Type FLX Freezer Floor Frost Heave Protection DESIGN GUIDE



Similar documents
SnoTrace KSR Surface Snow and Ice Melting INSTALLATION PROCEDURES

Electric Heat Tracing INSTALLATION PROCEDURES

BSX TM. Self-Regulating Heating Cable. Product Specifications

Thermwire. Selection Guide. Freeze Protection Heating Cable. Thermwire -Wrap. Pre-Assembled. Thermwire-Comp. Thermwire-Melt.

Self-Regulating Low Temperature Heating Cable

Complex Piping Design Guide for Self-Regulating Heating Cables

TubeTrace, ThermoTube

KSR-SK-DB In-Line Splice Kit KSR Snow Melting Cable INSTALLATION PROCEDURES

Heating Cable. Construction

MIQ TM Mineral Insulated Heating Cable INSTALLATION PROCEDURES. (North America)

Heat Tracing for the Refrigeration Industry

Pipe Freeze Protection Design/Install Guide

Installation Instructions. Industrial Heating Cable Products

Electric Heat Tracing INSTALLATION PROCEDURES

Pictorial Index... A-14 Introduction to Heat Trace Cable Systems Installation Examples Engineering Guide Heat Loss Tables...

ELECTRICAL GUIDELINES FOR SINGLE-FAMILY HOME OWNERS:

Nelson MI Cable is a high performance, industrial grade heat tracing cable used for applications requiring:

SCTK INSTALLATION PROCEDURES. Splice Connection Termination Kit. SCTK-1D for BSX, RSX, VSX SCTK-2D for KSX, HTSX SCTK-3D for HPT, FP

UNITHERM UNITHERM 2256/2266 SELF-REGULATING ELECTRIC TRACE TUBING

Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, Underground branch circuit feeding a detached garage:

WarmTrace TM INSTALLATION INSTRUCTIONS. Systems for Hot Water Temperature Maintenance. Systems for Hot Water Temperature Maintenance

FAK-7HTS High Temperature Tubing Bundle End Seal Kit INSTALLATION PROCEDURES

Frost Heave Protection System Installation and Operation Manual for Self-Regulating Heating Cable Systems

Installation Instructions SELF-REGULATING (SR) ROOF AND GUTTER DE-ICING CABLES INDUSTRIAL AND COMMERCIAL SERIES

CONTENTS. Yale University Design Standards. Underground Electrical Duct Bank. A. Summary. B. System Design and Performance Requirements

SECTION LOW VOLTAGE LIGHTING CONTROLS

2014 NEC Guide Lines for Home Owner Doing Electrical Work on their Property

SECTION SIGNAL WIRE AND CABLE

SELF-REGULATING PIPE TRACING HEATER CABLE

Installation, Operation and MAINTENANCE INSTRUCTIONS. Industrial Heating Cable Products IMPORTANT GENERAL INSTRUCTIONS

IEEE POWER ENGINEERING SOCIETY CHICAGO CHAPTER THE OKONITE COMPANY WEDNESDAY JANUARY 11, 2006 JIM FITZGERALD ENGINEERING LINGO

READ THIS MANUAL BEFORE PROCEEDING WITH THE INSTALLATION. FAILURE TO FOLLOW THE INSTALLATION INSTRUCTIONS MAY VOID YOUR WARRANTY!

Phase-Adaptive Power Module

Ducoterra Radiant Heating Panel Installation Manual

Switching Power Module

PRODUCT / APPLICATION INFORMATION

SECTION FIRE AND SMOKE ALARM SYSTEM. City of San Diego, CWP Guidelines

Chromalox PRECISION HEAT AND CONTROL. Electrical Heat Tracing Systems Design Guide

Self-Regulating Pipe Tracing Heating Cable Specification/Application Guide. Polyolefin. Performance and Rating Data

4 Installation Requirements

Mineral Insulated Heating

National Craft Assessment and Certification Program S P E C I F I C A T I O N S

Protection Systems. A UTC Fire & Security Company F Linear Heat Detector FEATURES DESCRIPTION APPLICATIONS BENEFITS

920 Series. Dual-point heat-tracing control system. Product overview. 920*E4FWL*SIS302*SS3102 shown

SOLAR PV STANDARD ELECTRICAL PLAN Microinverter Systems for Single Family Dwellings

PT-6000 Power Tower INSTALLATION MANUAL SPECIFICATIONS

All work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations.

INSTALLATION GUIDE HEAT TRACE WIRE SELF REGULATING HEAT CABLES

LEAD FREE FIREX. Interlock Armored Cables TECK90 and MC Industrial Cables. w w w. n e x a n s e n e r g y. c o m

White Paper SolarEdge Three Phase Inverter System Design and the National Electrical Code. June 2015 Revision 1.5

Electrical Grounding. Appendix C

Series 510 Submersible Level Transmitters

CTI TECHNICAL BULLETIN Number 9: A publication of the Cable Tray Institute

Sizing Circuit Breakers for Self-Regulating Heat Tracers

6/14/02 Chapter 14: Use of Electrical Test Equipment 1/20

Heat Tracing Sales Mt. Airy, Maryland Installation Instructions

RayClic Connection System Installation Instructions

FIRE ALARM SYSTEM. A. Shop drawings shall be submitted as follows: 1. Manufacturer's published literature. for aspproval.

Commercial Gas Furnace Upflow

Line Loss WSDOT Winter 2008 BZA

NELSON HEAT TRACING SYSTEMS

Errors Related to Cable Resistance Imbalance in Three Wire RTDs

The Contractor shall furnish and install all shielded power cable suitable for use on this project.

ETC TWO STAGE ELECTRONIC TEMPERATURE CONTROL

Design Considerations for Underfloor Heating Systems. What is Frost Heave Protection?

ALARMLINE ANALOGUE Linear Heat Detection System

I nstallation. M100Q Series Proportional Actuator with R81Q Controller Board for Thermistor Sensor Applications. Tools Needed.

SECTION COMMON WORK RESULTS FOR ELECTRONIC SAFETY AND SECURITY

PS4-24 OWNERS MANUAL 24 VAC 90 WATT WALL MOUNTED CCTV POWER SUPPLY

Appendix J: Engineering Specification for Electrical Heat-Tracing Systems

Installation Instructions DTS-HAZ DTS-HAZ-DC. for Use with Self-Regulating & Constant Wattage Heating Cables

SECTION MORTUARY REFRIGERATORS

RESIDENTIAL ELECTRICAL REQUIREMENTS (REVISED 3/28/2008) PERMIT REQUIREMENTS:

8146/5 Series Breaker Panelboards

Advanced Heat-Tracing Control System

Freezer Floor Heaving and Solution

MONTGOMERY COUNTY EXECUTIVE REGULATION Offices of the County Executive. 101 Monroe Street. Rockville, Maryland 20850

Universal MATE-N-LOK Connectors

Unarmored Variable Frequency Drive (VFD) Cable Termination Guide

rpsa FIRE PROTECTION ENGINEERS

Operating Instructions

T7079A,B Solid State Remote Temperature Controllers

Operating Instructions

WIRE AND CABLE ENGINEERING GUIDE

THERMONET UNDERFLOOR HEATING STANDARD THERMOSTAT KIT STOCK CODE 5260

SECTION FIRE ALARM AND SMOKE DETECTION SYSTEMS

HEAT TRACING PRODUCTS

FACTORY AUTOMATION. Manual Laying loops for Loop detector LC10-1 and LC10-2

PART 1 - INTRODUCTION...

Insulation Resistance Testing of Low Voltage Cables in the Field

KNOW YOUR OPTIONS: 69 KV XLPE POWER CABLE

Cold Weather Concrete Practices

Wintergard wet roof & gutter De-icing

Engineering Specifications

THERMAL MANAGEMENT SOLUTIONS

SECTION SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS

KNOW YOUR OPTIONS: 230 KV POWER CABLES

4 Posiflow Proportional Solenoid Valves

Pre-Delivery Instructions

Calculating Heat Loss by Mark Crombie, Chromalox

Transcription:

Type FLX Freezer Floor Frost Heave Protection DESIGN GUIDE Commercial Products

Type FLX TM Freezer Floor Frost Heave Protection DESIGN GUIDE Contents Introduction...2 Application Information... 2-3 Product Description Characteristics Approvals Basis for a Good Design...3 Frost Heave Protection Design Outline... 3-6 Step 1: Establish Design Conditions Step 2: Determine Conduit Spacing Step 3: Branch Circuit Breaker Sizing Step 4: Determine the System Layout Step 5: Establish Control Method to Operate System System Components...7 Frost Heave Protection Bill of Materials...7 General Specification...8 For additional information about frost heave protection of freezer floors with heat tracing contact Thermon.

Freezer Frost Heave Protection Introduction... The substrata of freezer floors can withstand cold temperatures for a period of time; however, the ground temperature will eventually drop below freezing. At that point, if water is present in the substrate, frost heaving of the freezer floor will occur. FLX cables, when run in conduit in the substrate, provide frost heave protection by maintaining the ground temperature above freezing. Small or large frost heave protection applications can be easily designed utilizing FLX self-regulating heating cables. Establishing the proper design, procurement and installation of materials for a project will ensure a successful heat tracing system installation. The information contained within this design guide will assist engineers and contractors in establishing a successful electric heat tracing design and installation based on: Freezer temperature Available power supply Freezer size Substrate makeup Monitoring/control requirements After following the designated steps in this design guide, the engineer/contractor will be able to design, specify or establish a bill of materials for a freezer floor frost heave protection system. If design parameters are different than those in this design guide, contact your local Thermon factory representative for additional information. Characteristics... Product Description... FLX self-regulating heating cable includes a parallel circuit construction that allows the cable to be cut to length and terminated in the field. The semiconductive heating matrix provides the self-regulating feature. FLX heating cable varies its heat output to compensate for the surrounding conditions along the entire length of a circuit. Whenever the heat loss of the freezer floor increases, the heat output of the cable increases. Conversely, when the heat loss decreases, the cable reacts by reducing its heat output. This self-regulating feature occurs along the entire length of a heat tracing circuit to ensure each point receives the required amount of heat while conserving energy. FLX 8 heating cables are rated for nominal heat outputs of 5.5 W/ft in counduit at 40 F (18 W/m in conduit at 4 C) when powered at 110 to 120 Vac or 208 to 277 Vac. FLX selfregulating cables include a tinned copper braid to provide grounding and polyolefin outer jacket for additional mechanical protection for the cable. Bus Wire Bus wire... 16 AWG nickel-plated copper Heating core... radiation cross-linked polyolefin Primary dielectric insulation... radiation cross-linked polyolefin Metallic braid...12 AWG (equivalent size) tinned copper Outer jacket... OJ, polyolefin Minimum bend radius... 1.25" (32 mm) Supply voltage... 110-120 or 208-277 Vac Circuit protection... 30 ma ground-fault protection required Max. operating temperature (power-on)... 150 F (65 C) Max. exposure temperature (power-off)... 185 F (85 C) Minimum installation temperature... -60 F (-51 C) Semiconductive Heating Matrix Radiation Cross-Linked Polyolefin Insulation Tinned Copper Braid Polyolefin Outer Jacket 2

DESIGN GUIDE Product Approvals... Tests... Compliances Thermon s Type FLX self-regulating heating cable carries the following major agency approval: Underwriters Laboratories Inc. In addition to the numerous agency tests performed, FLX has also passed the testing guidelines outlined in IEEE Standard 515.1, Recommended Practice for the Testing, Design, Installation, and Maintenance of Electrical Resistance Heat Tracing for Commercial Applications. FLX Cables Meet or Exceed the Following Tests... Test Standard Followed Dielectric Withstand IEEE 515.1 (4.2.1) Water Resistance IEEE 515.1 (4.2.3) Thermal Stability IEEE 515.1 (4.2.6) Flammability IEEE 515.1 (4.2.7) Deformation IEEE 515.1 (4.2.8) Cold Bend IEEE 515.1 (4.2.10) Moisture Resistance IEEE 515.1 (4.5.1) Pull Strength IEEE 515.1 (4.5.2) Basis for a Good Design... As freezers and refrigerated facilities are typically maintained at temperatures below freezing, the substrata below these facilities results in temperatures below freezing. If moisture is present, it will begin to freeze, expand and eventually cause the floor to heave. Due to differences found in construction, substrata and power availability, no particular design may be effective in all situations to maintain subsoil temperatures above freezing. This design guide helps the reader evaluate different scenarios so that each project may be designed to meet specific requirements. Frost Heave Protection Design Outline... The following steps outline the design process for an FLX 8 freezer floor frost heave protection system (required for each separate facility): Step 1: Establish Design Conditions Collect relevant project data: a. Facility size Length of area Width of area b.facility substrate Concrete cap thickness Insulation type and thickness Substrate type and thickness c. Temperature Facility temperature Step 2: Determine Conduit Spacing Based on: a. Thermal insulation Type of insulation Thickness of insulation b.minimum operating temperature Step 3: Determine Maximum Circuit Length and Electrical Load Based on: a. Operating voltage b.branch circuit breaker size c. Circuit lengths Step 4: Determine the System Layout Review freezer floor plans to establish: a. Conduit layout b. Junction box locations c. Pull box locations Step 5: Establish Control Method Needed to Operate System a. Thermostatic control b.rtds with HeatChek systems The step-by-step procedures which follow will provide the reader with the detailed information required to design and specify a fully functional frost heave protection system. 3

Freezer Frost Heave Protection Step 1: Establish Design Conditions The following data is required in determining the heat load for a frost heave protection system. Size of Facility... Total surface area including physical dimensions of all areas with floor temperatures expected to be at or below freezing. Floor Substrata... Finished Floor In freezer applications, this surface is typically concrete. As this surface does not generally affect the overall heat load, this design guide assumes a 4" (10 cm) layer of concrete. Type and Thickness of Insulation This design guide is based on industry standards with a thermal conductivity of 0.20 Btu in/hr ft 2 F. The design selection tables in Step 2 allow for an insulation thickness of both 4" and 6" (10 cm and 15 cm). Substrate Generally composed of concrete or gravel, the heating cable is placed within this layer, allowing even heat distribution between heating passes. Facility Operating Temperatures... Determine the low operating temperature of the storage facility. It is not uncommon for the required operating temperatures to change; therefore, use the lowest expected temperature for calculating heat loads. Step 2: Determine Conduit Spacing The primary factors in determining heat and corresponding conduit spacing requirements in frost heave protection systems are thermal insulation and minimum operating temperatures. Insulation does not stop the flow of heat; it merely slows the heat transfer down depending on the type and thickness of insulation present. This guide assumes a core soil temperature of 55 F (13 C) for below-grade installations. As with installations above grade, thermal insulation around the perimeter should be considered. The primary objective of the heating system is to replace the heat lost through the thermal insulation and maintain temperatures below the insulation at or above 40 F (4 C). This is generally accomplished by placing the conduits on 4' to 8' (1.2 m to 2.4 m) center-to-center spacing. Using the design criteria provided, refer to Design Selection Tables 2.0 to determine the required conduit spacing. A 50% safety factor has been included in the values shown. The design selection chart provides specific heat loss requirements based on the following: Freezer operating temperatures Insulation thickness Fixed insulation thermal conductivity If the thermal insulation type or thickness for your specific needs is different from that shown, contact your local Thermon factory representative for design assistance. Freezer Operating Temperature Table 2.0 Design Selection Floor Insulation 1 (R-20) Conduit Spacing ft (m) Floor Insulation 1 (R-30) -40 F (-40 C) -- 4.5 (1.4) -20 F (-29 C) 4.0 (1.2) 6.0 (1.8) -10 F (-23 C) 5.0 (1.5) 7.5 (2.3) 0 F (-18 C) 6.0 (1.8) 8.0 (2.4) 10 F (-12 C) 8.0 (2.4) 8.0 (2.4) 20 F (-6 C) 8.0 (2.4) 8.0 (2.4) Notes... 1. Insulation values are based on industry standards with a thermal conductivity of 0.20 Btu in/hr ft 2 F. Insulation with R-20 and R-30 are based on 4" and 6" (10 cm and 15 cm) thickness respectively. 4

DESIGN GUIDE Step 3: Maximum Circuit Lengths and Total Heating Load Thermon s Type FLX heating cable is designed to operate on standard line voltages of 120, 208, 220, 240 or 277 Vac. Cable selection is contingent upon the following variables: Operating voltage Available branch circuit breaker size Circuit length requirements Maximum allowable circuit length Table 3.0 provides the maximum continuous circuit length allowable based on line voltage and the circuit breaker rating. A 40 F (4 C) start-up is assumed. Catalog Number Table 3.0 Cable Selection Service Voltage Maximum Circuit Length 15 Amp 20 Amp 30 Amp FLX 8-1 110-120 130 (40) 175 (53) 220 (67) FLX 8-2 208-277 260 (80) 350 (105) 440 (135) Notes... Ratings are based on dry conduit conditions (no moisture or water inside conduit). Contact Thermon if start-up conditions are other than 40 F (4 C). The National Electrical Code and Canadian Electrical Code require ground-fault protection of equipment for each branch circuit supplying electric heating equipment. Check local codes for ground-fault protection requirements. Formula 3.0 Estimating Circuit Length Circuit Length = (Freezer Floor Area ft 2 Conduit Spacing) + End Allowances + Termination Allowances Every heat tracing circuit will require some additional heating cable to make the various terminations. Use the following guidelines to determine the amount of extra cable required: End Allowances... Allow an additional 4' of FLX cable for each end. Length of cable required to extend from conduit located in subfloor to the junction box located above the finished floor. (See Detail Below) Termination Allowances... Allow an additional 2' of FLX cable for each termination. Length of heating cable inside junction box. Option: FLX 8 Self-Regulating heating cable may extend between junction boxes inside a protective conduit thus reducing the need to make a termination at each junction box. If this approach is used, the termination allowance becomes the center-to-center distance between conduits. Example... Branch circuit requirements of an individual heater circuit are dependent upon the supply voltage and the total length of heater cable installed. Determine an estimated circuit length for an individual circuit by using Formula 3.0. As an example, assume the freezer floor for a given facility to be 32' x 45' (1440 ft 2 ) with 8' center-to-center conduit spacing. Use Formula 3.0 to determine an estimated circuit length for the individual circuit requirements: Circuit Length = (1440 8) + 32 1 + 16 2 Total footage of FLX can be estimated... Total FLX cable required = 228 linear feet Notes... 1. End allowance includes 8 junction boxes mutiplied by 4 feet each to equal 32 feet. 2. Termination allowance includes 8 terminations multiplied by 2 foot each to equal 16 feet. 32' Junction Box 45' Power feed wire inside conduit. FLX may extend between boxes. See Option in Formula 3.0 above. 8' O.C. FLX Heating Cable inside Conduit Formula 3.1 Estimating Operating Load Nominal Electrical Load = (Total Cable Required x 5.5 W/ft) The total operating load of a FLX frost heave system can be determined by inserting the appropriate values into Formula 3.1. Example... Floor Insulation Subfloor Junction Box Conduit End Allowance Using Formula 3.1 total output (in watts) can be estimated... Total output = 228 x 5.5 Total output = 1254 watts 5

Freezer Frost Heave Protection Step 4: Determine System Layout Heating cables used for frost heave protection systems can be installed in metallic or nonmetallic conduits under the insulated floor. These conduits allow the heater cable to be replaced with new cable should the need arise. Conduits used for heating cable should be a minimum of 3/4" inside diameter. Where the size of the freezer permits, conduit layout can utilize a looping design allowing all junction/pull boxes to be located along one wall. If the length requires, straight line runs locating junction boxes along walls opposite each other may be used. The conduit layout and number of bends should be arranged in order that the pulling force of the heating cable does not exceed 667 newtons (150 pounds) (refer to Details 4.1 and 4.2). As per the National Electrical Code, Article 348-10, There shall not be more than the equivalent of four quarter bends (360 degrees total) between pull points, e.g., conduit bodies and boxes. Location of junction boxes must allow accessibility to the wiring without removing any part of the building or other substance used to establish finished grade. Typically junction boxes are located 12" to 24" (30 to 61 cm) above the finished floor (refer to Detail 4.3). Once the locations of the junction boxes are known, begin conduit layout using the information provided in the earlier steps. Determine layout using center-to-center spacing selected in Step 2. Do not exceed continuous circuit lengths shown in Table 3.0. For installation in concrete subslab, secure conduit to reinforcing steel using steel tie wire. For installation in gravel subslab, secure conduit using the addition of rebar or steel spikes to maintain recommended spacing. Step 5: Establish Control Method to Operate the System All frost heave protection systems should be controlled. There are two basic ways to control and monitor a frost heave protection system: Recommended: Proportional control using a Resistance Temperature Detector (RTD) with HeatChekSystem Turns system on proportionally based on subfloor temperatures. At maximum heat loss system is 100% on. RTDs, to be located in a minimum of 1-1/4"conduit between electric heat tracing conduits, have the ability to limit the cable s power output to closely match heat loss (refer to Detail 5.1). Alternate: On/Off Thermostatic Control Turns system on and off based on subfloor temperatures. Sensor is located in 1-1/4" conduit between electric heat tracing conduits (not shown). Detail 4.1 Looping Design RTD Sensor Conduit Conduit with Heating Cable Detail 4.2 Straight Line Design RTD Sensor Conduit Conduit with Heating Cable Detail 4.3 Junction Box Detail 5.1 HeatChek System 6

DESIGN GUIDE System Components... A system with Type FLX heating cable for frost heave protection will typically include the following components: 1. FLX 8 self-regulating heating cable 2. TBX-3LC power connection kit 3. ET-6C end termination kit 4. JB-K nonmetallic junction box 5. Adjustable Thermostat (not shown) 6. RTD-500-3 resistance temperature detector 7. HeatChek control and monitoring system 8. CL Electric Heat Tracing caution labels peel and stick to junction boxes, power distribution and control panel(s), or as required by code or specification (not shown) 1 FLX Self-Regulating He 4 2 3 Frost Heave Protection Bill of Materials... Use the design outline steps on page 3 and the detailed steps on pages 4 through 6 to assemble an FLX bill of materials. It is recommended that some additional heating cable per circuit be allowed to compensate for variations between the existing drawings and the actual installation area. 7 Quantity Description FLX 8-1 OJ or FLX 8-2 OJ Self-Regulating Heating Cable (refer to Table 3.0 on page 5 for proper cable type) TBX-3LC Power Connection Kit ET-6C End Termination Kit JB-K Nonmetallic Junction Box (for cable termination) CL Electric Heat Tracing Caution Labels (peel-andstick labels attach to junction boxes, power distribution and control panel(s), or as required by code or specification) Adjustable Thermostat (not shown) RTD-500-3 Resistance Temperature Detector (for use with the HeatChek system) HeatChek Control and Monitoring System 6 7

Freezer General Frost Specification Heave Protection Part 1... General Furnish and install a complete UL Listed system of heaters and components approved specifically for freezer floor frost heave protection. The heat tracing system shall conform to IEEE Standard 515.1-1995. Part 2... Products 1. The self-regulating heating cable shall be of parallel construction and shall consist of two nickel-plated copper bus wires embedded in a radiation cross-linked semiconductive polymer core. The heater shall include a tinned copper braid to provide grounding and polyolefin outer jacket for additional mechanical protection for the cable 2. The heater shall operate on line voltage of (select: 110-120, 208, 220, 240, 277 or 480) Vac without the use of transformers. 3. The heating cable shall be suitable for use with metallic and nonmetallic conduit. 4. Power connections and end seal terminations shall be made in junction/pull boxes as described under Part 5, Installation. 5. For additional energy conservation, the heating cable shall be controlled by (select): a. An adjustable thermostat based on current loads for each circuit. b. A resistance temperature detector (RTD) used in conjunction with a microprocessor-based temperature control and monitoring module. Control and monitoring shall be capable of switching up to 30 amps per circuit at 120/208/220/240/277 Vac. c. When the load of the heating cable exceeds the rating of the temperature controller, the heating cable shall be controlled through an appropriately sized contactor. 6. All heating cable core will be permanently marked with the manufacturer s identification number for traceability. 7. Acceptable products and manufacturers are: a. FLX 8 Self-Regulating heating cable and accessories as manufactured by Thermon Industries, Inc. b. HeatChek systems and components as manufactured by Thermon Industries, Inc. 8. Refer to the manufacturer s Freezer Floor Frost Heave Protection Design Guide for design details, insulation requirements, maximum circuit lengths and accessory information. Part 3... System Performance 1. Heating cable layout should be based on (select preferred design method): a. Manufacturer s frost heave protection design guide. b. Section 6.5, Frost Heave Prevention, of the IEEE Standard 515.1-1995, Recommended Practice for the Testing, Design, Installation, and Maintenance of Electrical Resistance Heat Tracing for Commercial Applications. 2. System performance shall be based on temperatures below the insulation barrier of 40 F (4 C) during freezer operation. Part 4... Manufacturer 1. The manufacturer shall demonstrate experience manufacturing and designing freezer floor frost heave protection systems with self-regulating heating cables. This experience may be documented with a list of projects utilizing at least 500 feet (152 m) of self-regulating heating cable. 2. Manufacturer s Quality Assurance Program shall be certified to the ISO 9001 Standard. Part 5... Installation 1. Heating cable shall be installed in a minimum 3/4" conduit within the base layer of the substrate, approximately 2" (5 cm) below the insulation barrier. 2. Installer shall follow manufacturer s installation instructions and design guide for proper installation and layout methods. Deviations from these instructions could result in performance characteristics other than intended. 3. Power connections and end terminations shall be located in NEMA 4 junction boxes. Heating cable located between junction boxes and substrate shall be encased in conduit. 4. All installations and terminations must be made to conform to the NEC and any other applicable national or local code requirements. 5. Locate the RTD sensors as indicated on the system drawings. 6. Circuit breakers supplying power to the heat tracing must be equipped with a minimum of 30 ma ground-fault equipment protection (5 ma GFCI should not be used as nuisance tripping may result). 7. The electrician (see Division 16 Electrical) shall connect system to power. Part 6... Testing 1. Heating cable shall be tested with a 2,500 Vdc megohmeter (megger) between the heating cable bus wires and the heating cable s metallic braid. While a 2,500 Vdc megger test is recommended, the minimum acceptable level for testing is 1,000 Vdc. This test should be performed a minimum of three times: a. Prior to installation while the cable is still on reel(s). b. After installation of heating cable and completion of power connection and end terminations. c. Upon completion of concrete cap pour. 2. The minimum acceptable level for the megger readings is 20 megohms, regardless of the circuit length. 3. Results of the megger readings should be recorded and submitted to the construction manager. 8

Thermon... The Heat Tracing Specialists 100 Thermon Drive PO Box 609 San Marcos, TX 78667-0609 Phone: 512-396-5801 Facsimile: 512-754-2431 800-730-HEAT www.thermon.com Form CPD1038-0603 Thermon Manufacturing Co. Printed in U.S.A.