INSPECTION IN-PROCESS AND FINAL QUALITY ASSURANCE



Similar documents
Supplier Quality Requirements and Clauses

L-3 Communications Corporation AMI Purchase Order Supplement No. 3 Quality Assurance

Workmanship Standards Personnel Training and Certification Explained. Jeannette Plante. NASA Workmanship Standards Program Manager

Quality Supplier Requirements for Beckwith Electric Co., Inc.

TRAINING SERVICES. Training Courses Curriculum Development Highly Skilled Staff. Training Courses Curriculum Development Highly Skilled

Acceptability of Printed Circuit Board Assemblies

QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC.

UNCONTROLLED COPY FOR REFERENCE ONLY

MEDFORD FABRICATION CSC, INC. Quality System Manual. Date of issue: 03/25/2010 Revision : F

SOLDERING ELECTRICAL AND ELECTRONIC EQUIPMENT

IPC Certification Centre

Auditing Contract Manufacturing Processes

Gulfstream Production Certificate Operations

Assembly Instruction CAI- Connector with universal Endbell

RTP s NUCLEAR QUALITY ASSURANCE PROGRAM

How To Manage A Plant

Self-Audit Checklist

Directory chapter 02 - DIN Power (to 6 A) Types D, E, F, FM, 2F, F9, interface connectors I/U Technical characteristics types D and E

T146 Electro Mechanical Engineering Technician MTCU Code Program Learning Outcomes

SUPPLIER QUALITY MANAGEMENT SYSTEM QUESTIONNAIRE

POWERPOLE CONNECTOR GENERAL INSTALLATION TIPS

QUALITY ASSURANCE PROVISIONS OF PURCHASE ORDER

Figure 1 (end) Updated document to corporate requirements Added text to Paragraph 2.4

ENGINEERING RELEASE MODEL: LEARJET MODEL 20 AND 35/36 SERIES DRAWING. NO.: SHEET: 1 OF 1

Surgi Manufacturing Quality Manual

10-3. SYSTEM TESTING AND DOCUMENTATION

Supplier Quality. Assurance Provisions. Manual. SQAP-001 Rev. E

Material and Components Used for UL/C-UL/ULC Mark Follow-Up Services

SEMME3012 Installing marine lighting, alarm, detection and monitoring equipment and systems

EVANS ELECTRONIC TEMPERATURE CONTROL TROUBLESHOOTING GUIDE for systems equipped with electric coolant valve and external PC board.

Company Quality Manual Document No. QM Rev 0. 0 John Rickey Initial Release. Controlled Copy Stamp. authorized signature

AMPSEAL* Automotive Plug Connector and Header Assembly

BUILDING INSTRUCTIONS

DATA REQUIREMENTS DESCRIPTION (DRD)

Technical Update TAA.TU Rev. 1

Copies of this document shall be classified either as Controlled or Uncontrolled, and shall be identified as such on the cover sheet.

Technical Manual Index August 1, 2016

WIRE, TERMINAL AND CONNECTOR REPAIR CONDUCTORS

Quality Assurance Provisions

9. QUALITY CONTROL/QUALITY ASSURANCE

DVD-60C The Seven Sins of Wire Harness Assembly

Navico-Northstar 2kW JRC Radar Package, Scanner Cable Removal and Replacement

Emergency Power System Services Industrial UPS, Batteries, Chargers, Inverters and Static Switches

TOOL SVC NUMBERS: , SVC CONTENTS ITEM QTY DESCRIPTION PART NUMBER 1 1 CUTTING TOOL EXTRACTION TOOL/PART#

- power windows - alarm system - electric door mirror control - door warning light - central locking - seat memory

7.1 Safety Precautions-Aircraft and Workshop Workshop Practices 3 3 3

ISO 9000 Quality Standard Background Information Quality Systems Implementation

Quality Management System and Procedures

Classification Appeal Decision Under Section 5346 of Title 5, United States Code

Pro Logic Version Diagnostics Manual

Configuration Management Self Assessment Checklist

Distributors In addition to the requirements noted herein, Distributors shall have a Quality System

Supplier Process Management Plan

GENERAL WELDING & FABRICATING, INC. 991 Maple Road Elma, New York 14059

Special Specification 6033 Computerized Transportation Management System

PPI/TZ Standard Quality Requirements for Suppliers -SQRS-

Product Order Quality Requirements Meggitt (Orange County), Inc.

PUSH BUTTON START INSTALLATION MANUAL

VT-44 Overview Of Component Preparation And Manual Insertion Leader s Guide

UniStream CPU-for-Panel

Specialties Manufacturing. Talladega Castings & Machine Co., Inc. ISO 9001:2008. Quality Manual

SUPPLIER Form #: 007 AUDIT QUESTIONNAIRE

DEDICATED TO EMBEDDED SOLUTIONS

Quality Assurance Requirements. For. Pratt & Whitney/Space Propulsion, Chemical Systems Division

Position Cat5e (EMT) Modular Plug Connectors. Application Specification

Helical Products Co., Inc.

Quality Management System General

Table of Contents 1. SCOPE APPLICABLE DOCUMENTS TERMS AND DEFINITIONS QUALITY MANAGEMENT SYSTEM...4-8

AVNET Logistics & EM Americas. Quality Manual

Anderson Powerpoles. Powerpole Assembly Instructions for SCOUT, NAVIGATOR AND RANGER ROV s

GEN3 PRO SEFI System Modifying an LS1 Coil-on-Plug (COP) System to Use an External 24X Wheel and Sensor

AMETEK Airtechnology Group Ltd

Section 10.9 STRUCTURAL STEEL AND MISCELLANEOUS METAL COMPONENTS

fin DULLES CORRIDOR METRORAIL PROJECT METROPOLITAN WASHINGTON AIRPORTS AUTHORITY Quality Program Plan Revision 6, June 2008

Example ESD Control Program Document Based on ANSI/ESD S

2016 Instructor Training & Certification Schedule

Small form factor bay converter and hard drive installation

STEEL fabrication quality SySTEmS guideline

D. Infrared scanning reports with pictures printed in a final report with any deficiencies and actions taken to rectify.

MCR1900 Media Converter 19-Slot Chassis

1993 ACCESSORIES & EQUIPMENT Volkswagen Instrument Panels. Volkswagen; EuroVan, Passat

Installation & Weatherproofing Guide for ENCOM Broadband Radios

Aegis Standard Report Template Examples

SUGGESTED SPECIFICATION for Series 185 Service Entrance Rated Automatic Transfer Switches

HANDLING PRECAUTIONS FOR STATIC-SENSITIVE DEVICES

CYGNAL Application Note

TBM5, TBM5-S and TBM5-SV

Cascade Profiler Fibre Channel SAN Attached Storage Installation Guide. Version 8.2 March 2009

Express5800/120Ed. Rack Mount Kit Installation Procedures PN:

TOYOTA TACOMA HANDS FREE BLU LOGIC Preparation

PDI-P10LCD Pre-Tensioned Swivel Cartridge

RECOMMENDED TOOLS PERSONAL & VEHICLE PROTECTION SAFETY GLASSES

RMA Procedure. 2.0 SCOPE This covers all material returned to your company s manufacturing facility.

WSD130 SOLDERING STATION

Section 8.1 Volume I QUALITY ASSURANCE PROGRAM OF PRECAST PRESTRESSED CONCRETE PRODUCTS

Co-location Interconnect Power Panel (CIPP) Installation Guide

Corrective and Preventive Actions

Advantium 2 Plus Alarm

Transcription:

INSPECTION IN-PROCESS AND FINAL QUALITY ASSURANCE 1.0 SCOPE: The purpose of this procedure is to document mandatory to ensure compliance to Project Requirements. inspection points and 2.0 REFERENCE DOCUMENTS: NHB 5300.1 (3A-1) Requirements for Soldering Electrical connections. NHB 5300.4 (3G) Requirements for Interconnecting Cables, Harnesses and Wiring. NHB 5300.4 (3H) Requirements for Crimping and Wire Wrapping. NHB 5300.4 (3J) Requirements for Conformal Coating and Staking of Printed Wiring Boards and Electrical Assemblies. MIT DOCUMENTS: 99-01003 Electrostatic Discharge (ESD), handling of Parts and Equipment. 99-02003 Calibration Procedure for Measuring and Test Equipment. Applicable drawing, at the current revision. C.S.R.Procedures, if listed on the drawing. Applicable Assembly Work Order (AWO). Applicable Configuration Tracability List. Applicable schematic. 3.0 INSPECTOR REQUIREMENTS: Current certification in the following: NHB 5300.4 (3A1), (3G), (3H), (3J) and Rework Repair and Modification. Training in Electrostatic Discharge MIT #99-01003

4.0 TOOLS: Microscope, 3x to 10x. Vernier, calibrated. ESD Station and strap Meter, calibrated U.V. light 5.0 GOVERNMENT SOURCE INSPECTION: The Government has the right to inspect any part, subassembly, or contract end item. The Government representative shall be given 48 hours advanced notice, before material is ready for inspection. 6.0 QUALITY ASSURANCE: Visual inspections (100%) are mandated by NASA. Acceptance is dependent on all of the following: 6.1 GENERAL: Verify that the Assembly Work Order (AWO) has been signed by three managers. Verify that the AWO accompanies the assembly being inspected. The assembly must be done in the correct sequence. A supervisor's approval is required to skip a step.

6.2 IN PROCESS INSPECTION: 6.2.1 ELECTRONIC PARTS: Assure that each part is correctly identified, reference the Configuration Tracability List. An incorrect or damaged part shall be returned to Bonded Stock for replacement, using the Return Policy Form. Verify that all polarities are correct. Refer to the drawing. Assure the project's requirements of NHB 5300.4 (3A1) and NHB 5300.4 (3J), including, but not limited to tinning, gold removal, mounting, lead form, stress relief, solder, cleanliness, staking and conformal coat, are satisfied. 6.2.2 MECHANICAL HARDWARE: Assure that hardware is correct. Refer to Configuration Tracability List. Incorrect or damaged hardware shall be returned to for replacement, using the Return Policy Form. Verify that torque tools are calibrated, per 99-02003. Parts shall be torqued before soldering, per AWO. Bonded Stock 6.2.3 CABLES: Verify correct wire, contacts & connectors, per the CTL. Wrong or damaged parts shall be returned to Bonded Stock for replacement, using the Return Policy Form. To assure compliance with NHB 5300.4 (3G) & (3H) verify all of the following (where applicable): All strands are free of damage, refer NHB 5300.4 (3A1). Tinning, gold removal, and solder meet NHB 5300.4 (3A1). Crimp is correctly located, per NHB 5300.4 (3H). Crimp is indented correctly, per NHB 5300.4 (3H). Crimp tool, meter and pull tester are calibrated. Verify that Destructive Pull Tests were performed and recorded. Record the force and locations of each break in the Tensile Test Log. Refer to Drawing and NHB 5300.4 (3H) for marking criteria. Verify connections using a meter and schematic. All connector pins shall be push tested to assure proper into the connector body, refer NHB 5300.4. 7.0 DISCREPANCIES: Any deviation from either the AWO, Drawing or the NASA criteria shall be discussed with the technician and fabrication supervisor. seating

7.0.1 PROCEDURE: If a discrepancy is caused by a change to the process, the AWO must be revised. Affix a red rejection stamp to the Fault Log, until a change has been made. A blue stamp shall interlock the red stamp upon acceptance, date. 7.0.2 SPECIFICATION: If a discrepancy is a deviation from the Drawing or any of the specifications, affix red rejection stamp to the Fault Log, date, and proceed to 7.1, or 7.4 as applicable. 7.1 REWORK AUTHORIZED: Rework shall be done in accordance with the AWO and applicable Drawings and Specifications. 7.2 SUCCESSFUL REWORK: On completion of rework, part will be re-inspected. All and NASA requirements must be satisfied. Blue acceptance stamp must interlock the red rejection date. 7.3 UNSUCCESSFUL REWORK: In the event of unsuccessful rework, this shall be indicated on the Fault Log, also on MIT's Non Conforming Material's Report #99-02004. Notify the Q.A. Manager or the Project Manager, as to the for dispositioning of the part. 7.4 REWORK DECLINED: If the Fabrication Supervisor declines rework, initiate #99-02004, Non Conforming Material Report. The Q.A. Manager or Project Manager shall be informed, as to the need for dispositioning of the part. MIT stamp, need MIT

7.5 MATERIAL REVIEW BOARD: Parts shall be segrated in a locked cabinet, pending the decision of the MRB. Parts shall be processed according to the decision of the Material Review Board. These parts do not have to meet the NASA criteria. Specific conditions may be allowed MRB that would not be approved under ordinary The NMR will be closed out, accordingly. The AWO will be updated to reflect the board's action. Blue acceptance stamp shall interlock with red, determined that the part may be used as is, or that the repair meets the specific criteria of the MRB. by circumstances.. if 8.0 FINAL INSPECTION: Assure that the AWO is completely filled out. Assure that the AWO mixing log (for chemicals) is complete. Assure that the mate/demate log is complete, reference NHB 5300.4.(3H). Assure that any.e.c.o.'s have been incorporated. Assure that all fault log items have been satisfied. Assure that all parts are correct, per drawing. Assure that all parts shows no sign of damage. Affix a blue acceptance stamp and date to the AWO.