CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES
|
|
|
- Lawrence Rice
- 10 years ago
- Views:
Transcription
1 1.0 SCOPE CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES This document establishes the minimum quality program requirements for a contractor providing equipment, material, and construction services on Engineering and Construction Services (E&CS) construction sites. 2.0 GENERAL The quality requirements set forth in this document; the purchaser s surveys, audits, and surveillances; or the absence, lack of, or deficiency in these requirements shall in no way relieve the contractor of any contractual obligations or responsibilities. 3.0 QUALITY PROGRAM The contractor shall establish, document, and maintain a corporate and site-specific quality program that meets the requirements of this CQR document, and provides any additional controls necessary to ensure compliance with the purchaser's procurement documents. The contractor shall be responsible for ensuring the quality of all equipment, material, or service obtained from subcontractors or from the contractor s corporate branch locations meets the requirements of the purchaser's procurement documents. All applicable requirements of the purchaser s must be communicated to all contractor work locations and subcontractors. The contractor shall be responsible for ensuring the quality of the equipment, material, or services provided by subcontractors meets the purchaser s procurement document requirements. Subcontractors not included in the contractor s proposal must be approved in writing by the purchaser, prior to using the subcontractor. 3.1 Quality Program Requirements The contractor shall have an updated quality program, approved and signed by senior management, which contains, but is not limited to, the following: 1. Quality Organization - The quality program shall define the organizational structure of the contractor, with particular emphasis on the quality organization. The quality responsibilities shall be defined, including any project quality requirements. The program shall contain an organizational chart identifying the quality management structure of the contractor. This chart shall establish a quality reporting level to a sufficiently high level of autonomous and independent management to ensure quality problems can be resolved without undue influence from the construction or scheduling processes. 2. Contractor Quality Representative(s) - The quality program shall identify the contractor s representative(s) authorized to resolve quality matters. The contractor s quality representative(s) shall be personnel other than those performing the work and not reporting directly to management responsible for construction or scheduling. The contractor shall designate an onsite quality professional who is qualified to properly inspect and evaluate the work being performed. 3. Quality Personnel Training - The quality program shall provide for, and require the indoctrination and training of, quality personnel performing or managing activities affecting quality. This shall include at a minimum, the quality program, procedures, project-specific technical requirements, and revisions to each as they occur. CQR-1, Contractor Quality Requirements for Construction Services 1 of 7 (Attachment A, CO-03)
2 The quality program shall identify the activities requiring personnel certification and the requirements for obtaining and maintaining certification. Documentation shall be generated and maintained that quality personnel have completed the training and are familiar with its contents, prior to the start of work activities. 4. Procedures - The contractor shall develop and use procedures, guidelines, related forms, and other documents, as part of the site-specific quality program, to address the processes, actions, and activities necessary for the implementation of the quality activities related to the scope of work. The procedures shall be controlled and available to the employees performing the work. The procedures shall identify activities to be performed and responsible parties, and shall provide documentation as objective evidence to verify that controls have been satisfactorily established and performed. The contractor shall develop process procedures to include technical criteria as noted in the purchaser s specifications for the areas referenced in Item 6, Construction Process Control, as related to the scope of work and conditions of the contract. These process procedures shall contain the following information, as applicable: Scope of work covered by the procedure. Key personnel involved in the process and their responsibilities. Technical criteria and references with applicable acceptance criteria. Procedural steps, explained in a logical manner, demonstrating how the process will be accomplished and accepted. Special conditions, exceptions, or activities relevant to the scope of work and site conditions. Key inspection points and hold points, including interfaces with the purchaser. Relevant forms and checklists, as they apply to the scope of the procedure, to ensure consistency and a determination of the status (for example, acceptance). Documentation requirements for the process and the need for submittal to the purchaser. Inspection and test plans (ITP) may be submitted in lieu of or in addition to the requirements listed above. (See attachment E for a sample ITP.) 5. Document Control - The contractor shall have measures in place to control issuance of, receipt of, and changes to contractor s documents affecting quality. All purchaser-supplied documents, including revisions, shall be controlled by the contractor s organization. The contractor s system shall maintain traceability, identify proper status, and control transmittal of controlled documents. The contractor shall ensure that documents are reviewed for adequacy, approved for release by authorized personnel, and distributed to the appropriate work location. The contractor shall ensure changes to documents receive the same level of authorization as the original documents. All changes shall be processed in writing or electronically, and all obsolete documents shall be removed promptly from all points of issue and use, or be adequately marked to identify their status. Documents shall be easily retrievable, legible, reproducible, and uniquely identified. 6. Construction Process Control - Construction activities affecting quality shall be prescribed by documented instructions, procedures, or drawings of a type appropriate to the circumstances and shall be accomplished in accordance with the applicable documents. CQR-1, Contractor Quality Requirements for Construction Services 2 of 7 (Attachment A, CO-03)
3 Fabrication, installation, construction, and inspection activities shall be performed in accordance with applicable codes, technical specifications, manufacturer s recommendations, and engineering drawings. Procedures shall address how special conditions will be met, explain key inspection areas and hold points, identify special equipment needs, define acceptance criteria, and include copies of all relevant forms and checklists. Procedures and/or ITPs, including appropriate inspection and testing, shall be provided to the purchaser for the following work activities as deemed appropriate by E&CS for the applicable contractual work scope: Earthwork operations including soils. Concrete operations. Caisson operations. Piling operations. Grouting operations. Fit up and installation of structural steel. Fit up and installation of ductwork. Installation of high-strength bolting. Installation of insulation. Piping installation. Installation of equipment, including rotating equipment. Installation of electrical systems. Installation of instrumentation. Installation and fabrication of fiberglass components to include inspection and testing. Application of coatings and paint systems to include surface preparation, inspection, and testing. Survey control. Material receipt, storage, and handling. Document control. Additional procedures may be required as deemed appropriate by E&CS and as outlined in the contractual scope of work. 7. Control of Special Processes - The contractor shall control special processes that control or verify quality, such as those used in welding, heat treating, and nondestructive examination. Special processes shall be performed by qualified personnel using qualified procedures in accordance with specified technical requirements. The contractor shall submit the initial and any subsequent revision of special process procedures for E&CS approval. The contractor shall submit and maintain documentation for the certification and/or qualification of personnel, processes, or equipment according to the requirements of applicable codes and standards. 8. Control and Calibration of Measuring and Testing Equipment - Measuring and testing equipment (MTE) utilized will be appropriate to the work performed and in good repair and working condition. At prescribed intervals, or prior to each use, all MTE and devices used for inspection or testing shall be calibrated and adjusted against certified equipment having a known valid relationship to nationally recognized standards. CQR-1, Contractor Quality Requirements for Construction Services 3 of 7 (Attachment A, CO-03)
4 When no national standards exist, the basis employed for calibration shall be documented. The contractor shall: Identify MTE and provide a tag, sticker, or other suitable means to show the calibration status. Maintain calibration records and maintain traceability of calibrated equipment. Calibration documentation shall provide traceability by demonstrating an unbroken chain of calibration or comparisons linking them to relevant national standards or physical constants. If MTE is found to be out of calibration, the equipment and the tests performed with the out-of-calibration equipment shall be evaluated. The equipment shall be tagged and segregated (if space permits) and shall not be used until it has been calibrated, repaired, and found acceptable for use. If it cannot be repaired, the equipment shall be properly dispositioned. If the results of the testing performed with the equipment are not valid, a nonconformance shall be written. Calibration and control measures are not required for commercial equipment such as rulers, tape measures, and so forth, if such equipment is not used for Quality Control (QC) or quality verification purposes and provides the required accuracy. 9. Inspection and Testing - The contractor shall have an inspection program that includes receiving, inprocess, and final inspections. Procedures used to control inspection shall include characteristics to be inspected, examined, or tested and the acceptance criteria used. The contractor shall include, as part of the inspection program, necessary documentation of the inspection activities by use of forms, reports, tags, or other suitable means. The contractor shall supply quality representatives in sufficient number to provide the timely and accurate quality inspection of work activities. The contractor QC representatives must be qualified to inspect and evaluate the work in accordance with contract conditions and technical specifications. The contractor shall provide résumés and any other applicable qualifications, or certifications of all quality representatives for review and approval by the purchaser, if requested. In-process inspection shall include necessary verification that procedures for special processes are being used when applicable, and that physical examinations of the material or equipment are being conducted. Final inspection shall include verification that all required records and documents are complete and that physical examination of the material or equipment has been made. The contractor shall have a system to indicate the inspection status of each item being inspected by use of stamps, tags, travelers, or other suitable means. If testing is required, the contractor shall have documented testing procedures and shall perform the tests to ensure the end product meets the requirements of the contract documents. If the need arises, the contractor may hire a qualified third-party testing agency to supplement QC staffing requirements. The qualifications of this agency, along with the qualifications of inspectors or technicians assigned to the construction site, shall be submitted to E&CS for review. 10. Material Receipt, Storage, and Handling - The contractor shall establish and maintain a system for handling, storage, preservation, and traceability of all materials and equipment from the time of receipt through the entire process to protect the quality of products and prevent damage, deterioration, or loss. The equipment manufacturer s handling and storage requirements shall be met, or any exceptions shall be approved by E&CS. CQR-1, Contractor Quality Requirements for Construction Services 4 of 7 (Attachment A, CO-03)
5 The system shall include provisions for protection and identification of the product until delivery to the purchaser, including provisions for preventive maintenance as required. The contractor shall have an inspection program that includes receiving inspections. Procedures used to control inspection shall include characteristics to be inspected, examined, or tested and the acceptance criteria used. 11. Nonconforming Items and Corrective Action - The contractor shall have a written procedure for identifying and controlling nonconforming items. These measures shall establish personnel responsibilities and authority for disposition of those items. The procedure shall establish methods for investigating each nonconformance and initiating corrective action to prevent recurrence. The procedure shall establish methods to verify repair, rework, use-as-is, or disposal of the nonconforming items and subsequent reinspection or re-testing as required to ensure compliance with procurement documents. The procedure shall contain provisions for the issuance of a hold tag or similar measures to isolate nonconforming items from construction use until such a time as the nonconformance has been resolved. E&CS shall be notified of all identified nonconformances related to project engineering, procurement, and construction activities. Records shall be maintained to document the nature, extent, and disposition of the nonconforming items and the corrective action to prevent recurrence. 12. Subcontractor Management - The contractor shall have written procedures and be responsible for ensuring the quality of all materials and equipment obtained from sub-suppliers, or work performed by subcontractors, meets the requirements of this document and the purchaser s procurement documents. All applicable requirements of the purchaser s must be communicated to the sub-suppliers or subcontractors. The contractor shall ensure the quality of equipment or services provided by subsuppliers or subcontractors meets the purchaser s procurement documents. The purchaser must approve in writing all subcontractors, sub-suppliers, and manufacturing not included in the contractor s proposal. 13. Quality Records - The contractor shall adequately define quality records and identify procedures for the care, custody, control, and retention of those records. 14. Quality Program Evaluations - The contractor shall routinely monitor the effectiveness of the quality program through inspections, meetings, assessments, or audits and make appropriate adjustments to the quality program to comply with requirements. 4.0 QUALITY PROGRAM DOCUMENTATION SUBMITTAL AND EVALUATION 4.1 Documentation Required For Qualification and Evaluation Contractors requesting the opportunity to perform work for E&CS shall submit their application and one uncontrolled copy of their corporate quality program through the BROWZ contractor qualification and evaluation web-based system. E&CS shall review the potential contractor s quality program as a part of the qualification process. E&CS uses attachment B as a guide in the review of these quality programs. Deficiencies noted during the CQR-1, Contractor Quality Requirements for Construction Services 5 of 7 (Attachment A, CO-03)
6 review will be documented on the checklist and transmitted on BROWZ to the potential contractor for consideration or correction. 4.2 Documentation Required with Proposal Contractors selected to bid on a particular scope of work shall submit a quality program as part of their bid proposal as specified in the special conditions of the contract. This quality program shall meet the requirements of this document. E&CS shall use attachment B, Contractor Corporate Quality Program Evaluation Checklist, as a guide in the review of these quality programs. Deficiencies noted during the review will be forwarded to the bid evaluation team for proper consideration and action. If the contractor is an unsuccessful bidder, the quality program may be destroyed after the purchase order has been placed. 4.3 Documentation required for approval prior to start of construction activities Site-Specific Quality Program Program Transmittal Upon award, a contractor shall formally transmit to the purchaser s site construction management, within 5 days of initial site mobilization, a site-specific quality program that meets the requirements of this document. The submitted contractor quality program shall be specific to the particular project and shall encompass all relevant portions of the work to be performed on the project. All subcontractor quality assurance programs and QC procedures are considered part of the contractor s quality program and are to be formally transmitted to the purchaser s site construction management along with the contractor s quality program Personnel Certification The contractor shall submit to the purchaser the qualifications and/or certifications of all contractor and testing agency personnel performing inspection and tests. The purchaser reserves the right to request personnel be replaced if their qualifications are not appropriate for the inspections and tests being performed. At the purchaser s sole discretion, the contractor shall designate a full-time onsite quality professional who is qualified to properly inspect and evaluate the work being performed. This individual shall be familiar with the scope of work being performed and shall be onsite whenever work is being performed. This individual shall be responsible for interfacing with the purchaser with regard to the contractor s quality program to ensure the work performed by the contractor meets all quality standards. This individual shall have authority and the autonomy to enforce the contractor s approved quality program Program Review The purchaser s site construction management shall conduct a formal review of the contractor s sitespecific quality program and procedures according to the Contractor Site-Specific Quality Program Review Checklist. The purchaser may conduct an initial pre-construction meeting with the contractor to clarify, discuss, and review the results of the contractor site-specific quality program evaluation. The purchaser reserves the right to request inspection and test plans and any additional documentation and procedures to supplement and further define the contractor quality program. CQR-1, Contractor Quality Requirements for Construction Services 6 of 7 (Attachment A, CO-03)
7 Acceptance/Follow-up After evaluation by the E&CS construction site manager or designee, results of the contractor site-specific evaluation shall be formally transmitted to the contractor. Results will be noted on the E&CS Contractor Site-Specific Quality Program Review Checklist. Acceptable results are considered accepted for use for work performed by the contractor on the specific project. Unacceptable results, including corrective action as applicable, shall be added to the checklist for appropriate follow-up and resolution. After corrective actions are taken and satisfactory results are obtained, the construction quality lead shall sign the accepted Contractor Site-Specific Quality Program Evaluation Form. NOTE If acceptable results are not achieved in a timely manner, E&CS construction management may issue an NCR addressing the nonconforming items. E&CS reserves the right to perform whatever inspection, testing, and monitoring necessary to ensure quality workmanship and conformance to applicable procedures, project specifications, and drawings. All revisions, deletions, addendums, or changes to the approved contractor quality program shall be submitted to the purchaser for review and approval. 4.4 Other Documentation Required for Approval Quality Control Documentation List When required by the procurement documents, the contractor shall compile and submit for approval a QC documentation list of the specific documents to be generated during erection or installation at the construction site. This documentation shall include, but is not limited to, copies of all forms, checklists, ITPs, and so forth to be used to verify QC and conformance to specifications requirements. 5.0 QA SURVEYS, AUDITS, AND SURVEILLANCE 5.1 General The contractor s work and adherence to procedures are subject to surveys, audits, and surveillance by the purchaser or purchaser s authorized representatives. This surveying, auditing, and surveillance shall in no way relieve the contractor of any contractual responsibilities. 5.2 Quality Surveillances The contractor s quality program shall be subject to surveillance by the purchaser and will vary depending on the contractor s performance, past records, past surveillance results, and other factors. The contractor shall respond in writing to all findings. Responses to reports on nonconforming items shall be documented and corrective action accomplished expeditiously. Subcontractors also are subject to surveillance by Purchaser. CQR-1, Contractor Quality Requirements for Construction Services 7 of 7 (Attachment A, CO-03)
8 SOUTHERN COMPANY OPERATIONS ENGINEERING AND CONSTRUCTION SERVICES CONTRACTOR CORPORATE QUALITY PROGRAM EVALUATION CHECKLIST Contractor: Anticipated Scope of Work: 1) Is the contractor s written program approved and signed by a senior management official? 2) Does the contractor s written program contain stipulations for the periodic review and update of the program to reflect changes in quality policies and procedures? 3) Does the contractor s program define the organizational structure, roles, and responsibilities of the contractor quality personnel? 4) Does the contractor s program include an organization chart identifying its quality management structure? Contractor Corporate Quality Program Evaluation Checklist 1 of 7 (Attachment B, CO-03)
9 5) Does the organization chart indicate an autonomous and independent level of management that permits quality issues to be resolved without undue influence from production or scheduling processes? 6) Does the program identify the contractor s senior management representative who is authorized to resolve quality matters? 7) Does the contractor s program indicate the contractor will supply quality representatives in a sufficient number to provide timely and accurate quality oversight of work activities? 8) Does the contractor s program indicate résumés and any other applicable qualifications/certifications of all quality representatives will be provided to the purchaser for review and approval? This will include third party agencies hired by the contractor. 9) Does the contractor s program include written procedures to control the issuance of, receipt of, and changes to documents to include instructions, specifications, procedures, and drawings? Contractor Corporate Quality Program Evaluation Checklist 2 of 7 (Attachment B, CO-03)
10 10) Does the contractor s program incorporate a document control system that maintains traceability of controlled documents, identifies the status of all controlled documents, and documents the transmittal of controlled documents to subcontractors? 11) Does the contractor s program indicate document changes will be processed in writing, and all obsolete documents will be removed promptly or adequately marked to identify their status? 12) Does the contractor s program indicate procedures will address how special conditions will be met, explain key inspection areas and hold points, define acceptance criteria, and include copies of all relevant forms and checklists? 13) Does the contractor s program include provisions for the calibration and control of measuring and test equipment appropriate for the work performed and ensure the equipment is in good repair and working condition? 14) Does the program indicate the contractor will maintain calibration records and maintain traceability of calibrated equipment? Contractor Corporate Quality Program Evaluation Checklist 3 of 7 (Attachment B, CO-03)
11 15) Does the contractor s program include an inspection program that includes receiving, in-process, and final inspections? 16) Does the contractor s inspection program include necessary documentation of the inspection activities by use of forms, reports, tags, or other suitable means? 17) Does the program indicate the contractor has documented testing procedures and shall perform the tests to ensure the end product meets the requirements of the contract document? 18) Do these procedures include or reference the use of ITPs? Comments/Action Items 19) Does the program address the contractor establishing and maintaining a system for handling, storage, preservation, and traceability of all materials and equipment from the time of receipt through the completion of work to protect the quality of products and prevent damage, deterioration, or loss? Contractor Corporate Quality Program Evaluation Checklist 4 of 7 (Attachment B, CO-03)
12 20) Does the material receipt, handling, and storage system also include provisions for protection, preventative maintenance, and identification of the product throughout the construction process? 21) Does the contractor have a written policy/procedure for identifying and controlling nonconforming items? 22) Does the nonconformance policy contain provisions for the issuance of a hold tag (or similar measures) to isolate nonconforming items from construction use until such time as the nonconformance has been resolved? 23) Does the nonconformance policy indicate the purchaser will be notified of all identified nonconformance items related to project engineering, procurement, and construction activities? 24) Does the contractor s nonconformance policy indicate records shall be maintained to document the nature, extent, and disposition of the nonconforming items, and the corrective action to prevent recurrence? Contractor Corporate Quality Program Evaluation Checklist 5 of 7 (Attachment B, CO-03)
13 25) Does the contractor s quality program indicate all subcontractors and sub-suppliers not included in the contractor s proposal will be submitted to the purchaser for approval? 26) Does the contractor s quality program indicate all subcontractors and sub-suppliers will either work under the contractor s quality program or have an acceptable quality program of their own per the requirements of this procedure? 27) Does the contractor s quality program adequately define quality records and identify procedures for the care, custody, control, and retention of those records? 28) Does the contractor s program indicate personnel will be trained in their quality program in addition to specialized training for work to be performed, as applicable? 29) Does the contractor s program indicate only those individuals who are properly trained, qualified, and/or certified/licensed (as applicable) will be utilized on the work to be performed? Contractor Corporate Quality Program Evaluation Checklist 6 of 7 (Attachment B, CO-03)
14 Overall Comments ACCEPTABLE- The submitted Corporate Quality Program meets or exceeds the minimum quality requirements as set forth in the purchaser s procurement documents. If the above referenced contractor is selected for a particular scope of work, a site-specific Quality Program shall to be developed, submitted, and accepted by E&CS as required by the contract documents. Quality Representative signature Date CONDITIONALLY ACCEPTABLE- The submitted quality program conditionally meets the minimum quality requirement on a conditional basis, and based on the identified gaps in the quality program, requires corrective action. Recommendations for enhancements are noted above for consideration by the contractor. If the above referenced contractor is selected for a particular scope of work, a site-specific Quality Program shall be developed, submitted, and accepted by E&CS as required by the contract documents. Quality Representative signature Date UNACCEPTABLE- The submitted quality program does not meet the minimum quality requirements as set forth in the purchaser s procurement documents. Observed deficiencies/recommended corrective actions are noted in comments above. Quality Representative signature Date Contractor Corporate Quality Program Evaluation Checklist 7 of 7 (Attachment B, CO-03)
15 SOUTHERN COMPANY OPERATIONS ENGINEERING AND CONSTRUCTION SERVICES CONTRACTOR SITE-SPECIFIC QUALITY PROGRAM REVIEW CHECKLIST Project: Contractor: P.O./Contract Number: Scope of Work: 1) Has the contractor submitted a site-specific Quality Program for this project? 2) Does this program contain a contractor management review and approval process to address updates, revisions, and other changes that might occur over the course of the project? 3) Does the program contain the required elements to properly address the scope of work for this project? 4) Is there a clear understanding of the processes necessary to achieve the agreed-on end product? Does the program contain appropriate inspection and test plans (or equivalent) to support the processes? Are there provisions to allow these processes and plans to be documented and agreed on by all parties? Contractor Site-Specific Quality Program Review Checklist 1 of 5 (Attachment C, CO-03)
16 5) Does the program address written procedures needed for special processes such as welding and NDE? 6) Does the program contain a site-specific organization chart with sufficient description to delineate roles and responsibilities? 7) Does the program designate an onsite quality professional who is qualified to properly inspect and evaluate the work being performed? Has the associated resume(s) been received and reviewed? 8) Does the program outline a site document control process that includes a process for ensuring the latest approved drawings and other documents are being maintained, controlled, and used in the field? 9) Does the program address a contractor request for information process? Will the contractor use PIMS for their processing? 10) Does the program contain procedures for the proper receipt, storage, and handling of materials received by the contractor? Contractor Site-Specific Quality Program Review Checklist 2 of 5 (Attachment C, CO-03)
17 11) Does the program include provisions for the proper administration, tracking, and documentation for preventive maintenance of equipment? 12) Are the third-party inspectors and technicians hired by the contractor qualified and/or certified as required by standards and specifications? Has appropriate documentation and/or resumes been submitted for review? 13) Does the program contain a procedure or process on the proper calibration and control of inspection and testing equipment? 14) Does the program define how survey control will be established and maintained and who will perform this function? 15) If the survey function will be performed by a third party, has appropriate qualification documentation been submitted for review? 16) Does the contractor have in place a process for identifying, documenting, and controlling nonconforming conditions? Contractor Site-Specific Quality Program Review Checklist 3 of 5 (Attachment C, CO-03)
18 17) Does the nonconformance policy contain provisions for the issuance of a hold tag (or similar measure) to isolate nonconforming items from construction use until such time as the nonconformance has been resolved? 18) Does the nonconformance policy indicate the purchaser will be notified of all identified nonconformances related to project engineering, procurement, and construction activities? 19) Does the program address a process for the training of contractor s employees to ensure they have the technical capabilities and skill sets necessary to perform the required tasks and to produce a quality product? 20) Does the contractor s quality program indicate all subcontractors and sub-suppliers not included in the contractor s proposal will be submitted to the purchaser for approval? Contractor Site-Specific Quality Program Review Checklist 4 of 5 (Attachment C, CO-03)
19 21) Does the contractor s quality program indicate all subcontractors and sub-suppliers will either work under the contractor s quality program or have an acceptable quality program of their own per the requirements of procedure CO-CS-01, Contractor Quality Programs Evaluation and Oversight? 22) Does the contractor s quality program adequately define quality records and identify procedures for the care, custody, control, and retention of those records? ACCEPTABLE- The submitted Site-Specific Quality Program meets or exceeds the minimum quality for the contracted scope of work. Results shall be sent to the contractor using the CMC form or other suitable documented means. Quality Representative signature Date CONDITIONALLY ACCEPTABLE- The submitted Site-Specific Quality Program conditionally meets the minimum quality requirements on a conditional basis, and based on the identified gaps in the quality program requires corrective action. Recommended corrective actions are noted in the comments above. Results shall be sent to the contractor using the CMC form or other suitable documented means. Quality Representative signature Date UNACCEPTABLE- The submitted Site-Specific Quality Program does not meet the minimum quality for the contracted scope of work. Observed deficiencies/recommended corrective actions are noted in comments above. Results shall be sent to the contractor using the CMC form or other suitable documented means. Quality Representative signature Date Contractor Site-Specific Quality Program Review Checklist 5 of 5 (Attachment C, CO-03)
20 Contract Administration Revision Date: 6/8/2015 Southern Company Plant Project Inspection and Test Plan (ITP) ITP No.: Rev./Date: System/Item: Contractor: Discipline(s): Description: Spec. # Activity Frequency Site-Specific Procedures Acceptance Criteria List Documentation C C/L T CQ OQ Legend: 1) C = Contractor C/L = E&CS Coordinator/Lead T = Third Party CQ = Contractor Quality Representative OQ = E&CS Quality Lead 2) I= Inspect R = Review D= Document Special Instructions / Concerns: Southern Company Quality Representative: Southern Company Discipline Lead: Contractor Representative: Inspection and Test Plan (ITP) 1 of 1 (Attachment D, CO-03)
MEDFORD FABRICATION CSC, INC. Quality System Manual. Date of issue: 03/25/2010 Revision : F
MEDFORD FABRICATION CSC, INC Quality System Manual Date of issue: 03/25/2010 Revision : F Table of Contents System Description 1.0 Introduction 2.0 Company Quality Policy 3.0 Organization Charts 4.0 Quality
Quality Assurance QUALITY ASSURANCE PLAN
Revision 2 Page 1 of 40 QUALITY ASSURANCE PLAN PLAN APPROVALS: Jeff Shouse Signature on File DIRECTOR OF QUALITY ASSURANCE DIRECTOR OF QUALITY ASSURANCE (signature) DATE Rodney Baltzer Signature on File
Surgi Manufacturing Quality Manual
Surgi Manufacturing Page 1 of 18 Approvals: QA: Eng. Mgt. : A Date: 18Aug98 1. Introduction... 4 1.1 Scope... 4 1.2 Purpose... 4 1.3 Authority... 4 1.4 Issue of the Manual... 4 1.5 Amendments... 4 1.6
Company Quality Manual Document No. QM Rev 0. 0 John Rickey Initial Release. Controlled Copy Stamp. authorized signature
Far West Technology, Inc. ISO 9001 Quality Manual Document No.: QM Revision: 0 Issue Date: 27 August 1997 Approval Signatures President/CEO Executive Vice President Vice President/CFO Change Record Rev
Quality Assurance Manual for Low Level Radioactive. Waste Disposal Facility
WM 07 Conference, February 25 March 1 2007, Tucson, AZ Quality Assurance Manual for Low Level Radioactive Waste Disposal Facility Yasser T. Mohamed Hot Laboratories and Waste Management Center, Egyptian
Quality Assurance Manual. QAM-2013-Rev2
QAM-2013-Rev2 President s Policy and Authorization of Quality Control The management system for the Steel Structural Fabrication of Pinnacle Industrial Services entrusted through furnishing high quality
DEC STD 017-2 - ISO 9002 - Quality Systems - Model for Quality Assurance in Production and Installation
Digital Internal Use Only DEC STD 017-2 - ISO 9002 - Quality Systems - Model for Quality Assurance in Production and Installation DOCUMENT IDENTIFIER: A-DS-EL00017-02-0000 Rev A, ABSTRACT: This standard
GENERAL WELDING & FABRICATING, INC. 991 Maple Road Elma, New York 14059
QUALITY MANUAL GENERAL WELDING & FABRICATING, INC. 991 Maple Road Elma, New York 14059 Distribution: Position Location Copy # President / CEO Office 1 Operations Manager Office 2 Quality Assurance Office
14620 Henry Road Houston, Texas 77060 PH: 281-447-3980 FX: 281-447-3988. WEB: www.texasinternational.com QUALITY MANUAL
14620 Henry Road Houston, Texas 77060 PH: 281-447-3980 FX: 281-447-3988 WEB: www.texasinternational.com QUALITY MANUAL ISO 9001:2008 API Spec Q1, 9th Edition API Spec 8C 5 Th Edition MANUAL NUMBER: Electronic
MEAT GRADING AND CERTIFICATION BRANCH QUALITY MANUAL
United States Department of Agriculture Marketing and Regulatory Programs Agricultural Marketing Service Livestock and Seed Program Meat Grading & Certification Branch MGC Instruction 800 May 9, 2005 Page
UNCONTROLLED COPY FOR REFERENCE ONLY
CLOVER MACHINE AND MFG. 800 MATHEW ST. #101 SANTA CLARA, CA 95050 727-3380 727-7015 fax REVISION: DATE: PAGE 1 OF 45 QUALITY POLICY MANUAL DISTRIBUTION LIST: President Purchasing Manager Vice President
US EPA REGION III QUALITY MANAGEMENT PLAN REVIEW CHECKLIST
US EPA REGION III Organization: EPA Organization: EPA Program: Contact: EPA Contact: EPA Contract/Grant/IAG Number: Phone Number: Phone Number: Reviewer: Date Reviewed: Reviewer Organization: Check New
QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC.
QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC. Hattiesburg, MS Revision E 01/19/11 Revised to ISO 9001:2008 on July 9, 2009 JPM OF MISSISSIPPI, INC. MANAGEMENT QUALITY POLICY It is the goal of JPM of
BASE CONSTRUCTION INC
BASE CONSTRUCTION INC 14252 CULVER DRIVE A-630 IRVINE,CA 92604-0326 OFFICE:949 387-3471 Shop 714 994 9563 CELL:949 735-5292 FAX:949 786-8753 QUALITY ASSURANCE and QUALITY CONTROL MANUAL 1 TABLE OF CONTENTS
JOHN HART GENERATING STATION REPLACEMENT PROJECT. Schedule 9. Quality Management
JOHN HART GENERATING STATION REPLACEMENT PROJECT Schedule 9 Quality Management SCHEDULE 9 QUALITY MANAGEMENT TABLE OF CONTENTS 1. QUALITY MANAGEMENT SYSTEM... 1 1.1 Quality Management System...1 1.2 Project
ISO 9001:2008 STANDARD OPERATING PROCEDURES MANUAL
8200 Brownleigh Drive Raleigh, NC 27617-7423 Phone: (919) 510-9696 Fax: (919) 510-9668 ISO 9001:2008 STANDARD OPERATING PROCEDURES MANUAL ALLIANCE OF PROFESSIONALS & CONSULTANTS, INC. - 1 - Table of Contents
CORPORATE QUALITY MANUAL
Corporate Quality Manual Preface The following Corporate Quality Manual is written within the framework of ISO 9001:2008 Quality System by the employees of CyberOptics. CyberOptics recognizes the importance
Copies of this document shall be classified either as Controlled or Uncontrolled, and shall be identified as such on the cover sheet.
INTRODUCTION This document describes an inspection system broken down into four separate levels. When Inspection Level IV is invoked, this system meets the requirements of former MIL-I-45208A. The primary
CENTRIS CONSULTING. Quality Control Manual
CENTRIS CONSULTING Quality Control Manual ISO 9001:2008 Introduction Centris Consulting developed and implemented a Quality Management System in order to document the company s best business practices,
Section 100 Contractor Quality Control Program
7/21/2014 AC 150/5370-10G Section 100 Contractor Quality Control Program 100-01 General. When the specification requires a Contractor Quality Control Program, the Contractor shall establish, provide, and
Tronair Quality Manual
Tronair, Inc. 1740 Eber Road Holland, Ohio U.S.A. 43528-9794 http://www.tronair.com/ Tronair Quality Manual Authored By: David L. Kidd WARNING: No part of this document may be reproduced in any form, without
Specialties Manufacturing. Talladega Castings & Machine Co., Inc. ISO 9001:2008. Quality Manual
Specialties Manufacturing Talladega Castings & Machine Co., Inc. ISO 9001:2008 This document is the property of TMS and may not be reproduced, wholly, or in part, without the express consent of TMS. Rev.
Owner-User Pressure Equipment Integrity Management Requirements
the pressure equipment safety authority Owner-User Pressure Equipment Integrity Management Requirements AB-512 Edition 2, Revision 0 Issued 2015-06-25 Owner-user Pressure Equipment Integrity Management
Quality Management System
LH Sleightholme Ltd, Westfield Works, Helperthorpe, Malton, North Yorkshire YO17 8TQ Quality Management System MANUAL ISO 9001:2008 This Quality Management System Manual has been issued on the authority
UL Qualified Firestop Contractor Program Management System Elements. March 13, 2013
UL Qualified Firestop Contractor Program Management System Elements March 13, 2013 UL and the UL logo are trademarks of UL LLC 2013 Benefits to becoming a Qualified Firestop Contractor Independent, 3 rd
CHAPTER VII CONSTRUCTION QUALITY CONTROL INSPECTION PROGRAM 1
CHAPTER VII CONSTRUCTION QUALITY CONTROL INSPECTION PROGRAM 1 1 This Chapter of the FERC Engineering Guidelines has been prepared under contract with R & H Thomas, Inc. JANUARY 1993 Chapter VII Construction
Helical Products Co., Inc.
Q01 GENERAL REQUIREMENTS 1. Supplier Responsibilities 1.1. Delivery Certification By delivering products or services on the Contract, the Supplier certifies that such products or services are in compliance
ISO 9001 Quality Systems Manual
ISO 9001 Quality Systems Manual Revision: D Issue Date: March 10, 2004 Introduction Micro Memory Bank, Inc. developed and implemented a Quality Management System in order to document the company s best
STEEL fabrication quality SySTEmS guideline
STEEL fabrication quality systems guideline Copyright 2002 by Canadian Institute of Steel Construction All rights reserved. This book or any part therof must not be reproduced in any form without written
RTP s NUCLEAR QUALITY ASSURANCE PROGRAM
RTP s NUCLEAR QUALITY ASSURANCE PROGRAM RTP operates under one quality program, whether you purchase products that are commercial grade, nuclear safety-related or industrial safety compliant (IEC 61508).
UL Qualified Firestop Contractor Program Requirements April 2012
UL Qualified Firestop Contractor Program Requirements April 2012 For more information, please contact your local UL Field Representative INTRODUCTION: In order for a firestop systems installer/contractor
Micro Plastics, Inc. Quality Manual
ISO 9001:2008 11 Industry Lane Flippin, Arkansas 72634 QM-001-2008-F Page 2 of 39 Introduction Micro Plastics, Inc. developed and implemented a Quality Management System in order to document the company
Cartel Electronics. AS 9100 Quality Systems Manual
Cartel Electronics AS 9100 Quality Systems Manual 1900 C Petra Lane Placentia, California 92870 Introduction Cartel Electronics, as a global supplier to the aviation, space, and space industries, has developed
Quality Management System Manual
Quality Management System Manual This manual has been reviewed and approved for use by: Jack Zazulak President, Aurora Machine Limited March 07, 2011 Date - Copyright Notice - This document is the exclusive
AVNET Logistics & EM Americas. Quality Manual
AVNET Logistics & EM Americas Quality Manual Avnet is committed to ensuring customer satisfaction while meeting all customer and applicable legal, statutory and regulatory requirements. This is accomplished
GLOBAL AEROSPACE PROCEDURE
1 of 13 1. PURPOSE: This procedure establishes the minimum PPG Aerospace requirements for a Supplier's Quality Plan. These requirements pertain to the documentation and inspection/testing necessary to
Generic CMMS Quality Assurance Plan
Generic CMMS Quality Assurance Plan Scope In accordance with the Quality Policy, the Quality System of CMMS is based upon the requirements and structure of ISO (the International Organization for Standardization)
ISO 9001:2008 Audit Checklist
g GE Power & Water ISO 9001:2008 Audit Checklist Organization Auditor Date Page 1 Std. 4.1 General s a. Are processes identified b. Sequence & interaction of processes determined? c. Criteria for operation
Qualified Contractor Management System
FCIA Education Program Quality Module UL Qualified Contractor Firm Candidates Management System & Audit Preparation Education FCIA July 8, 2007; November 2007; March 2008 FCIA Management System Education
ISO 9001: 2008 Construction Quality Management System Sample - Selected pages (not a complete plan)
ISO 9001: 2008 Construction Quality Management System Sample - Selected pages (not a complete plan) Part 1: Project-Specific Quality Plan Part 2: Company Quality Manual Part 3: Submittal Forms Part 4:
Quality Management Plan
September 8, 2015 NYNJ LINK DEVELOPER LLC Revision 0 Developer s Maintenance and Control Facility Elizabeth, NJ Parsons Project No.: 648109 & 449252 This page intentionally left blank. This page intentionally
QUALITY MANUAL ISO 9001. Quality Management System
Page 1 of 20 QUALITY MANUAL ISO 9001 Quality Management System Printed copies are not controlled unless marked "CONTROLLED". Upon receipt of this document, discard all previous copies. Page 2 of 20 Approval
SUPPLIER QUALITY SYSTEM AUDIT
Company Name: Date: Company Address: Quality Assurance Mgr: President: Number of employees: Is your company receptive to source inspection? List all standards the quality system is based on Web Page: Company
VDOT GOVERNANCE DOCUMENT
VDOT GOVERNANCE DOCUMENT Minimum Requirements for Quality Assurance and Quality Control on Design Build and Public-Private Transportation Act Projects Location and Design Division Alternate Project Delivery
fin DULLES CORRIDOR METRORAIL PROJECT METROPOLITAN WASHINGTON AIRPORTS AUTHORITY Quality Program Plan Revision 6, June 2008
^ fin DULLES CORRIDOR METRORAIL PROJECT METROPOLITAN WASHINGTON AIRPORTS AUTHORITY DULLES CORRIDOR METRORAIL PROJECT Quality Program Plan Revision 6, June 2008 Prepared and Approved By: o^lfr Jon D. Chri^tensen
QUALITY POLICY MANUAL Document: 01-090000 Revision: E Effective Date: January 15, 2010
Section i INTRODUCTION QUALITY POLICY STATEMENT: The purpose of our business is to provide continuity of electrical power to keep businesses in business. We do this by helping clients solve their power
SPECIAL INSPECTION AND TESTING AGREEMENT INTERNATIONAL BUILDING CODE
Community Development Permit Services SPECIAL INSPECTION AND TESTING AGREEMENT INTERNATIONAL BUILDING CODE PROJECT NAME PROJECT ADDRESS PERMIT NUMBER CITY RECEIVED STAMP AND INITIALS Instructions: BEFORE
ISO 9001 (2000) QUALITY MANAGEMENT SYSTEM ASSESSMENT REPORT SUPPLIER/ SUBCONTRACTOR
Page 1 of 20 ISO 9001 (2000) QUALITY MANAGEMENT SYSTEM ASSESSMENT REPORT SUPPLIER/ SUBCONTRACTOR SUPPLIER/ SUBCONTRACTOR NAME: ADDRESS: CITY AND STATE: ZIP CODE: SUPPLIER/MANUFACTURER NO PHONE: DIVISION:
QT-2 QUALITY MANUAL Written to the requirements of ASME NQA-1-2008 & 09a and 10 CFR Part 21. Revision: 14
QT-2 QUALITY MANUAL Written to the requirements of ASME NQA-1-2008 & 09a and 10 CFR Part 21 Revision: 14 SPRINGS FABRICATION, INC. ADVANCED TECHNOLOGY GROUP 2685 Industrial Lane Broomfield, CO 80020 Controlled
Quality Manual. DuraTech Industries, Inc. 3216 Commerce Street La Crosse, WI 54603 MANUAL SERIAL NUMBER 1
Quality Manual Approval Page Document: QA1000 Issue Date: 5/29/1997 Page 1 of 17 Revision Date: 5/20/2013 DuraTech Industries, Inc. 3216 Commerce Street La Crosse, WI 54603 MANUAL SERIAL NUMBER 1 This
The President of Inductors Inc. is the senior executive responsible for operations.
Title: Quality Management System Manual Page: 1 of 20 INTRODUCTION Inductors Inc., founded in 1991, specializes in the distribution of inductive components, including but not limited to standard and custom
Guidelines for the Acceptance of Manufacturer's Quality Assurance Systems for Welding Consumables
(1987) Guidelines for the Acceptance of Manufacturer's Quality Assurance Systems for Welding Consumables 1. General 1.1 Introduction 1.1.1 The present guidelines are to serve as a supplement to the IACS
NIST HANDBOOK 150-5 CHECKLIST CONSTRUCTION MATERIALS TESTING
NIST HANDBOOK 150-5 CHECKLIST CONSTRUCTION MATERIALS TESTING Instructions to the Assessor: This checklist addresses specific accreditation criteria prescribed in NIST Handbook 150-5, Construction Materials
Quality Manual TABLE OF CONTENTS APPROVAL SIGNATURE PAGE 1.1 1 AMENDMENT RECORD 1.2 2 SCOPE 2.0 3 EXCLUSIONS 2.1 3
TABLE OF CONTENTS DESCRIPTION SECTION PAGE INTRODUCTION 1.0 1 APPROVAL SIGNATURE PAGE 1.1 1 AMENDMENT RECORD 1.2 2 SCOPE 2.0 3 EXCLUSIONS 2.1 3 CORPORATE POLICY 3.0 3 QUALITY MANAGEMENT SYSTEM 4.0 4 GENERAL
Quality Manual ALABAMA RESEARCH & DEVELOPMENT. This Quality Manual complies with the Requirements of ISO 9001:2008.
ALABAMA RESEARCH & DEVELOPMENT This complies with the Requirements of ISO 9001:2008. Prepared By: Phyllis Olsen Release Date: 03/19/09 Quality Policy & Objectives s quality policy is to achieve sustained,
ISO 9001:2000 Gap Analysis Checklist
ISO 9001:2000 Gap Analysis Checklist Type: Assessor: ISO 9001 REQUIREMENTS STATUS ACTION/COMMENTS 4 Quality Management System 4.1 General Requirements Processes needed for the quality management system
Chapter 4: Contractor Quality Control
Chapter 4: Contractor Quality Control Seattle District, NWS Last updated: 05FEB14 Chapter 4 Contractor Quality Control 1. GENERAL. Contractor is responsible for quality control and shall establish and
Control No: QQM-02 Title: Quality Management Systems Manual Revision 10 07/08/2010 ISO 9001:2008 Page: 1 of 22
ISO 9001:2008 Page: 1 of 22 Central Technologies has developed a Quality Management System, and the associated procedures and work instructions, to be compliant to ISO 9001:2008. Utilizing this Quality
L-3 Communications Corporation AMI Purchase Order Supplement No. 3 Quality Assurance
Q10 QUALITY SYSTEM REQUIREMENTS Q10A Q10B ISO 9001:2008 Seller s quality system shall be in compliance with the requirements of ISO 9001, Model for in Design, Development, Production, Installation and
ISO 9001:2000 AUDIT CHECKLIST
ISO 9001:2000 AUDIT CHECKLIST No. Question Proc. Ref. Comments 4 Quality Management System 4.1 General Requirements 1 Has the organization established, documented, implemented and maintained a quality
Self-Audit Checklist
Page 1 Company Name: Date of audit: Date of last audit performed: Name of person performing self-audit: Signature: Name of person responsible for quality system: Signature: Number of non-compliances: Page
Quality Manual Printed copy valid for 24 hours from time of printing unless stamped CONTROLLED COPY in red. Page
Quality Manual Page 1 of 20 Change Log Document Revision Date Description of Change 15/04/09 Initial Release Page 2 of 20 1.0 Scope and Exclusions Scope This Quality Manual contains policies that have
QUALITY MANUAL 3 KENDRICK ROAD WAREHAM, MA 02571 508-295-9591 FAX 508-295-6752
QUALITY MANUAL 3 KENDRICK ROAD WAREHAM, MA 02571 508-295-9591 FAX 508-295-6752 Section 1. REVISION STATUS Revision 01 Initial Issue 02/13/95 Revision 02 ECO No.Q-0032 05/07/96 Revision 03 ECO No.97171
Quality Management System-A Revision 7 (NRC-approved Version)
Westinghouse Non-Proprietary Class 3 2013 Westinghouse Electric Company LLC. All Rights Reserved. Quality Management System-A (NRC-approved Version) Westinghouse Electric Company Quality Management System
Testing Facility Laboratory Manual
Quality Synthetic Rubber's Testing Facility Laboratory Manual Quality Synthetic Rubber, Inc. 1700 Highland Road P.O. Box 1030 Twinsburg, Ohio 44087-9030 Phone: 330-425-8472 Duns Code: 01-753-2458 Z-Code:
Quality System Manual
Quality System Manual Document: QM Issue: 3 Revision: 1 Date: July 24, 2014 General Introduction ISS: 3 REV: 1 Page: 2 of 56 Section 1.2 Document Revision Page REV REV DETAILS LEVEL DATE Page Para. DESCRIPTION
ISO/IEC 17025 QUALITY MANUAL
1800 NW 169 th Pl, Beaverton, OR 97006 Revision F Date: 9/18/06 PAGE 1 OF 18 TABLE OF CONTENTS Quality Manual Section Applicable ISO/IEC 17025:2005 clause(s) Page Quality Policy 4.2.2 3 Introduction 4
Quality Manual. UK Wide Security Solutions Ltd. 1 QM-001 Quality Manual Issue 1. January 1, 2011
Quality Manual 1 QM-001 Quality Manual Issue 1 January 1, 2011 This document is uncontrolled when printed. Please verify with Quality Management Representative 16 Dukes Close, West Way, Walworth Industrial
AS9100 Quality Manual
Origination Date: August 14, 2009 Document Identifier: Quality Manual Revision Date: 8/5/2015 Revision Level: Q AS 9100 UNCONTROLLED IF PRINTED Page 1 of 17 1 Scope Advanced Companies (Advanced) has established
Software Quality Subcontractor Survey Questionnaire INSTRUCTIONS FOR PURCHASE ORDER ATTACHMENT Q-201
PURCHASE ORDER ATTACHMENT Q-201A Software Quality Subcontractor Survey Questionnaire INSTRUCTIONS FOR PURCHASE ORDER ATTACHMENT Q-201 1. A qualified employee shall be selected by the Software Quality Manager
Quality Manual. This Quality Manual complies with the Requirements of ISO 9001:2008 and ISO/IEC 80079-34, Explosive Atmospheres - Edition 1.
This complies with the Requirements of ISO 9001:2008 and ISO/IEC 80079-34, Explosive Atmospheres - Edition 1.0 2011-04 Prepared By: Phyllis Olsen Release Date: 10/28/15 Certificate No: CERT-08776-2006-AQ-HOU-RvA
INDIANA DEPARTMENT OF TRANSPORTATION QUALIFIED LABORATORY AND TECHNICIAN PROGRAM
1/1/13 INDIANA DEPARTMENT OF TRANSPORTATION QUALIFIED LABORATORY AND TECHNICIAN PROGRAM The purpose of the Qualified Laboratory and Technician Program is to establish policies, procedures, and guidelines
Row Manufacturing Inc. Quality Manual ISO 9001:2008
Row Manufacturing Inc. Quality Manual ISO 9001:2008 Row Manufacturing 210 Durham Drive Athens, Alabama 35611 Phone:256.232.4151 Fax:256.232.4133 Page 2 of 33 This Page intentionally left Blank Page 3 of
PPI/TZ Standard Quality Requirements for Suppliers -SQRS-
PPI/TZ Standard Quality Requirements for Suppliers -SQRS- AS9100, ISO 13485 and ISO 9001 Revision: November 16, 2015 For questions concerning Standard Quality Requirements for Supplier (SQRS), please contact
GE Oil & Gas. Quality at. GE Oil & Gas. GE imagination at work QUALITY
GE Oil & Gas Quality at GE Oil & Gas GE imagination at work QUALITY 2 - Quality at GE Oil & Gas TABLE OF CONTENTS GE Oil & Gas and Quality Visions Our Customer Commitments The Quality Organization and
Quality. Manual. Advanced Monolithic Systems, Inc. Document #00-0001 Rev A. Advanced Monolithic Systems, Inc.
Advanced Monolithic Systems, Inc. Quality Manual Document #00-0001 Rev A Advanced Monolithic Systems, Inc. Page 1 of 1 Quality Manual Table of Contents Name Page # 1.0 Scope... 5 1.1 Introduction... 5
ACCREDITATION CRITERIA FOR FABRICATOR INSPECTION PROGRAMS FOR STRUCTURAL STEEL. AC172 February 2015 (Effective April 1, 2015)
ACCREDITATION CRITERIA FOR FABRICATOR INSPECTION PROGRAMS FOR STRUCTURAL STEEL AC172 February 2015 (Effective April 1, 2015) Requirements related to the Designated Accreditation Representative (DAR) and
Gulfstream Production Certificate Operations
SUPPLIER QUALITY ASSURANCE SYSTEM REQUIREMENTS SQAR 0001 REV D Supplier s Quality System David H. Trucksis Donald A. Strickland R. Christiansen PREPARED BY: REVIEWED BY: APPROVED BY: Robert W. Mullen Jr.
How DCMA Helps To Ensure Good Measurements
How DCMA Helps To Ensure Good Measurements Speaker/Author: Robert Field Defense Contract Management Agency 605 Stewart Avenue Garden City, New York 11530 Email: [email protected] Phone: (516) 228-5886;
QUALITY OPERATING PROCEDURE QOP-00-02 QUALITY ASSURANCE SYSTEM MANUAL
PAGE 1 OF 40 QUALITY Note: The revision level of this document and any referenced documents must be verified for latest issue before use QOP-00-02 TITLE QUALITY ASSURANCE SYSTEM MANUAL APPROVALS DATE REVISIONS
ONTIC UK SUPPLIER QUALITY SURVEY
MAIL-IN / ONSITE This report is intended to furnish data relative to the Suppliers capability to control the quality of supplies and services furnished to Ontic UK. Please complete this Survey and return
QUALITY MANAGEMENT SYSTEM (QMS) ASSESSMENT CHECKLIST
1. QUALITY MANAGEMENT SYSTEM QUALITY MANAGEMENT SYSTEM (QMS) ASSESSMENT CHECKLIST 1.1 Quality Management System General 1.1.1 Is objective evidence available to demonstrate that the MDSAP site has defined,
Supplier Quality. Assurance Provisions. Manual. SQAP-001 Rev. E
9060 WINNETKA AVENUE NORTHRIDGE, CA 91324 USA Supplier Quality Assurance Provisions Manual SQAP-001 Revision E Page 1 of 14 Table of Contents 1 General Requirements... 4 1.1 Supplier Control... 4 1.2 Supplier
Revision Date Author Description of change. 10 07Jun13 Mark Benton Removed Admin. Manager from approval
Page 2 of 15 Document Revision History Revision Date Author Description of change 10 07Jun13 Mark Benton Removed Admin. Manager from approval 12Feb13 Mark Benton 08 01Oct12 Mark Benton 07 8/30/2012 Refer
CITY & COUNTY OF DENVER COMMUNITY PLANNING & DEVELOPMENT BUILDING PERMIT POLICY Special Inspector Qualification Michael Roach, P.E., Building Official
Reference: IBC Chapter 17, Section 1704 General: Special inspections required by IBC Chapter 17 shall be conducted by qualified persons working for an approved agency. The Building Official shall maintain
This Business Management System Manual is based on ISO 9001:2008 requirements
Page 1 of 19 (Formerly: Quality Management System Manual) When the ISO 9001:2008 standard is identifying the Quality Manual or Quality Management System, Turbonetics is representing this requirement with
Standard Practice for Quality Control Systems for Nondestructive Testing Agencies 1
Designation: E 1212 99 AMERICAN SOCIETY FOR TESTING AND MATERIALS 100 Barr Harbor Dr., West Conshohocken, PA 19428 Reprinted from the Annual Book of ASTM Standards. Copyright ASTM Standard Practice for
Quality management systems
L E C T U R E 9 Quality management systems LECTURE 9 - OVERVIEW Quality management system based on ISO 9000 WHAT IS QMS (QUALITY MANAGEMENT SYSTEM) Goal: Meet customer needs Quality management system includes
Quality Management System General
Audit Date: Quality Management System General Requirement: 4.1 and 4.2.2-QMS General Verify Scope Comments/Evidence/Findings: Verify the Exclusions is applicable and justified How are the processes in
Contractor s Quality Program Manual
Contractor s Quality Program Manual March 2015 ILLINOIS STATE TOLL HIGHWAY AUTHORITY The CONTRACTOR S QUALITY PROGRAM MANUAL dated March 2015 replaces the previous version dated March 2014. Major Highlight
ACCEPTANCE CRITERIA FOR QUALITY DOCUMENTATION (AC10) June 2014
ACCEPTANCE CRITERIA FOR QUALITY DOCUMENTATION (AC10) 1.0 INTRODUCTION June 2014 1.1 Purpose: The purpose of this acceptance criteria is to establish requirements for information that is provided to ICC-ES
Eagle Machining, Inc. Quality Management System
Eagle Machining, Inc. Quality Management System 1 of 10310 Antoine Drive Bldg D, Houston, Texas 77086 BUSINESS OPERATING MANUAL (QUALITY MANUAL) Revision Date: 08/01/2014 Approved By: Joseph Vu Date: 08/01/2014
Quality Management System Manual Revision L
This Page 1 of 35 of the Quality Management System Manual If issued as a controlled copy, the serial number of this copy is Quality Management System Manual Certified to AS9100 Revision C Printed copies
How To Ensure Quality Assurance
1001 Robb Hill Road Oakdale, PA 15071-3200 412/923-2670 PROCUREMENT SPECIFICATION: SUPPLIER QUALITY MANAGEMENT SYSTEM REQUIREMENTS Specification Number: ATI-QA-703, Rev 4 Date: 11/12/13 Page: 1 of 7 Written
AS/NZS 4801:2001. Safety Management Systems (SMS) Self-Assessment Checklist. Revision 1 (January 2014)
AS/NZS 4801:2001 Safety Management Systems (SMS) Self-Assessment Checklist This document restates the requirements of AS/NZS 4801:2001 for Safety Management Systems (SMS) and has been developed to assist
Notes. Score. 1 Basic Services 1.1. A few instances; could have been more proactive
Jacobs Contract performance Tracking spreadsheet = Excellent 2 = Meets performance standards 1 = Improvement needed 0= Unsatisfactory Report for the time period: Annual report 210 Total average score 2.86
Example of a food company quality
Appendix A manual Example of a food company quality Contents Date: 13/03/95 RME-QLMN-OO Page 1 of 3 Section Title ISO 9001 reference 01 In trod uction 02 Purpose 03 Scope 04 Definitions 05 Management responsibility
Quality Management System MANUAL. SDIX, LLC Headquarters: 111 Pencader Drive Newark, Delaware 19702
Quality Management System MANUAL SDIX, LLC Headquarters: 111 Pencader Drive Newark, Delaware 19702 Doc. No. G5500 Rev. 9.2 Status : APPROVED Effective: 9/25/2015 Page 2 of 23 Quality Manual Table of Contents
ISO 9001:2008 QUALITY MANUAL. Revision B
ISO 9001:2008 QUALITY MANUAL Revision B Because we want you to achieve the highest levels of performance, we connect care Because with leading we want science you to achieve continuously the highest improve,