Dell Force10 S25 Systems. Quick Start Guide. Regulatory Model: S25N/S25V/S25P



Similar documents
Active Fabric Manager (AFM) Plug-in for VMware vcenter Virtual Distributed Switch (VDS) CLI Guide

Dell Fabric Manager Installation Guide 1.0.0

BX7000 Multi-Access Gateway Getting Started Guide

Configuring the Switch with the CLI-Based Setup Program

Installing idrac Certificate Using RACADM Commands

How To Create A Web Server On A Zen Nlb (Networking) With A Web Browser On A Linux Server On An Ipad Or Ipad On A Raspberry Web 2.4 (

idrac7 Version With Lifecycle Controller 2 Version 1.1 Quick Start Guide

Managing Web Server Certificates on idrac

Dell Latitude E6320. Setup and Features Information. About Warnings. Front and Back View

Express5800/120Ed. Rack Mount Kit Installation Procedures PN:

Hardware Manual Product Model: DAS-3626 VDSL2 Switch Release 1.00

Dell EqualLogic PS Series iscsi Storage Arrays With Microsoft Windows Server Failover Clusters Hardware Installation and Troubleshooting Guide

Dell Wyse Datacenter for View RDS Desktops and Remote Applications

Getting Started Guide for the Catalyst 2960-X and 2960-XR Switches

Dell Precision Workstation T3600/T5600/ T7600

MCR1900 Media Converter 19-Slot Chassis

Dell Solutions Configurator Guide for the Dell Blueprint for Big Data & Analytics

Quick Start Guide. Cisco Small Business. 300 Series Managed Switches

AI120 AIswitch Series 120 Chassis

Chassis, Power Supply, and Element Management

Dell Vostro 3350/3450/3550/3750

BODi rs BD004 Series Bandwidth-on-Demand Internet with Reliability and Survivability. Quick Start Guide NOTES

HP Port Switches Quick Setup Guide

Starting a Management Session

Using Dell EqualLogic and Multipath I/O with Citrix XenServer 6.2

Dell Vostro 3460/3560

How to Set Up Your NSM4000 Appliance

Dell Server Management Pack Suite Version For Microsoft System Center Operations Manager And System Center Essentials User s Guide

Quick Start Guide. Cisco Small Business. 200E Series Advanced Smart Switches

Job Aid Pre-Installation Information S8500 Media Server

About the BitStorm 6051 POTS Splitter

Recommended Methods for Updating Firmware on Dell Servers

Quick Start Guide Series 1 RU Gen 2 Data Center Switches. Arista Networks. DCS-7150S-64 PDOC

PS6500 Storage Arrays Rack Mount Instructions

IP DSLAM IDL Quick Installation Guide

Quick Setup Guide. Tandberg Data DPS1000 Series Model: DPS1100 and DPS1200, Release: 1.3

NetClock 9400 SeriesTM

10 Port L2 Managed Gigabit Ethernet Switch with 2 Open SFP Slots - Rack Mountable

High Performance SQL Server with Storage Center 6.4 All Flash Array

Industrial L2+ Managed Gigabit/ 10 Gigabit Ethernet Switch. IGS-5225 Series. Quick Installation Guide

Command Line Interface User s Guide

NC-12 Modbus Application

Configuring the Switch with the CLI Setup Program

Quick Start Guide. 500 Series Stackable Managed Switches

Dell Latitude 3440/3540

Switch Quick Configuration CLI Guide for

HP UPS R1500 Generation 3

BIT COMMANDER. Serial RS232 / RS485 to Ethernet Converter

Dell Latitude E5440/E5540

Connector and Cable Specifications

Adit 3200 QUICK START GUIDE

How To Install An At-S100 (Geo) On A Network Card (Geoswitch)

Moxa EtherDevice Switch

MX5, MX10, MX40, and MX80 3D Universal Edge Router Quick Start

HP R12000 and R18000 DirectFlow UPS User Guide

Industrial-Grade UPS System Heavy-duty power protection for harsh industrial environments

N560 series H/W Installation Guide

Intel Active Management Technology with System Defense Feature Quick Start Guide

Uninterruptible Power Supply

Remote Installation of VMware ESX Server Software Using Dell Remote Access Controller

Dell Latitude E6540. Setup and Features Information. Front and Back View. About Warnings

Acano solution. Acano Solution Installation Guide. Acano. January B

HP StorageWorks 8Gb Simple SAN Connection Kit quick start instructions

Citrix NetScaler Citrix NetScaler 10.1 Quick Start Guide: MPX 8005/8015/8200/8400/8600/8800 Platform

INSTALLATION INSTRUCTIONS

8800 Series VAC PSU XCM88PS1

Installation and Setup Guide EMC DATA DOMAIN DD610 STORAGE SYSTEM

HUAWEI Tecal E6000 Blade Server

Upgrade to Microsoft Windows Server 2012 R2 on Dell PowerEdge Servers Abstract

DSA E-Series E2600, DE1600, DE6600. en Storage System Site Preparation Guide

How To Connect To A Network On A Pc Or Mac (For Mac) On A Microsoft Mac 2.5 (For Ipo) On An Ipo 2.2 (For Pc) On Zephone (For Pnet) On

RC001-4/RC002-4 (REV.B) 4-slot rack mounted chassis User manual

EMBEDDED ACCESS CONTROL Hardware Installation Guide

Full_IG.book Page 1 Monday, January 9, :11 PM. ProSafe 24 Port Gigabit Switch Installation Guide

Connecting to the Switch

Senses SV series industrial monitor user manual

Storage System. Planning Checklist. EC E1, First Edition

UPS Network Interface. Quick InstallationGuide

Foglight Experience Monitor and Foglight Experience Viewer

Command Line Interface User s Guide

Unpacking the Product. Rack Installation. Then, use the screws provided with the equipment rack to mount the firewall in the rack.

Configuring iscsi Multipath

SIP Proxy Server. Administrator Installation and Configuration Guide. V2.31b. 09SIPXM.SY2.31b.EN3

Ixia Director TM. Powerful, All-in-One Smart Filtering with Ultra-High Port Density. Efficient Monitoring Access DATA SHEET

Dell OpenManage Network Manager Version 5.3 Service Pack 2 Quick Start Guide

How To Install A Cisco Cisco 520-T1 Router On A Network Card (Cisco) With A Network Cable (Cio) And A Network (Cnet) (Coconc) (Net) And An Ipo (

McAfee Firewall Enterprise

INSTALLATION GUIDE. Card Reader & Controller with KIM Swipe Reader for Solitaire 850 / 950 / 850L Learnlok PK2930

Quick Start Guide. Cisco Small Business. 300 Series Managed Switches

Setting Up the Cisco IP Phone

About the HotWire Slot Standalone Shelf

Setting Up and Testing the MAX Hardware

AT-9400Ts Stack Installation Guide

VMware vsphere 5 on Dell PowerEdge Systems Deployment Guide

SuperLoader 3. Quick Start Guide. Installing the Autoloader 0

Small form factor bay converter and hard drive installation

Quick Installation Guide 24-port PoE switch with 2 copper Gigabit ports and 2 Gigabit SFP ports (af Version 15.4W)

dedicated KVM switch and rackmount screen technology User Manual IP-S101 Combo KVM Extender Designed and manufactured by Austin Hughes

USER MANUAL GUIMGR Graphical User Interface Manager for FRM301/FRM401 Media Racks

Daker DK 1, 2, 3 kva. Manuel d installation Installation manual. Part. LE05334AC-07/13-01 GF

Transcription:

Dell Force10 S25 Systems Quick Start Guide Regulatory Model: S25N/S25V/S25P

Dell Force10 S25 Systems Quick Start Guide Regulatory Model: S25N/S25V/S25P

Notes, Cautions, and Warnings NOTE: A NOTE indicates important information that helps you make better use of your computer. CAUTION: A CAUTION indicates potential damage to hardware or loss of data if instructions are not followed. WARNING: A WARNING indicates a potential for property damage, personal injury, or death. If you purchased a Dell n Series computer, any references in this publication to Microsoft Windows operating systems are not applicable. Information in this publication is subject to change without notice. 2011 Dell Inc. All rights reserved. Reproduction of these materials in any manner whatsoever without the written permission of Dell Inc. is strictly forbidden. Trademarks used in this text: Dell, the DELL logo, Dell Precision, OptiPlex, Latitude, PowerEdge, PowerVault, PowerConnect, OpenManage, EqualLogic, KACE, FlexAddress and Vostro are trademarks of Dell Inc. Intel, Pentium, Xeon, Core and Celeron are registered trademarks of Intel Corporation in the U.S. and other countries. AMD is a registered trademark and AMD Opteron, AMD Phenom, and AMD Sempron are trademarks of Advanced Micro Devices, Inc. Microsoft, Windows, Windows Server, MS-DOS and Windows Vista are either trademarks or registered trademarks of Microsoft Corporation in the United States and/or other countries. Red Hat Enterprise Linux and Enterprise Linux are registered trademarks of Red Hat, Inc. in the United States and/or other countries. Novell is a registered trademark and SUSE is a trademark of Novell Inc. in the United States and other countries. Oracle is a registered trademark of Oracle Corporation and/or its affiliates. Citrix, Xen, XenServer and XenMotion are either registered trademarks or trademarks of Citrix Systems, Inc. in the United States and/or other countries. VMware, Virtual SMP, vmotion, vcenter, and vsphere are registered trademarks or trademarks of VMWare, Inc. in the United States or other countries. Other trademarks and trade names may be used in this publication to refer to either the entities claiming the marks and names or their products. Dell Inc. disclaims any proprietary interest in trademarks and trade names other than its own. Regulatory Model: S25N/S25V/S25P 2011-9 P/N 0594R1 Rev. A00

About this Guide This document is intended as a Quick Start Guide to get new systems up and running and ready for configuration. For complete installation and configuration information, refer to the following documents: Documentation S25N/S25V S25P Hardware installation and power-up instructions Installing S25N and S25V Systems Installing the S25P System Software configuration FTOS Configuration Guide FTOS Configuration Guide Command line interface FTOS Command Line FTOS Command Line Reference Guide Reference Guide Latest updates FTOS Release Notes for the S-Series FTOS Release Notes for the S-Series About this Guide 3

4 About this Guide

1 Installing the Hardware This guide assumes all site preparation has been performed before installing the chassis. Installing the Chassis in a Rack or Cabinet To install the S25N, S25V, or S25P system, Dell Force10 recommends that you complete the installation procedures in the order presented below. NOTE: Unless stated otherwise, the installation instructions below apply to the S25N, S25V, and S25P systems. Always handle the system and its components with care. Avoid dropping the switch or its field replaceable units. CAUTION: Always wear an ESD-preventive wrist or heel ground strap when handling the chassis and its components. As with all electrical devices of this type, take all necessary safety precautions to prevent injury when installing this system. Electrostatic discharge (ESD) damage can occur if components are mishandled. Installing a Chassis in a Two-Post Rack The chassis is shipped with the universal front-mounting brackets (rack ears) attached. Ensure that there is adequate clearance surrounding the rack to permit access and airflow. The S25 chassis can be installed using several methods. This document describes the most common installation method: two-post rack. For information regarding other installation methods, refer to the Installing S25N and S25V Systems guide and the Installing the S25P System guide. This document does not include stacking or installing stacked units. Refer to the Installing S25N and S25V Systems guide and the Installing the S25P System guide for details on stacking installation and cabling. Installing the Hardware 5

Alarm AC DC XFP25 27 XFP26 P28 STACK ID Alarm AC1 AC2 XFP25 27 XFP26 P28 Stack ID S50-01-GE-24V S25-01-GE-24P Step Task 1 Dell Force10 recommends that one person hold the chassis in place while a second person attaches the brackets to the posts. 2 Position the unit in the rack. Secure the unit with two of the supplied screws through each bracket and onto the rack post. S25N/V S25P 6 Installing the Hardware

Attach a Ground Cable to the System CAUTION: To prevent electrical shock, make sure the switch is grounded properly. If you do not ground your equipment correctly, excessive emissions can result. Use a qualified electrician to ensure that the power cables meet your local electrical requirements. NOTE: The rack installation ears are not suitable for grounding. CAUTION: Grounding conductors must be made of copper. Do not use aluminum conductors. NOTE: Coat the one-hole lug with an anti-oxidant compound prior to crimping. Bring any un-plated mating surfaces to a shiny finish, and coat with an anti-oxidant prior to mating. Plated mating surfaces must be clean and free from contamination. Connect the grounding cable to the FG terminal first (located on the PSU side of the chassis), then connect the opposite end to the appropriate grounding point at your site to ensure an adequate unit ground. Install the SFP and XFP Optics The S25 chassis have four receptacles on the I/O side that accommodate 10/100/1000 SFP optical transceivers. Additionally, the S25 has bays on the PSU side that accommodate optional CX4 or XFP modules. A 10GbE module contains two ports. 10GbE modules should only be inserted or removed when the switch is powered down. SFP and XFP transceivers can be inserted or removed while the switch is running. CAUTION: Before connecting a transceiver to a source, check the receive power of the transceiver with an optical power meter. Generally, Dell Force10 specified optics are not to be subjected to receive power higher than that stipulated by the optic specification. If the optic is exposed to optical power in excess of the specification, there is a high likelihood that it will be damaged. Installing SFPs NOTE: When a copper SFP2 module with catalog number GP-SFP2-1T is used in the S25P switch, the SFP speed can be manually set with the speed command. When the speed is set to 10 or 100 Mbps, the duplex command can also be executed. Installing the Hardware 7

CAUTION: Electrostatic discharge (ESD) damage can occur if components are mishandled. Always wear an ESD-preventive wrist or heel ground strap when handling the chassis and its components. WARNING: Follow all warning labels when working with optical fibers. Always wear eye protection when working with optical fibers. Never look directly into the end of a terminated or unterminated fiber or connector as it may cause eye damage. Step Task 1 Position the SFP so it is in the upright position. (The SFP optic has a key that prevents it from being inserted incorrectly.). 2 Insert the SFP into the port until it gently snaps into place. S25N/V with SFP S25P with SFP S25-01-GE-24P 8 Installing the Hardware

Installing XFPs CAUTION: Electrostatic discharge (ESD) damage can occur if components are mishandled. Always wear an ESD-preventive wrist or heel ground strap when handling the chassis and its components. WARNING: Follow all warning labels when working with optical fibers. Always wear eye protection when working with optical fibers. Never look directly into the end of a terminated or unterminated fiber or connector as it may cause eye damage. CAUTION: You can insert and connect XFP transceivers while the switch is operating. You can also disconnect and remove XFP transceivers while the switch is operating. However, inserting or removing the module is not supported; it can crash or lock up the switch, requiring a reboot. CAUTION: The CX4 module does not use transceivers. However, you can use a CX4 cable with an XFP port by inserting a CX4 XFP converter (catalog name GP- XFP-1CX4) into the slot. An XFP port does not support the use of the cx4-cable-length command. Step Task 1 Position the XFP so it is in the upright position. (The XFP optic has a key that prevents it from being inserted incorrectly.). 2 Insert the optic into the port until it gently snaps into place. NOTE: For details on Dell Force10 supported optics, refer to http://www.force10networks.com/products/specifications.asp Installing the Hardware 9

Power Up Sequence Supply Power and Power Up the System There is no power switch. Supply power to the unit only after it is mounted. S25N CAUTION: To prevent electrical shock, make sure the switch is grounded properly. If you do not ground your equipment correctly, excessive emissions can result. Use a qualified electrician to ensure that the power cables meet your local electrical requirements. NOTE: A US AC power cable is included in the shipping container for powering up an AC power supply. All other power cables must be ordered separately. The S25N has two AC receptacles in the PSU side of the unit. The system can use either power source independently, or act in load-sharing mode. S25V The S25V has both an AC (3-prong plug receptacle) and a DC (-48V terminaltype) connection on the PSU side of the unit. Each power source can be used independently or in load-sharing combination. In other words, you have three options for providing power to the switch AC only, DC only, or using both AC and DC sources. To use AC only, connect the supplied AC power cord first to the switch (receptacle on the right as you face the PSU side of the unit) and then to the power source. Connect the plug to the AC receptacle, making sure that the power cord is secure. For DC power, you must provide your own cables to connect to the power source. Cables must be sized for 11.5 A service at no more than -48 VDC input. Step Task 1 Make sure that the remote power source (the circuit breaker panel) is in the OFF position. 2 Remove the safety cover from the DC terminal block. 10 Installing the Hardware

Step S25P The S25P has two AC power supplies acting in load-sharing mode or can be used independently. Use the power cords shipped with the S25P to connect it to AC power outlets, ideally on separate circuits. Several versions of the power cord are available, based on country requirements. S25P-DC Task 3 Connect the -48 V and -48 V RTN (Return) cables to the switch terminals and then to the remote power sources. 4 Replace the safety covers on the DC terminal block. The PSU side of the S25P-DC contains two terminal blocks for two DC power supply inputs acting in load-sharing mode. The left terminal block, as you face the PSU side, corresponds to the DC2 status LED on the I/O side of the switch; DC1 is on the right. Cables must be sized for 11.5 A service at -48VDC input (per NEC in the United States. Internationally, follow local safety codes.) Step Task 1 Make sure that the remote power source (the circuit breaker panel) is in the OFF position. 2 Remove the safety cover from the DC terminal block. 3 Connect the grounding cable to the FG terminal first, then connect the opposite end to the appropriate grounding point at your site to ensure an adequate chassis ground. 4 Connect the -48 V and -48 V RTN (Return) cables to the switch terminals and then to the remote power sources, ideally on separate circuit breakers. 5 Replace the safety covers on the DC terminal blocks. 6 If you are connecting both terminal blocks, do not supply power until both terminal blocks are connected. You can supply power to either one or both. The S25P-DC uses the power supplies in load-sharing mode and does not set a precedence for either power source. Failover is hitless. Installing the Hardware 11

CAUTION: Electrostatic discharge (ESD) damage can occur if components are mishandled. Always wear an ESD-preventive wrist or heel ground strap when handling the system and its components. Power Supplies On the S25N, S25V, and S25P systems, either the AC or DC power supplies alone are sufficient to power the switch. When both AC and DC power supplies are connected, they act in roughly a 60%/40% load-sharing mode. WARNING: To prevent electrical shock, make sure the system is grounded properly. If you do not ground your equipment correctly, excessive emissions may result. Use a qualified electrician to ensure that the power cables meet your local electrical requirements. Fans Ventilation is side-to-side, on the switch as you face the I/O side. The fans operate at a constant speed and with automatic speed adjustment for temperature changes. Switch Number of Fans S25N 4 S25V 5 S25P 6 For the S25N and S25V, FTOS turns on major and minor alarms and logs temperature warnings at the following temperatures (in degrees Celsius), and logs another message when the temperature returns to normal. The Command Line Interface (CLI) also reports an alarm. The fan speed changes accordingly. Temperature Warnings (in Degrees S25N S25V Celsius) Major On 62 60 Major Off 58 56 Minor On 60 58 Minor Off 50 47 12 Installing the Hardware

Specifications Chassis Physical Design Parameter S25N/V Specifications S25P Specifications Height 1.73 inches (4.4 cm) 1.73 inches (4.4 cm) Width 17.32 inches (44.0 cm) (19" rack-mountable) 17.32 inches (44.0 cm) (19" rack-mountable) Depth Chassis weight with factory-installed components 16.73 inches (42.5cm) (standard 1 rack unit) 19.5 pounds (approx.) (8.85 kg) 16.73 inches (42.5cm) (standard 1 rack unit) 14.41 pounds (approx.) (6.54 kg) Rack clearance required Front: 5-inches (12.7 cm) Rear: 5-inches (12.7 cm) Front: 5-inches (12.7 cm) Rear: 5-inches (12.7 cm) Environmental Parameters Parameter S25N/V Specifications S25P Specifications Temperature 32 to 122 F (0 to 50 C) (-40 to 158 F (-40 to 70 C) non-operating (storage temperature) 32 to 122 F (0 to 50 C) (-40 to 158 F (-40 to 70 C) non-operating (storage temperature) Maximum Thermal Output Maximum altitude Relative humidity S25N: 349.05 BTU/Hour S25V: 349.05 BTU/Hour No performance degradation to 10,000 feet (3,048 meters) 10 to 85% non-condensing (operating) 5 to 95% non-condensing (storage) S25P: 305 BTU/Hour S25P-DC: 262 BTU/Hour No performance degradation to 10,000 feet (3,048 meters) 10 to 85% non-condensing (operating) 5 to 95% non-condensing (storage) Shock MIL-STD-810 MIL-STD-810 Vibration Telcordia GR-63-CORE Telcordia GR-63-CORE Installing the Hardware 13

Parameter S25N/V Specifications S25P Specifications ISO 7779 A-weighted sound pressure level S25N: 42.0 dba at 73.4 F (23 C) S25V: 42.9 dba at 73.4 F (23 C) 45.1 dba at 73.4 F (23 C) Power Requirements Parameter S25N/V Specifications S25P Specifications Nominal Input Voltage 90 254 VAC, 47/63 Hz S25P: 90 254 VAC, 47/63 Hz S25P-DC: -48 VDC Maximum Current Draw S25N: 2 A @ 100/120 VAC; 1 A @ 200/240 VAC Minimum AC Current Draw S25V (AC): 6.5 A @ 100/120 VAC; 3.25A @ 200/240 VAC S25V (DC): 11.5A @ -48 VDC.35 A @ 254 VAC.62 A @ 90 VAC S25P: 2 A @ 100/120 VAC; 1 A @ 200/240 VAC S25P-DC: 3.6 A @ -48 VDC.25 A @ 254 VAC.56 A @ 90 VAC Maximum power consumption Maximum PoE power S25N, S25V: 102W S25N (AC): 156W S25N (DC): 136W 320W for PoE using either AC or DC inputs 790W for PoE using loadsharing AC and DC inputs S25P: 90W S25P-DC: 77W Installing Power Supplies The S25N, S25V, and S25P are shipped with power supplies installed and are not hot-swappable. 14 Installing the Hardware

2 Installing the Software Navigating CLI Modes The FTOS prompt changes to indicate the CLI mode. You must move linearly through the command modes, with the exception of the end command which takes you directly to EXEC Privilege mode; the exit command moves you up one command mode level. Console Access Access the command line through a serial console port or a Telnet session. When the system successfully boots, you enter the command line in the EXEC mode. NOTE: You must have a password configured on a virtual terminal line before you can Telnet into the system. Therefore, you must use a console connection when connecting to the system for the first time. Serial Console The RS-232 console port is labeled on the chassis. It is in the upper right-hand side, as you face the PSU side of the chassis. Installing the Software 15

Stack ID AC1 XFP25 XFP26 Alarm AC2 P28 27 Step Task 1 Install the RJ-45 copper cable that is shipped with the system into the console port. CAUTION: You must install a straight-through RJ-45 copper cable (a standard Ethernet cable) into the console port. This is different from many other implementations that require an Ethernet crossover cable (or rollover cable). If connecting to a terminal server and using a crossover cable, daisychain another crossover cable to effectively get a straightthrough cable connection. Many console terminal servers use octopus cables that are crossover cables. To accommodate the octopus cable, connect an additional crossover cable, as above, to effectively install a straight-through cable. 2 If necessary, connect the RJ-45/DB-9 adapter that is shipped with the system to the end of the RJ-45 cable that will connect to your terminal. 16 Installing the Software

Step Task 3 Set your initial console terminal settings to match the default console settings on the switch. 9600 baud rate No parity 8 data bits 1 stop bit No flow control (console port only) After establishing a connection, you can modify the settings to match at each end of the connection. 4 S25P only: If you use the console port to download software to the switch, you will probably want to raise the console baud rate. Establish a connection with the default settings to verify the connection. Then use the lineconfig command to access the Line Config mode, and use the serial baudrate command to raise the baud rate on the console port. (Match the settings in your terminal access program.) Accessing the Console Port Connect the RJ-45/DB-9 adapter that is shipped with the S25P system to the RJ- 45 cable. Table 2-1. Pin Assignments for Console Port Signal RJ-45 Pinout NC 1 NC 2 RXD 3 GND 4 GND 5 TXD 6 NC 7 NC 8 Installing the Software 17

Default Configuration A version of the Dell Force10 Operating System (FTOS) is pre-loaded onto the chassis, however the system is not configured when you power up for the first time (except for the default hostname, which is Force10). You must configure the system using the Command Line Interface (CLI). Configure Layer 2 (Data Link) Mode Use the switchport command in INTERFACE mode to enable Layer 2 data transmissions through an individual interface. The user cannot configure switching or Layer 2 protocols such as spanning tree protocol on an interface unless the interface has been set to Layer 2 mode. Step Task Command Syntax Command Mode 1 Enable the interface. no shutdown INTERFACE 2 Place the interface in Layer 2 (switching) mode. switchport To view the interfaces in Layer 2 mode, use the show interfaces switchport command in the EXEC mode. Configure a Host Name INTERFACE The host name appears in the prompt. The default host name is Force10. Host names must start with a letter and end with a letter or digit. Characters within the string can be letters, digits, and hyphens. Task Command Syntax Command Mode Create a new host name. hostname name CONFIGURATION Access the System Remotely You can configure the system to be accessed remotely by Telnet. 18 Installing the Software

The S25N, S25V, and S25P systems do not have a dedicated management port, nor a separate management routing able. Configure any port on one of the chassis to be the port through which you manage the system and configure an IP route to that gateway. Step Task Command Syntax Command Mode 1 Configure an IP address for the port through which you will manage the system. 2 Configure an IP route with a default gateway. 3 Configure a username and password. ip address ip route username INTERFACE CONFIGURATION CONFIGURATION Configure the Management Port IP Address Assign IP addresses to the management ports in order to access the system remotely. NOTE: Assign different IP addresses to each RPM s management port. Step Task Command Syntax Command Mode 1 Enter INTERFACE mode for the Management port. 2 Assign an IP address to the interface. Configure a Management Route interface ManagementEthernet slot/port ip address ip-address/mask CONFIGURATION INTERFACE 3 Enable the interface. no shutdown INTERFACE Define a path from the system to the network from which you are accessing the system remotely. Management routes are separate from IP routes and are only used to manage the system through the management port. Installing the Software 19

Task Command Syntax Command Mode Configure a management route to the network from which you are accessing the system. management route ip-address/mask gateway Configure a Username and Password CONFIGURATION In FTOS, you can assign a specific username to limit user access to the system. Task Command Syntax Command Mode Configure a username and password to access the system remotely. username name [access-class access-listname] [nopassword password [encryption-type] password] [privilege level] Configure the Enable Password CONFIGURATION The EXEC Privilege mode is accessed by the enable command. Configure a password as a basic security measure. When using a console connection, EXEC Privilege mode is unrestricted by default; it cannot be reached by a VTY connection if no password is configured. There are two types of enable passwords: enable password stores the password in the running/startup configuration using a DES encryption method. enable secret is stored in the running/startup configuration in using a stronger, MD5 encryption method. Dell Force10 recommends using the enable secret password. Task Command Syntax Command Mode Create a password to access EXEC Privilege mode. enable [password secret] [level level] [encryption-type] password CONFIGURATION 20 Installing the Software

Create a VLAN The Default VLAN is part of the system startup configuration, and is by default, VLAN 1. You may make another VLAN the Default VLAN. The Default VLAN cannot be deleted, disabled, or configured (you cannot assign it an IP address), and only untagged interfaces can belong to it. When an interface is configured, a switchport automatically places it in the default VLAN as an untagged interface. All switchports must belong to at least one VLAN, so to remove a switchport from the Default VLAN, you must place it as tagged or untagged in some other VLAN, or remove the switchport configuration. Task Command Syntax Command Mode Create a VLAN interface vlan vlan-id CONFIGURATION Display all VLANs. show vlan vlan-id EXEC Privilege Assign Interfaces to a VLAN A port may either be an untagged member of a single VLAN, or a tagged member of perhaps multiple VLANs. Untagged Ports ports that do not append an 802.1Q VLAN tag to frames on egress, and do not accept tagged frames on ingress (tagged frames are dropped). Untagged ports must be connected to VLAN-unaware devices. Tagged Ports ports that append an 802.1Q tag to frames on egress, and accept only tagged frames on ingress (untagged frames are dropped). Tagged ports must be connected to VLAN-aware devices. When you configure an enabled port as a switchport, the port is placed in the default VLAN. To remove a switchport from the default VLAN, remove the switchport configuration. To move the port to another VLAN, add it to the desired VLAN as either a tagged or untagged member. To view just the interfaces that are in Layer 2 mode, enter the show interfaces switchport command in the EXEC mode. Installing the Software 21

Step Task Command Syntax Command Mode 1 Assign a switchport to a VLAN. 2 Display all switchports and the VLANs of which they are members. Assign an IP address to a VLAN [tagged untagged] interface show vlan INTERFACE VLAN EXEC Privilege NOTE: An IP address cannot be assigned to the Default VLAN, which, by default, is VLAN 1. To assign another VLAN ID to the Default VLAN, use the default vlan-id vlan-id command. Task Command Syntax Command Mode Configure an IP address and mask on the interface. ip address ip-address mask [secondary] INTERFACE Connecting the Chassis to the Network Once you have completed the hardware installation and software configuration, you can connect to your company network by following your company s cabling requirements. 22 Installing the Software

Printed in the U.S.A. www.dell.com support.dell.com