Frequently Asked Questions (V2016-2)



Similar documents
OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY

VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT

CHECKLIST FOR SUBMISSION Construction Productivity Awards - Projects 2015

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS

BMIC S APPETITE GUIDE EFFECTIVE JUNE 2013

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

KIEWIT CM/GC Enabling/Utilities

NAHB PRODUCT DEFINITION

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components

C-2 Construction, Inc. - NAICS Codes

NOTICE TO CONTRACTORS

Qatar National Construction Standards 2010 Contents

Tennessee 07/01/14. Contracting Class Codes with Descriptions (8)

Think Of Us First! When It s Time to Distribute Your Plans

Repair and Remodeling Estimating Methods. 4th Edition. RSMeans

Which generic risk assessments are provided? Construction Risk. Assessments Plus. ervices

Guidelines on Prior Approval (PA) Application to recruit Foreign Workers (Construction)

Estimating Database Checklist

Building Condition Assessment Report

Important Information for Owners of Buildings in Flood Zones

48. AQUARIUM. Aquarium. Classification: Cluster: Location: Close to junction of Inselrhue and Loiter Way, Belle Isle. Total Area: No.

Acceptance on the Approved List of contractors cannot however guarantee that any work orders will be issued to that contractor.

Design and Build of Passenger Terminal Building North Extension At Macau International Airport (RFQ-198) Section 6 Bill of Quantities

BILL OF QUANTITIES Part No.: Part Description

American Safety Insurance Company

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE NOTICE TO PROPERTY OWNER

Park View Place. Compass. House. Royal Wharf Gardens Endeavour. House. Thameside. Sienna. House. House. Apartments Townhouses.

D Sample Notices to Property Owners, Sample Affidavits, and Other Material

CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES

CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING DEPARTMENT SUBSTATION & EQUIPMENT SECTION

CONSTRUCTION LAW. Mechanical Roofing Contractor. Electrical Class A Air Conditioning. Contractor Class B Air Conditioning

Site Survey Questionnaire

ANNEX A. Page 4 of 30

SECTION TABLE OF CONTENTS. H Proposed Material, Product or Equipment Substitution Request

ISSUING AGENCY: New Mexico Public Regulation Commission, Insurance Division. [7-1-97; NMAC Rn & A, 13 NMAC 17.6.

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year

CONTRACT PRICE ADJUSTMENT PROVISIONS (CPAP)

Milestones Primary. Early Start. Orig Dur. Early Finish. Act ID. Description NOTICE TO PROCEED START CONSTRUCTION

VOLUME I PROCUREMENT AND CONTRACTING DOCUMENTS GROUP

MARKET SCOUT CONTRACTORS QUESTIONNAIRE (complete in addition to an Acord application) 1. Applicant:

LITITZ MUTUAL INSURANCE COMPANY 2 North Broad Street Lititz, Pennsylvania - MAIN OFFICE -

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

Building Condition Assessment Report

APPLICATION FOR NON-SUBSTANTIAL DAMAGE / IMPROVEMENT REVIEW

MORE JOB AND TRAINING OPPORTUNITIES FOR LOCALS IN CONSTRUCTION SECTOR

RESPONSIBILITY FOR REPAIRS AND MAINTENANCE FAIR FUNDING: April 2002

CONSTRUCTION SKILLS REGISTER HANDBOOK

Design Development Quality Management Phase Checklist Project Phase Checklist Series

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

REGISTRATION OF INTEREST

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT

Quantity Take-off. Quantity Take-off

Information for Construction Contractors. Terry O Neill Taxpayer Service Specialist

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE APPLICATION REVIEW

GENERAL LIABILITY PROGRAM FOR ARTISAN CONTRACTORS

Exhibit C: Scope of Work and Schedule of Deliverables

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.

Construction Industry Scheme

QATAR RAIL DOHA METRO PROJECT BUSINESS OPPORTUNITIES FOR LOCAL MARKET Daniel Leckel Chief Program Officer. 7 May, 2015

NATIONAL INSTITUTE OF GOVERNMENT PURCHASING (NIGP) DESIGN AND CONSTRUCTION CODES

ADDENDUM NO. 1. DATE: February 10, 2015 INVITATION FOR BID: IFB K Commerce Road Renovations Project DATED: February 9, 2015

HOWARD UNIVERSITY. I. Policy Statement. II. Rationale. III. Entities Affected by the Policy. IV. Definitions. Policy Number:

Sub-Bid Contractor Update Statement. Tab A - Invitation for Bids. Tab B - Instructions to Bidders

Building, Plumbing, Electrical and Residential Water and Sewer Inspection Requirements

SECTION ALUMINUM FRAMED ENTRANCES and STOREFRONTS. System 402 Flush-Glazed Screw Spline Storefront

Notice to Property Owners

SUBSTANTIAL IMPROVEMENT/DAMAGE NOTICE TO PROPERTY OWNERS

Hanson Building Products. precast basement solutions

PROJECT COST ESTIMATES & FEASIBILITIES

Knock Down Rebuild. Building Process Building process - knock down rebuild 1

King Post Wall Information

Proposed A&A work at E-Commerce Air-Hub at SATS Airfreight Terminal 1 (AFT1)

Sports Buildings: budget costs for the Flood Relief Fund

MAKE CHECK PAYABLE TO MIAMI-DADE COUNTY

Special Use Commercial Properties

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT

Construction Technologies Career Field Pathways and Course Structure

ATTACHMENT A STRUCTURAL INTERIOR DESIGN (SID) REQUIREMENTS

NORTH PENN HIGH SCHOOL RENOVATIONS

Repairs, Remodeling, Additions, and Retrofitting

MICHIGAN STATE HOUSING DEVELOPMENT AUTHORITY LOW INCOME HOUSING TAX CREDIT PROGRAM COST CERTIFICATION GUIDELINES TABLE OF CONTENTS

2. What building projects are exempted? (permit not required)

PROJECT TITLE : 2-STOREY RESIDENCE LOCATION : ALONG DAANG HARI,MOLINO.BACOOR,CAVITE OWNER : CUEVASVILLE REALTY

TD AMERITRADE Park Omaha

17,280 square feet Overview:

DEADLINES FOR PROJECTS REQUIRING MANDATORY BIM (BUILDING INFORMATION MODELLING) E-SUBMISSION FOR REGULATORY APPROVAL

Technical qualifications for licensing

Co-operative Housing Federation of Toronto Inc.

Region IV 1371 Peachtree Street. N.E. Suite 700 Atlanta, GA 30309

B-1 Buildings & Service Maintenance

PREQUALIFIED SUBCONTRACTOR LIST

REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N

SIGMA LINK: - ACQUISITION MANAGEMENT SOLUTION LIST OF COMMODITIES

Construction Contractors

Transcription:

Frequently Asked Questions (V2016-2) Having problem uploading your manpower report to epss? Your monthly submission can be done by uploading the manpower report to epss. For epss to recognize your submission, the manpower report should comply with the following: 1. The report must follow the excel template which can be downloaded at the home page, after you login to epss. 2. The excel report must be saved in Excel 97-2003 Workbook (*.xls) format. 3. The excel report header must contain the correct project information for epss to recognize your submission. Example of acceptable inputs for the manpower report Builder UEN No. 201600123H Project BP No. A1122-00001-2016 Project Name building project at xxx Builder xxx building pte ltd. Month that Data is submitted for 3 Only numerical values accepted Year that Data is submitted for 2014 Electronic Productivity Submission System (epss) Q1. What is the aim of the epss? The aim of the epss is to help builders monitor their projects manpower usage and allows them to submit the manpower usage and productivity data to BCA on a monthly basis. From the data collected, BCA can calculate the industry average project productivity for the different building categories. Q2. Is the submission of the manpower data compulsory? In conjunction with the enhanced Buildability framework [Refer to Regulation 10 of Building Control (Buildability and Productivity) Regulations 2011], it is a mandatory requirement for builders to submit construction productivity data to BCA from 15 July 2011. This requirement is applicable to all projects with GFA of more than 5000m², including new building projects, and upgrading and A&A projects. 1

Q3. Why do I receive a reminder email for not submitting productivity data? For construction projects with GFA of more than 5000m 2, epss requires builders to submit the manpower data on a monthly basis. For projects not subjected to the mandatory requirement, we are encouraging builders to submit the manpower data through the epss so that builders can monitor their project manpower usage. epss checks the status of the monthly manpower data submission and a reminder email will be sent to the builders company administrator for the months where the manpower data was not submitted. Q4. How is the industry average project productivity beneficial to the builder? The industry average project productivity can be used to assess a project s productivity performance and the builder can use this data to set improvement targets for future projects. In addition, the manpower data is one of the submission requirements when a builder applies for the BCA s Construction Excellence Awards and Construction Productivity Awards. Q5. What is the definition of project productivity? The project productivity is defined as the floor area (in square meters) completed per manday. The project productivity is calculated as follows: Project Productivity = Total constructed floor area (m²) Total number of site workers (mandays) A project is deemed to be more productive if a larger floor area can be constructed with the same mandays. In other words, the higher the figure, the better is the project productivity. Q6. What is the definition of total floor area? Total floor area will include the Gross Floor Area (GFA), roof area, environmental deck and basement carpark area, if any. Q7. What is the definition of one manday? One manday is taken as one worker working for 8 hours. Thus, if the worker works for 12 hours on a particular day, the actual manday clocked by worker shall be calculated as 12/8 = 1.5 mandays. 2

Q8. For a worker doing multiple trades, which trade do I include the manpower under? A multi-skilled worker who spends more than 50% of his time on a particular trade in one day shall be recorded under that trade even if he performs other trades on the same day. Q9. Can a builder have more than 1 user account in the epss? Yes. Each builder should designate an epss administrator from his/her company. BCA will issue a Username and Password to the epss administrator. The administrator can log into the epss and issue multiple accounts to other users in the company, e.g. one account for each project site. More details can be found in the User Guide. Q10. How do I register new projects for monthly productivity data submission? New projects are created by BCA while users are only able to view or edit project details. However, if you wish to create your building projects in epss where those projects are not subjected to Buildability framework, you may send your request to BCA_EPSS@bca.gov.sg. epss admin will create the project profile in the system for your subsequent submissions of monthly productivity data. Q11. How to submit the Productivity Data? Are there any forms or templates to follow? There are two methods to submit monthly productivity data. One method is to key in the data manually by following the steps on page 8 and 11 of the User Manual epss Guidebook on BCA Electronic Productivity. Another method is to import a manpower report which is generated by the biometric system. The steps are shown on page 5 and 15 under Section 3.1 and 3.5 respectively. For the latter, the manpower report template can be found on the home page once you have login to the epss. You may inform your biometric system supplier to customize the manpower report according to the manpower report template, so that epss can recognize and retrieve the relevant information from your report. Please refer to the User Manual for more details. Q12. How do I amend the submitted data? Once you have submitted the monthly productivity data, the submission status for the month which you submitted for will be marked as SUBMITTED. You are still allowed to make changes to the productivity data if the status is SUBMITTED. Please click the orange rectangular button labelled as EDIT DATA found on the right of the form. 3

Once the submission is confirmed by the BCA, the submission status will be changed to CLOSED and no changes are allowed. You may contact BCA if you would like to make further changes to a CLOSED submission. Q13. Who is the qualified person for epss update, the appointed technical personnel or the approved personnel? The submission of manpower data to epss does not require a specific qualified person, as long as the person is granted access and responsible for the safeguarding of the company s manpower data. Q14. I am unable to recall the previous Username and Password. Can I request for a new Username and Password? Yes, if you have forgotten the Password or would like to request for a new Username and Password, please email us at BCA_EPSS@bca.gov.sg. EPSS admin will reset the password or create a new account for you once your identity is verified. Q15. How do I change the user account details if our administrator has left the company? You may login to the epss and change the user account details under the Admin tab. Q16. How do I change the completion date of the project if there is an extension to the project duration? You may login to the epss and change the completion date under the tab View/edit project for each respective project. This step applies for editing of other project details such as the Gross Floor Area, Roof Area, Buildable Design Score and Constructability Score etc. Biometric Authentication System (BAS) Q1. What are the hardware requirements for BAS? The hardware requirements shall include the following: a) Biometric readers that has the following features: 4

Located at all worksite entrance and exit for the purpose of electronically monitoring and tracking the manpower usage throughout the contract duration. Robust and durable design that is suitable for rugged construction environment Fast and secure sensor that accurately captures and authenticates distinguishing physiological traits. At each controlled access location, the system shall be able to achieve a maximum clearance time of 1 minute for every 10 persons. b) Provision to guide the flow of workers (e.g. turnstiles and railings) c) A real time monitoring and recording device installed at each controlled access point to prevent any fraudulent attempt by the site personnel. d) Suitable measure(s) (e.g. backup battery supply etc.) such that the integrity of the manpower monitoring data is not affected during power outage. Q2. What are the software requirements for BAS? The software requirements shall include the following: a) Accurately monitor and track the manpower under their respective trade b) Generate raw data or output in the required format which shall include employee name, date, clock in time, clock out time, tabulation on the number of hours at site c) Generate the manpower report according to BCA s current epss in Microsoft Excel format (please refer to: Appendix A for building project template Appendix B for rail project template Appendix C for road project template) The Contractor shall refer to BCA s website (https://www.bca.gov.sg/epss/ ) for the latest requirements on manpower submission to epss. Q3. What is the cost of setting up the BAS system together with all the hardware and software including operation and maintenance cost? Generally, the cost of setting up a BAS system that includes the software, hardware, turnstile and railings for 2 access points on site about $30k to $40k. Nevertheless, the price of BAS varies according to site condition and system requirement. The user should consult BAS vendors and select a system which suits the project site. Some examples of such BAS vendors are listed in Table A below. For BAS that will be adopted in construction projects to monitor the manpower usage and linked to the submission of manpower data through the epss, builders can seek 5

financial support to defray the cost of adoption from the Mechanisation Credit (MechC) Scheme under the Construction Productivity and Capability Fund (CPCF). For more information on the MechC scheme, please refer to http://www.bca.gov.sg/mechc/mechc.html. Table A: List of some vendors who have supplied and installed BAS to past local construction projects for the purpose of submitting monthly productivity data via the epss S/N Vendors 1. ADEMCO (Far East) Pte Ltd 2. Auto System Pte Ltd 3. Bartronics Asia Pte Led 4. Elid Technology International Pte Ltd 5. Flick Solutions Pte Ltd 6. Future Net Technologies Pte Ltd 7. Intercorp Solutions Pte Ltd 8. IqDynamics Pte Ltd 9. Malifax Technologies (S) Pte Ltd 10. Oneberry Technologies Pte Ltd 11. Professional Software Systems Pte Ltd 12. Securcomm Solution Pte Ltd 13. Smart Touch Technology Pte Ltd 14. Synergix Technologies 15. VHSoft Technologies Co Ltd 16. XID Technologies Pte Ltd 17. Elixir Technology 18. Magicsoft Asia Pte Ltd 19. NEC Corporation 20. Info Tech, Inc 21. Echol Tech Pte Ltd NOTE: The above publishing of BAS vendors is solely for the purpose of sharing of information to facilitate the industry users to source for such products. They do NOT represent any form of endorsement, approval or accreditation by BCA for their purchase, lease or use. Please note that this list is not exhaustive. Q4. Is the installation and operation of the BAS compulsory? To enhance the reliability and efficiency in the collection of Construction Productivity Data, builders need to install and operate the BAS for building works with Gross Floor Area (GFA) of 5000 m2 or more submitted for Planning Permission on or after 1 November 2014. This is mandated under Regulation 10(a) of the Building Control (Buildability and Productivity) Regulations 2011. Builders will submit the Construction Productivity Data obtained from the BAS via the epss. 6

Appendix A: Sample Report Format for EPSS Submission (For Reference Only) -Building project Submission of Monthly Manpower Usage Builder UEN No. Project BP No. Project Name Builder Month that data is submitted for Year that data is submitted for Trades Site Management Team Site Management Team Manpower Used (mandays) Basement Site Clearance & Mobilisation Machine Operator Excavation Work Temporary Retaining Structure Carpentry System Formwork Installation Steel Reinforcement Fixing Pre-stressing Work Precast Concrete Installation Waterproofing Architectural Works M&E Works Sub-Total (Basement) 7

Structure Works Carpentry System Formwork Installation Steel Reinforcement Fixing Pre-stressing Work Precast Concrete Installation Structural Steel Work Sub-Total (Structure Works) Architectural Works Brick/ Blockwall Precast Concrete Installation Plaster Skim-coat Dry Partition Wall Glass Partition Cladding/ Curtain Wall Waterproofing Floor Screeds & hardeners Tiling/ Marble/ Stone Wood Flooring Resilient Flooring (Carpet, Vinyl) Resilient Flooring (Laminate) Raised Floor False Ceiling Door Window Cabinets & Wardrobe Painting Roofing System Sub-Total (Architectural Works) 8

Building Services and M&E Works Plumbing/ Sanitary/ Gas System Fire Prevention and Protection System Electrical System ACMV System Lift/ Escalator Sub Total (Building Services and M&E Works) General Machine Operator Quality Assurance Scaffold Safety and Health Sub-Total (General) External Works Estates Roads, Driveways, Road Ancillaries, Footways Landscape Sub-Total (External Works) 9

Appendix B: Sample Report Format for EPSS Submission (For Reference Only) -Rail Project Submission Of Monthly Manpower Usage Builder UEN No. Project BP No. Project Name Builder Month that Data is submitted for Year that Data is submitted for Trades Site Management Team Site Management Team Manpower Used (mandays) ERSS/Excavation (Station/Viaduct/Cut and cover tunnels/depot) Site Clearance & Mobilisation Machine Operator Demolition Works Soil Improvement Works (e.g. JGP, WSM, etc.) Ground Freezing Retaining Structures (e.g. Dwall) Vertical Elements (e.g. King Posts, Deck Posts, etc.) Under-pinning Works Formwork Installation Steel Reinforcement Fixing Waterproofing Temporary Strutting/Sheet piling/propping Works Shortcreting Works Rock Mining Micro-tunnelling Recharge Well/Passive Relief Well Blasting Excavation Work 10

Sub-Total (ERSS/Excavation) Permanent Structure Works (Station/Viaduct/Cut and cover tunnels/depot) Machine Operator Piling Works Formwork Installation Steel Reinforcement Fixing Pre-stressing work Precast structural concrete component installation Structural Steel Work Waterproofing Viaduct Segment Casting Viaduct Segment Handling Viaduct Segment Launching Viaduct Deck Furnitures Sub-Total (Permanent Structure Works) Bored Tunnelling Works TBM Operator Ring Builder/grouter (including surface ops.) Segment and service handling Locomotive driver Bridge/Mobile crane operator Rigger/signal worker Segment gasket installer Mechanical and electrical workers Storemen and general workers Sub-Total (Bored Tunnelling Works) Architectural Works General Work Waterproofing Fire Stopping 11

Sprayed mineral fire protection Structural Carcass Work Concrete Finishes and precast concrete panels Brick and Block Construction Stone Masonry Enclosure Work Roofing External Cladding Stone Cladding Glazing Doors and Hatches Roller Shutters and Grilles Door and Window Hardware Louvres Internal Cladding Vitreous Enamel Panels Partitions Finishing Work Suspended Ceiling Cementitous Toppings Granite Flooring Tactile Paving Access Floor Plastering Tiling Resilient Finishes Gratings Painting Metal Fixtures Commissioning Work Furniture and Fittings Signs, advertising and displays Sub-Total (Architectural Works) Building Service and E&M Works (Exclude System-Wide Contracts) 12

Plumbing and Sanitary Fire Prevention and Protection System Electrical system ACMV/HVAC system Lift /Escalator Earth Mat/ Touch Voltage Protection Cable ducts/pits Waste water treatment Sub-Total (Building Service and M&E Works) General Machine Operator Quality Assurance Scaffold Safety and Health Sub-Total (General) External Works Trial Trench/Utility Detection Underground Obstruction Utilities Diversion Drain Diversion/Drainage works Traffic Diversion External Paving Roads and Driveways Bus Shelters, Linkways, Taxi Stands, Drop-off Bays, Road Ancillaries Fencing Landscape Sub-Total (External Works) 13

Appendix C: Sample Report Format for EPSS Submission (For Reference Only) -Road Project Builder UEN No. Project BP No. Project Name Builder Month that Data is submitted for Year that Data is submitted for Site Management Team Site Management Team Trades ManPowerUsed(mandays) General Works Site Clearance & Mob-in Surveying Soil Investigations Instrumentations Health & Safety & General Maintenance HouseKeeping Utilities Diversion/Support Demolition Work SubTotal(General Works) Tunnel/Underpass/Culverts (>5m internal span) Temporary Works Machiner Operator Ground Improvement Works Excavation Work Structural Steel Works(e.g. struts, king post, decking) Falsework Formwork System formwork 14

Traffic Diversion Permanent Works Ground Improvement Works Excavation (D-wall trenching) Formwork Steel Reinforcement Fixing Structural Steel Work Waterproofing Backfill of Earth Road Works Premixing kerb, grating, EM trench Precast concrete component (e.g. painting, erection of signage) Electrical and Mechanical Works Plumbing/ Sanitary/ Gas System Fire Prevention and Protection System Electrical System ACMV System Lift/ Escalator Earth Mat/Touch Voltage Protection Cable ducts/pits SubTotal(Tunnel/Underpass/Culverts (>5m internal span) At-grade Road Widening / Construction Temporary Works (Retaining Wall/Drain/Culvert < 5m internal span) Ground Improvement Works 15

Excavation Work Formwork Earth retaining structures Traffic diversion Permanent Works (Retaining Wall/Drain/Culvert < 5m internal span) Ground Improvement Works Formwork Steel Reinforcement Fixing Premixing including sub-base, base and road base Grating and Railing Planting/turfing Bus stops and Linkways Precast concrete component Ancillary Works Backfill of Earth (e.g. painting, erection of signage) SubTotal(At-grade Road Widening / Construction) Elevated Structures such as Flyovers & Viaducts (Including POB) Temporary Works Ground Improvement Works Earth Retaining Structures Excavation Work Formwork System formwork Falsework Steel work such as fabrication of launching girder Traffic Diversion Permanent Works 16

Formwork Steel Reinforcement Fixing Pre-stressing/post-tensioning Launching of precast segment Waterproofing Backfill of Earth Road Works Premixing Grating and Railing Planting / Turfing Precast concrete component (e.g. painting, erection of signage) Ancilliary Works Irrigation System Cable ducts/pits SubTotal(Elevated Structures) 17