhaustve Regresson An Exploraton of Regresson-Based Data Mnng Technques Usng Super Computaton Antony Daves, Ph.D. Assocate Professor of Economcs Duquesne Unversty Pttsburgh, PA 58 Research Fellow The

More information

Traffic-light a stress test for life insurance provisions

Traffic-light a stress test for life insurance provisions MEMORANDUM Date 006-09-7 Authors Bengt von Bahr, Göran Ronge Traffc-lght a stress test for lfe nsurance provsons Fnansnspetonen P.O. Box 6750 SE-113 85 Stocholm [Sveavägen 167] Tel +46 8 787 80 00 Fax

More information

Statistical Methods to Develop Rating Models

Statistical Methods to Develop Rating Models Statstcal Methods to Develop Ratng Models [Evelyn Hayden and Danel Porath, Österrechsche Natonalbank and Unversty of Appled Scences at Manz] Source: The Basel II Rsk Parameters Estmaton, Valdaton, and

More information

Underwriting Risk. Glenn Meyers. Insurance Services Office, Inc.

Underwriting Risk. Glenn Meyers. Insurance Services Office, Inc. Underwrtng Rsk By Glenn Meyers Insurance Servces Offce, Inc. Abstract In a compettve nsurance market, nsurers have lmted nfluence on the premum charged for an nsurance contract. hey must decde whether

More information

2008/8. An integrated model for warehouse and inventory planning. Géraldine Strack and Yves Pochet

2008/8. An integrated model for warehouse and inventory planning. Géraldine Strack and Yves Pochet 2008/8 An ntegrated model for warehouse and nventory plannng Géraldne Strack and Yves Pochet CORE Voe du Roman Pays 34 B-1348 Louvan-la-Neuve, Belgum. Tel (32 10) 47 43 04 Fax (32 10) 47 43 01 E-mal: corestat-lbrary@uclouvan.be

More information

SCHEDULING OF CONSTRUCTION PROJECTS BY MEANS OF EVOLUTIONARY ALGORITHMS

SCHEDULING OF CONSTRUCTION PROJECTS BY MEANS OF EVOLUTIONARY ALGORITHMS SCHEDULING OF CONSTRUCTION PROJECTS BY MEANS OF EVOLUTIONARY ALGORITHMS Magdalena Rogalska 1, Wocech Bożeko 2,Zdzsław Heduck 3, 1 Lubln Unversty of Technology, 2- Lubln, Nadbystrzycka 4., Poland. E-mal:rogalska@akropols.pol.lubln.pl

More information

Calculation of Sampling Weights

Calculation of Sampling Weights Perre Foy Statstcs Canada 4 Calculaton of Samplng Weghts 4.1 OVERVIEW The basc sample desgn used n TIMSS Populatons 1 and 2 was a two-stage stratfed cluster desgn. 1 The frst stage conssted of a sample

More information

An Interest-Oriented Network Evolution Mechanism for Online Communities

An Interest-Oriented Network Evolution Mechanism for Online Communities An Interest-Orented Network Evoluton Mechansm for Onlne Communtes Cahong Sun and Xaopng Yang School of Informaton, Renmn Unversty of Chna, Bejng 100872, P.R. Chna {chsun,yang}@ruc.edu.cn Abstract. Onlne

More information

How To Understand The Results Of The German Meris Cloud And Water Vapour Product

How To Understand The Results Of The German Meris Cloud And Water Vapour Product Ttel: Project: Doc. No.: MERIS level 3 cloud and water vapour products MAPP MAPP-ATBD-ClWVL3 Issue: 1 Revson: 0 Date: 9.12.1998 Functon Name Organsaton Sgnature Date Author: Bennartz FUB Preusker FUB Schüller

More information

Feature selection for intrusion detection. Slobodan Petrović NISlab, Gjøvik University College

Feature selection for intrusion detection. Slobodan Petrović NISlab, Gjøvik University College Feature selecton for ntruson detecton Slobodan Petrovć NISlab, Gjøvk Unversty College Contents The feature selecton problem Intruson detecton Traffc features relevant for IDS The CFS measure The mrmr measure

More information

Damage detection in composite laminates using coin-tap method

Damage detection in composite laminates using coin-tap method Damage detecton n composte lamnates usng con-tap method S.J. Km Korea Aerospace Research Insttute, 45 Eoeun-Dong, Youseong-Gu, 35-333 Daejeon, Republc of Korea yaeln@kar.re.kr 45 The con-tap test has the

More information

Time Value of Money Module

Time Value of Money Module Tme Value of Money Module O BJECTIVES After readng ths Module, you wll be able to: Understand smple nterest and compound nterest. 2 Compute and use the future value of a sngle sum. 3 Compute and use the

More information

BUSINESS PROCESS PERFORMANCE MANAGEMENT USING BAYESIAN BELIEF NETWORK. 0688, dskim@ssu.ac.kr

BUSINESS PROCESS PERFORMANCE MANAGEMENT USING BAYESIAN BELIEF NETWORK. 0688, dskim@ssu.ac.kr Proceedngs of the 41st Internatonal Conference on Computers & Industral Engneerng BUSINESS PROCESS PERFORMANCE MANAGEMENT USING BAYESIAN BELIEF NETWORK Yeong-bn Mn 1, Yongwoo Shn 2, Km Jeehong 1, Dongsoo

More information

Small pots lump sum payment instruction

Small pots lump sum payment instruction For customers Small pots lump sum payment nstructon Please read these notes before completng ths nstructon About ths nstructon Use ths nstructon f you re an ndvdual wth Aegon Retrement Choces Self Invested

More information

Efficient Striping Techniques for Variable Bit Rate Continuous Media File Servers æ

Efficient Striping Techniques for Variable Bit Rate Continuous Media File Servers æ Effcent Strpng Technques for Varable Bt Rate Contnuous Meda Fle Servers æ Prashant J. Shenoy Harrck M. Vn Department of Computer Scence, Department of Computer Scences, Unversty of Massachusetts at Amherst

More information

Risk-based Fatigue Estimate of Deep Water Risers -- Course Project for EM388F: Fracture Mechanics, Spring 2008

Risk-based Fatigue Estimate of Deep Water Risers -- Course Project for EM388F: Fracture Mechanics, Spring 2008 Rsk-based Fatgue Estmate of Deep Water Rsers -- Course Project for EM388F: Fracture Mechancs, Sprng 2008 Chen Sh Department of Cvl, Archtectural, and Envronmental Engneerng The Unversty of Texas at Austn

More information

A hybrid global optimization algorithm based on parallel chaos optimization and outlook algorithm

A hybrid global optimization algorithm based on parallel chaos optimization and outlook algorithm Avalable onlne www.ocpr.com Journal of Chemcal and Pharmaceutcal Research, 2014, 6(7):1884-1889 Research Artcle ISSN : 0975-7384 CODEN(USA) : JCPRC5 A hybrd global optmzaton algorthm based on parallel

More information

Survey on Virtual Machine Placement Techniques in Cloud Computing Environment

Survey on Virtual Machine Placement Techniques in Cloud Computing Environment Survey on Vrtual Machne Placement Technques n Cloud Computng Envronment Rajeev Kumar Gupta and R. K. Paterya Department of Computer Scence & Engneerng, MANIT, Bhopal, Inda ABSTRACT In tradtonal data center

More information

Causal, Explanatory Forecasting. Analysis. Regression Analysis. Simple Linear Regression. Which is Independent? Forecasting

Causal, Explanatory Forecasting. Analysis. Regression Analysis. Simple Linear Regression. Which is Independent? Forecasting Causal, Explanatory Forecastng Assumes cause-and-effect relatonshp between system nputs and ts output Forecastng wth Regresson Analyss Rchard S. Barr Inputs System Cause + Effect Relatonshp The job of

More information

J. Parallel Distrib. Comput.

J. Parallel Distrib. Comput. J. Parallel Dstrb. Comput. 71 (2011) 62 76 Contents lsts avalable at ScenceDrect J. Parallel Dstrb. Comput. journal homepage: www.elsever.com/locate/jpdc Optmzng server placement n dstrbuted systems n

More information

NPAR TESTS. One-Sample Chi-Square Test. Cell Specification. Observed Frequencies 1O i 6. Expected Frequencies 1EXP i 6

NPAR TESTS. One-Sample Chi-Square Test. Cell Specification. Observed Frequencies 1O i 6. Expected Frequencies 1EXP i 6 PAR TESTS If a WEIGHT varable s specfed, t s used to replcate a case as many tmes as ndcated by the weght value rounded to the nearest nteger. If the workspace requrements are exceeded and samplng has

More information

Abstract. 260 Business Intelligence Journal July IDENTIFICATION OF DEMAND THROUGH STATISTICAL DISTRIBUTION MODELING FOR IMPROVED DEMAND FORECASTING

Abstract. 260 Business Intelligence Journal July IDENTIFICATION OF DEMAND THROUGH STATISTICAL DISTRIBUTION MODELING FOR IMPROVED DEMAND FORECASTING 260 Busness Intellgence Journal July IDENTIFICATION OF DEMAND THROUGH STATISTICAL DISTRIBUTION MODELING FOR IMPROVED DEMAND FORECASTING Murphy Choy Mchelle L.F. Cheong School of Informaton Systems, Sngapore

More information

Ants Can Schedule Software Projects

Ants Can Schedule Software Projects Ants Can Schedule Software Proects Broderck Crawford 1,2, Rcardo Soto 1,3, Frankln Johnson 4, and Erc Monfroy 5 1 Pontfca Unversdad Católca de Valparaíso, Chle FrstName.Name@ucv.cl 2 Unversdad Fns Terrae,

More information

RELIABILITY, RISK AND AVAILABILITY ANLYSIS OF A CONTAINER GANTRY CRANE ABSTRACT

RELIABILITY, RISK AND AVAILABILITY ANLYSIS OF A CONTAINER GANTRY CRANE ABSTRACT Kolowrock Krzysztof Joanna oszynska MODELLING ENVIRONMENT AND INFRATRUCTURE INFLUENCE ON RELIABILITY AND OPERATION RT&A # () (Vol.) March RELIABILITY RIK AND AVAILABILITY ANLYI OF A CONTAINER GANTRY CRANE

More information

Mining Multiple Large Data Sources

Mining Multiple Large Data Sources The Internatonal Arab Journal of Informaton Technology, Vol. 7, No. 3, July 2 24 Mnng Multple Large Data Sources Anmesh Adhkar, Pralhad Ramachandrarao 2, Bhanu Prasad 3, and Jhml Adhkar 4 Department of

More information

Forecasting the Direction and Strength of Stock Market Movement

Forecasting the Direction and Strength of Stock Market Movement Forecastng the Drecton and Strength of Stock Market Movement Jngwe Chen Mng Chen Nan Ye cjngwe@stanford.edu mchen5@stanford.edu nanye@stanford.edu Abstract - Stock market s one of the most complcated systems

More information

Kiel Institute for World Economics Duesternbrooker Weg 120 24105 Kiel (Germany) Kiel Working Paper No. 1120

Kiel Institute for World Economics Duesternbrooker Weg 120 24105 Kiel (Germany) Kiel Working Paper No. 1120 Kel Insttute for World Economcs Duesternbrooker Weg 45 Kel (Germany) Kel Workng Paper No. Path Dependences n enture Captal Markets by Andrea Schertler July The responsblty for the contents of the workng

More information

Methodology to Determine Relationships between Performance Factors in Hadoop Cloud Computing Applications

Methodology to Determine Relationships between Performance Factors in Hadoop Cloud Computing Applications Methodology to Determne Relatonshps between Performance Factors n Hadoop Cloud Computng Applcatons Lus Eduardo Bautsta Vllalpando 1,2, Alan Aprl 1 and Alan Abran 1 1 Department of Software Engneerng and

More information

Enabling P2P One-view Multi-party Video Conferencing

Enabling P2P One-view Multi-party Video Conferencing Enablng P2P One-vew Mult-party Vdeo Conferencng Yongxang Zhao, Yong Lu, Changja Chen, and JanYn Zhang Abstract Mult-Party Vdeo Conferencng (MPVC) facltates realtme group nteracton between users. Whle P2P

More information

Hollinger Canadian Publishing Holdings Co. ( HCPH ) proceeding under the Companies Creditors Arrangement Act ( CCAA )

Hollinger Canadian Publishing Holdings Co. ( HCPH ) proceeding under the Companies Creditors Arrangement Act ( CCAA ) February 17, 2011 Andrew J. Hatnay ahatnay@kmlaw.ca Dear Sr/Madam: Re: Re: Hollnger Canadan Publshng Holdngs Co. ( HCPH ) proceedng under the Companes Credtors Arrangement Act ( CCAA ) Update on CCAA Proceedngs

More information

Simulation and optimization of supply chains: alternative or complementary approaches?

Simulation and optimization of supply chains: alternative or complementary approaches? Smulaton and optmzaton of supply chans: alternatve or complementary approaches? Chrstan Almeder Margaretha Preusser Rchard F. Hartl Orgnally publshed n: OR Spectrum (2009) 31:95 119 DOI 10.1007/s00291-007-0118-z

More information

ECONOMICS OF PLANT ENERGY SAVINGS PROJECTS IN A CHANGING MARKET Douglas C White Emerson Process Management

ECONOMICS OF PLANT ENERGY SAVINGS PROJECTS IN A CHANGING MARKET Douglas C White Emerson Process Management ECONOMICS OF PLANT ENERGY SAVINGS PROJECTS IN A CHANGING MARKET Douglas C Whte Emerson Process Management Abstract Energy prces have exhbted sgnfcant volatlty n recent years. For example, natural gas prces

More information

Section 5.4 Annuities, Present Value, and Amortization

Section 5.4 Annuities, Present Value, and Amortization Secton 5.4 Annutes, Present Value, and Amortzaton Present Value In Secton 5.2, we saw that the present value of A dollars at nterest rate per perod for n perods s the amount that must be deposted today

More information

Performance Analysis of Energy Consumption of Smartphone Running Mobile Hotspot Application

Performance Analysis of Energy Consumption of Smartphone Running Mobile Hotspot Application Internatonal Journal of mart Grd and lean Energy Performance Analyss of Energy onsumpton of martphone Runnng Moble Hotspot Applcaton Yun on hung a chool of Electronc Engneerng, oongsl Unversty, 511 angdo-dong,

More information

Data Broadcast on a Multi-System Heterogeneous Overlayed Wireless Network *

Data Broadcast on a Multi-System Heterogeneous Overlayed Wireless Network * JOURNAL OF INFORMATION SCIENCE AND ENGINEERING 24, 819-840 (2008) Data Broadcast on a Mult-System Heterogeneous Overlayed Wreless Network * Department of Computer Scence Natonal Chao Tung Unversty Hsnchu,

More information

PSYCHOLOGICAL RESEARCH (PYC 304-C) Lecture 12

PSYCHOLOGICAL RESEARCH (PYC 304-C) Lecture 12 14 The Ch-squared dstrbuton PSYCHOLOGICAL RESEARCH (PYC 304-C) Lecture 1 If a normal varable X, havng mean µ and varance σ, s standardsed, the new varable Z has a mean 0 and varance 1. When ths standardsed

More information

A General Simulation Framework for Supply Chain Modeling: State of the Art and Case Study

A General Simulation Framework for Supply Chain Modeling: State of the Art and Case Study IJCSI Internatonal Journal of Computer Scence Issues, Vol. 7, Issue 2, No 3, March 2010 ISSN (Onlne): 1694-0784 ISSN (Prnt): 1694-0814 1 A General Smulaton Framework for Supply Chan Modelng: State of the

More information

How To Solve An Onlne Control Polcy On A Vrtualzed Data Center

How To Solve An Onlne Control Polcy On A Vrtualzed Data Center Dynamc Resource Allocaton and Power Management n Vrtualzed Data Centers Rahul Urgaonkar, Ulas C. Kozat, Ken Igarash, Mchael J. Neely urgaonka@usc.edu, {kozat, garash}@docomolabs-usa.com, mjneely@usc.edu

More information

Characterization of Assembly. Variation Analysis Methods. A Thesis. Presented to the. Department of Mechanical Engineering. Brigham Young University

Characterization of Assembly. Variation Analysis Methods. A Thesis. Presented to the. Department of Mechanical Engineering. Brigham Young University Characterzaton of Assembly Varaton Analyss Methods A Thess Presented to the Department of Mechancal Engneerng Brgham Young Unversty In Partal Fulfllment of the Requrements for the Degree Master of Scence

More information

Course outline. Financial Time Series Analysis. Overview. Data analysis. Predictive signal. Trading strategy

Course outline. Financial Time Series Analysis. Overview. Data analysis. Predictive signal. Trading strategy Fnancal Tme Seres Analyss Patrck McSharry patrck@mcsharry.net www.mcsharry.net Trnty Term 2014 Mathematcal Insttute Unversty of Oxford Course outlne 1. Data analyss, probablty, correlatons, vsualsaton

More information

Chapter 4 ECONOMIC DISPATCH AND UNIT COMMITMENT

Chapter 4 ECONOMIC DISPATCH AND UNIT COMMITMENT Chapter 4 ECOOMIC DISATCH AD UIT COMMITMET ITRODUCTIO A power system has several power plants. Each power plant has several generatng unts. At any pont of tme, the total load n the system s met by the

More information

Outsourcing inventory management decisions in healthcare: Models and application

Outsourcing inventory management decisions in healthcare: Models and application European Journal of Operatonal Research 154 (24) 271 29 O.R. Applcatons Outsourcng nventory management decsons n healthcare: Models and applcaton www.elsever.com/locate/dsw Lawrence Ncholson a, Asoo J.

More information

Logical Development Of Vogel s Approximation Method (LD-VAM): An Approach To Find Basic Feasible Solution Of Transportation Problem

Logical Development Of Vogel s Approximation Method (LD-VAM): An Approach To Find Basic Feasible Solution Of Transportation Problem INTERNATIONAL JOURNAL OF SCIENTIFIC & TECHNOLOGY RESEARCH VOLUME, ISSUE, FEBRUARY ISSN 77-866 Logcal Development Of Vogel s Approxmaton Method (LD- An Approach To Fnd Basc Feasble Soluton Of Transportaton

More information

Calculating the high frequency transmission line parameters of power cables

Calculating the high frequency transmission line parameters of power cables < ' Calculatng the hgh frequency transmsson lne parameters of power cables Authors: Dr. John Dcknson, Laboratory Servces Manager, N 0 RW E B Communcatons Mr. Peter J. Ncholson, Project Assgnment Manager,

More information

INVESTIGATION OF VEHICULAR USERS FAIRNESS IN CDMA-HDR NETWORKS

INVESTIGATION OF VEHICULAR USERS FAIRNESS IN CDMA-HDR NETWORKS 21 22 September 2007, BULGARIA 119 Proceedngs of the Internatonal Conference on Informaton Technologes (InfoTech-2007) 21 st 22 nd September 2007, Bulgara vol. 2 INVESTIGATION OF VEHICULAR USERS FAIRNESS

More information

1. Fundamentals of probability theory 2. Emergence of communication traffic 3. Stochastic & Markovian Processes (SP & MP)

1. Fundamentals of probability theory 2. Emergence of communication traffic 3. Stochastic & Markovian Processes (SP & MP) 6.3 / -- Communcaton Networks II (Görg) SS20 -- www.comnets.un-bremen.de Communcaton Networks II Contents. Fundamentals of probablty theory 2. Emergence of communcaton traffc 3. Stochastc & Markovan Processes

More information

MARKET SHARE CONSTRAINTS AND THE LOSS FUNCTION IN CHOICE BASED CONJOINT ANALYSIS

MARKET SHARE CONSTRAINTS AND THE LOSS FUNCTION IN CHOICE BASED CONJOINT ANALYSIS MARKET SHARE CONSTRAINTS AND THE LOSS FUNCTION IN CHOICE BASED CONJOINT ANALYSIS Tmothy J. Glbrde Assstant Professor of Marketng 315 Mendoza College of Busness Unversty of Notre Dame Notre Dame, IN 46556

More information

Fault tolerance in cloud technologies presented as a service

Fault tolerance in cloud technologies presented as a service Internatonal Scentfc Conference Computer Scence 2015 Pavel Dzhunev, PhD student Fault tolerance n cloud technologes presented as a servce INTRODUCTION Improvements n technques for vrtualzaton and performance

More information

IMPACT ANALYSIS OF A CELLULAR PHONE

IMPACT ANALYSIS OF A CELLULAR PHONE 4 th ASA & μeta Internatonal Conference IMPACT AALYSIS OF A CELLULAR PHOE We Lu, 2 Hongy L Bejng FEAonlne Engneerng Co.,Ltd. Bejng, Chna ABSTRACT Drop test smulaton plays an mportant role n nvestgatng

More information

A Replication-Based and Fault Tolerant Allocation Algorithm for Cloud Computing

A Replication-Based and Fault Tolerant Allocation Algorithm for Cloud Computing A Replcaton-Based and Fault Tolerant Allocaton Algorthm for Cloud Computng Tork Altameem Dept of Computer Scence, RCC, Kng Saud Unversty, PO Box: 28095 11437 Ryadh-Saud Araba Abstract The very large nfrastructure

More information

Implementation of Deutsch's Algorithm Using Mathcad

Implementation of Deutsch's Algorithm Using Mathcad Implementaton of Deutsch's Algorthm Usng Mathcad Frank Roux The followng s a Mathcad mplementaton of Davd Deutsch's quantum computer prototype as presented on pages - n "Machnes, Logc and Quantum Physcs"

More information

Testing and Debugging Resource Allocation for Fault Detection and Removal Process

Testing and Debugging Resource Allocation for Fault Detection and Removal Process Internatonal Journal of New Computer Archtectures and ther Applcatons (IJNCAA) 4(4): 93-00 The Socety of Dgtal Informaton and Wreless Communcatons, 04 (ISSN: 0-9085) Testng and Debuggng Resource Allocaton

More information

METHODOLOGY TO DETERMINE RELATIONSHIPS BETWEEN PERFORMANCE FACTORS IN HADOOP CLOUD COMPUTING APPLICATIONS

METHODOLOGY TO DETERMINE RELATIONSHIPS BETWEEN PERFORMANCE FACTORS IN HADOOP CLOUD COMPUTING APPLICATIONS METHODOLOGY TO DETERMINE RELATIONSHIPS BETWEEN PERFORMANCE FACTORS IN HADOOP CLOUD COMPUTING APPLICATIONS Lus Eduardo Bautsta Vllalpando 1,2, Alan Aprl 1 and Alan Abran 1 1 Department of Software Engneerng

More information

2. SYSTEM MODEL. the SLA (unlike the only other related mechanism [15] we can compare it is never able to meet the SLA).

2. SYSTEM MODEL. the SLA (unlike the only other related mechanism [15] we can compare it is never able to meet the SLA). Managng Server Energy and Operatonal Costs n Hostng Centers Yyu Chen Dept. of IE Penn State Unversty Unversty Park, PA 16802 yzc107@psu.edu Anand Svasubramanam Dept. of CSE Penn State Unversty Unversty

More information

How Sets of Coherent Probabilities May Serve as Models for Degrees of Incoherence

How Sets of Coherent Probabilities May Serve as Models for Degrees of Incoherence 1 st Internatonal Symposum on Imprecse Probabltes and Ther Applcatons, Ghent, Belgum, 29 June 2 July 1999 How Sets of Coherent Probabltes May Serve as Models for Degrees of Incoherence Mar J. Schervsh

More information

Joint Scheduling of Processing and Shuffle Phases in MapReduce Systems

Joint Scheduling of Processing and Shuffle Phases in MapReduce Systems Jont Schedulng of Processng and Shuffle Phases n MapReduce Systems Fangfe Chen, Mural Kodalam, T. V. Lakshman Department of Computer Scence and Engneerng, The Penn State Unversty Bell Laboratores, Alcatel-Lucent

More information

RESEARCH ON DUAL-SHAKER SINE VIBRATION CONTROL. Yaoqi FENG 1, Hanping QIU 1. China Academy of Space Technology (CAST) yaoqi.feng@yahoo.

RESEARCH ON DUAL-SHAKER SINE VIBRATION CONTROL. Yaoqi FENG 1, Hanping QIU 1. China Academy of Space Technology (CAST) yaoqi.feng@yahoo. ICSV4 Carns Australa 9- July, 007 RESEARCH ON DUAL-SHAKER SINE VIBRATION CONTROL Yaoq FENG, Hanpng QIU Dynamc Test Laboratory, BISEE Chna Academy of Space Technology (CAST) yaoq.feng@yahoo.com Abstract

More information

Single and multiple stage classifiers implementing logistic discrimination

Single and multiple stage classifiers implementing logistic discrimination Sngle and multple stage classfers mplementng logstc dscrmnaton Hélo Radke Bttencourt 1 Dens Alter de Olvera Moraes 2 Vctor Haertel 2 1 Pontfíca Unversdade Católca do Ro Grande do Sul - PUCRS Av. Ipranga,

More information