Aker Solutions Pusnes deck machinery
Aker Solutions Deck machinery 2009 3 For more than one hundred years and thousands of ships Aker Solutions is a leading global supplier of marine and offshore products and services, and is recognised worldwide as a leader in the design, engineering and supply of the innovative Pusnes deck machinery and Pusnes mooring and loading systems for marine and offshore applications. Aker Solutions aim is to be its customers preferred partner, based on its ability to understand their business and add value to their projects. Close co-operation with classification societies and maritime authorities, combined with innovative design, quality products and world wide lifecycle service, makes Aker Solutions the perfect partner for your marine and offshore projects.
4 Deck machinery 2009 Aker Solutions Reliable deck machinery Aker Solutions is one of the world s largest manufacturers of deck machinery. Several thousand ship sets of Pusnes hydraulic and electric deck machinery have been delivered to vessels sailing all over the world. The production of winches was established in 1875 and today both Pusnes electric deck machinery and high-pressure Pusnes hydraulic deck machinery are important products in the company s portfolio.the deck machinery has been developed and improved over the years in order to fulfil new requirements and meet new market demands. Winches designed to operate in Arctic conditions are just one example of recent developments. Pusnes lifecycle services has an established worldwide network to assist customers wherever the need occurs. When purchasing equipment, our customers not only receive quality products, they make an investment in the future, and Pusnes lifecycle services ensures that this investment reaches its full potential. Achievements Our business areas Main skills Developments Original patent holder of Pusnes split drum Innovator of spring applied failsafe band brakes Innovator of high slack rope speed mooring winches Low speed / high torque motors Deck machinery Mooring systems Loading systems Lifecycle services Research and development Project execution Engineering Procurement Fabrication follow-up Commissioning Lifecycle service Standardisation 3D modelling OCIMF winches Single point mooring (SPM) Arctic technology
Aker Solutions Deck machinery 2009 5 Pusnes lifecycle services Aker Solutions has a worldwide lifecycle network which supplies customers with spare parts, service and support wherever the need occurs. Pusnes lifecycle services offers fast and efficient delivery of spare parts and skilled personnel for commissioning, maintenance and repair work. Beneficial equipment upgrades and modification of existing equipment and systems is also provided. Pusnes academy Pusnes academy, located in Arendal, was officially opened January 2009. The academy is equipped with top class, modern facilities ensuring the perfect learning environment. Operator courses are available for the company s entire product range and include theory, operation and hands-on experience. Tailored courses are available upon request. Locations Pusnes lifecycle services locations for mooring and loading systems. Arendal (Norway) Houston (USA) Dubai (UAE) Busan (Korea) Guangzhou (Peoples Republic of China) Singapore Macae (Brazil)
6 Deck machinery 2009 Aker Solutions Pusnes hydraulic deck machinery Aker Solutions delivers high-pressure Pusnes hydraulic deck machinery based on a ring main system with a working pressure of approximately 250 bar. The equipment design meets the requirements of all classification societies and satisfies the demand for flexibility and easy maintenance. Product range Winch/windlasses for ø46 mm ø144 mm anchor chain (other sizes on request) Mooring winches from 10 tons 40 tons (other sizes on request) Hydraulic power unit (HPU) The hydraulic system utilises small diameter piping thereby facilitating installation and saving space on deck and in pump rooms. The complete ring main system includes electric motors, variable axial piston pumps, valves and miscellaneous hydraulic components, all mounted on the hydraulic power unit, minimising the yard s installation work. Integration of equipment driven by a common hydraulic power unit in a ring main system enables all units to be operated simultaneously. This simple piping consists of main and branch lines and no valves are needed between the pipes. All or any combination of the following hydraulic equipment may be integrated in the ring main system, thereby reducing both equipment and installation costs. Cargo pumps Pump station Cargo pumps Cargo pumps Cargo valves Cranes Deck machinery Hatch covers Thrusters Deck machinery Cranes Thrusters Benefits for yards Flexible design for drum layout Simple installation Compact piping design Low material cost Low weight Low installation cost Easy integration with other onboard hydraulic systems Commissioning and support No need for separate servo system Benefits for owner Redundancy Easy, safe and quick operation High slack rope speed Low lifecycle cost Proven system design Automatic torque limitation Worldwide lifecycle service and support Reliable partner Options Hydraulic operated band brake and/or disc brake Stainless steel brake drum surfaces Isolation valves for easy maintenance Shipside remote control Automatic mooring Chain length and/or speed measurement Bridge operated anchor drop Monitoring of brake holding force Wireless remote control Enclosed type windlass gearing Tube, plate or air coolers available
Aker Solutions Deck machinery 2009 7 Solution overview Remote control stand Hydraulic power unit with starter Bridge panel for anchor drop Cable lifter unit with disc brake M4 M3 Bridge anchor drop M2 M1 W2 W1 Mooring winch (M1-M4) Hydraulic motor Combined anchor windlass/ mooring winch (W1-W2) Features Simplified hydraulic system Various cooling arrangements to maximize operation High torque and high slack rope speed ensuring the shortest possible mooring period Constant pull on all units Integration of other equipment Low weight Ship-side remote control with auto high/low speed Hydraulic deck machinery solution consists of Anchoring systems Windlasses for chain dimensions up to 144 mm Materials selected for easy maintenance Fulfils all Classification Societies requirements Split type bearings for drive shaft Strong, durable design Easy maintenance Proven design Advanced braking systems available Chain stoppers Mooring winches Mooring winches from 10 tons and above Optimal control of torque and high slack rope speed ensuring shortest possible mooring period All mooring winches can operate simultaneously at full load High brake holding capacity Primary gearbox totally enclosed with gears running in oil bath Easy automatic mooring operation Hydraulic power unit Self-contained and skid-mounted easing shipyard s installation Pumps located outside the tank for easy maintenance Oil coolers water type as standard, air type as option Full flow filter for return oil Floating mount of pump/electric motor unit minimising noise and vibration Fulfils all Classification Societies requirements Pulse dampers available (silencer)
8 Deck machinery 2009 Aker Solutions Pusnes electric deck machinery Pusnes frequency controlled deck machinery utilises step-less control from zero to nominal speed thereby ensuring smooth, accurate and safe operation. The pole changing type deck machinery utilises a PLC control and 3-speed motor which provides high tension and high slack rope speed while ensuring safe operation. The increase in environmental awareness is becoming more and more apparent in the type of equipment that shipowners are choosing for their vessels. A direct result is the increasing popularity of diesel electric propulsion systems and electric deck machinery. In line with the increasing awareness of environmentally sound solutions, Pusnes electric deck machinery has undergone significant modernisation and streamlining. Electric deck machinery eliminates the need for hydraulics and therefore risk to the environment. The new generation of Pusnes electric deck machinery has either frequency controlled or pole changing motors. This is just one example of Aker Solutions commitment to further developing deck machinery solutions tailored to meet future market demands. Pole changing systems Utilise a multiple speed AC-brake motor Power 380/440/690V AC 50Hz/60Hz Flange mounted electro motors with protection IP 56 Motors equipped with space heaters, temperature sensors and fail-safe brakes High operational safety including overload conditions Frequency controlled systems Utilise a standard AC-brake motor and external brake resistor for lowering anchor Power 380/440/690V AC 50Hz/60Hz Flange mounted electro motors with protection IP 56 Motors equipped with space heaters, temperature sensors and fail-safe brakes High operational safety including overload conditions Benefits for yard Easy installation Reduced commissioning costs No piping No flushing Compact size Less cabling Reduced cable sizes Low weight Benefits for owner No environmental pollution Low lifecycle cost Proven system design Low noise Short start-up time in cold climates Frequency control has step-less and smooth operation Automatic torque limitation Low power consumption Tension indication available Remote diagnosis available Extensive customer support Options Automatic mooring with or without monitoring EX motors for hazardous areas Chain length and speed measurement Tension indication Portable or wireless remote control Closed type windlass gearing Remote control of drum brake and clutch Remote control of chain stoppers Stainless steel brake drum surfaces Hydraulic operated disc brake on Cable lifter unit Automated anchor drop
Aker Solutions Deck machinery 2009 9 Solution overview M4 Pusnes lifecycle services AC Motors M2 M1 W2 W1 modem modem M3 Mooring winch (M1-M4) Combined anchor windlass / mooring winch (W1-W2) Bridge Bridge remote operated anchor drop Cargo RS 485 RS 485 control RS 485 RS 485 Engine control Power 400-690 VAC M4 M3 M2 M1 W2 W1 Electric deck machinery solution consists of Anchoring systems Windlasses for chain dimensions up to 144 mm Material selected for easy maintenance Fulfils all Classification Societies requirements Split type bearings for drive shaft Strong, durable design Easy maintenance Proven design Advanced braking systems available Chain stoppers Mooring winches Mooring winches from 10 tons and above Optimal control of torque and high slack rope speed ensuring shortest possible mooring period All mooring winches can operate simultaneously at full load High brake holding capacity Primary gearbox totally enclosed with gears running in oil bath Easy automatic mooring operation
10 Deck machinery 2009 Aker Solutions Pusnes emergency towing system The two main features of the Pusnes emergency towing system are simplicity and durability. The Pusnes emergency towing system (Pusnes ETS ) was originally designed for tankers loading at the Statfjord field in the North Sea. It has been further developed and today fulfils all new regulations with respect to single point mooring (SPM), yield strength and safety factors. The forward Pusnes chain stopper design makes it suitable as the strongpoint for SPM. High quality and compact design with easy installation at low cost, both for newbuildings and existing vessels, are important factors for ensuring complete customer satisfaction. The Pusnes ETS meets these criteria. Product range Aft Pusnes ETS Storage drum for towing wire with retrieval gear Complete pick-up gear stored in separate container Complies with: - IMO resolution MSC.35 (63) - SOLAS V/15-1(b) - LOOP regulations - OPA 90 - OCIMF Forward Pusnes ETS Combined chain stopper including foundation for ETS and SPM Smit bracket for ETS and SPM Panama fairlead 4 rib type Chafing chain Complies with: - IMO resolution MSC.35 (63) - SOLAS V/15-1(b) - LOOP regulations - OPA 90 - OCIMF Pusnes escorting and pull-back system Fairleads, Panama deck mounting Tug towing bollard Benefits for yard Benefits for owner Options Pusnes ETS aft Options Pusnes ETS forward Low installation cost Compact design Easy installation Type approved Safety against fire Towing wire on a storage drum Centrifugal brake for controlled payout Gear for retrieval of towing wire Combined strongpoint & fairlead Type approved Portable air-motor for retrieval of the towing wire Below deck installation Strength calculation Deck support Bow shackle, D-type Guide roller Panama fairlead 8 rib type
Aker Solutions Deck machinery 2009 11 Exploring the Arctic and sub-arctic regions Aker Solutions has met the challenge of functional and reliable systems for rough and extreme weather conditions. As development of the Arctic continues, the need for specialised equipment for these harsh and environmentally vulnerable areas becomes significant. When Roald Amundsen planned his exploration of the Arctics he chose an anchor winch from Pusnes Mekaniske Verksted for his polar vessel FRAM. He was well aware that reliable systems were a must if he should succeed in being the first to reach the South Pole. The majority of today s shuttle tankers operate in the extreme weather conditions of the North Sea or in the Arctic north of Russia, where reliable systems are a must. Customers continue to depend on Aker Solutions to develop and deliver equipment that meets these demands. With over 100 years of experience supplying deck machinery designed for extreme conditions, Aker Solutions has acquired extensive expertise and skill, which is reflected in other innovative products such as the Pusnes Arctic crane offloading system. Arctic and sub-arctic deliveries include mooring and loading systems to the northern territories of Canada and Russia. Varandey field, Russia First offloading with Pusnes bow loading system and Pusnes offloading system. June 8, 2008.
0049 Contact Aker Solutions: Headquarters Aker Pusnes AS Service Box 732 4808 Arendal NORWAY Tel: +47 37 08 73 00 Fax: +47 37 08 65 50 Pusnes@akersolutions.com North America South America Aker Solutions do Brazil Ltda. Rodovia Amaral Peixoto km 162 ZEN Rio das Ostras, RJ BRAZIL Tel: +55 22 2273 9010 Mobile: +55 22 9283 5650 Pusnes.Brazil@akersolutions.com Middle East Asia Aker Pusnes Korea Co., Ltd. 837, Daera-Ri, Gijang-Eub Gijang-Gun Busan 619-903 SOUTH KOREA Tel: +82 51 720 6200 Fax: +82 51 720 6230 Mobile: +82 10 6583 7748 office@pusnes.co.kr Aker Solutions c/o Bee Fortune Co. Ltd. Tower 1, Flat A, 23F 268 Zhong Shan Da Dao Tianhe District Guangzhou CHINA 510660 Tel: +86 20 8231 5211 Fax: +86 20 8231 1200 beechan@vip.163.com Aker Solutions 2103 City West Blvd, Suite 400 Houston, TX 77042 USA Tel: +1 713 270 2679 Fax: +1 713 272 4070 Mobile: +1 832 630 0112 Pusnes.Houston@akersolutions.com Aker Solutions Plot No. 33, Port of Fujairah P.O. Box 2501 Fujairah UNITED ARAB EMIRATES Tel: +971 9 228 2338 Fax: +971 9 228 1898 Mobile: +971 50 433 7750 Pusnes.Dubai@akersolutions.com Aker Solutions 25, Benoi Lane SINGAPORE 627800 Tel: +65 6303 4465 Fax: +65 6303 4456 Mobile: +65 9231 6890 Pusnes.Singapore@akersolutions.com 2009 Aker Solutions Novmber 2009. All rights reserved. www.akersolutions.com/pusnes