Thermal Mass Availability for Cooling Data Centers during Power Shutdown



Similar documents
Rate of Heating Analysis of Data Centers during Power Shutdown

Benefits of Cold Aisle Containment During Cooling Failure

Managing Data Centre Heat Issues

Thermal Storage System Provides Emergency Data Center Cooling

Data Center Temperature Rise During a Cooling System Outage

DataCenter 2020: hot aisle and cold aisle containment efficiencies reveal no significant differences

Data Center Temperature Rise During a Cooling System Outage

Data Center 2020: Delivering high density in the Data Center; efficiently and reliably

The New Data Center Cooling Paradigm The Tiered Approach

- White Paper - Data Centre Cooling. Best Practice

Elements of Energy Efficiency in Data Centre Cooling Architecture

How To Improve Energy Efficiency Through Raising Inlet Temperatures

Power and Cooling for Ultra-High Density Racks and Blade Servers

Cooling Audit for Identifying Potential Cooling Problems in Data Centers

Energy Recovery Systems for the Efficient Cooling of Data Centers using Absorption Chillers and Renewable Energy Resources

An Introduction to Cold Aisle Containment Systems in the Data Centre

Dealing with Thermal Issues in Data Center Universal Aisle Containment

BRUNS-PAK Presents MARK S. EVANKO, Principal

High Density Data Centers Fraught with Peril. Richard A. Greco, Principal EYP Mission Critical Facilities, Inc.

Improving Data Center Energy Efficiency Through Environmental Optimization

Analysis of data centre cooling energy efficiency

Data Center Cooling: Fend Off The Phantom Meltdown Of Mass Destruction. 670 Deer Road n Cherry Hill, NJ n n

Data Center Components Overview

Using Computational Fluid Dynamics (CFD) for improving cooling system efficiency for Data centers

I-STUTE Project - WP2.3 Data Centre Cooling. Project Review Meeting 8, Loughborough University, 29 th June 2015

News in Data Center Cooling

DATA CENTER COOLING INNOVATIVE COOLING TECHNOLOGIES FOR YOUR DATA CENTER

Unified Physical Infrastructure SM (UPI) Strategies for Smart Data Centers

Driving Data Center Efficiency Through the Adoption of Best Practices

Application of CFD modelling to the Design of Modern Data Centres

Sealing Gaps Under IT Racks: CFD Analysis Reveals Significant Savings Potential

Airflow and Cooling Performance of Data Centers: Two Performance Metrics

Liquid Cooling Solutions for DATA CENTERS - R.M.IYENGAR BLUESTAR LIMITED.

COMPARISON OF EFFICIENCY AND COSTS BETWEEN THREE CONCEPTS FOR DATA-CENTRE HEAT DISSIPATION

Server Room Thermal Assessment

APC APPLICATION NOTE #92

THERMAL ANALYSIS OF A DATA CENTRE COOLING SYSTEM UNDER FAULT CONDITIONS

Element D Services Heating, Ventilating, and Air Conditioning

COMPARATIVE ANALYSIS OF WIDELY USED AIR CONTAINMENT SYSTEMS IN COMMERCIAL DATA CENTERS FOR MAXIMUM COOLING PERFORMANCE KASTURI RANGAN RAJAGOPALAN

How High Temperature Data Centers & Intel Technologies save Energy, Money, Water and Greenhouse Gas Emissions

Optimizing Network Performance through PASSIVE AIR FLOW MANAGEMENT IN THE DATA CENTER

Data center upgrade proposal. (phase one)

Chiller-less Facilities: They May Be Closer Than You Think

Choosing Close-Coupled IT Cooling Solutions

Benefits of. Air Flow Management. Data Center

Combining Cold Aisle Containment with Intelligent Control to Optimize Data Center Cooling Efficiency

Great Lakes Data Room Case Study

A Comparative Study of Various High Density Data Center Cooling Technologies. A Thesis Presented. Kwok Wu. The Graduate School

Verizon SMARTS Data Center Design Phase 1 Conceptual Study Report Ms. Leah Zabarenko Verizon Business 2606A Carsins Run Road Aberdeen, MD 21001

Rittal White Paper 508: Economized Data Center Cooling Defining Methods & Implementation Practices By: Daniel Kennedy

AisleLok Modular Containment vs. Legacy Containment: A Comparative CFD Study of IT Inlet Temperatures and Fan Energy Savings

Cooling Capacity Factor (CCF) Reveals Stranded Capacity and Data Center Cost Savings

How High Temperature Data Centers & Intel Technologies save Energy, Money, Water and Greenhouse Gas Emissions

Comparing Air Cooler Ratings Part 1: Not All Rating Methods are Created Equal

Prediction Is Better Than Cure CFD Simulation For Data Center Operation.

Data Center Power Consumption

Energy Impact of Increased Server Inlet Temperature

Rack Hygiene. Data Center White Paper. Executive Summary

DataCenter 2020: first results for energy-optimization at existing data centers

How to Build a Data Centre Cooling Budget. Ian Cathcart

CURBING THE COST OF DATA CENTER COOLING. Charles B. Kensky, PE, LEED AP BD+C, CEA Executive Vice President Bala Consulting Engineers

Office of the Government Chief Information Officer. Green Data Centre Practices

GREEN DATA CENTER DESIGN

Best Practices for Wire-free Environmental Monitoring in the Data Center

Best Practices for Wire-free Environmental Monitoring in the Data Center

RVH/BCH Data Centres Proposals for Surge Protection and Ventilation

The Benefits of Supply Air Temperature Control in the Data Centre

GREEN FIELD DATA CENTER DESIGN WATER COOLING FOR MAXIMUM EFFICIENCY. Shlomo Novotny, Vice President and Chief Technology Officer, Vette Corp.

Data Centre Cooling Air Performance Metrics

ANCIS I N C O R P O R A T E D

Performance Estimation of Water Thermal Energy Storage Tank by Using Simplified Simulation

Airflow Simulation Solves Data Centre Cooling Problem

CFD SIMULATION OF SDHW STORAGE TANK WITH AND WITHOUT HEATER

Analysis of the UNH Data Center Using CFD Modeling

Modeling Rack and Server Heat Capacity in a Physics Based Dynamic CFD Model of Data Centers. Sami Alkharabsheh, Bahgat Sammakia 10/28/2013

Supporting Cisco Switches In Hot Aisle/Cold Aisle Data Centers

International Telecommunication Union SERIES L: CONSTRUCTION, INSTALLATION AND PROTECTION OF TELECOMMUNICATION CABLES IN PUBLIC NETWORKS

Energy Efficiency Opportunities in Federal High Performance Computing Data Centers

Impacts of Perforated Tile Open Areas on Airflow Uniformity and Air Management Performance in a Modular Data Center

Investigation into the energy consumption of a data center with a thermosyphon heat exchanger

Enclosure and Airflow Management Solution

Optimum Climate Control For Datacenter - Case Study. T. Prabu March 17 th 2009

Creating Data Center Efficiencies Using Closed-Loop Design Brent Goren, Data Center Consultant

GUIDE TO ICT SERVER ROOM ENERGY EFFICIENCY. Public Sector ICT Special Working Group

Modelling and Evaluation of Distributed Airflow Control in Data Centers

CANNON T4 MINI / MICRO DATA CENTRE SYSTEMS

Zhao et al. 2.2 Experimental Results in Winter Season The analysis given below was based on the data collected from Nov to Mar. 15, 2004.

Energy and Cost Analysis of Rittal Corporation Liquid Cooled Package

Reducing the Annual Cost of a Telecommunications Data Center

University of St Andrews. Energy Efficient Data Centre Cooling

FNT EXPERT PAPER. // Data Center Efficiency AUTHOR. Using CFD to Optimize Cooling in Design and Operation.

How High Temperature Data Centers and Intel Technologies Decrease Operating Costs

DETERMINATION OF THE HEAT STORAGE CAPACITY OF PCM AND PCM-OBJECTS AS A FUNCTION OF TEMPERATURE. E. Günther, S. Hiebler, H. Mehling

How To Run A Data Center Efficiently

Data Center Rack Level Cooling Utilizing Water-Cooled, Passive Rear Door Heat Exchangers (RDHx) as a Cost Effective Alternative to CRAH Air Cooling

DOE FEMP First Thursday Seminar. Learner Guide. Core Competency Areas Addressed in the Training. Energy/Sustainability Managers and Facility Managers

RiMatrix S Make easy.

The Different Types of Air Conditioning Equipment for IT Environments

Absolute and relative humidity Precise and comfort air-conditioning

2A.1 Features of Chiller Control Components A.3 Chilled-Water Supply Temperature Control A.4 Cooling-Water Supply Control...

Transcription:

2010 American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. (www.ashrae.org). Published in ASHRAE Transactions (2010, vol 116, part 2). For personal use only. Additional reproduction, distribution, or transmission in either print or digital form is not permitted without ASHRAE s prior written permission. AB-10-C022 Thermal Mass Availability for Cooling Data Centers during Power Shutdown Kishor Khankari 1, PhD Member, ASHRAE Abstract During power outage servers in the data centers are powered by uninterrupted power supply (UPS). At the same time, the cooling system components such as CRACs, AHUs, and chillers stop operating for a short period until powered by alternate power sources. During this period servers continue generating heat in the data center room without active cooling. It is common notion that data centers contain large thermal mass, and hence, large heat capacity in the steel rack enclosures to protect servers from the thermal shock due to rising room air temperatures. However, the rate of air temperature rise and the availability of rack thermal mass depend on several factors including the height of the data center room, number of rack enclosures and their size, number of rack rows and their layout, and heat load density of a data center. It is crucial for design engineers and facility managers to know how much time can be available for restarting the active cooling systems before servers reach automatic shutoff temperatures. With the help of a heat transfer model this paper systematically analyzes the effect of various parameters and the impact of rack thermal mass on the time that air requires to reach the thermal shutoff threshold temperature. INTRODUCTION Continuous supply of electrical power to mission critical facilities is essential not only for uninterrupted operation of servers but also for providing continued cooling to maintain supply air temperatures within the acceptable range of 64.4 F (18 C) to 80.6 F (27 C) (as recommended by ASHRAE thermal guidelines (2). However, during power outage situations servers continue to operate by the power provided by uninterrupted power supply (UPS) units while the supply of cooling air is completely halted until alternate means of powering the cooling system are activated. During this time servers continue to generate heat and the server fans continue to circulate room air several times though the servers. This can result in 1 Kishor Khankari is Associate Partner at Syska Hennessy GrouP, Ann Arbor, Michigan. 2010 ASHRAE 205

sharp increase in the room air temperature to undesirable levels, which in turn can lead to automatic shutdown of servers and in some cases can even cause thermal damage to servers. Often alternate means such as thermal storage systems or standby generators are provided to continue cooling operation during the power outage period (3). However it takes some time to restart these systems and resume normal cooling operation (1). It is crucial to understand the rate of temperature rise of the room air during this off cooling period and how long servers can sustain such a situation without automatic thermal shutdown. Data centers contain large number of rack enclosures constructed out of rolled carbon steel. It is important to know what role this large thermal mass can play during this off cooling period. Volumetric thermal capacity of this mass is equivalent to that of water (about 4000 kj/m 3 K). The goal of this paper is to evaluate contributions of this thermal mass in attenuating the rise of air temperature during the power outage situation. The rate of such temperature rise depends on several factors including heat load density of data centers, height of data center room, number of rack enclosures and their layout, and the extent of exposed surface area available for utilizing the thermal mass. This paper presents heat transfer analysis to systematically evaluate the effect of these parameters on the extent of air temperature rise of data center facilities. DESCRIPTION OF HEAT TRANSFER MODEL The heat transfer analysis developed during this study is based on the hypothesis that the total heat generated by servers during the off cooling period is primarily dissipated to the surrounding air through active recirculation induced by the server fans. Air then dissipates part of this heat to the surroundings through several pathways that includes rack enclosure mass, mass of the cold air trapped under the raised floor, and to the outside world through the building envelop. Thus, the total generated heat is dissipated through various heat transfer pathways is shown in Figure 1 and described by the following equations. Room Rack -Back Rack Rack -Front Plenum Slab Figure 1: Schematic diagram showing various heat transfer pathways. 206 ASHRAE Transactions

(1) (2a) (2b) (2c) (2d) The rate of heat transfer mechanisms between the air and the other components, as shown in the equation (2), depends on their respective heat transfer coefficients (U), exposed surface area (A), and their respective temperature differences ( T) with the room air. The rate of air temperature rise can be potentially reduced if the rate of heat transport to these other components such as rack enclosures can be enhanced. However, these rates depend on the design and layout of the data center. This is further discussed under the results and discussion section. The above heat transfer model is a zero dimensional model and assumes all spatial variations within the data center are negligible. It is assumed that all the heat generated by the servers is primarily carried away by convection mechanism of the circulating air. The air in the data center room is assumed to be well mixed, and hence, assumes a single mixed temperature. Since the air is rapidly moved by the server fans this assumption is quite reasonable. Also all the rack enclosure mass assumes a single temperature. The resistance to heat transfer within the rack mass is assumed to be small due to large thermal conductivity compared to the heat transfer coefficient on the surfaces. It should be noted the thermal mass of racks considered in this analysis does not include the thermal mass of servers. Unlike rack enclosures the servers are assumed primarily as a source of heat generation, and therefore, their associated thermal mass is not available for the room air to reject heat. All references to rack mass or rack surface area in this paper refer to those of rack enclosures. It is further assumed that initially, right after the power outage, the room air and the rack mass are in thermal equilibrium and assume a certain average initial temperature. Heat transfer due to the other thermal masses such as ducts, pipes, building components, and coils in the air handler units are not considered in this analysis. The rate of heat generation from servers is assumed to be constant over the period analysis. When air handler fans are placed on UPS, then the cold air in the supply plenum can be circulated at least for some time to provide cooling right after the power outage (3). This analysis assumes air handler fans are not connected to UPS, and hence, due to thermal stratification the cold air in the supply plenum is trapped under the raised floor. In this situation as shown in the equation (2d), the hot air from the data center room can transfer heat into the cold plenum while the ASHRAE Transactions 207

plenum air can exchange heat with the ground through the slab. Thus, the hot air in the data center room can indirectly exchange heat with the ground. In the case of flat floor data center, the room can directly exchange heat with the ground through slab. The analysis of flat floor data center is not part of this paper. The rate of heat transfer to rack mass depends on the extent of the surface area of the racks exposed to the surrounding moving air. For most racks only top and bottom surfaces are available for exchanging the heat. In addition, side faces of the end racks located at the end of each rack row are available for such exchange. The net available surface area of the racks can be calculated by the following equation (3). Note the available surface area increases with the size of racks, number of racks, and with the number of rack rows. Ideally the maximum surface area of racks would be available if all the racks have side panels and are separated from each other to allow passage of air. However, such an arrangement is not practical first due to the requirement of large floor space and secondly to avoid any air leakage between the cold and hot aisles during the normal operation. In order to understand the effect of thermal mass on lowering the air temperature rise in the data center, a hypothetical case is considered where all the heat generated by servers is entirely absorbed by the room air. In this situation, the heat transfer model in equation (1) becomes (3) (4) This trend in the rise in the air temperature is shown for comparison in a few cases to evaluate the impact of the rack thermal mass in reducing the air temperature. DESCRIPTION OF THE CASES ANALYZED A list of various parameters analyzed with their respective levels is shown in Table (1). A 2500 sq.ft. data center with heat load density of 200 W/sqft consisting of a total rack enclosures arranged in 10 rack rows was considered as a base case. A total of five additional cases were analyzed by systematically varying room height (Case 1), heat load density (Case 2), weight of racks (Case 3), number of rack rows (Case 4), and number of racks (Case 5) from the base case parameters. As shown in the Table (1) efforts were made to vary only one parameter at a time to clearly understand its effect on the air temperature rise. A total 3 levels (1 base case level and 2 additional levels) of each parameter were analyzed. As shown in the Table (1) the initial average temperature of room air, rack mass, and that of the air in the under floor plenum were kept at the same levels for all the cases. Similarly the ambient and ground temperatures were kept constant in all the cases. Table (1) also shows values of various thermal conductances employed in this analysis. It should be noted that the value given for the rack thermal 208 ASHRAE Transactions

conductance is for a single rack. In the case of multiple racks as considered in this analysis, the value of rack thermal conductance becomes much larger compared to the conductnaces of other heat transfer pathways. The heat transfer model described in the previous section was employed to study the effect various parameters on the rise in air temperatures in a data center. The heat transfer equations were solved numerically for a total duration of 5 minutes of the off cooling period. Table 1: List of parameters employed in the analysis. Parameter Base Case Case 1 (room height) Case 2 (heat load density) Case 3 (rack weight) Case 4 Case 5 (number of (number of rack rows) racks) Room Area, sq.ft. 2500 (232.2 m2) Room height, ft 10 (3 m) 15 ft (4.6 m) 20 ft (6.1 m) Supply plenum height, ft 3 (0.9 m) Heat load density, W/sqft 200 (2153 W/m2) 50 (538 W/m2) (1076 W/m2) Heat load per rack, kw 5 1.25, 2.5 20, 10 Length (ft) 4 (1.2 m) Width (ft) 2 (0.6 m) Height (ft) 6.5 (1.98 m) Weight per rack (lb) 250 (113 kg) 200 (90.7 kg) 300 (136 kg) Racks per row 10 20, 5 Number of rack rows 10 5, 20 2.5, 5 Number of racks 25, 50 Initial temperature of air, F 65 (18.3 C) Thermal conductance (W/K) Initial temperature of rack mass, F 65 (18.3 C) Single Rack 197 Initial temperature of plenum air, F 60 (15.6 C) Building Envelop 123 Ambient air temperature, F 72 (22.2 C) Plenum top 130 Ground temperature, F 60 (15.6 C) Plenum bottom 58 RESULTS AND DISCUSSION Results of the analysis are presented mainly in three formats: 1) variation of room air temperature with time (Figure 2); 2) time required for the air temperature to reach server shut off threshold temperatures of 95F and 125F (Figure 3); 3) how the total heat generated by servers is absorbed among various heat transfer pathways is expressed as percent of the total generated heat during the 5 minutes period (Figure 4). A few general observations from the results of this analysis which are common in all the cases are as follows. Figure 2 indicates the rate of rise of air temperature reaches almost a constant value within five minutes in all the cases. This stage is generally reached when a certain constant temperature difference between the air temperature and the temperature of the racks mass is attained. Secondly, the results for all the cases as shown in Figure 3 indicate that higher server shut off temperature (125 F) provide significantly larger time window to power the alternate cooling systems than that for the lower temperature of 95 F. In fact in most cases, with couple of exceptions, air reaches 95F temperature within 50 seconds. Finally only less than 2 percent of the total generated heat is ASHRAE Transactions 209

dissipated to the under floor plenum and through the building envelop while rest of the heat is mainly absorbed by the room air and the rack mass (Figure 4). The results for each case are discussed in detail below. Case 1: Effect of Room Height Increasing the room height increases the heat capacity of the room air. As a result, for identical data centers with the same number of racks and heat load, taller rooms can keep the air temperature lower and hold more heat. As shown in Figure 2a and Figure 3, for every 5 ft increase in the room height, the time required to reach 95 F threshold temperatures increased by about 50 percent and that by about 25 percent to reach 125 F temperatures. In other words, by increasing the room height from 10 ft to 20 ft, the time required for reaching 95 F threshold temperature increased almost by a factor of 2 and by a factor of 1.5 for the temperature of 125 F. It should be noted that room height has significant effect on the air temperature rise during the first few seconds when the temperature difference between the air and rack thermal mass is still low. Figure 2a also shows corresponding variations in the rack mass temperature. It should be noted the rate of heating of air and rack mass and the temperature difference between the room air and rack mass almost reaches a constant value after about 90 seconds. Figure 4 indicates with increase in room height the percent heat absorbed by the room air increases and that of the rack mass decreases. With respect to the air heat capacity, the rack containment systems have order of magnitude less heat capacity of the air than that in the data centers. Such systems with high heat load can reach very high air temperatures in a very short time during the power outage situation. Case 2: Effect of Heat Load Density The rate of heat generation directly affects the rate of heating of the room air. For identical data centers with similar dimensions and the same number of racks and layout, low density data centers can provide significantly larger time window to start cooling operation during the power outage than that for high density data centers. Figure 2b and Figure 3 show in the case of 50 W/sqft and W/sqft heat load densities, the room air temperature did not rise beyond 84 F and 102 F, and hence, did not reach the threshold temperatures during the 5 minute period. On the other hand, in the case of 200 W/sqft heat load density, the room air temperature reached 140 F during the same time while reaching 95 F and 125 F threshold temperatures just after 45 and 193 seconds, respectively. It should be noted, as shown in Table 1, in all these cases the number of racks was kept to constant value of. This resulted in lower heat load per rack for low density data centers. Also, it kept the ratio of room heat capacity to the rack mass heat capacity constant. As a result, as shown in Figure 4, the heat load density did not affect the relative distribution of the heat absorbed between the room air and the rack mass. Case 3: Effect of Weight of Racks Increasing the weight of racks increases the thermal mass (heat capacity) of 210 ASHRAE Transactions

racks. This helps in keeping the rack mass temperature down, which in turn, can help in keeping larger temperature difference between the room air and the rack mass. However, this factor has only secondary effect on the room air temperature. The primary link between the room air and the rack thermal mass is the thermal conductance (UA factor) as shown in the equation (2b). Since the number of racks and number of rack rows were kept constant in all these cases, the surface area for heat transfer remained the same. Therefore, weight of the racks alone has marginal effect on keeping the air temperature down especially during a few initial seconds of the power outage. As indicated in Figure 2c, the effect of rack weight becomes significant only after 80 seconds of heating, and therefore, the threshold temperature of 95 F are reached almost at the same time of 45 seconds in all the cases. However, when the servers are set for higher threshold temperature of 125F, every 50 lb increase in the rack weight increased the time required to reach the threshold temperature by about 12 per cent. The curve for 0 lb rack weight indicates absence of any rack thermal mass and shows hypothetical rise in the air temperature according to equation (4). This trend in comparison with the other curves indicates how rack thermal mass helps in attenuating the rate of temperature rise of room air. As expected, Figure 4 shows due to increase in the heat capacity the rack mass absorbs more heat than that of room air. Case 4: Effect of Number of Rack Rows As mentioned before and indicated by equation (3), increasing the number of rack rows increases the available surface area for heat transfer between room air and the rack mass. This factor affects the availability of rack thermal mass for heat transfer, and therefore, affects the room air temperature more significantly than the weight of the racks alone. It should be noted that in all these cases all the other parameters including the weight of the racks are kept at the same levels. As shown in Figure 2d and in Figure 3, increasing the rack rows from 5 to 20, the time required to reach the server shut off temperature of 95 F and 125F increases by 26 and 48 percent, respectively. Due to increased surface area and resulting increase in the rate of heat transfer; increase in the number racks rows increases the percent of the total heat absorption by the rack mass as shown in Figure 4. Case 5: Effect of Number of Racks This factor combines the previous two factors together. Increase in the number of racks increases the thermal mass of racks as well as its availability by increasing the total heat transfer surface area. As shown in Table 1, the size of the data center as well as the heat load density kept at the same level as in the base case. Therefore, fewer racks mean more empty space in the data center resulting in higher heat load concentrated at one location with high heat density racks. On the other hand, increasing the number of racks resulted in more distributed heat load in the entire data center. As shown in Figure 2e and in Figure 3, increase in the number of racks from 25 to 50 and from 25 to increased the time required for the room air to reach 95F threshold temperature by 13 percent and 45 percent, respectively. However, for similar increase in the number of racks air would take 28 percent and 180 percent more time to reach 125 F ASHRAE Transactions 211

threshold temperatures, respectively. This analysis again indicates significant advantage of increasing the server shut off threshold temperatures to higher levels. Figure 2e also shows with fewer racks the rate of air temperature rise reaches close to the hypothetical maximum rate as per equation (4). With increased thermal mass and increased heat transfer surface area result in higher percentage of the total generated heat absorbed by the racks as shown in Figure 4. SUMMARY AND CONCLUSIONS A zero dimensional heat transfer model was developed to understand the rate of heating of the room air and the time it requires for room air to reach certain server shutoff temperature under the power outage situation in a data center. Several factors were evaluated to study the effect of rack enclosure thermal mass on attenuation of the rate of room air heating. This analysis indicated that rack thermal mass can play important role in keeping the room air temperature down during the power outage situation. However, availability of this thermal mass depends on the extent of the exposed surface area of the racks which can increase by increasing the number of racks and number of rack rows. Also the room height plays a significant role in keeping the air temperature low especially during the initial seconds of power outage. Servers with high thermal shutoff threshold temperatures can provide significantly longer time for cooling systems to activate. In general data centers with higher room heights, large number of rack enclosures arranged in large number of rack rows, and equipped with severs that can sustain higher temperatures before automatic thermal shutoff can provide substantially longer time for the cooling systems to activate. Low density data centers with these attributes have the lowest risk for server thermal shutoff and can provide even longer time than that of the high density data centers for activating the cooling systems. NOMENCLATURE = Surface area of rack thermal mass (m 2 ) = Height of rack enclosures (m) = Depth of rack enclosures (m) = Width of rack enclosures (m) = Number of rack enclosures = Number of rack rows = Rate of heat generation from servers (W) = Rate of heat absorbed by room air (W) = Rate of heat loss to rack enclosures (W) = Rate of heat loss to building envelop (W) = Rate of heat loss to under floor plenum (W) = Temperature of room air (K) 212 ASHRAE Transactions

= Temperature of rack thermal mass (K) = Temperature of air in the plenum (K) T = Time (s) REFERENCES = Heat capacity of room air (J/K) = Heat capacity of rack mass (J/K) = Thermal conductance between room air and rack thermal mass (W/K) = Thermal conductance between room air and building envelop (W/K) = Thermal conductance between room air and raised floor (W/K) = Thermal conductance between plenum air and ground slab (W/K) = Temperature difference between room air and rack thermal mass (K) = Temperature difference between room air and ambient air (K) = Temperature difference between room air and plenum air (K) = Temperature difference between plenum air and ground (K) Anonymous. Data center thermal runaway. White Paper No 105. Active Power. 2007. ASHRAE Technical Committee 9.9 et. al. 2008 ASHRAE Environmental Guidelines for Datacom Equipment - Expanding the Recommended Environmental Envelope. 2008 Garday D. and Housley J. Thermal storage systems provides emergency data center cooling. White paper. Intel Information Technology, 2007. Temperature (F) 150 145 140 135 130 125 120 115 110 105 95 90 62.7 57.2 51.6 46.1 40.5 35.0 Temperature (C) Room Height Tair (10 ft, 3 m) Tair (15 ft, 4.6 m) Tair (20 ft, 6.1 m) Track (10 ft, 3 m) Track (15 ft, 4.6 m) Track (20 ft, 6.1 m) 85 29.4 80 75 23.9 70 65 0 20 40 60 80 120 140 160 180 200 220 240 260 280 300 Time (s) 18.3 Figure 2a: Variation of room air temperature with time for various room heights (Case 1) ASHRAE Transactions 213

150 145 140 135 130 125 62.7 57.2 51.6 Heat Load 200 W/sqft (2153 W/m2) W/sqft (1076 W/m2) 50 W/sqft (538 W/m2) Room Air Temperature (F) 120 115 110 105 95 90 85 46.1 40.5 35.0 29.4 Room Air Temperature (C) 80 75 23.9 70 65 0 20 40 60 80 120 140 160 180 200 220 240 260 280 300 Time (s) 18.3 Figure 2b: Variation of room air temperature with time for various heat loads (Case 2) Room Air Temperature (F) 150 145 140 135 130 125 120 115 110 105 95 90 85 80 75 70 65 0 20 40 60 80 120 140 160 180 200 220 240 260 280 300 Time (s) Rack Weight 200 lb 62.7 (90.7 kg) 250 lb (113 kg) 300 lb 57.2 (136 kg) 0 lb (0 kg) 51.6 46.1 40.5 35.0 29.4 23.9 18.3 Room Air Temperature (C) Figure 2c: Variation of room air temperature with time for various rack weights (Case 3) 214 ASHRAE Transactions

150 145 140 135 130 62.7 57.2 Number of rack rows 20 10 5 0 Room Air Temperature (F) 125 120 115 110 105 95 90 85 80 75 70 65 51.6 46.1 40.5 35.0 29.4 23.9 18.3 0 20 40 60 80 120 140 160 180 200 220 240 260 280 300 Time (s) Room Air Temperature (C) Figure 2d: Variation of room air temperature with time for various number of rack rows (Case 4) Room Air Temperature (F) 150 145 140 135 130 125 120 115 110 105 95 90 85 80 75 70 65 0 20 40 60 80 120 140 160 180 200 220 240 260 280 300 Time (s) Numberof racks 62.7 50 57.2 51.6 46.1 40.5 35.0 29.4 23.9 18.3 Room Air Temperature (C) 25 0 Figure 2e: Variation of room air temperature with time for various numbers of racks (Case 5) ASHRAE Transactions 215

Room Height 20 ft (6.1 m) 15 ft (4.6 m) 10 ft (3 m) Temperature 125 F (51.7 C) 95 F (35 C) Number of Rack Rows 20 10 5 125 F (51.7 C) 95 F (35 C) 0 50 150 200 250 300 Time required to reach threshold temperature (s) 0 50 150 200 250 300 Time required to reach threshold temperature (s) 200 W/sq.ft (2153 W/m2) Case 1: Effect of room height Temperature 125 F (51.7 C) 95 F (35 C) Case 4: Effect of number of rack rows 125 F (51.7 C) 95 F (35 C) Heat Load Density W/sq.ft (1076 W/m2) 50 W/sq.ft (538 W/m2) >300 s >300 s Number of Racks 50 25 0 50 150 200 250 300 Time required to reach threshold temperature (s) Case 2: Effect of heat load density 0 50 150 200 250 300 Time required to reach threshold temperature (s) Case 5: Effect of number of racks 300 lb (136 kg) Temperature 125 F (51.7 C) 95 F (35 C) Rack Weight 250 lb (113 kg) 200 lb (90.7 kg) 0 50 150 200 250 300 Time required to reach threshold temperature (s) Case 3: Effect of rack weight Figure 3: Effect of various parameters on the time required to reach server shutoff threshold temperatures in a data center. 216 ASHRAE Transactions

20 ft (6.1 m) Room Racks 20 Room Racks Room Height 15 ft (4.6 m) 10 ft (3 m) Enevelop Plenum Number of Rack Rows 10 5 Enevelop Plenum 0 20 40 60 80 0 20 40 60 80 Percent Heat Loss Percent Heat Loss Case 1: Effect of room height Case4: Effect of number of rack rows 200 W/sq.ft (2153 W/m2) Room Racks Room Racks Heat Load Density W/sq.ft (1076 W/m2) 50 W/sq.ft (538 W/m2) Enevelop Plenum Number of Racks 50 25 Enevelop Plenum 0 20 40 60 80 0 20 40 60 80 Percent Heat Loss Percent Heat Loss Case 2: Effect of heat load density Case 5: Effect of number of racks 300 lb (136 kg) Room Racks Rack Weight 250 lb (113 kg) Enevelop Plenum 200 lb (90.7 kg) 0 20 40 60 80 Percent Heat Loss Case 3: Effect of rack weight Figure 4: Effect of various parameters on the percent of the total heat loss to various components in a data center. ASHRAE Transactions 217