Configuration Management Self Assessment Checklist
|
|
|
- Winfred Hamilton
- 9 years ago
- Views:
Transcription
1 Configuration Management Self Assessment Checklist Introduction: The purpose of this Configuration Management (CM) Self- Assessment Checklist is to ensure that the Organization correctly understands the CM requirements levied by Customer and/or described in SCMH Configuration Management Guidelines and is implementing them in an appropriate manner. It is advised that the negative answers serve as an opportunity for process improvement for the organization Configuration Management Organization Resources and Tools Yes No Remarks A. CM Organization and Resources Does the Organization have a defined/documented CM process? Is there a "Single Point" Responsibility for CM? Does the CM process follow the contract requirements? Does the Organization have an adequate, single-point release system for configuration documentation (Eng drawings, design specs, ICDs, work instructions/op cards, process specs, tool drawings, etc.)? CM Planning and Tools Yes No Remarks Are the CM activities defined in the Organization s existing CM command media, as cited in its CM Plan, adequate to meet program needs? Is the CM Plan periodically reviewed for updates (i.e., as flow-down requirements or internal Organization process changes)? Is the CM Plan part of the Organization s command media (i.e., recognized to be on a par with other essential Company disciplines)? Are the documented processes available and effectively disseminated to all Organization personnel? Do company policies and procedures emphasize the importance of maintaining a CM system? Are policies and procedures consistent with the latest contractual requirements or program needs? Are there CM procedures and controls to insure sub-tier supplier or Organization compliance to CM requirements? Is there a closed loop identification and resolution system for hardware and software configuration management problems? 1
2 Configuration Identification Yes No Remarks A. Product structure, identification of CIs Is each design configuration of a detailed part, subassembly or assembly and computer program or module identified by a unique part number? Does the Organization's part numbering system show the relationship between assemblies and detail parts? Are the Organization s part number change processes consistent with CM practices? B. Configuration Documentation (Specifications and Drawings) Has the Organization correctly identified the components selected by the Customer as Configuration Items (CI) in all its documentation (specifications, drawings, procedures, reports, nameplates, decals, etc)? If required as part of the development process, has the Organization properly identified CIs to Customer and in all its documentation? Is the approval status of CI specifications documented? Do drawings comply with Customer requirements for drawing format, reproduction, storage and delivery? Is there a drawing error reporting system in operation? Are there sufficient instructions on the preparation, checking, revision and release of engineering drawings? Do drawings on the Manufacturing floor reflect the most current approved configuration of the product being produced by manufacturing? C. Release System and control libraries, etc. Does the Engineering release process for drawings and parts lists: Control all records and release activities including change incorporation? Define change release accountability? Require distribution of engineering drawings? Check and approve drawings prior to release? D. Baseline Management Practices Prior to Configuration Audit, do the Organization's procedures require that changes to baseline specifications be approved by the Customer as Major (Class I) changes before being made and acted on? Subsequent to Configuration Audit, do Organization's procedures require that changes to product baseline documentation classified as a Minor (Class II) or Major (Class I) change be approved by Customer before being made or acted upon? E. Product Identifiers Are there nameplate drawings? Are nameplates found on Organization end items? Does the nameplate information comply with SOW requirements (i.e., Contract No., part number, CAGE code, serial number, CI and/or CI and/or CSCI numbers, etc.)? Is the correct version of Software identified on the nameplate? 2
3 Configuration Control Yes No Remarks A. Change Coordination and Change Approval Is a formal Configuration Change Board (CCB) regularly convened? Are all changes routed to Product Support, Manufacturing, Quality Control, and Product Management for impact evaluation/implementation? Is there a single point authority (CCB leader) to approve or reject changes? On sub-tier supplier requested changes, is substantiating data submitted and verified? Is the total systems impact of a proposed change formally established? Are baseline changes ever released before CCB or customer approval/concurrence? B. Change Control and Release Do adequate procedures exist to initiate, process, implement and report the status of Class I and II engineering changes? Does the CCB evaluate and approve each Class I change? Are CCB decisions documented and tracked? Are disposition (reject, approved, pending) of changes by the CCB adequately documented? Are change identification numbers assigned early enough in the processing of changes to assure accumulation of all data pertinent to the change? Are change requests prepared and tracked for every change? Does the CM authority log in proposed changes and assign a control number? Is the change initiator notified of the disposition of his/her change? Is there a formal design or engineering review board that analyzes proposed changes? Are changes marked with the change request or identification control number? Is there a procedure for expediting change processing when needed to avoid safety problems, excessive costs, or production line stoppage? Is there a system for controlling part number and serial number assignments? Do formal change control procedures cover all engineering released documents? C. Change Release and Implementation Are the changed engineering documents identified as officially released? Is the release data marked on them? Does the disposition decision (e.g., scrap, rework, or use as is) appear on the change form (ECO/ECP)? Is effectivity given for the changes? Does the engineering change document cross reference the authorizing Engineering Change Proposal number for changes? Are change documents issued to cover changes in support, training or test equipment? D. Change Incorporation Are manufacturing, inspection, manufacturing planning, and procurement notified of an initial release or an approved change? Do standard records provide positive identification of the configuration of each deliverable item at time of delivery or customer acceptance? 3
4 Configuration Control (continued) Yes No Remarks E. Change Control for Non-conforming products Does the Organization have clearly documented methods for controlling/accounting for major/minor deviations/waivers? Does the Organization identify that a deviation/waiver has been granted to specific items of hardware/software? Does the Organization system control the use of non-standard or substitute parts? Does the Organization implement a Material Review Board (MRB) activity? F. Retrofit Change Control Is there a retrofit order established for Class I changes that are not incorporated on all units? Are retrofit order preparation and implementation assignments made? Are retrofit order schedules set? Are retrofit order approval responsibilities and procedures established? CM Status Accounting Yes No Remarks Is there a defined and documented process for collecting, recording, processing, maintaining, and reporting configuration data necessary for the program? CM Reviews and Audits Yes No Remarks Are there defined Organization CM activities to support both program and technical reviews? Is there a defined process for the required Configuration Audits(s) for (a) Customer conducted CM audits? Sub-tier Supplier CM Yes No Remarks Is there a defined process for the flow-down of CM requirements to sub-tier suppliers? Is there evidence of adequate flow-down to sub-tier suppliers (Purchase Order, etc)? Is there a defined process for sub-tier supplier CM surveillance? 4
5 ASSESSMENT CONCLUSIONS Strong points : Weak points/opportunity for improvement : Corrective Action Plans : 5
SOFTWARE CONFIGURATION MANAGEMENT GUIDEBOOK
Office of Safety and Mission Assurance NASA-GB-9503 SOFTWARE CONFIGURATION MANAGEMENT GUIDEBOOK AUGUST 1995 National Aeronautics and Space Administration Washington, D.C. 20546 PREFACE The growth in cost
DATA REQUIREMENTS DESCRIPTION (DRD)
DATA REQUIREMENTS DESCRIPTION (DRD) 1. DPD NO.: XXX ISSUE: Draft 2. DRD NO.: STD/AD 3. DATA TYPE: 2/3 4. DATE REVISED: 5. PAGE: 1/4 6. TITLE: Functional and Physical Configuration Audit (FCA/PCA) Documentation
Lockheed Martin Tactical Aircraft Systems (LMTAS) Fort Worth, Texas CONFIGURATION MANAGEMENT REQUIREMENTS FOR SUPPLIERS AND SUBCONTRACTORS.
Lockheed Martin Tactical Aircraft Systems (LMTAS) Fort Worth, Texas CONFIGURATION MANAGEMENT REQUIREMENTS FOR SUPPLIERS AND SUBCONTRACTORS Approved: //signed// J. K. Goodman, Manager Configuration Management
MEDFORD FABRICATION CSC, INC. Quality System Manual. Date of issue: 03/25/2010 Revision : F
MEDFORD FABRICATION CSC, INC Quality System Manual Date of issue: 03/25/2010 Revision : F Table of Contents System Description 1.0 Introduction 2.0 Company Quality Policy 3.0 Organization Charts 4.0 Quality
IMPROVING QUALITY WITH IFS QUALITY MANAGEMENT IFS CUSTOMER SUMMIT 2011, CHICAGO
www.ifsworld.com IMPROVING QUALITY WITH IFS QUALITY MANAGEMENT IFS CUSTOMER SUMMIT 2011, CHICAGO KARIN RAINESALO BUSINESS SOLUTIONS CONSULTANT [email protected] IFS CUSTOMER SUMMIT 2011, CHICAGO
CONFIGURATION MANAGEMENT PLAN GUIDELINES
I-680 SMART CARPOOL LANE PROJECT SYSTEM ENGINEERING MANAGEMENT PLAN CONFIGURATION MANAGEMENT PLAN GUIDELINE SECTIONS: PLAN GUIDELINES 1. GENERAL 2. ROLES AND RESPONSIBILITIES 3. CONFIGURATION MANAGEMENT
Configuration Management ISO 10007
Configuration Management ISO 10007 Introduction Configuration Management Overview: What is Configuration Management? Collection of tools, techniques and experience designed to reduce costs and improve
Surgi Manufacturing Quality Manual
Surgi Manufacturing Page 1 of 18 Approvals: QA: Eng. Mgt. : A Date: 18Aug98 1. Introduction... 4 1.1 Scope... 4 1.2 Purpose... 4 1.3 Authority... 4 1.4 Issue of the Manual... 4 1.5 Amendments... 4 1.6
074-8432-552 Page 1 of 7 Effective Date: 12/18/03 Software Supplier Process Requirements
Page 1 of 7 Software Supplier Process Requirements 1.0 QUALITY SYSTEM FRAMEWORK 1.1 QUALITY POLICY The Seller shall document and implement a quality program in the form of Quality manual or detailed Quality
Helical Products Co., Inc.
Q01 GENERAL REQUIREMENTS 1. Supplier Responsibilities 1.1. Delivery Certification By delivering products or services on the Contract, the Supplier certifies that such products or services are in compliance
<name of project> Software Project Management Plan
The document in this file is adapted from the IEEE standards for Software Project Management Plans, 1058-1998, which conforms to the requirements of ISO standard 12207 Software Life Cycle Processes. Tailor
Gulfstream Production Certificate Operations
SUPPLIER QUALITY ASSURANCE SYSTEM REQUIREMENTS SQAR 0001 REV D Supplier s Quality System David H. Trucksis Donald A. Strickland R. Christiansen PREPARED BY: REVIEWED BY: APPROVED BY: Robert W. Mullen Jr.
Software and Hardware Configuration Management
DOWNLOADED AND/OR HARD COPY UNCONTROLLED Verify that this is the correct version before use. AUTHORITY DATE Jeffrey Northey (original signature on file) IMS Manager 07/09/2014 Doug Dorrer (original signature
CONFIGURATION MANAGEMENT PLAN
CONFIGURATION MANAGEMENT PLAN Integrated Procurement System U.S. Election Commission i CONFIGURATION MANAGEMENT PLAN TABLE OF CONTENTS Page # 1.0 CONFIGURATION CONTROL...3 1.1 Change Control Board (CCB)...3
Technical Baseline Management
Technical Baseline Management September 30, 2003 Pat Hascall LAT System Engineering 1 Technical Baseline Management We are required to manage the configuration of our technical baseline What is configuration
COMMISSION REGULATION (EU)
L 122/22 Official Journal of the European Union 11.5.2011 COMMISSION REGULATION (EU) No 445/2011 of 10 May 2011 on a system of certification of entities in charge of maintenance for freight wagons and
5 FAH-5 H-510 CONFIGURATION MANAGEMENT
5 FAH-5 H-500 CONFIGURATION MANAGEMENT 5 FAH-5 H-510 PROJECT DEVELOPMENT AND CHANGE CONTROL (CT:ITS-4; 06-21-2012) (Office of Origin: IRM/BMP/GRP/GP) (Updated only to revise Office of Origin) 5 FAH-5 H-511
Q2A First Article Inspection (FAI) AS9102 * Revised ** Added
Page 1 of 5 Q2A First Article Inspection (FAI) AS9102 * Revised ** Added NOTE: A hard copy of this document may not be the document currently in effect. The current version is always the version on the
Spillemyndigheden s change management programme. Version 1.3.0 of 1 July 2012
Version 1.3.0 of 1 July 2012 Contents 1 Introduction... 3 1.1 Authority... 3 1.2 Objective... 3 1.3 Target audience... 3 1.4 Version... 3 1.5 Enquiries... 3 2. Framework for managing system changes...
UNCONTROLLED COPY FOR REFERENCE ONLY
CLOVER MACHINE AND MFG. 800 MATHEW ST. #101 SANTA CLARA, CA 95050 727-3380 727-7015 fax REVISION: DATE: PAGE 1 OF 45 QUALITY POLICY MANUAL DISTRIBUTION LIST: President Purchasing Manager Vice President
D R A F T. Resource Ordering and Status System (ROSS) Software Configuration Management Guidelines
TO #GA81 Resource Ordering and Status System (ROSS) D R A F T Resource Ordering and Status System (ROSS) Software Configuration Management Guidelines June 28, 2000 Version 1.1 Contract: GS-35F-4863G Delivery
New Program Quality Requirements for Suppliers (NPQR) For Limited Manufacturing of Components and/or Processes for Engineering Certification
New Program Quality Requirements for Suppliers (NPQR) For Limited Manufacturing of Components and/or Processes for Engineering Certification Revision A New Program Quality Requirements for Suppliers Rev.
Independent Verification and Validation of SAPHIRE 8 Software Configuration Management Plan
INL/EXT-09-17141 Rev. 1 Independent Verification and Validation of SAPHIRE 8 Software Configuration Management Plan February 2010 The INL is a U.S. Department of Energy National Laboratory operated by
USACE NAVFAC Sample QA/QC Plan 20 selected pages (out of )
USACE NAVFAC Sample QA/QC Plan 20 selected pages (out of ) Part 1: Project Specific Quality Plan Part 2: Quality Manual Part 3: Submittal Forms Contact: First Time Quality 410 451 8006 Pat [Pick the date]
The transition to a complete paperless system for operations process management will yield the following immediate benefits:
Solumina is designed for companies that manufacture or service complex products with multiple levels of sub-assemblies, and that are subject to frequent engineering changes. PROCESS PLANNING MANUFACTURING
Generic CMMS Quality Assurance Plan
Generic CMMS Quality Assurance Plan Scope In accordance with the Quality Policy, the Quality System of CMMS is based upon the requirements and structure of ISO (the International Organization for Standardization)
Karas Engineering AS9100 QUALITY MANAGEMENT SYSTEM MANUAL
Karas Engineering AS9100 QUALITY MANAGEMENT SYSTEM MANUAL Revision D October 27, 2015 Statement of Commitment and Authority Commitment This Quality Management System Manual (QMSM) delineates the processes,
EPA Classification No.: CIO 2123.0-P-01.1 CIO Approval Date: 06/10/2013 CIO Transmittal No.: 13-003 Review Date: 06/10/2016
Issued by the EPA Chief Information Officer, Pursuant to Delegation 1-84, dated June 7, 2005 CONFIGURATION MANAGEMENT PROCEDURE 1 PURPOSE The purpose of this procedure is to describe the process EPA Program
Supplier Engineering Change Control Training
GE Energy Supplier Engineering Change Control Training Mark Bailey Supplier Product Quality Life Cycle Quality Requires Frozen Process & Design Quality Designed In Frozen Supplier Designs Supplier CID
Quality Assurance Requirements. For. Pratt & Whitney/Space Propulsion, Chemical Systems Division
Quality Assurance Requirements For Pratt & Whitney/Space Propulsion, FORM 06.13.02.02 (REV. 6) Page 1 of 14 Table of Contents SECTION I QUALITY SYSTEMS REQUIREMENTS... 5 1. QUALITY ASSURANCE PROGRAM...
Certified Professional in Configuration Management Glossary of Terms
Certified Professional in Configuration Management Glossary of terms used in Configuration Management Issue 2007.07 Association of the International Certified Configuration Manager e.v. Copyright 2007,
SUPPLIER QUALITY SYSTEM AUDIT CHECKLIST
General Information SUPPLIER QUALITY SYSTEM AUDIT CHECKLIST Vendor Code: Phone Fax: Vendor Name: Vendor Address: Completed by: Title: Signature: Date: Management Name: Title: Products/Services Description
Configuration Management Practices
Safety Critical Software Management Practices Linda Westfall Westfall Team, Inc. International Conference on Software Quality ICSQ 2011 Copyright 1999-2010 Westfall Team, Inc. All Rights Reserved. Management
ORACLE QUALITY ORACLE DATA SHEET KEY FEATURES
ORACLE QUALITY KEY FEATURES Enterprise wide Quality Data Repository In-process Quality Integrated with manufacturing, logistics, maintenance and service modules in the Oracle E-Business Suite. Analysis
Supplier Quality Assurance Requirements Manual
12716 EAST PINE STREET TULSA, OK 74116 Supplier Quality Assurance Requirements Manual Approved: Mike Collins Quality Assurance Manager Precise Machining & Manufacturing 1 Record of Revisions Revision D
JSP 886 DEFENCE LOGISTIC SUPPORT CHAIN MANUAL VOLUME 7 INTEGRATED LOGISTIC SUPPORT PART 8.12 CONFIGURATION MANAGEMENT
JSP 886 DEFENCE LOGISTIC SUPPORT CHAIN MANUAL VOLUME 7 INTEGRATED LOGISTIC SUPPORT PART 8.12 CONFIGURATION MANAGEMENT THE MASTER VERSION OF JSP 886 IS PUBLISHED ON THE DEFENCE INTRANET. FOR TECHNICAL REASONS,
Superconducting Magnet Division
Magnet Division Specification Specification Number: SMD-MAG-1001 Superconducting Magnet Division Revision: A Procedure for Preparation and Processing of ECR/ECN Prepared by: Design Group Supervisor: Production
SUPPLIER Form #: 007 AUDIT QUESTIONNAIRE
1.0 BACKGROUND INFORMATION Company Name: Company Address: Phone Number: Fax Number: Number of years in business: Number of employees: Annual Sales in Dollars: Size of Facility in Square Feet: Name of Senior
RTP s NUCLEAR QUALITY ASSURANCE PROGRAM
RTP s NUCLEAR QUALITY ASSURANCE PROGRAM RTP operates under one quality program, whether you purchase products that are commercial grade, nuclear safety-related or industrial safety compliant (IEC 61508).
L-3 Communications Corporation AMI Purchase Order Supplement No. 3 Quality Assurance
Q10 QUALITY SYSTEM REQUIREMENTS Q10A Q10B ISO 9001:2008 Seller s quality system shall be in compliance with the requirements of ISO 9001, Model for in Design, Development, Production, Installation and
THE PROJECT MANAGEMENT KNOWLEDGE AREAS
THE PROJECT MANAGEMENT KNOWLEDGE AREAS 4. Project Integration Management 5. Project Scope Management 6. Project Time Management 7. Project Cost Management 8. Project Quality Management 9. Project Human
CHAPTER 7 Software Configuration Management
CHAPTER 7 Software Configuration Management ACRONYMS CCB CM FCA MTBF PCA SCCB SCI SCM SCMP SCR SCSA SEI/CMMI SQA SRS USNRC INTRODUCTION Configuration Control Board Configuration Management Functional Configuration
PPI/TZ Standard Quality Requirements for Suppliers -SQRS-
PPI/TZ Standard Quality Requirements for Suppliers -SQRS- AS9100, ISO 13485 and ISO 9001 Revision: November 16, 2015 For questions concerning Standard Quality Requirements for Supplier (SQRS), please contact
GLOBAL AEROSPACE PROCEDURE
1 of 13 1. PURPOSE: This procedure establishes the minimum PPG Aerospace requirements for a Supplier's Quality Plan. These requirements pertain to the documentation and inspection/testing necessary to
KOLLMORGEN. Title: Standard Operating Procedure Counterfeit Parts
Approved By: Elliott Major Date: 11-19-09 Page 1 of 9 Rev ECO Date Approve Rev ECO Date Approve A R01_13541 07-23-10 DWL B R01_14787 12-15-11 DWL C R01_14910 03-07-12 DWL D R01_14964 04-16-12 DWL 1.0 Purpose
Change Management Plan (CMP)
Change Management Plan (CMP) i Version/Change Record Revision Date Description ii Table of Contents 1.0 Introduction... 5 1.1 Purpose... 5 1.2 Plan Scope... 5 1.3 Document Overview... 7 1.4 Referenced
CMS Policy for Configuration Management
Chief Information Officer Centers for Medicare & Medicaid Services CMS Policy for Configuration April 2012 Document Number: CMS-CIO-POL-MGT01-01 TABLE OF CONTENTS 1. PURPOSE...1 2. BACKGROUND...1 3. CONFIGURATION
CMII-100H. CMII Standard for Enterprise-Wide Configuration Management and Integrated Process Excellence. by the Institute of Configuration Management
CMII-100H CMII Standard for Enterprise-Wide Configuration Management and Integrated Process Excellence by the Institute of Configuration Management and CMII Research Institute Revision H; Released March
SUPPLIER QUALITY MANAGEMENT SYSTEM QUESTIONNAIRE
Company Name Street Address City, State, Zip code Phone Number Fax Company Website Email Address ORGANIZATION NAME PHONE NUMBER EMAIL ADDRESS President/CEO General Manager Engineering Manager Production
CHANGES, DEVIATIONS & WAIVERS PROCESSES
PROCEDURE CHANGES, DEVIATIONS & WAIVERS PROCESSES This document is stored electronically. Printed version might not be the latest. SAOCOM PROJECT COMISION NACIONAL DE ACTIVIDADES ESPACIALES BUENOS AIRES
How To Manage A Plant
MALAT 9100 QUALITY REQUIREMENTS For Suppliers of Category 12, 13 This Document is located in the Internet site http://www.iai.co.il/sip_storage/files/2/35782.pdf Date: March 2012 Prepared by : S. Migdal
ONTIC UK SUPPLIER QUALITY SURVEY
MAIL-IN / ONSITE This report is intended to furnish data relative to the Suppliers capability to control the quality of supplies and services furnished to Ontic UK. Please complete this Survey and return
NATO QUALITY ASSURANCE REQUIREMENTS FOR DESIGN, DEVELOPMENT AND PRODUCTION
NATO QUALITY ASSURANCE REQUIREMENTS FOR DESIGN, DEVELOPMENT AND PRODUCTION AQAP 2110 (June 2003) I ORIGINAL Page blank II ORIGINAL NORTH ATLANTIC TREATY ORGANIZATION NATO STANDARDISATION AGENCY (NSA) NATO
Software Quality Subcontractor Survey Questionnaire INSTRUCTIONS FOR PURCHASE ORDER ATTACHMENT Q-201
PURCHASE ORDER ATTACHMENT Q-201A Software Quality Subcontractor Survey Questionnaire INSTRUCTIONS FOR PURCHASE ORDER ATTACHMENT Q-201 1. A qualified employee shall be selected by the Software Quality Manager
Supplier Quality Assurance Requirements Manual
1701 West Tacoma Broken Arrow, Ok. 74012 Supplier Quality Assurance Requirements Manual Approved: Bryan Sanderlin President/COO/CEO OSECO, Inc. Darrel Bilke Quality Assurance Manager OSECO, Inc. 1 Record
INSPECTION IN-PROCESS AND FINAL QUALITY ASSURANCE
INSPECTION IN-PROCESS AND FINAL QUALITY ASSURANCE 1.0 SCOPE: The purpose of this procedure is to document mandatory to ensure compliance to Project Requirements. inspection points and 2.0 REFERENCE DOCUMENTS:
The Configuration Management process area involves the following:
CONFIGURATION MANAGEMENT A Support Process Area at Maturity Level 2 Purpose The purpose of is to establish and maintain the integrity of work products using configuration identification, configuration
The Fulfillment of AS 9100 Rev C Requirements by EnterpriseIQ
The Fulfillment of AS 9100 Rev C Requirements by EnterpriseIQ Manufacturers have worked to meet the stringent requirements of AS9100 for decades; the recent introduction of Revision C has further expanded
Quality Assurance Manual for Low Level Radioactive. Waste Disposal Facility
WM 07 Conference, February 25 March 1 2007, Tucson, AZ Quality Assurance Manual for Low Level Radioactive Waste Disposal Facility Yasser T. Mohamed Hot Laboratories and Waste Management Center, Egyptian
Supplier Handbook Terms and Conditions
* 2 / 7 TABLE OF CONTENTS 1. Section 1 Introduction 1.1. Objective 1.2. Scope 1.3 Contact Information 2. Section 2 Quality Expectations 2.0 Application of This Section 2.1 Change Notification 2.2 Quality
Supplier Quality Requirements F16 Program
ISRAEL AEROSPACE INDUSTRIES LTD. MILITARY AIRCRAFT GROUP, LAHAV DIVISION DOCUMENT IDENTIFIER : WF16Z/150901 Supplier Quality Requirements F16 Program RESTRICTION ON USE, DUPLICATION, OR DISCLOSURE OF PROPRIETARY
GARDNER AEROSPACE SUPPLIER QUALITY REQUIREMENTS MANUAL
GARDNER AEROSPACE SUPPLIER QUALITY REQUIREMENTS MANUAL Issue Number: 1 Issue Date: 12/9/14 1 of 19 Contents Revision Summary... 4 1.0 Introduction... 5 2.0 Supplier Quality System Requirements... 6 3.0
ISO 20000-1:2005 Requirements Summary
Contents 3. Requirements for a Management System... 3 3.1 Management Responsibility... 3 3.2 Documentation Requirements... 3 3.3 Competence, Awareness, and Training... 4 4. Planning and Implementing Service
Supplier Quality. Assurance Provisions. Manual. SQAP-001 Rev. E
9060 WINNETKA AVENUE NORTHRIDGE, CA 91324 USA Supplier Quality Assurance Provisions Manual SQAP-001 Revision E Page 1 of 14 Table of Contents 1 General Requirements... 4 1.1 Supplier Control... 4 1.2 Supplier
How To Integrate Software And Systems
September 25, 2014 EFFECTIVE METHODS FOR SOFTWARE AND SYSTEMS INTEGRATION P R E S E N T E D B Y: D R. B O Y D L. S U M M E R S 1 Software Engineer (Quality) Defense and Space The Boeing Company - Seattle,
General Platform Criterion Assessment Question
Purpose: [E]nsure that the assets required to deliver services are properly controlled, and that accurate and reliable information about those assets is available when and where it is needed. (ST 4.3.1)
NATO GUIDANCE ON THE USE OF THE AQAP 2000 SERIES
NATO GUIDANCE ON THE USE OF THE AQAP 2000 SERIES (June 2003) I ORIGINAL Page blank II ORIGINAL NORTH ATLANTIC TREATY ORGANIZATION NATO STANDARDISATION AGENCY (NSA) NATO LETTER OF PROMULGATION June 2003
Supplier Guide. Suppliers for production material or services may be qualified for the list in one or more of the following ways:
Supplier Guide Purpose The purpose of this guide is to inform potential and current Suppliers to Jay Industries, Inc. of our policies as well as quality and performance requirements. Application This guide
CORPORATE QUALITY MANUAL
Corporate Quality Manual Preface The following Corporate Quality Manual is written within the framework of ISO 9001:2008 Quality System by the employees of CyberOptics. CyberOptics recognizes the importance
Service Support. 2005 Kasse Initiatives, LLC. ITIL Configuration Management - 1. version 2.0
Service Support Configuration Management ITIL Configuration Management - 1 Goals of Configuration Management The goals of Configuration Management are to: Account for all the IT assets and configurations
CONFIGURATION MANAGEMENT (CM) GUIDELINES
CONFIGURATION MANAGEMENT (CM) GUIDELINES Prepared by: S. E. Snook Software Quality Engineering 330 Corporate Way Suite 300 Orange Park, FL, USA 32073 Configuration Management Guidelines 1 1. PURPOSE STATEMENT
Telephone Security Equipment. Submission and Evaluation. Procedures COMMITTEE ON NATIONAL SECURITY SYSTEMS. CNSSI No.
COMMITTEE ON NATIONAL SECURITY SYSTEMS April 2013 Telephone Security Equipment Submission and Evaluation Procedures THIS DOCUMENT PRESCRIBES MINIMUM STANDARDS YOUR DEPARTMENT OR AGENCY MAY REQUIRE FURTHER
Department of Administration Portfolio Management System 1.3 June 30, 2010
E 06/ 30/ 2010 EX AM PL 1. 3 06/ 28/ 2010 06/ 24/ 2010 06/ 23/ 2010 06/ 15/ 2010 06/ 18/ 2010 Portfolio System 1.3 June 30, 2010 Contents Section 1. Project Overview... 1 1.1 Project Description... 1 1.2
NATO STANDARD AQAP-2310 NATO QUALITY MANAGEMENT SYSTEM REQUIREMENTS FOR AVIATION, SPACE AND DEFENCE SUPPLIERS
NATO STANDARD AQAP-2310 NATO QUALITY MANAGEMENT SYSTEM REQUIREMENTS FOR AVIATION, SPACE AND DEFENCE SUPPLIERS Edition A Version 1 April 2013 NORTH ATLANTIC TREATY ORGANIZATION ALLIED ADMINISTRATIVE PUBLICATION
ITIL Roles Descriptions
ITIL Roles s Role Process Liaison Incident Analyst Operations Assurance Analyst Infrastructure Solution Architect Problem Manager Problem Owner Change Manager Change Owner CAB Member Release Analyst Test
Quality Management System Manual ISO9001:2008
Quality Management System Manual ISO9001:2008 Controlled Copy Rev. 3 Page 1 of 21 7/1/13 Table of Contents Company Profile...5 Past...5 Present...5 Mission...5 Vision...5 Locations...6 1 Scope...6 1.1
DEPARTMENT OF DEFENSE INTERIM STANDARD PRACTICE CONFIGURATION MANAGEMENT
NOT MEASUREMENT SENSITIVE MIL-STD-3046(ARMY) 06 March 2013 DEPARTMENT OF DEFENSE INTERIM STANDARD PRACTICE CONFIGURATION MANAGEMENT AMSC 9275 AREA SESS DISTRIBUTION STATEMENT A. Approved for public release;
CITY UNIVERSITY OF HONG KONG
CITY UNIVERSITY OF HONG KONG (Approved by the Information Strategy and Governance Committee in December 2013) PUBLIC Date of Issue: 2013-12-24 Document Control Document Owner Classification Publication
Appendix E Program Management Plan Template
Appendix E Program Management Plan Template Version 2 March 7, 2005 This page is intentionally left blank. Version 2 March 7, 2005 Title Page Document Control Panel Table of Contents List of Acronyms Definitions
Cessna - Interiors Manufacturing Facility (IMF) Supplier Quality System Requirements
Cessna - Interiors Manufacturing Facility (IMF) Supplier Quality System Requirements Wichita KS Effective: 3-11-15 Rev. IR Page 1 of 6 1.0 Introduction This document establishes Cessna Interiors Manufacturing
How To Write A Contract For Software Quality Assurance
U.S. Department of Energy Washington, D.C. NOTICE DOE N 203.1 Approved: Expires: 06-02-01 SUBJECT: SOFTWARE QUALITY ASSURANCE 1. OBJECTIVES. To define requirements and responsibilities for software quality
Quality Management System Manual Revision L
This Page 1 of 35 of the Quality Management System Manual If issued as a controlled copy, the serial number of this copy is Quality Management System Manual Certified to AS9100 Revision C Printed copies
Procedure for Corrective and Preventative Action. Procedure No. 304
Procedure for Corrective and Preventative Action Procedure No. 304 Print Name Title Date Prepared by L. Naughton Quality Assurance 09/04/09 Consultant Reviewed by N.Mooney Assistant Fire and Safety Offficer
Quality Monitoring Checklist
Quality Monitoring Checklist Instructions: For each task below, the Quality Monitor indicates in the appropriate column if the Monitor accomplished the task by using the following codes Yes No N/A = Monitor
Fusion Engineering and Design
Fusion Engineering and Design 86 (2011) 2317 2321 Contents lists available at ScienceDirect Fusion Engineering and Design journal homepage: www.elsevier.com/locate/fusengdes The TBM-CA configuration management
DEPARTMENT OF DEFENSE STANDARD PRACTICE CONFIGURATION MANAGEMENT
NOTE: This draft, dated 21 August 2012, prepared by the U.S. Army ARDEC (AR), has not been approved and is subject to modification. DO NOT USE PRIOR TO APPROVAL. (Project SESS-2012-012.) NOT MEASUREMENT
AEROSPACE QUALITY MANAGEMENT SYSTEM - 9100
AEROSPACE QUALITY MANAGEMENT SYSTEM - 9100 Dale K. Gordon Rolls-Royce Royce North America Past Chairman Americas Aerospace Quality Group April 11th, 2003 Edinburgh General Assembly 1 of 24 Aerospace Quality
Company Quality Manual Document No. QM Rev 0. 0 John Rickey Initial Release. Controlled Copy Stamp. authorized signature
Far West Technology, Inc. ISO 9001 Quality Manual Document No.: QM Revision: 0 Issue Date: 27 August 1997 Approval Signatures President/CEO Executive Vice President Vice President/CFO Change Record Rev
AVNET Logistics & EM Americas. Quality Manual
AVNET Logistics & EM Americas Quality Manual Avnet is committed to ensuring customer satisfaction while meeting all customer and applicable legal, statutory and regulatory requirements. This is accomplished