DEMVE a Multi-Vendor Laboratory Environment for Research and Education Related to IEC 61850 Renewable Efficient Energy II Conference Vaasa 21.3.2012 Reino Virrankoski University of Vaasa Department of Computer Science Communications and Systems Engineering Group 21.3.2012 1
DEMVE Coordinated by Merinova, funded organizations the University of Vaasa Vaasa University of Applied Sciences (VAMK) Novia University of Applied Sciences Duration 24 months on 1.8.2011-31.7.2013 Building up a multi-vendor environment under IEC 61850 to Technobothnia for research and education purposes IEC 61850 training can then be offered in the context of Vaasa Energy Institute (VEI) 21.3.2012 2
Companies Participating to DEMVE-project 21.3.2012 3
IEC 61850 A standard for electrical substation automation; extended also for communication between substations An important enabler of local electricity production An important enabler of monitoring and control soutions required for Smart Grid Object oriented monitoring and control information for substation control and protection The abstract data models defined in IEC 61850 can be mapped to a number of communication protocols 21.3.2012 4
Baden November 1995 Around 65 persions WG 10 WG 11 WG 12 WG 10 WG 11 IEC 61850 Development History 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 System Overview Coding and Mapping Process Interfaces Committee draft First interoperability tests of bay devices Committee Final draft International Standard in Nimes 2004 IEC 61850 draft for voting Part 1 Introduction and Overview Part 2 Glossary Part 3 General requirements Part 4 System and project management Part 5 Communication requirements for functions and device models Part 6 Configuration description language Part 7 Basic communication structure, Principles and models Part 8 Mappings to MMS Part 9 Specific communication service mapping (SCSM) Part 10 Conformance testing Part 90-1 FOR THE COMMUNICATION BETWEEN SUBSTATIONS International Standard Process continues by technical issues - TISSUES FDFV Standard 2009-05-11 21.3.2012 5
Application Areas of IEC 61850 Standard Multi Vendor Environment Control Centers WAN Industrial Bus Distributed Power Plan Station Bus IEC 61850-8-1 Station Bus IEC 61850-8-1 Station Bus IEC 61850-8-1 Cyber Security Application Process Bus IEC 61850-9-2 M G 21.3.2012 6
IEC 61850 Multi-Vendor Environment VAMP Terminals ABB Terminals Siemens Terminals Schneider Electric Terminals Vacon Terminals Switch & Mervento Wind Turbines 21.3.2012 Erkki Antila, University of Vaasa 7
Challenges Related to IEC 61850 The standard enables distributed packet-connected control architecture, which is necessary to be able to enable local electricity production. It can also increase the system reliability. However, it is a big technological step for the automation systems. The standard allows many different options. As a consequence, the vendor spesific solutions can still be an issue and the compatibility between different vendors is currently not fully guaranteed. 21.3.2012 8
IEC 61850 Multi-Vendor Environment in Technobothnia Control Center Rack 1 (Schneider Electric) Substation Control System PACiS Control Center Rack 2 (ABB) Substation Control System MicroSCADA Pro Ver. 9.3 Building up to be completed during Q2/2012 IEC 61850/Ethernet RJ45/CAT6 Workstation 1 System Configuration Editor (SCE) System Management Tool (SMT) MiCOM S1 Studio COM600 Communication Gateway IEC 60870-5-104/ Ethernet RJ45/CAT6 Workstation 2 PCM600 Ver. 2.4 Engineering Pro + IET600 SAB600 Ver. 3.5 System Diagnostics Workstation 3 VAMPSET ICD-file, IED Capab. Descr. IID-file, IED Description SCD EDITOR SCD-file, Substation Conf. Descr. ICD-file of IED -> CID/IID, SCD & txt files Test Rack 1 Distribution Network 1 Test Rack 2 Distribution Network 2 IEC 61850/Ethernet Backbone-fibre optic Test Rack 3 Subtransmission Network Test Rack 4 Distributed Power Generation IEC 61850/Ethernet Fibre Optic IEC 61850/Ethernet RJ45/ CAT6 IEC 61850/Ethernet Fibre Optic IEC 61850/Ethernet RJ45/ CAT6 2 pcs ABB REF630 2 pcs SE MiCOM P139 2 pcs Siemens 7SJ6311 2 pcs ABB REF615 2 pcs VAMP 255 2 pcs Siemens 7SJ8011 ABB RET630 & REF630 VAMP 265 & VAMP 255 2 pcs Siemens 7SJ6311 2 pcs eroonkytkentäyksikkö (ABB & VAMP) 2 pcs Power Converter (ABB & Vacon) Option for line differential relays (2 pcs ABB RED615) Protection Relay Test Set and Commissioning Tool Waveform recording tool 21.3.2012 9
Research Issues Related to IEC 61850 Multi- Vendor Environment in Technobothnia Creation of core criterias to enable the compatibility between different vendors. Classification and instruction of interface requirements such that the automation requirements are filled. Reasearch regarding the compatibility of the files created by the software tools of different vendors. A simple conversion middleware will be made for the most important interfaces, if needed. Interfacing with wireless communication (long distance links, wireless sensor networks, etc.) 21.3.2012 10
Possible Training Courses based on IEC 61850 Multi-Vendor Environment in Technobothnia The Basics of IEC 61850 How to Implemant IEC 61850 Based System IEC 61850 Configuration Programs GOOSE Configuration For one vendor devices For multi-vendor devices Remote Terminal Unit (RTU) Configuration Adding single vendor devices to RTU Adding multi-vendor devices to RTU Implementing a Control Center in IEC 61850 Environment Wireless Automation Under IEC 61850 21.3.2012 11
Questions? Remember 3rd Workshop on Wireless Communication and Applications in Vaasa on 25.-26.4.2012 Day 1 (25.4.): Wireless Automation Day 2 (26.4.): Tactical Communication Systems Registration is mandatory, but free of charge. See http://cs.uwasa.fi/wowca2012/ for further details 12