Section 000 Organization of an Engineering District (Construction)



Similar documents
HIGHWAY AND BRIDGE SUBCONTRACTORS MANUAL

CONSTRUCTION COST ESTIMATES

LOCAL AGENCY CONTRACT ADMINISTRATION CHECKLIST

1. It would create hazardous effects of storm water run-off. 3. It would increase hazardous driving conditions on the public road.

CHAPTER 15 EQUAL EMPLOYMENT OPPORTUNITY, ON-THE-JOB TRAINING AND PREVAILING WAGES

Work Type Definition and Submittal Requirements Work Type: Construction Contract Administration & Management

Airport Safety and Construction Management Under The FAA

Bureau of Recreation and Conservation (BRC) Administrative Policy/Grant Guidelines

Work Breakdown Structure Element Dictionary Construction

NEW JERSEY DEPARTMENT OF TRANSPORTATION DISADVANTAGED BUSINESS ENTERPRISE GOAL SUBMISSION FEDERAL FISCAL YEARS 2014 THROUGH 2016

Work Breakdown Structure Element Dictionary. Final Design

Getting Connected with the Colorado Department of Transportation (CDOT)

INDIANA DEPARTMENT OF TRANSPORTATION QUALIFIED LABORATORY AND TECHNICIAN PROGRAM

Internal Audit RFP 2013 Questions and Answers

CONTRACTOR COMPLIANCE

Chapter IV - Labor Compliance (LC) Program Oversight and Procedures (FHWA-1273 IV.,V.)

LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT

Marion County Public Works

Utility Coordination Procedures for Hillsborough County Construction Projects within County Rights-of-Way

CIVIL RIGHTS EQUAL EMPLOYMENT OPPORTUNITY. Field Procedures Manual

Final Audit Follow-up As of January 31, 2014

CONTRACT COMPLIANCE REVIEW CHECKLIST Nevada Department of Transportation, Contract Compliance Division

New Hope-Solebury School District REQUEST FOR PROPOSAL

INTERNAL CONTROL MATRIX FOR AUDIT OF ESTIMATING SYSTEM CONTROLS Version No. 3.2 June d Page 1 of 7

DESCRIPTION OF WORK:

CHECKLIST TO DESIGNATE AREAS OF EVALUATION FOR REQUESTS FOR PROPOSAL (RFP)

Notes. Score. 1 Basic Services 1.1. A few instances; could have been more proactive

GENERAL. This manual addresses five local programs that are funded under the current Highway Act:

Appendix A Alternative Contracting General Engineering Consultant RFP. Appendix A

GUILFORD COUNTY SCHOOLS JOB DESCRIPTION JOB TITLE: EXECUTIVE DIRECTOR FACILITIES AND CONSTRUCTION MANAGEMENT GENERAL STATEMENT OF JOB

Reasons for Change Orders

Chapter 10 - Contract Completion

Welcome to the City of Chicago. Department of Procurement Services. Rahm Emanuel, Mayor Jamie Rhee, Chief Procurement Officer

Structures Construction Pre-Work Checklist PRE-WORK SHEET FOR PROJECT MANAGERS

Roadway Cost Per Centerline Mile Revised June 2014

Quality Assurance Program for Design-Bid-Build Projects. January by Texas Department of Transportation 512/ All Rights Reserved

Design-Build Mississippi Gate Additional Lane

REQUEST FOR PROPOSAL to provide ON-CALL ENVIRONMENTAL CONSULTING SERVICES for the RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT

TOWNSHIP OF BLOOMFIELD PUBLIC NOTICE FOR THE SOLICITATION OF PROFESSIONAL SERVICE CONTRACTS FOR FINANCIAL ADVISORY SERVICES

Pennsylvania Asphalt Improvement Network (PASIN) Hot Mix Asphalt Industry Baseline Assessment Report. December 2006

Master Document Audit Program. Version 7.4, dated November 2006 B-1 Planning Considerations. Purpose and Scope

Certified Payrolls Certified Payrolls Submittal Requirements Notice of Delinquent Certified Payroll

Patrece Richardson, Minority Business Officer REVISED 04/ PAGE 1

Work Type Definition and Submittal Requirements

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013

Chapter 22. Lump Sum Project Guidelines

County Insurance. #296 Risk Management

CONCRETE: CONTRACTOR S QUALITY CONTROL PLAN

STATE OF ALASKA DEPARTMENT OF ENVIRONMENTAL CONSERVATION ALASKA CLEAN WATER FUND & ALASKA DRINKING WATER FUND

Construction Management Program

PITTSBURG UNIFIED SCHOOL DISTRICT

Frequently Asked Questions Concerning the Public Bidding and Prevailing Wage Requirements of New Jersey Charter Schools

CONSTRUCTION MANAGEMENT

QUALITY ASSURANCE PROGRAM (QAP) City Rohnert Park

Scope of Work Construction Inspection and Materials Testing Services

PROJECT MANAGEMENT HANDBOOK, PART 2 - PHASE SPECIFIC PROJECT MANAGEMENT ISSUES

RFP Courier and Logistics Services For the Indiana State Department of Health

DESIGN-BUILD QUALITY MANAGEMENT PLAN OUTLINE

CHAPTER 5 QUALITY CONTROL AND QUALITY ASSURANCE

Procurement practices of school districts and charter schools; definitions

Nothing in this job description restricts management's right to assign or reassign duties and responsibilities to this job at any time.

Construction Management Standards of Practice

Mobile Highway Construction App. Improving State Operations. Contact: Phil Tomassini, CIO. Pennsylvania Department of Transportation.

CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES

Section 100 Contractor Quality Control Program

LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT CONSTRUCTION PLANS QUALITY CONTROL / QUALITY ASSURANCE MANUAL

CONSTRUCTION OF FEDERALLY FUNDED (FEDERAL AID) LOCAL AGENCY PROJECTS BY NON-COMPETITIVE BID CONTRACT (FORCE ACCOUNT) FINAL AUGUST 2015

PUBLIC RIGHT-OF-WAY ACCESSIBILITY TRANSITION PLAN

Contract Administration

HIGHWAY DEPARTMENT ACCESS AND RIGHT OF WAY WIDTH GUIDELINES

CONTRACT ADMINISTRATION. Procedures

City of Moreno Valley Date Council Approved March 13, 2007 Date Effective April 6, 2007 CLASS SPECIFICATION Senior Electrical Engineer, P.E.

The Commonwealth of Massachusetts AUDITOR OF THE COMMONWEALTH

How To Get Paid At A Public Work Project

SECTION SITE PREPARATION

Top 10 Compliance Risks For GSA Schedule Contractors

Metropolitan Nashville Airport Authority

CHAPTER 23. Contract Management and Administration

ADDENDUM NO. 1. Manchester Boston Regional Airport, City of Manchester, NH

REQUEST FOR QUALIFICATIONS PROJECT / PROGRAM MANAGEMENT CONSULTANT

CHAPTER VII CONSTRUCTION QUALITY CONTROL INSPECTION PROGRAM 1

Document Comparison. AIA Documents A and A131CMc 2003

REQUEST FOR QUOTATIONS MEDICAL CODING AUDITING SERVICES RFQ

Transcription:

Table of Contents 1. General Policies and Provisions... 000-1 2. District Executive... 000-2 3. Assistant District Executive Design... 000-3 4. Assistant District Executive Maintenance... 000-4 5. Assistant District Executive Construction... 000-5 6. Assistant Construction Engineer... 000-6 7. Structure Control Engineer... 000-7 8. Materials Engineer... 000-8 9. Construction Services Engineer... 000-9 10. Proposal and Work Order Review... 000-10 11. Inspector-in-Charge... 000-11 12. Inspectors... 000-12 13. Labor Compliance/EEO Coordinator... 000-13 14. Finals Unit... 000-14 15. Geotechnical Engineer... 000-15 PennDOT Publication 8 000-i

This Page Left Intentionally Blank PennDOT Publication 8 000-ii

1. General Policies and Provisions This chapter addresses general policies and provisions regarding the organization of an engineering district. The Pennsylvania Department of Transportation divides the Commonwealth into eleven Engineering Districts, each headed by a district executive. The district executive is assisted in the operation of the Engineering District by the following individuals and their staff: assistant district executive design, assistant district executive maintenance, assistant district executive construction, community relations coordinator, district fiscal control officer, and district human resources officer. A typical District is organized along the following lines, however it should be noted that several districts have organizational variances under the ADEs for instance one has the contract management unit in construction other units are under different ADEs depending on the District. One District has a fourth ADE. PennDOT Publication 8 000-1

2. District Executive The district executive is in charge of all work performed in the District. This includes all functions, including design, construction and maintenance of highways and bridges, coordination with municipalities, and issuance of permits for access to state highways and design of traffic signals. The district executive s responsibility also includes programming, budgeting, personnel assignments, and performance review. It is the district executive s responsibility to ensure that all contracts for work within the District are fulfilled as written, including compliance with the specifications, drawings, special provisions, and standard drawings. PennDOT Publication 8 000-2

3. Assistant District Executive Design The assistant district executive (ADE) design is responsible for coordinating all activities in the District concerning the design of highways and bridges. The activities include those related to geotechnical issues, structures, planning organizations, and plan and contract development. Surveying, utility relocations, and right-of-way also come under the jurisdiction of the ADE design. PennDOT Publication 8 000-3

4. Assistant District Executive Maintenance The assistant district executive (ADE) maintenance is responsible for coordinating all activities related to accidents, traffic, roadside maintenance, municipal services, access and hauling permits, and maintenance of roadways and bridges (including snow removal). County maintenance managers and their staff report to the ADE maintenance. PennDOT Publication 8 000-4

5. Assistant District Executive Construction The assistant district executive (ADE) construction is responsible for coordinating all activities related to contract construction work. To accomplish this, the ADE has a staff that includes a support services engineer, assistant construction engineers, materials engineers and individuals responsible for safety, equal employment opportunity (EEO), labor compliance, work orders, finals, and audits. The safety, EEO, and labor compliance functions are often assigned to one individual. PennDOT Publication 8 000-5

6. Assistant Construction Engineer The assistant district construction engineer (ACE) is responsible for overseeing and monitoring several construction projects within the District. This ACE is the immediate supervisor of the inspector-in-charge and functions as a coordinator between the inspector-incharge and district units to assist in resolving issues and problems. The ACE chairs the pre-construction meeting, conducts final inspections, and monitors the progress of the project (including estimates). The ACE also assists the inspector-in-charge in resolving compliance issues with the contractor and in obtaining assistance in resolving project issues. PennDOT Publication 8 000-6

7. Structure Control Engineer The structure control engineer is responsible for providing specialized engineering guidance and direction relating to structures. The structure control engineer should inspect all bridge foundations during construction, review deck placement procedures, review falsework submissions, and be consulted whenever non-routine construction problems are encountered. In some Districts, an ACE also serves as the structure control engineer. PennDOT Publication 8 000-7

8. Materials Engineer The materials engineer is responsible for approval and monitoring of aggregate sources, bituminous concrete plants, and Portland cement concrete plants. This responsibility includes plants established on the project sites. The materials engineer and staff members review quality control plans for the various facilities and project-specific plans for paving operations. The staff provides inspection and monitoring at bituminous and concrete plants, as well as periodic sampling, inspection, and testing of aggregate sources. They are also available for assistance with project-related issues. PennDOT Publication 8 000-8

9. Construction Services Engineer The construction services engineer is responsible for a number of functions. These include: monitoring contractors compliance with labor requirements (such as wage rates, and trainees), monitoring contractors safety plans, monitoring contractors compliance with EEO requirements; and processing work orders and other information related to construction contracts. Duties assigned to the construction services engineer may vary by District. PennDOT Publication 8 000-9

10. Proposal and Work Order Review One individual in the District Construction Unit is responsible for work order and proposal review. He or she reviews proposals for construction projects prior to bid, with an emphasis on items such as clarity, completeness, constructability, and bidability, then provides comments to the design project manager to ensure that the highest-quality plans are provided for bid to contractors. During the construction of projects, conditions sometimes require adjustments to quantities or additional items not anticipated in the design process. Also, the Department sometimes finds it necessary to have the contractor perform the work using the force account procedure. In such instances, work orders must be generated by the project inspection staff and submitted to the District for review and approval. PennDOT Publication 8 000-10

11. Inspector-in-Charge The inspector-in-charge of a project is responsible for all inspection work on a project, and for providing direction and guidance to the inspectors. He or she monitors the various contractor activities, visits field operations, reviews reports and other records, and monitors sampling and testing of materials. The inspector-in-charge is responsible for explaining to a property owner how the project will affect the owner s property. He or she should not discuss damages or indicate what settlement the property owner will receive; the right-of-way administrator provides this information. The inspector-in-charge, however, is responsible for notifying the contractor not to trespass or do any work on private property unless the contractor has written permission from the property owner. If the inspector-in-charge finds that a structure or slope will extend beyond the right-of-way limit, he or she should report this to the assistant district construction engineer before construction is started. He or she should also report any condition that will require more work or material than indicated in the contract. The inspector-in-charge also ensures that the contractor s maintenance and protection of traffic efforts are in compliance with the approved plans, and directs appropriate changes when required. If a detour is utilized, the inspector-in-charge is responsible for monitoring the detour conditions. PennDOT Publication 8 000-11

12. Inspectors Inspectors are assigned to a construction project to assist the inspector-in-charge in monitoring the contractors operations. Inspectors have various levels of experience and carry titles and responsibilities accordingly. Inspectors monitor the contractor s work for compliance with the contract, observe and document quality control testing, record information, and document quantities for completed work. PennDOT Publication 8 000-12

13. Labor Compliance/EEO Coordinator Department construction contracts contain two requirements relative to the contractor s workforce: Wage rates for various classifications of employees, including laborers, operators, carpenters, and flaggers. A commitment by the contractor to have a certain portion of the work performed by Disadvantaged Business Enterprises (DBE), Women s Business Enterprises (WBE), or Minority Business Enterprises (MBE). The construction inspection staff is responsible for monitoring wage rates through interviews and payroll reviews. Contractor payrolls are also submitted to the district labor compliance officer for review and approval. If the project staff identify a problem, the district labor compliance officer assists in its resolution. At the time the contractor submits a bid, he or she commits to subcontracting a percentage of the work to DBE, WBE, or MBE firms. During the course of construction, this percentage is closely monitored via payrolls and estimates. The district EEO coordinator will periodically visit the project site for spot reviews or to assist the inspection staff in resolving issues. PennDOT Publication 8 000-13

14. Finals Unit The finals unit conducts a final audit of the project records after the completion of construction. Duties for this unit vary by District. Staff is usually available to assist in setting up project records and may perform periodic audits to ensure conformance. PennDOT Publication 8 000-14

15. Geotechnical Engineer The geotechnical engineer is responsible for all work related to geology and associated engineering. He or she is responsible for oversight of geotechnical research and design for foundations, slopes, and other issues in the design phase. The geotechnical engineer also assists with construction related issues, such as foundations, sinkholes, slides, and unstable material. PennDOT Publication 8 000-15

This Page Left Intentionally Blank PennDOT Publication 8 000-16