Transmission Company Of Nigeria Management Unit Status Report on On-going s Presentation to The Honourable Minister Of State For Power Mohammed Wakili March, 2014 World Bank Intervention in Energy Sector in Nigeria
1 Rehabilitation & Reinforcement of 33/11KV Injection Substation: No. NGP-D1 Lot 1 Lot1A: Eko Lot Ikeja 1B 30/08/12 Amount $6,372,050.89 426,209,800.00 or MBH Power/ Shirdi Sai & Shreem Electric India JV 30/08/12 MBH Power/ Shirdi Sai & Shreem Electric India JV Installation of 1nos 15MVA Installation of 1set of 33KV Indoor breaker Installation of 40nos 500kVA s Installation of 80nos 11KV Feeder Pillar Installation of 80nos 11KV Drop Out Fuses Installation of 80nos 11KV Lighting Arresters Erection of 1000nos HT poles Erection of 1,100nos LT poles Stinging of 75km of AAC for HT and LT lines Installation of 1nos 15MVA Installation of 2set of 33KV breaker Installation of 2sets 33KV Gang Isolator Installation of 73nos 500kVA s Installation of 150nos 11KV Feeder Pillar Installation of 123nos 11KV Drop Out Fuses Installation of 123nos 11KV Lighting Arresters Erection of 1,100nos HT poles Erection of 1,500nos LT poles Stinging of 85km of AAC for HT and LT lines Status 1no 15MVA & 40no 500KVA 2,000meters 1Cx500mm2 cable 296,000meter All Aluminium Conductor awaiting custom clearance CT, VT and Circuit Breaker shipped 1no 15MVA & 40no 500KVA 3,760meter 1Cx500mm2 cable 374,000meter All Aluminium Conductor awaiting Custom clearance CT, VT and Circuit Breaker shipped
2 Rehabilitation & Reinforcement of 33/11KV Injection Substation: No. NGP-D1 Lot 2 Lot 2A: Ibadan 30/08/12 Amount $6,193,551.58 391,220,500.00 o r MBH Power/ Shirdi Sai & Shreem Electric India JV Installation of 1nos 15MVA Installation of 2set of 33KV Outdoor breaker Installation of 70nos 500kVA s Installation of 120nos 11KV Feeder Pillar Installation of 120nos 11KV Drop Out Fuses Installation of 120nos 11KV Lighting Arresters Erection of 1,000nos HT poles Erection of 900nos LT poles Stinging of 80km of AAC for HT and LT lines Status 1no 15MVA and 70no 500KVA 2,500meters 1Cx500mm2, cable 320,00meters All Aluminium Conductor CTs, VTs and Circuit Breaker shipped Lot 2B: Benin 30/08/12 MBH Power/ Shirdi Sai & Shreem Electric India JV Installation of 1nos 15MVA Installation of 2set of 33KV Outdoor breaker Installation of 2sets 33KV Gang Isolator Installation of 50nos 500kVA s Installation of 90nos 11KV Feeder Pillar Installation of 85nos 11KV Drop Out Fuses Installation of 85nos 11KV Lighting Arresters Erection of 1,000nos HT poles Erection of 850nos LT poles Stinging of 78km of AAC for HT and LT lines 1no 15MVA and 50no 500KVA 3,600meters 1Cx500mm2 cable 155,00meters All Aluminium Conductor CTs, VTs and Circuit Breaker shipped
3 Rehabilitation & Reinforcement of 33/11KV Injection Substation: No. NGP-D1 Lot 3 Lot 3A: Enugu 31/08/12 Amount $7,368,458.36 391,511,464.09 or News Engineerin g Ltd Installation of 1nos 15MVA Installation of 2set of 33KV breaker Installation of 70nos 500kVA s Installation of 150nos 11KV Feeder Pillar Installation of 120nos 11KV D/Out Fuses Installation of 120nos 11KV Lighting Arresters Erection of 1,000nos HT poles Erection of 1,500nos LT poles Stinging of 87km of AAC for HT & LT lines Status 15MVA & 500KVA s ready for FAT 3,600m 1Cx500mm2, 4,500m 4Cx150mm2, 3,150m 1Cx35mm2 cable and 360,000m of Aluminium conductor delivered to contractor wharehouse Circuit Breaker, CTs & VTs shipped Lot 3B: P/Harcour t 31/08/12 News Engineerin g Ltd Installation of 1nos 15MVA Installation of 2set of 33KV breaker Installation of 2sets 33KV Gang Isolator Installation of 50nos 500kVA s Installation of 110nos 11KV Feeder Pillar Installation of 100nos 11KV D/Out Fuses Installation of 100nos 11KV Lighting Arresters Erection of 1,000nos HT poles Erection of 900nos LT poles Stinging of 80km of AAC for HT & LT lines 15MVA and 500KVA s ready for FAT 3,090m 1Cx500mm2, 3,900m 4Cx150mm2, and 2,250m 1Cx35mm2 cable and and 360,000m of Aluminium conductor delivered to contractor wharehouse. Circuit Breaker, CTs & VTs shipped
4 Rehabilitation & Reinforcement of 33/11KV Injection Substation: No. NGP-D1 Lot 4 Lot 4A: Abuja Lot 4B: Jos 31/08/12 Amount $6,420,311.20 374,657,075.00 or Skipper Electrical Ltd India 31/08/12 Skipper Electrical Ltd India Installation of 1nos 15MVA Installation of 2set of 33KV Outdoor breaker Installation of 70nos 500kVA s Installation of 150nos 11KV Feeder Pillar Installation of 120nos 11KV Drop Out Fuses Installation of 120nos 11KV Lighting Arresters Erection of 1,650nos HT poles Erection of 1,200nos LT poles Stinging of 90km of AAC for HT and LT lines Installation of 1nos 15MVA Installation of 2set of 33KV Outdoor breaker Installation of 2sets 33KV Gang Isolator Installation of 70nos 500kVA s Installation of 150nos 11KV Feeder Pillar Installation of 120nos 11KV Drop Out Fuses Installation of 120nos 11KV Lighting Arresters Erection of 1,000nos HT poles Erection of 1,500nos LT poles Stinging of 93km of AAC for HT and LT lines Status 1no 15MVA and 30no 500KVA 150no feeder pillar, 120no lighting arresters 500No HT poles, 300 LT poles and and 380,000m All Aluminium Conductor Circuit breaker, CT and VT installed Erection and stringing in progress 1no 15MVA and 13no 500KVA, CT, VT and Circuit breaker 500No HT poles and 300 LT poles delivered to 150no feeder pillar, 120no lighting arresters and 380,000m All Aluminium Conductor cleared from port and delivered to Abuja
5 Rehabilitation & Reinforcement of 33/11KV Injection Substation: No. NGP-D1 Lot 5 Lot 5A: Kaduna Lot 5B: Kano 30/08/12 Amount $4,451,808.11 537,973,142.85 or Seacof Engineering Services/ Uktal galvanizers Ltd India JV 30/08/12 Seacof Engineering Services/ Uktal galvanizers Ltd India JV Installation of 1nos 15MVA Installation of 2set of 33KV Outdoor breaker Installation of 50nos 500kVA s Installation of 110nos 11KV Feeder Pillar Installation of 100nos 11KV Drop Out Fuses Installation of 100nos 11KV Lighting Arresters Erection of 1,850nos HT poles Erection of 1,000nos LT poles Stinging of 94km of AAC for HT and LT lines Installation of 1nos 15MVA Installation of 2set of 33KV Outdoor breaker Installation of 2sets 33KV Gang Isolator Installation of 70nos 500kVA s Installation of 150nos 11KV Feeder Pillar Installation of 120nos 11KV Drop Out Fuses Installation of 120nos 11KV Lighting Arresters Erection of 1,000nos HT poles Erection of 1,500nos LT poles Stinging of 93km of AAC for HT and LT lines Status 700No HT poles 2,500no Pin insulators and 400no crossarms delivered to Conductors, Cables & insulators awaiting clearance at the port 15MVA & 500KVA s shipment process in progress 400No HT poles 1,000no Pin insulators & crossarms 300no Conductors, Cables & insulators awaiting clearance at the port 15MVA & 500KVA s shipment process in progress
6 Rehabilitation & Reinforcement of 33/11KV Injection Substation: No. NGP- D1 Lot 6 Lot 6A: Yola Amount or 30/08/12 $2,692,036.74 Seacof Engineering Services/ Uktal galvanizers Ltd India JV Installation of 1nos 15MVA Installation of 2set of 33KV Outdoor breaker Installation of 40nos 500kVA s Installation of 80nos 11KV Feeder Pillar Installation of 80nos 11KV Drop Out Fuses Installation of 80nos 11KV Lighting Arresters Erection of 1,000nos HT poles Erection of 1,100nos LT poles Stinging of 94km of AAC for HT and LT lines Status 1no 15MVA 1,500meters 1Cx500mm2 cable delivered to 2,000meters 4cx150mm2 cable delivered to 365,000meter All Aluminium Conductor Sectionalizers Pole erection on going 7 Supply & Installation of 300no 11KV Onload sectionalisers at Karu, Luth, Ogba, Agege & Chanllenge No NGP- D2 Abuja, Ibadan, Ikeja, & Eko 30/11/11 $456,300.00 60,200,000.00 Crown Resources Development Ltd Installation of 60No. 11KV Onload sectionalisers in Karu, Abuja Installation of 50No. 11KV Onload sectionalisers in LUTH, Lagos Installation of 70No. 11KV Onload sectionalisers in Ogba, Lagos Installation of 90No. 11KV Onload sectionalisers in Agege Installation of 30No. 11KV Onload sectionalisers in challenge, Ibadan
8 Rehabilitation of 33KV Switchgears in Eko Electricity Distribution Company No. NGP- D3 Lot 1 Lot 1: Lagos Amount or 02/07/11 $2,692,036.74 ABB Nigeria Ltd Rehabilitation of 33kV indoor switchgears (GIS) complete at 7No Injection Substations in Eko Disco Status Rehabilitation 33KV Indoor switchgears completed and awaiting commissioning 9 Rehabilitation of 33KV Underground cable In Eko Electricity Distribution Company No. NGP- D3 Lot 2 Lot 2: Lagos 21/07/11 $456,300.00 60,200,000.00 Seacof Engineering Services Ltd Rehabilitation of 12no 33KV Underground Feeders in Eko Discos Rehabilitation of the 33KV Underground cable feeder Completed and ready for commissioning
10 Conversion of LVDS to HVDS in Kano No. NGP-D4 Lot 1 Amount Kano 13/02/13 $83,177.28 147,783,290.00 or Seacof Engineering Services Installation of 560no 50KVA Installation of 300no 25KVA Installation of 500no 11KV Drop Out Fuses Installation of 430no 11KV Triple pole Air Break Switches Installation of 1,000no LV distribution Boxes. Erection of 1,973no HT poles Stringing of 37Km AAC HT & LT lines Status 860no 50KVA/25KVA s 11KV 500no Drop Out Fuses 11KV 430no Triple pole Air Break Switches delivered to 1,000no LV distribution Boxes 1,500no HT poles delivered to Pole erection is on-going 11 Conversion of LVDS to HVDS in Kaduna No. NGP-D4 Lot 2 Kaduna 08/02/13 $439,873,290.46 115,870,650.00 News Engineering Nigeria Ltd Installation of 560no 50KVA Installation of 300no 25KVA Installation of 500no 11KV Drop Out Fuses Installation of 430no 11KV Triple pole Air Break Switches Installation of 1,000no LV distribution Boxes. Erection of 1,712no HT poles Stringing of 35Km AAC HT & LT lines 860no 50KVA/25KVA s 11KV 500no Drop Out Fuses 11KV 430no Triple pole Air Break Switches delivered to 1,000no LV distribution Boxes 1,200no HT poles delivered to Pole erection is on-going
12 Conversion of LVDS to HVDS in Benin No. NGP-D4 Lot 3 Amount Benin 13/02/13 $83,146.03 151,519,140.00 or Seacof Engineering Services Installation of 560no 50KVA Installation of 300no 25KVA Installation of 500no 11KV Drop Out Fuses Installation of 430no 11KV Triple pole Air Break Switches Installation of 1,000no LV distribution Boxes. Erection of 1,676no HT poles Stringing of 35Km AAC HT & LT lines Status 860no 50KVA/25KVA s 11KV 500no Drop Out Fuses 11KV 430no Triple pole Air Break Switches delivered to 1,000no LV distribution Boxes 1,200no HT poles delivered to Pole erection is on-going 13 Conversion of LVDS to HVDS in Enugu No. NGP-D4 Lot 4 Enugu 18/02/13 $570,781.90 133,437,813.00 East India Udyog Ltd Installation of 560no 50KVA Installation of 300no 25KVA Installation of 500no 11KV Drop Out Fuses Installation of 430no 11KV Triple pole Air Break Switches Installation of 1,000no LV distribution Boxes. Erection of 2,220no HT poles Stringing of 40Km AAC HT & LT lines 860no 50KVA/25KVA s 11KV 500no Drop Out Fuses 11KV 430no Triple pole Air Break Switches delivered to 1,000no LV distribution Boxes 1,200no HT poles delivered to
14 Conversion of LVDS to HVDS in P/Harcourt No. NGP-D4 Lot 5 Amount P/Harcourt 13/02/13 $603,511.03 133,888,664.24 or East India Udyog Ltd Installation of 560no 50KVA Installation of 300no 25KVA Installation of 500no 11KV Drop Out Fuses Installation of 430no 11KV Triple pole Air Break Switches Installation of 1,000no LV distribution Boxes. Erection of 2,432no HT poles Stringing of 40Km AAC HT & LT lines Status 860no 50KVA/25KVA s 11KV 500no Drop Out Fuses 11KV 430no Triple pole Air Break Switches delivered to 1,000no LV distribution Boxes 1,200no HT poles delivered to 15 Electrification of Rural Communities in Enugu State. No. D2-D6 Lot 1 Enugu 18/02/13 $861,131.06 63, 120,267.00 East India Udyog Ltd Installation of 28no 25kVA, 101no 50kVA, 2no 200KVA, 1no 500KVA, 1no 300KVA 33/0.415kV Distribution Transformers. Stringing of 33KV overhead lines and Connection and Metering of 3,000 customers within the Communities All the s in the contract 89no s mounted on poles 425no HT poles erected and still on-going
16 Electrification of Rural Communities in Ogun State. No. D2-D6 Lot 2 Amount Ogun 18/02/13 $1,153,221.40 76, 084,514.82 or East India Udyog Ltd Installation of 40no 25kVA and 70no 50kVA 33/0.415kV Distribution Transformers. Stringing of 33KV overhead lines and Connection and Metering of 3,000 customers within the Communities Status 69no s delivered to 425no HT poles erected and still on-going 17 Electrification of Rural Communities in Cross River State. No. D2-D6 Lot 3a Obalinku 31/01/13 $203, 567.76 34, 556,940.00 Crown Resources Dev. Ltd Installation of 18no 25kVA and 44no 50kVA 33/0.415kV Distribution Transformers. Stringing of 33KV overhead lines, Connection and Metering of 1,900 customers within the Communities completed and awaiting commissioning. 18 Electrification of Rural Communities in Cross River State. No. D2-D6 Lot 3b Ogoja 31/01/13 $259,109.14 52, 503,759.00 Crown Resources Dev. Ltd Installation of 14no 25kVA and 45no 50kVA 33/0.415kV Distribution Transformers. Stringing of 33KV overhead lines, Connection and Metering of 1,800 customers within the Communities 700nos of HT and 110nos of LT poles erected and stringed. Installation of s is on-going
19 Conversion of LVDS to HVDS in Kubwa. No. D2-E lot 3 Kubwa- Abuja Amount 21/05/2013 $5,385,952.52 197,841,286.00 or Goodluck Steel Tubes/Voltect PVT Ltd, India Installation of 915no 50kVA 11/0.415kV Distribution Transformers. Stringing of 33KV overhead lines, Connection of 9,150 customers within the Kubwa Status 544no 50kVA 11/0.415kV Distribution Transformers 20 Supply and Installation of Prepayment meters in Kaduna State. No. NGP- D5 Kaduna 19/11/13 $203, 567.76 34, 556,940.00 Shenzien Inhmeter Co. Ltd/Triplesea Ltd Supply and Installation of 40,000no of Pre Payment meters Signed and Kick-off meeting held. 10% advance payment paid
ON-GOING TRANSMISSION CONTRACTS under NEGIP 1 Rehabilitation & Reinforcement of Transmission Substations No. NGP-T1 Lot 1 Lot1: Afam I, Afam IV, Port Harcourt, Aba Town, Eket Amount 22/06/12 $7,785,548.00 607,923,722.00 or GIT/XIAN Electric Engineering Ltd Installation of 1nos 60MVA at Afam I 132/33KV Transmission Substation Rehabilitation of Afam IV 330/132KV Transmission Substation Rehabilitation of Port Harcourt 330/132KV Transmission Substation Installation of 1nos 60MVA at Aba Town 132/33KV Transmission Substation Installation of 1nos 60MVA at Eket 132/33KV Transmission Substation Status Technical specification for 60MVA approved 2 Rehabilitation & Reinforcement of Transmission Substations No. NGP-T1 Lot 2 Lot 2: Akangba, Ikeja West, Ikorodu, Akangba 22/06/12 $12,718,326.54 875,641,230.00 MBH Power/ Shreem Electric Ltd Rehabilitation of Akangba 330/132KV Transmission Substation Rehabilitation of Ikeja West 330/132KV Transmission Substation Installation of 1nos 60MVA at Ikorodu 132/33KV Transmission Substation Installation of 2nos 60MVA at Akangba 132/33KV Transmission Substation Technical specification for 60MVA, 33kV and 132kV circuit breakers approved
ON-GOING TRANSMISSION CONTRACTS under NEGIP 3 Rehabilitation & Reinforcement of Transmission Substations No. NGP-T1 Lot 3 4 Rehabilitation & Reinforcement of Transmission Substations: No. NGP- T1 Lot 4 Lot 3: Osogbo, Ayede, Ijebu Ode Lot 4: Kaduna (Mando), Kano (Dan Agundi) Amount 22/06/12 $8,922,440.46 165,542,625.14 22/06/12 $7,733,578.46 143,314,092.30 or Fedders Llyod Corporation Fedders Llyod Corporation Installation of 1nos 60MVA at Osogbo 132/33KV Transmission Substation Installation of 1nos 60MVA at Ayede 132/33KV Transmission Substation Rehabilitation of Ayede 330/132KV Transmission Substation Installation of 1nos 60MVA at Ijebu Ode 132/33KV Transmission Substation Installation of 1nos 60MVA at Kaduna (Mando) 132/33KV Transmission Substation Installation of 1nos 60MVA at Kano (Dan Agundi) 132/33KV Transmission Substation Status 3No 60MVA, s delivered to 3Nos Earthing. 25No Circuit Breaker CT and VT awaiting clearance at Apapa port 2No 60MVA, s delivered to 2No Earthing. 39No CTs and 27No VTs 25No Circuit Breaker and 52No Isolators delivered to 5Nos 330KV Circuit breaker, Illumination materials, Conductors shipped.
ON-GOING TRANSMISSION CONTRACTS under NEGIP Amount or Status 5 Civil Reconstruction and Flood Control of sinking Alagbon 132kV Substation Alagbon- Lago 12/04/13 695,384,351.75 Bussdor and Company Ltd Flood Control of Alagbon 132/33KKV Substation 75% of the material on
ON-GOING GENERATION CONTRACTS under WRDSEM 1 Rehabilitation of Kainji Hydroelectric Power Plant (Units 5, 6 & 12) and the Common Systems. No. KR1A Amount or Kainji 27/06/11 $81,746,642.49.00 Hydrochina Huadong/ Harbin Electric Machinery Company Consortium Rehabilitation of units 5,6, and 12 of the Hydroelectric power plant Status Unit 5: All the parts have been dismantled and overhauling of the unit is on-going. Rehabilitation of intake gate 80% completed Unit 6 : All the parts have been dismantled and overhauling of the unit is on-going. Unit 12 : All the parts have been dismantled and overhauling of the unit is ongoing. To be commissioned in April, 2015 2 Rehabilitation of Jebba Spillway Discharege Channel, Grouting of Auxillary Dam 3 Jebba 27/11/12 2,277,000,000.00 Ceinsa Consortium Rehabilitation of Spillway Discharge Channel. 40% of work completed. Construction of the Coffer-dam in process. To be completed in April, 2014: Protective wall A &C are 90% & 97% Completed Rehabilitation of well 53 of the auxiliary dam completed. Rehabilitation of spillway discharge channel is 82% completed
CONTRACT UNDER BIDDING PROCESS or Status 1 Construction, Rehabilitation and Reinforcement 330/132KV Transmission substation No. NGP-T4 N/A Under Bidding Process
THANK YOU ALL FOR YOUR ATTENTION!!! STAY CONNECTED.. ENGR. CIROMA.A. JOSEPH, FNSE MIAD, FCAI, MNIMC, MNISP GENERAL MANAGER TRANSMISSION COMPANY OF NIGERIA PLC PROJECT MANAGEMENT UNIT NO. 7 KAMPALA STREET, WUSE II ABUJA - NIGERIA. +234-803-305-1744 e-mail- ciromaddd@yahoo.co.uk jciroma@gmail.com,jciroma@nepapmu.org.ng