MECHANICAL TRADE SCOPE OF WORK GUIDELINES

Similar documents
SECTION TABLE OF CONTENTS. H Proposed Material, Product or Equipment Substitution Request

Solicitation Items Report

SECTION GENERAL PROVISIONS FOR HVAC WORK

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

ST. MONICA FOOD PANTRY HOUSTON, TEXAS

HEANEY General Contracting, Inc.

1.2 Refrigerant Equipment. General

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

ADDENDUM NO. 1. DATE: February 10, 2015 INVITATION FOR BID: IFB K Commerce Road Renovations Project DATED: February 9, 2015

ESTIMATING PLUMBING, HEATING, VENTILATING, AND AIR CONDITIONING (HVAC), AND ELECTRICAL WORK

Nominal Life Expectancy for Building Components

Home Energy Evaluation Report for Fritz Kreiss and Catherine McQueen

All work shall comply with applicable codes and ordinances. Work shall comply with the BOCA National Plumbing Code, latest edition.

Estimating Database Checklist

COMMISSIONING OF HVAC SYSTEMS

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.

OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY

SECTION HEATING, VENTILATION AND AIR CONDITIONING EQUIPMENT

NYC Department of Education Building Condition Assessment Survey BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 10004

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS

Crawford Inspection Services C.C.B. #

SECTION MORTUARY REFRIGERATORS

SWF Home Inspections

Guidelines for energy efficient heating, ventilation and air conditioning (HVAC) systems

Subpart 1. Installation. All plumbing systems must be. installed and tested according to this chapter and chapter 4715,

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT

Acumen Enterprises, Inc.

Sub-Bid Contractor Update Statement. Tab A - Invitation for Bids. Tab B - Instructions to Bidders

SECTION PACKAGED ROOFTOP AIR CONDITIONING UNITS NON-CUSTOM

Home Maintenance Checklist

PIPES AND TUBES FOR HVAC PIPING AND EQUIPMENT

Basics of HVAC Cleaning

HYDRONIC DESIGNER / INSTALLER MODULE DESCRIPTIONS

Exhibit IV Approved Measures List. Page 1 of 5

COMPREHENSIVE PROPERTY INSPECTIONS

Construction Technologies Career Field Pathways and Course Structure

Project Close Out Summary

STATE OF FLORIDA HOME INSPECTION STANDARDS OF PRACTICE:

Home Inspection Report

DESIGN CHECKLIST PROJECT NAME DISCIPLINE DATE TYPE REVIEW REVIEWER DRAWINGS REVIEWED

Does Wall Township require an inspection by the building department on resale of a home?

VOLUME I PROCUREMENT AND CONTRACTING DOCUMENTS GROUP

City of St. Charles Basement Finish or Remodel

PULASKI AND DUBLIN MIDDLE SCHOOLS

Heating, Ventilation, Air Conditioning and Refrigeration (HVACR)

October 5, 2015 Dear Client,

Inspection Report Atlanta Strip Mall Commercial Building Property Address:

RESIDENTIAL HEATING OIL SERVICE CONTRACT ANNUAL COST $276.00

Building Condition Assessment Report

A. The Commissioning Authority (CxA) has been contracted or will be contracted directly with the Owner for this project.

2 STEPS TO CONDUCTING YOUR HVAC ASSESSMENT

Line Card.

HVAC Checklist - Long Form

UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) March

Topics for Today. Order of Magnitude Mechanical Estimating. Order of Magnitude Estimate Goal. Project Delivery Methods. Questions for Client

Element D Services Plumbing

Restaurant & café guide

Scope of Work Class I Contractor s Licenses. Putnam County Ordinance Section 17. Types of Authorized Contractor Licenses.

Evaluate, Clean, and Tune Guidance

Inspection Tech. (330) Inspected By: Aaron Westerburg

Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year

Important Ontario Fire Code Information for Building Owners in the City of Windsor

CLASS B AIR CONDITIONING CONTRACTORS GENERAL TRADE KNOWLEDGE EXAMINATION CONTENT INFORMATION

MECHANICAL PLAN REVIEW REQUIREMENTS

101 Low-Cost /No-Cost. Home Energy-Saving Measures

Arizona Health Care Association DISASTER PLANNING AND EMERGENCY MANAGEMENT GUIDE POST INCIDENT DAMAGE ASSESSMENT CHECKLIST

Inspecton Report. Property Address:

MISCELLANEOUS ELECTRICAL JOBS REQUIRING PERMITS

AIR CONDITIONING EFFICIENCY F8 Energy eco-efficiency opportunities in Queensland Foundries

Building Condition Assessment Report

KIEWIT CM/GC Enabling/Utilities

SPACE TYPE: LABORATORY (WET) FOR CHEMISTRY AND BIOLOGY

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

Board Seminar Facilities. School Year Submitted by Joseph L. Lisa-Director of Facilities

Propery Inspection Report

BUILDING DEPARTMENT 8748 W. 82 nd Place - Justice, IL Phone: (708) Fax: (708)

Vari Inspection Services

Attachment J-C18.1. HVAC Work Instructions

2012 BIM Guidelines and Standards (Rev. 00) University at Albany

How To Get A Building Permit In Florida

Printed Monday, August 27, 2007 Inspected By: Michelle Teague. Client Information: Inspection, Condo City Lane Chicago, IL. Inspected 8/22/07 8:00 AM

#506 New Multi-Family Buildings & Additions Plan Intake Submittal Checklist

GROWTH MANAGEMENT DEPARTMENT 201 SE 3 rd ST, (Second Floor), Ocala, FL (352) ; FAX: (352)

BUILDER'S WARRANTY AGREEMENT NOT TRANSFERRABLE

INSTALLING SEISMIC RESTRAINTS FOR MECHANICAL EQUIPMENT

Fire Alarm System Standpipes Sprinkler Systems Fire Drills Commercial Cooking Hood and more

PLUMBING, HEATING & AIR CONDITIONING, REFRIGERATION & BOILER INSTALLATION CONTRACTORS QUESTIONNAIRE

Applications for building permits will not be reviewed until all of the required information has been submitted.

Glossary of Heating, Ventilation and Air Conditioning Terms

Element D Services Heating, Ventilating, and Air Conditioning

Think Of Us First! When It s Time to Distribute Your Plans

COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES

Project Building Permit No. One complete set of Record or as-built drawings (electronic) One complete set of Record or as-built drawings (hard copy)

SPECIFICATION TECHNICAL AIR-CONDITIONING UNITS SINGLE AND SPLIT (DUCTED) (AIR COOLED PACKAGED UNIT)

PLEASE READ. The official text of New Jersey Statutes can be found through the home page of the New Jersey Legislature

Arapahoe County Residential Water Heater Installation and Inspection Guide

21.1 Functions, Basic Configuration, and Interfaces

Facilities Maintenance Standards rev

Air-Conditioning, Heating, and Refrigeration Institute. Sheet Metal and Air-Conditioning Contractors National Association

LHI ONE YEAR HOME WARRANTY AGREEMENT

Transcription:

MECHANICAL TRADE SCOPE OF WORK GUIDELINES OTTAWA REGION 2009 Comprised of Piping Trade, Ventilation (HVAC) Trade, Fire Protection Trade Endorsed by the following organizations Ottawa Construction Association General Contractors Association of Ottawa Mechanical Contractors Association of Ottawa Supported by the following organization Consulting Engineers of Ontario Ottawa Chapter OTTAWA CHAPTER MECHANICAL CONTRACTORS ASSOCIATION OF OTTAWA

Mechanical Trade Scope of Work Mechanical Trade Scope of Work The following mechanical trade scope guidelines are comprised of 3 individual trade scopes piping, ventilation (HVAC) and fire protection which combined are defined as the mechanical scope. These trade guidelines are the product of a detailed review and consensus building process involving representatives from the Ottawa Construction Association, the General Contractors Association of Ottawa, the Mechanical Contractors Association of Ottawa and the Consulting Engineers Association Ottawa Chapter. The desired benefit of developing Ottawa region trade scope guidelines is to minimize dispute in the bidding and construction process as to what is included or excluded in a particular trade scope of work. Tabulating items to be included in a bid provides a common basis for which bidding becomes truly competitive, fair to all concerned and minimizes the potential for on-site dispute. The associations that have come together to develop these trade scope guidelines support their use by their respective members as the recommended standard on all construction projects. 2

Pipe Trade Scope Pipe Trade Scope Items included and excluded Mechanical (piping) Contractor shall provide the following: (provide means; supply & install unless specifically noted otherwise). Provided: 1. Mechanical (piping) coordination and interference drawing. 2. Supports for roof top piping. 3. All necessary sleeving for piping. 4. Mechanical (piping) commissioning, as built drawings and operation and maintenance drawings as specified. 5. Comply with codes as specified. 6. Hangers and supports for plumbing, piping. 7. The mechanical (piping) contractor shall include contingency funds and cash allowances specifically called for in the mechanical tender documents. 8. In renovated areas, cut, cap, disconnect and make safe ALL mechanical (piping) items as defined by the Scope. 9. Fuel piping, water piping, exhaust piping, for generator units and supply of fuel oil when clearly specified. Muffler and flex installation only. 10. Beyond the specified contract full warranty (CCA), the extended warranty (ies) are limited to the terms of the manufacturers warranty (ies). 11. Trade clean up see OCA Recommended Day to Day Clean up Standard of Practice. 12. Protection of other trades work from damage by this trade. 13. Hoisting for mechanical (piping) materials and equipment. 14. Arrange inspection for plumbing work. 3

Pipe Trade Scope 15. X-rays of welded joints when required by code or specified. 16. Scaffolding as required for mechanical (piping) work. 17. Design, supply and installation of vibration isolation and Seismic Restraint for mechanical systems. 18. Identification. 19. Testing, adjusting and balancing of hydronic systems. 20. All steel bases and steel supports for mechanical (piping) equipment when specified or detailed only on mechanical. 21. BAS (Building Automated Systems) and/or EMCS (Energy Management Control Systems) when specified in the Pipe Trade Scope. 22. Supply access door(s) when required by mechanical (piping). 23. Variable frequency drives are supplied by mechanical (piping) where specified. 24. Fire-stopping for mechanical (piping) systems. 25. Mechanical (piping) permits and inspection fees when and where required. 26. Mechanical (piping) connections to specialty equipment which is supplied and installed by others. 27. Fire extinguishers, only if there is no sprinkler system in the building. 28. Medical gas systems, piping and equipment as specified. 29. Piping and connections only to automotive hoists. 30. Water treatment and all associated piping, meters, tanks, pumps, filters, softeners. 31. Cast iron catch basin and manhole covers, trench gratings, sump frames and covers when specified or detailed on mechanical (piping) drawings within the building. 32. Soap dispensing systems when specified in mechanical (piping). 33. Laboratory sinks, faucets and gas outlets where specified in piping specifications. 34. Prefab shower cabinets or surrounds complete with manufactured bases. 35. Whirlpool and therapeutic baths when specified in mechanical (piping) specifications. 36. Manufactured sumps, pits and covers complete with pumps inside building walls. 37. All plumbing systems. 38. Chiller units. 39. Cooling towers. 40. Hydronic heating, chilled water, condenser water and steam piping systems. 41. Natural gas and propane piping systems within buildings. 42. All hot water heaters and storage tanks. 43. All hydronic baseboard radiation, ceiling radiant panels, force flow units, hot water unit heaters. 44. All water based solar heating panel systems. 45. All heat exchangers and converters. 46. All in-slab heating and snow melting piping systems. 47. All chemical water treatment for mechanical (piping) systems. 48. Air compressors and vacuum pumps systems. 49. Mechanical insulation for piping. 50. Fire Standpipe system including fire pump and fire extinguishers when not part of a sprinkler system. 51. All plastic-pipe venting for fossil fuel combustion. 52. Initial generator fuel-tank fill-up excluding pre-packaged units that do not have external tank. 4

Pipe Trade Scope Excluded: 1. All x-rays and/or scanning of concrete floors and walls, including cutting and coring. 2. Excavation, bedding and backfilling. 3. Vapour barrier and insulation not applied to mechanical (piping) systems. 4. All electrical wiring above 50 volts. 5. Caulking and grouting of all types except fire-stopping for mechanical (piping) systems. 6. Temporary heat, ventilation, light, power and sanitation. 7. All civil work hoarding and protection barriers, unless specific to your trade. 8. Temporary water services or connections. 9. Catwalks, ladders, gratings unless specified as part of mechanical (piping). 10. Municipal Building Permit fees and utility hook-up fees. 11. Supply of flex connections and muffler for generator units. 12. Supply and installation of all appliances. 13. Supply and installation of wood backing. 14. Cutting of all holes for mechanical (piping) components into millwork items. 15. All cast-in-place concrete, including rebar and formwork. 16. Site services. 17. Roofing, flashing and counter flashing. 18. Roof-vent flashing. 19. Washroom accessories. 20. Shower curtains and doors unless specified. 21. Metallic venting of gas fired equipment, unless specified. 5

Ventilation (HVAC) Trade Scope Ventilation (HVAC) Trade Scope Items included and excluded Ventilation (HVAC) Contractor shall provide the following: (provide means; supply & install unless specifically noted otherwise). Provided: 1. Mechanical (HVAC) Coordination and Interference Drawing 2. Supports for rooftop ductwork, equipment and related refrigeration piping 3. All necessary sleeving for ductwork, equipment and related refrigeration piping. All necessary coordination, sizing and layout for large openings for ductwork, equipment and related refrigeration piping required to penetrate through new reinforced concrete walls and slabs. 4. Mechanical (HVAC) commissioning, as-built drawings and operation and maintenance drawings and manuals as specified. 5. Comply with codes as specified. 6. Hangers and supports for ductwork systems. 7. The mechanical (HVAC) contractor shall include mechanical (HVAC) contingency funds and cash allowances specifically called for in the mechanical tender documents. 8. In renovated areas, cut, cap, disconnect and make safe ALL mechanical (HVAC) items as defined by the Scope. 9. Beyond the specified contract full warranty (CCA), the extended warranty(ies) are limited to the terms of the manufacturers warranty(ies). 10. Trade clean-up see OCA recommended day to day clean up Standard of Practice. 11. Hoisting for mechanical (HVAC) materials and equipment. 12. Scaffolding and access equipment as required for mechanical (HVAC) work. 13. Design, supply and installation of vibration isolation and Seismic Restraint for mechanical (HVAC) systems. 14. Mechanical (HVAC) identification. 15. Testing, adjusting and air balancing (TAB) of mechanical (HVAC) system. 6

Ventilation (HVAC) Trade Scope 16. All steel bases and steel supports for mechanical (HVAC) equipment when specified or detailed only on mechanical (HVAC) drawings and specifications. 17. BAS (Building Automated Systems) and/or EMCS (Energy Management Control Systems) will be completed by the Ventilation (HVAC) Trade contractor unless specified elsewhere. 18. Supply access door(s) when required by mechanical (HVAC). 19. Variable frequency drives are supplied by mechanical (HVAC) where specified. 20. Fire-stopping for mechanical (HVAC) systems. 21. Mechanical (HVAC) permits and inspection fees. 22. Mechanical (HVAC) connections to specialty equipment which is supplied and installed by others. 23. Vent ducting for generator units. 24. Sheet metal and non-metallic air handling ductwork, sheet metal plenums and casings including hangers and supports except concrete, masonry and drywall constructed shafts, tunnels or plenums. 25. Dust or material collector systems complete with all associated equipment and accessories. 26. Carbon monoxide exhaust systems complete with all associated equipment and accessories. 27. Pre-fabricated chimneys 16 gauge or lighter for all mechanical equipment. 28. Linear grilles for wall fin radiation, induction units and cabinet heaters, installed in architectural cabinets including extension collars excluding wood manufactured grilles. 29. All humidifiers which are part of the duct system or in ventilation equipment, or discharge into the duct systems or ventilation equipment. 30. All air moving equipment specified in mechanical drawings and specifications. 31. All dampers except where supplied by others. 32. Silencers and other special types of sound insulated air ducts. 33. Flexible type air ducts. 34. Acoustic ductwork lining. 35. Weather louvers complete with bird screen and blank-off panels, penthouses and vents where specified in mechanical drawings and specifications. 36. Gravity relief vents and intakes and roof hoods when specified or detailed on mechanical drawings and specifications. 37. Terminal boxes and air valves including coils. 38. All HVAC related filters. 39. Kitchen exhaust hood systems complete with fire suppression if kitchen hood specified in the mechanical specifications. Otherwise both kitchen exhaust hood and suppression systems are by the kitchen equipment supplier or others. 40. Range hood where specified. 41. Indirect fired self-contained heating and/or cooling units. 42. Registers, grilles, diffusers. 43. Supply and/or installation of door grilles where specified. 44. Electric and hydronic duct heaters. 45. Garbage and linen chutes of metal construction. 46. Counter flashing for HVAC equipment. 47. Unit heater gas fired. 48. Heat pumps of every type water or air-cooled. 49. Packaged and self-contained heating and cooling air conditioning units. 50. Environment Chambers where specified in mechanical drawings and specifications. 51. Window or wall type air conditioners and/or incremental units. 7

Ventilation (HVAC) Trade Scope 52. Refrigeration piping, associated insulation and refrigeration controls for equipment under mechanical (HVAC) scope. 53. Propeller ceiling fans ducted or non-ducted c/w guards and controllers if specified HVAC. 54. Prefabricated walk-in coolers and freezers and/or associated refrigeration equipment when specified in mechanical drawings and specifications. 55. Mechanical (HVAC) insulation. 56. Induction units. Excluded: 1. Underground concrete duct or concrete for encasing of underground ductwork. 2. Cutting for openings for door grilles. 3. Architectural louvers when no duct connected to them unless specified in mechanical drawings and specifications. 4. Humidifier piping. 5. Stand alone room humidifiers. 6. Cutting, coring or patching. 7. Sleeving of Structural openings. All formwork required form large openings for mechanical sleeving in new reinforced concrete walls and slabs. 8. All x-rays and/or scanning of concrete floors and walls. 9. All electrical wiring above 50 volts. 10. Motor starters, disconnects and motor control centres. 11. Caulking of louvers and wall grilles. 12. Temporary heat, ventilation, light, power and sanitation. 13. All civil work hoarding and protection barriers. 14. Catwalks, ladders, gratings unless specified as part of mechanical (HVAC). 15. Municipal Building Permit fees and utility hook-up fees. 16. Supply of flex connections and muffler for generator units. 17. Supply and installation of all appliances. 18. Supply and installation of wood backing. 19. Cutting of all holes for mechanical (HVAC) components into millwork items. 20. All cast-in-place concrete, including rebar and formwork. 21. Roofing, flashing and counter flashing. 22. Roof-vent flashing. 23. Plastic venting of gas fired equipment. 8

Fire Protection Trade Scope Fire Protection Trade Scope Items included and excluded Sprinkler (piping) Contractor shall provide the following: (provide means; supply & install unless specifically noted otherwise). Provided: 1. Mechanical (piping) coordination and interference drawing. 2. All necessary sleeving for piping. 3. Fire Protection. (piping) commissioning, as built drawings and operation and maintenance drawings as specified. 4. Comply with codes as specified. 5. Hangers and supports for sprinkler piping. 6. The Sprinkler (piping) contractor shall include contingency funds and cash allowances specifically called for in the tender documents. 7. In renovated areas, cut, cap, disconnect and make safe ALL Fire Protection (piping) items as defined by the Scope. 8. Sprinkler water piping, Fire hose Cabinets piping, Fire Pump piping when clearly specified. 9. Beyond the specified contract full warranty, the extended warranty (ies) is limited to the terms of the manufacturer s warranty (ies). 10. Trade clean up. (see OCA s rules) 11. Protection of other trades work from damage by this trade. 12. Hoisting for mechanical (piping) materials and equipment. 13. Arrange inspection for Fire Protection work. 14. Scaffolding as required for Fire Protection (piping) work. 15. Design, supply and installation of Seismic Restraint for mechanical systems. 16. Identification. 17. Testing, all Fire Protection Piping flow switches and fire pumps. 18. All steel bases and steel supports for Fire Pumps (piping) equipment when specified or detailed only on mechanical. 19. Supply access door(s) when required by Fire Protection. (piping). 20. Coordinate with Fire Alarm contractor for testing of all fire equipment related to Fire alarm panel. 9

Fire Protection Trade Scope 21. Fire-stopping for fire protection (piping) systems. 22. Fire Protection (piping) permits and inspection fees. 23. Fire Protection (piping) connections to specialty equipment which is supplied and installed by others. 24. Fire extinguishers.see Scope at bottom of page. 25. All items specified as general mechanical requirements which are applicable to material and equipment supplied by the sprinkler sub section listed. 26. Fire pump related to sprinkler and combined standpipe-sprinkler system (if system is not combined we do not include the fire pump. 27. Wet Pipe sprinkler system. 28. Dry Pipe sprinkler system. 29. Pre-Action sprinkler system. 30. Combination dry pipe and pre-action systems. 31. Deluge sprinkler systems. 32. Foam extinguishing systems. 33. Carbon Dioxide extinguishing piped systems Excluding Kitchen hood & related exhaust ducting extinguishing systems. 34. Halogen and other gas systems. 35. Dry Chemical extinguishing systems excluding Kitchen hood and related exhaust duct extinguishing systems 36. Combined sprinkler/standpipe hose systems including all fire extinguishers and associated cabinets. (All: meaning stand alone fire extinguishers, and associated Cabinets) 37. Fire extinguishers and associated cabinets as per the following with exceptions to Para.36 above. a. Where buildings have separate standpipe systems, fire extinguishers and associated cabinets are to be excluded from sprinkler sub bid package, even if specified in sprinkler section. b. Where buildings has a sprinkler system only, the fire extinguishers and associated cabinets are to be included in the sprinkler sub bid package, whether under a separate sub section or within the sprinkler sub section of the specifications. Excluded: 1. All x-rays and/or scanning of concrete floors and walls. 2. Cutting, coring, excavation and bedding. 3. Vapour barrier and insulation not applied to mechanical (piping) systems. 4. All high voltage wiring as set out by the ECA s union guidelines. 5. Motor starters, disconnects and motor control centres. 6. Caulking and grouting of all types except fire-stopping for mechanical (piping) systems. 7. Temporary heat, ventilation, light, power and sanitation. 8. All civil work hoarding and protection barriers. 9. Temporary water services or connections. 10. Catwalks, ladders, gratings unless specified as part of mechanical (piping). 11. Municipal Building Permit fees and utility hook-up fees. 12. Cutting of all holes for mechanical (piping) components into millwork items. 13. All cast-in-place concrete, including rebar and formwork. 14. Site services 10