CONCRETE: CONTRACTOR S QUALITY CONTROL PLAN
|
|
|
- Felicity Patrick
- 10 years ago
- Views:
Transcription
1 CONCRETE: CONTRACTOR S QUALITY CONTROL PLAN NOTE: This document is generally written in the imperative mood. The subject, "the Contractor" is implied. Also implied in this language are "shall", "shall be", or similar words and phrases. The word "will" generally pertains to decisions or actions of the Kansas Department of Transportation. 1. GENERAL Provide qualified personnel and sufficient equipment meeting the requirements listed in the Department's Construction Manual to conduct quality control testing which conforms with the Sampling and Testing Frequency Chart for Portland Cement Concrete Pavement for Quality Control/Quality Assurance Projects in Appendix B of this Manual. Calibrate and correlate the testing equipment with prescribed procedures and conduct tests in conformance with specified testing procedures as listed in the Department's Construction Manual. As a minimum, meet the calibration schedule as outlined in Table 1, Concrete Materials Test Equipment. Maintain control charts on an ongoing basis. File all reports, records, and diaries developed during the progress of construction activities as directed by the Engineer. Files become the property of the Engineer. Provide the following: Make copies of all test results and control charts readily available to the Engineer at the project site. Copies of all failing test results (based on a moving average of four tests, when appropriate) and summary sheet sent by facsimile on a daily basis to the Construction Engineer. 2. QUALITY CONTROL ORGANIZATION Submit a listing of the names and phone numbers of individuals and alternates responsible for quality control administration and inspection along with the proposed mix design data. Provide an organizational chart that shows the specified lines of authority relating both to mix design and quality control operations during production. Post a copy of the organizational chart in the Contractor's test facility. The Contractor's quality control organization or private testing firms representing the Contractor must include individuals who are certified by ACI, or a State approved equivalent, for the appropriate test methods. Only technicians certified in accordance with KDOT requirements may perform process control testing on the project. 3. QUALITY CONTROL PLAN Prepare a Quality Control Plan detailing the type and frequency of inspection, sampling and testing deemed necessary to measure and control the various properties of materials and construction governed by the Specifications. As a minimum, detail sampling location and techniques, and test frequency to be utilized in the sampling and testing plan. The Department may utilize quality control sampling and testing performed by the Contractor for acceptance. Submit the Quality Control Plan to the Engineer in writing a minimum of 30 days before work begins. Page 1/
2 3.1. Identify the personnel responsible for the Contractor's quality control in the plan. This should include the company official who will act as liaison with Department personnel, as well as the Certified Technician who will direct the inspection program. The class or classes of concrete involved will be listed separately. If existing mix designs are to be utilized, list the mix design numbers. Quality control sampling, testing, and inspection should be an integral part of the Contractor's quality control system. In addition to the above requirements, the Contractor's quality control system should document the quality control requirements considered to be normal activities necessary to control the production and placing of a given product or material at an acceptable quality level. Retain the latest ten gradation samples for use by the Engineer. It is intended that sampling and testing be in accordance with standard methods and procedures, and that measuring and testing equipment be standard, properly calibrated and documented in the Quality Manual. Detail in the Quality Control Plan any alternative sampling method, procedure and inspection equipment to be used Elements of the Plan. Include all elements that affect the quality of the PCCP including, but not limited to the following: Mix Designs Aggregate Production Quality of Components Stockpile Management Proportioning, including added water Mixing and transportation, including time from batching to completion of delivery Initial mix properties, including temperature, air content, and consistency Placement and consolidation, including a schedule for calibrating and checking vibrators Concrete yield versus Plan quantity records Compressive strength Finishing and curing Personnel Requirements: Detail in the Plan: The frequency of sampling and testing, coordination of activities, corrective actions to be taken, and documentation. How the duties and responsibilities are to be accomplished and documented, and whether more than one Certified Technician is required. The criteria utilized by the Technician to correct or reject unsatisfactory materials. Certified Technicians required duties: Perform and utilize quality control tests and other quality control practices to assure that delivered materials and proportioning meet the requirements of the mix designs, including temperature, slump, air content, and strength. Be available on the project site whenever concrete is being produced for use on or being placed on the project site. Periodically inspect all equipment utilized in transporting, proportioning, mixing, placing, consolidating, finishing, and curing to assure it is operating properly and that placement, consolidation, finishing, and curing conform to the mix design and other Contract requirements. Page 2/
3 4. DOCUMENTATION Maintain adequate records of all inspections and tests. Indicate the nature and number of observations made, the number and type of deficiencies found, the quantities approved and rejected, and the nature of corrective action taken as appropriate in the records. The Contractor's documentation procedures will be subject to approval of the Engineer before the start of the work and to compliance checks during the progress of the work. Charts and Forms. Keep all conforming and non-conforming inspections and test results complete and available at all times to the Engineer during the performance of the work. Provide forms on a computer-acceptable medium where required. Document batch tickets and gradation data in accordance with Department requirements. Chart test data for portland cement concrete, including gradation, in accordance with the applicable requirements. The Contractor may use other types of control charts as deemed appropriate. It is normally expected that testing and charting will be completed within 24 hours after sampling. All charts and records documenting the Contractor's quality control inspections and tests become property of the Department upon completion of the work. 5. CORRECTIVE ACTION Notify the Engineer when the moving average test result trend line for any property approaches the specification limits. Cease operations if two consecutive moving average points fall outside the Specification limits. Ceasing operations is the Contractor s responsibility. Quality control tests for this determination includes aggregate gradation, compliance with the mix design band, entrained air content, concrete unit mass, and density of fresh concrete in place. Production will be suspended pending the satisfactory results of a pre-production sample, unless waived by the District Materials Engineer. Failure to cease operations for the conditions cited above will subject all subsequent material to rejection by the Engineer, or acceptance at a reduced price, as determined by the Engineer. The Engineer may examine materials represented by individual test results which lie beyond the Contractor's normal quality control testing variation. The investigation may be based on either Contractor's test results or the Department's test results. The information from additional testing (including testing of in place pavement) may be used to define unacceptable work according to Standard Specifications For State Road And Bridge Construction Subsection , and apply appropriate price reductions or initiate corrective action as determined by the Engineer. For any test, if a dispute exists between the Engineer and the Contractor about the validity of the others test results, the KDOT Materials and Research Center (MRC) will perform referee testing. If one of the disputed Department test result was generated at the MRC, then an Independent Laboratory agreeable to both parties will be selected. The selected Laboratory must be approved by the AASHTO Accreditation Program for the appropriate test procedure. If referee testing indicates that the departments test results are correct, then the Contractor pays for the additional testing, including referee testing performed at the MRC. If the referee testing indicates that the Contractor's test results are correct then the Department pays for the additional testing. Page 3/
4 6. Non-Conforming Materials. Establish and maintain an effective and positive system for controlling non-conforming material, including procedures for its identification, isolation and disposition. Reclaim or rework non-conforming materials in accordance with procedures acceptable to the Engineer. Positively identify all non-conforming materials and products to prevent use, shipment, and intermingling with conforming materials and products. Provide holding areas, mutually agreeable to the Engineer and the Contractor. 7. Testing Facilities. Locate the Contractor's testing facility at the plant site or at the project site. Obtain approval of the facility by the Engineer before the commencement of mixture production. Any other laboratory location requires approval by the District Materials Engineer. Provide suitable space and specified testing equipment for use by the Contractor's quality control personnel to perform tests as required. KDOT s Materials and Research Center is Accredited through the AASHTO Accreditation Program (AAP). If the contractor s QC laboratory is not participating in the AAP, then the contractor shall have an AAP approved laboratory inspect the QC laboratory s equipment annually. The inspection shall include all equipment necessary to perform testing on specified types of material related to this contract; base and grading, aggregate, bituminous and concrete. Maintain a Quality Manual showing all calibrations performed on all test equipment and when next calibration is due for that equipment. As a minimum, follow the calibration/verification interval established in Table 1, Concrete Materials Test Equipment. To facilitate communication between the Contractor and the Engineer regarding quality control, equip the Contractor's testing facility with the following: A telephone with a private line for the exclusive use of the testing facility's quality control personnel. A copying machine. A facsimile machine for use by contractor personnel and the Engineer. Page 4/
5 Table 1, Concrete Materials Test Equipment Equipment Test Method Requirements Interval (months) Mechanical Shakers KT-2 Check Sieving Thoroughness. 12 General Purpose Balances, Scales and Calibrate 12 Masses AASHTO M 231 Test Thermometers KT-17, KT-22 & Standardize 6 AASHTO T 231 Compression Testing Machine KT- Standardize 12 22, KT-23 & AASHTO T 22 Sieves AASHTO M 92 Check Physical Conditions. 6 Water tanks AASHTO M 201 Cleaned and refilled with 3 g/l of hydrated lime (calcium hydroxide). Verify recording thermometer Pressure Meter KT-18 Standardize 3 Volumetric Meter KT-19 Standardize 12 Slump Cones- KT-21 Check Critical Dimensions. 12 Unit Mass KT-20 Standardize 12 Capping Material AASHTO T 231 Check Strength. 3 Reusable Molds KT-23 Check Critical Dimensions. 12 Nuclear Density Gauge KT-36 & 38 Check for Uniformity Testing Requirements. Take all samples for tests at random locations, selected as specified in the Contractors quality control plan and at the rates specified in the Sampling and Testing Frequency Chart for Portland Cement Concrete Pavement for Quality Control/Quality Assurance Projects in Appendix B of Part V of this manual. Record and document all test results and calculations on data sheets that are acceptable to the Engineer. Record specific test results on a daily summary sheet approved by the Engineer to facilitate the computation of moving test averages. Base moving averages on 4 consecutive test results. Include a description of quality control actions taken (adjustment of aggregate or additive proportions in the mix, moisture adjustments, etc.) in the Daily Quality Control Summary Sheet. Post quality control charts and keep current, show both individual test results and moving average values. As a minimum, plot the single test values and the 4 test moving average values on approved control charts for the following properties: Percent air in concrete mixture. Slump of concrete mixture. Concrete unit mass. In place concrete density on plastic concrete as a percentage of determined unit mass. Gradation of individual aggregates. Plot individual test results in black for each test point. Connect points with a solid black line. Plot the moving average for each test variable in red starting with the fourth test. Connect the points with a dashed red line. Plot the Department's verification test results with green asterisks. Do not include the Department's verification tests in the moving average. Indicate specification working range limits for single test results on the control charts using a dotted green line and for four point moving average results with a solid green line. NOTE: Section of this manual, Example of a Laboratories Quality Manual, will provide examples of equipment procedures to verify that equipment is in proper condition. Also, examples of records for calibrating/verifying equipment are presented. Page 5/
NRMCA Quality Certification. Ready Mixed Concrete Quality Management System. Certification Criteria Document
NRMCA Quality Certification Ready Mixed Concrete Quality Management System Certification Criteria Document Version 1 February 2014 NRMCA Quality Certification Ready Mixed Concrete Quality Management System
Inspections: Central Laboratory of the Regions
Page 1 Inspections: Central Laboratory of the Regions Protocol for Open Laboratory Review of a CDOT Materials Testing Laboratory Protocol for the Inspection of Region Materials Laboratories by the Central
STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 888 PORTLAND CEMENT CONCRETE PAVEMENT USING QC/QA.
STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 888 PORTLAND CEMENT CONCRETE PAVEMENT USING QC/QA October 21, 2011 888.01 General 888.02 Materials 888.03 Concrete Proportioning 888.04
Quality Assurance Program. June 2005 2005 by Texas Department of Transportation (512) 416-2055 all rights reserved
Quality Assurance Program June 2005 2005 by Texas Department of Transportation (512) 416-2055 all rights reserved Quality Assurance Program June 2005 Manual Notices Manual Notice 2005-1To: Users of the
Quality Assurance Program for Design-Bid-Build Projects. January 2016. 2016 by Texas Department of Transportation 512/506-5802 All Rights Reserved
Quality Assurance Program for Design-Bid-Build Projects January 2016 2016 by Texas Department of Transportation 512/506-5802 All Rights Reserved TABLE OF CONTENTS SECTION 1 - INTRODUCTION... 4 1.1 Overview...
Section 100 Contractor Quality Control Program
7/21/2014 AC 150/5370-10G Section 100 Contractor Quality Control Program 100-01 General. When the specification requires a Contractor Quality Control Program, the Contractor shall establish, provide, and
C. Section 014510 TESTING LABORATORY SERVICE.
SECTION 014500 QUALITY CONTROL PART 1 GENERAL 1.01 RELATED REQUIREMENTS A. Drawings and General Provisions of Contract, including General and Special Conditions and other Division 1 Specification Sections,
Work Type Definition and Submittal Requirements
Work Type: Highway Materials Testing Geotechnical Laboratory Testing, Geotechnical Laboratory Testing, Standard Penetration (SPT) & Rock Coring, Cone Penetration Test, Solid Stem Auger Drilling, and Materials
CHAPTER 4 CONCRETE TRAINING AND QUALIFICATIONPROGRAM
Concrete Training Qualification Program Topic No. 700-000-001 Effective: July 1, 2002 Construction Training and Qualification Manual Revision: March 22, 2011 Concrete Training and Qualification Program
Quality Assurance Concepts. Outline
Quality Assurance Concepts Peter C. Taylor Outline What is quality? Who cares? How do we get it? What is the important stuff? 1 Defining Quality Simple Definition (Philip Crosby) Quality: Conformance to
GRADATION OF AGGREGATE FOR CONCRETE BLOCK
GRADATION OF AGGREGATE FOR CONCRETE BLOCK Although numerous papers have been written concerning the proper gradation for concrete mixes, they have generally dealt with plastic mixes, and very little published
INDIANA DEPARTMENT OF TRANSPORTATION QUALIFIED LABORATORY AND TECHNICIAN PROGRAM
1/1/13 INDIANA DEPARTMENT OF TRANSPORTATION QUALIFIED LABORATORY AND TECHNICIAN PROGRAM The purpose of the Qualified Laboratory and Technician Program is to establish policies, procedures, and guidelines
NOTE: FOR PROJECTS REQUIRING CONTRACTOR MIX DESIGN, THE DESIGN PROCEDURES ARE SPECIFIED IN THE SPECIAL PROVISIONS OF THE CONTRACT.
September 1, 2003 CONCRETE MANUAL 5-694.300 MIX DESIGN 5-694.300 NOTE: FOR PROJECTS REQUIRING CONTRACTOR MIX DESIGN, THE DESIGN PROCEDURES ARE SPECIFIED IN THE SPECIAL PROVISIONS OF THE CONTRACT. 5-694.301
Construction Management Program
Use and Limitation: The Sponsor may use this document as a guide in preparing a construction management program for their specific project. Sponsors and Consultants are cautioned that the provision of
MINIMUM QUALITY CONTROL PLAN FOR FIELD PLACEMENT OF LATEX MODIFIED MORTAR OR CONCRETE WEARING SURFACE
CS-1042 (8-13) www.dot.state.pa.us MINIMUM QUALITY CONTROL PLAN FOR FIELD PLACEMENT OF LATEX MODIFIED MORTAR OR CONCRETE WEARING SURFACE State Route (SR) Section County ECMS# Prime/Sub Contractor Latex
QUALITY ASSURANCE PROGRAM (QAP) City Rohnert Park
QUALITY ASSURANCE PROGRAM (QAP) City Rohnert Park The purpose of this program is to provide assurance that the materials incorporated into the construction projects are in conformance with the contract
Oh No, We Got an Airport Job! Contractor Quality Control. Investment in Staff, Labs and Equipment. We ve Come A Long Way.
Contractor Quality Control Oh No, We Got an Airport Job! John Savastio Quality Control Manager Highway Materials, Inc. We ve Come A Long Way. Investment in Staff, Labs and Equipment Acceptance based on
6 QUALITY CONTROL PROCEDURES
6 QUALITY CONTROL PROCEDURES Producer Personnel Management Representative Certified Asphalt Technicians Qualified Technicians Reference Publications Field Laboratory Test Equipment Calibration Diary Materials
VDOT GOVERNANCE DOCUMENT
VDOT GOVERNANCE DOCUMENT Minimum Requirements for Quality Assurance and Quality Control on Design Build and Public-Private Transportation Act Projects Location and Design Division Alternate Project Delivery
Example Specification for Concrete using Current Building Code Requirements
Example Specification for Concrete using Current Building Code Requirements DISCLAIMER: This specification is an example that accompanies a seminar titled The P2P Initiative: Performance-based Specs for
Soils and Aggregates Division
Dan Sajedi, Division Chief 443-572-5162 George Hall, Assistant Division Chief Field Operations 443-572-5271 Eric Frempong, Assistant Division Chief Laboratory 443-572-5055 Aggregate Materials, Controlled
Quality Assurance Procedures for Construction and Materials Sampling and Testing 14
Page 1 Quality Assurance Procedures for Construction and Materials Sampling and Testing 14 1. PURPOSE 1.1 To prescribe policies, procedures, and guidelines to assure the quality of materials on all Colorado
CHAPTER 7: SUBDIVISION CONSTRUCTION, INSPECTION AND BONDING. 7.05 Subdivision Improvement Performance Bond Requirements
CHAPTER 7: SUBDIVISION CONSTRUCTION, INSPECTION AND BONDING 7.00 Construction 7.01 Inspection and Testing of Improvements 7.02 Approval of Improvements 7.03 City Engineer s Acceptance of All Improvements
The quality and uniformity of ready mixed concrete
The New NRMCA Quality Certification Program Why should companies have a quality management system? by Karthik H. Obla and Colin L. Lobo The quality and uniformity of ready mixed concrete delivered to a
DIVISION 300 BASES SECTION 304 AGGREGATE BASE COURSE DESCRIPTION MATERIALS CONSTRUCTION REQUIREMENTS
304.06 DIVISION 300 BASES SECTION 304 AGGREGATE BASE COURSE DESCRIPTION 304.01 This work consists of furnishing and placing one or more courses of aggregate and additives, if required, on a prepared subgrade.
Section 8.1 Volume I QUALITY ASSURANCE PROGRAM OF PRECAST PRESTRESSED CONCRETE PRODUCTS
Section 8.1 Volume I QUALITY ASSURANCE PROGRAM OF PRECAST PRESTRESSED CONCRETE PRODUCTS 8.1.1 PURPOSE This procedure provides guidelines related to the implementation of quality control and quality assurance
4-02 Gravel Base. 4-04 Ballast and Crushed Surfacing
Chapter 4 Bases 4-02 Gravel Base GEN 4-02.1 General Instructions Gravel Base is typically used in the construction of the roadway section and provides support for the pavement. For the pavement to provide
SUPPLIER Form #: 007 AUDIT QUESTIONNAIRE
1.0 BACKGROUND INFORMATION Company Name: Company Address: Phone Number: Fax Number: Number of years in business: Number of employees: Annual Sales in Dollars: Size of Facility in Square Feet: Name of Senior
NorthEast Transportation Training and Certification Program (NETTCP) Course Registration Form
(NETTCP) Course Registration Form Interim Certification (Cost $300 members / $425 non-members) HMA Plant Technician* HMA Paving Inspector* Soils & Aggregate Inspector* Soils & Aggregate Lab Technician*
Section 300 Base Courses
Table of Contents 1. Importance of Base Courses... 300-1 2. Types of Bases... 300-3 A. Cement Treated Permeable Base Course... 300-3 B. Bituminous Concrete Base Courses... 300-6 C. Superpave Asphalt HMA
EVALUATION AND ACCREDITATION OF SUPPLIER TEST FACILITIES GP 10
EVALUATION AND ACCREDITATION OF SUPPLIER TEST FACILITIES GP 10 EVALUATION AND ACCREDITATION OF TESTING FACILITIES USED BY SUPPLIER OF MATERIALS TO GENERAL MOTORS PREFACE TO GP-10 General Motors expects
Georgia Department of Transportation. Office of Materials and Research. Standard Operating Procedure (SOP) 19
Laboratory SOP 19 Revised July 1, 2003 Georgia Department of Transportation Office of Materials and Research Standard Operating Procedure (SOP) 19 This Standard Operating Procedure provides a means whereby
PROPERTIES AND MIX DESIGNATIONS 5-694.200
September 1, 2003 CONCRETE MANUAL 5-694.200 5-694.210 PROPERTIES OF CONCRETE PROPERTIES AND MIX DESIGNATIONS 5-694.200 Inspectors should familiarize themselves with the most important properties of concrete:
Shotcrete Quality Control and Testing for an Underground Mine in Canada
Shotcrete Quality Control and Testing for an Underground Mine in Canada By Dudley R. (Rusty) Morgan and Mazin Ezzet AMEC Earth & Environmental, a division of AMEC Americas Limited SHOTCRETE FOR AFRICA
SOIL-LIME TESTING. Test Procedure for. TxDOT Designation: Tex-121-E 1. SCOPE 2. APPARATUS 3. MATERIALS TXDOT DESIGNATION: TEX-121-E
Test Procedure for SOIL-LIME TESTING TxDOT Designation: Tex-121-E Effective Date: August 2002 1. SCOPE 1.1 This method consists of three parts. 1.1.1 Part I determines the unconfined compressive strength
SPECIAL NOTE FOR ASPHALT WATERPROOFING MIX FOR BRIDGE-DECK OVERLAYS AND ADJACENT APPROACHES
SPECIAL NOTE FOR ASPHALT WATERPROOFING MIX FOR BRIDGE-DECK OVERLAYS AND ADJACENT APPROACHES 1. DESCRIPTION. Asphalt Waterproofing Mix (AWM) is a highly elastomeric, polymermodified, impermeable asphalt
Table of Contents. Introduction and Purpose... 3. Technician Certification Programs... 4
November 2015 Table of Contents Introduction and Purpose... 3 Technician Certification Programs... 4 Program Administration... 4 Required Experience... 5 Training Programs... 6 Waivers for Experience...
Project Procedures Guide. Sampling Frequencies for Materials Testing and Inspection
Project Procedures Guide Sampling Frequencies for Materials Testing and Inspection PREFACE This Project Procedures Guide is intended for use as a resource in determining reasonable sampling frequencies
UNCONTROLLED COPY FOR REFERENCE ONLY
CLOVER MACHINE AND MFG. 800 MATHEW ST. #101 SANTA CLARA, CA 95050 727-3380 727-7015 fax REVISION: DATE: PAGE 1 OF 45 QUALITY POLICY MANUAL DISTRIBUTION LIST: President Purchasing Manager Vice President
RTP s NUCLEAR QUALITY ASSURANCE PROGRAM
RTP s NUCLEAR QUALITY ASSURANCE PROGRAM RTP operates under one quality program, whether you purchase products that are commercial grade, nuclear safety-related or industrial safety compliant (IEC 61508).
CHAPTER VII CONSTRUCTION QUALITY CONTROL INSPECTION PROGRAM 1
CHAPTER VII CONSTRUCTION QUALITY CONTROL INSPECTION PROGRAM 1 1 This Chapter of the FERC Engineering Guidelines has been prepared under contract with R & H Thomas, Inc. JANUARY 1993 Chapter VII Construction
South Dakota QC/QA Asphalt Concrete Training Manual January 2015
South Dakota QC/QA Asphalt Concrete Training Manual January 2015 January 2015 QC/QA ASPHALT CONCRETE TRAINING MANUAL prepared by South Dakota Department of Transportation Division of Planning/Engineering
SECTION 311 PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE
PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE 311.1 DESCRIPTION: This item shall consist of a cement treated subgrade base course composed of a mixture of local soil, portland
BQ-9000 Quality Management System. Certified Marketer Requirements
BQ-9000 Quality Management System Certified Marketer Requirements Revision 3 Effective Date: February 1, 2007 This requirements document has been prepared by the National Biodiesel Accreditation Commission,
NIST HANDBOOK 150-5 CHECKLIST CONSTRUCTION MATERIALS TESTING
NIST HANDBOOK 150-5 CHECKLIST CONSTRUCTION MATERIALS TESTING Instructions to the Assessor: This checklist addresses specific accreditation criteria prescribed in NIST Handbook 150-5, Construction Materials
State of Illinois Department of Transportation Bureau of Materials and Physical Research POLICY MEMORANDUM Springfield
State of Illinois Department of Transportation Bureau of Materials and Physical Research POLICY MEMORANDUM Springfield Revised: November, 0 0-08. This Policy Memorandum supersedes number 0-08. dated October
SUPPLIER QUALITY MANAGEMENT SYSTEM QUESTIONNAIRE
Company Name Street Address City, State, Zip code Phone Number Fax Company Website Email Address ORGANIZATION NAME PHONE NUMBER EMAIL ADDRESS President/CEO General Manager Engineering Manager Production
QUALITY ASSURANCE PROGRAM
QUALITY ASSURANCE PROGRAM (Revised December, 2009) TABLE OF CONTENTS I. Overview..1 II. III. IV. Roles and Responsibilities...5 Laboratory Certification Program 7 Technician Certification Program...10
SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND.
SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND. 623.10.1 Description. This work shall consist of preparing the surface,
STEEL fabrication quality SySTEmS guideline
STEEL fabrication quality systems guideline Copyright 2002 by Canadian Institute of Steel Construction All rights reserved. This book or any part therof must not be reproduced in any form without written
MEAT GRADING AND CERTIFICATION BRANCH QUALITY MANUAL
United States Department of Agriculture Marketing and Regulatory Programs Agricultural Marketing Service Livestock and Seed Program Meat Grading & Certification Branch MGC Instruction 800 May 9, 2005 Page
Chapter 8 Design of Concrete Mixes
Chapter 8 Design of Concrete Mixes 1 The basic procedure for mix design is applicable to concrete for most purposes including pavements. Concrete mixes should meet; Workability (slump/vebe) Compressive
JOHN HART GENERATING STATION REPLACEMENT PROJECT. Schedule 9. Quality Management
JOHN HART GENERATING STATION REPLACEMENT PROJECT Schedule 9 Quality Management SCHEDULE 9 QUALITY MANAGEMENT TABLE OF CONTENTS 1. QUALITY MANAGEMENT SYSTEM... 1 1.1 Quality Management System...1 1.2 Project
DEC STD 017-2 - ISO 9002 - Quality Systems - Model for Quality Assurance in Production and Installation
Digital Internal Use Only DEC STD 017-2 - ISO 9002 - Quality Systems - Model for Quality Assurance in Production and Installation DOCUMENT IDENTIFIER: A-DS-EL00017-02-0000 Rev A, ABSTRACT: This standard
SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS
SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS Section Page 36-1 GENERAL... 36.1 36-2 PIPEMAKING EQUIPMENT... 36.1 36-3 TRENCH EXCAVATION... 36.1 36-4 SPECIAL FOUNDATION TREATMENT...
CLASS II BASE COURSE - Section 302
CLASS II BASE COURSE - Section 302 Class II Base Courses are similar to Class I Base Courses, with the exception that placement on a subgrade layer built in accordance with Specification Section 305 is
STANDARD INSPECTION & TEST PLAN (ITP) FOR CIVIL WORKS :
CONSTRUCTION OF BG RAILAY SIDING AT KADAPA IRD (ITP) F CIVIL KS : 1.0 GENERAL NOTES: Inspection & Test Plan (ITP) given herein is indicative only. Contractor shall prepare and submit ITP for all activities.
CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES
1.0 SCOPE CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES This document establishes the minimum quality program requirements for a contractor providing equipment, material, and construction
Quality Assurance QUALITY ASSURANCE PLAN
Revision 2 Page 1 of 40 QUALITY ASSURANCE PLAN PLAN APPROVALS: Jeff Shouse Signature on File DIRECTOR OF QUALITY ASSURANCE DIRECTOR OF QUALITY ASSURANCE (signature) DATE Rodney Baltzer Signature on File
SECTION 334 (Pages 243-266) is deleted and the following substituted: SECTION 334 SUPERPAVE ASPHALT CONCRETE
334 SUPERPAVE ASPHALT CONCRETE. (REV 12-20-04) (FA 1-6-05) (7-05) SECTION 334 (Pages 243-266) is deleted and the following substituted: SECTION 334 SUPERPAVE ASPHALT CONCRETE 334-1 Description. 334-1.1
LOCAL PUBLIC AGENCY (LPA) QUALITY ASSURANCE PROGRAM
Certified LPA Field Tested Materials LOCAL PUBLIC AGENCY (LPA) QUALITY ASSURANCE PROGRAM (Revised February 2015) TABLE OF CONTENTS I. Overview..1 II. III. IV. Roles and Responsibilities...5 Laboratory
Guide to Specifying Concrete Performance
Guide to Specifying Concrete Performance Phase II Report of Preparation of a Performance-Based Specification For Cast-in-Place Concrete Developed by: Kenneth C. Hover John Bickley R. Doug Hooton Reviewed
SPECIFICATION FOR CONSTRUCTION OF UNBOUND GRANULAR PAVEMENT LAYERS
TNZ B/02:2005 SPECIFICATION FOR CONSTRUCTION OF UNBOUND 1. SCOPE This specification shall apply to the construction of unbound granular pavement layers. The term pavement layer shall apply to any layer
738-B-297 POLYMERIC CONCRETE BRIDGE DECK OVERLAY. (Adopted 02-20-14)
POLYMERIC CONCRETE BRIDGE DECK OVERLAY (Adopted 02-20-14) Description The polymeric concrete bridge deck overlay shall consist of an epoxy polymer that acts together with special aggregate to form an overlay
Lab 1 Concrete Proportioning, Mixing, and Testing
Lab 1 Concrete Proportioning, Mixing, and Testing Supplemental Lab manual Objectives Concepts Background Experimental Procedure Report Requirements Discussion Prepared By Mutlu Ozer Objectives Students
Hot Mix Asphalt Test Result Verification and Dispute Resolution
Colorado Procedure 17-15 Standard Practice for Hot Mix Asphalt Test Result Verification and Dispute Resolution 1. SCOPE 1.1 The purpose of this Hot Mix Asphalt (HMA) Test Result Verification and Dispute
CHAPTER 2 AGGREGATE TECHNICIAN TRAINING AND QUALIFICATION PROGRAM
CHAPTER 2 AGGREGATE TECHNICIAN TRAINING AND QUALIFICATION PROGRAM 2.1 PURPOSE... 2-1 2.2 BACKGROUND.. 2-1 2.3 QUALIFICATION REQUIREMENTS BY JOB FUNCTION.. 2-1 2.3.1 Aggregate Testing Technician. 2-1 2.3.2
QUALITY CONTROL MANUAL
QUALITY CONTROL MANUAL TABLE OF CONTENTS PREFACE I II III IV Title Page Table of Contents Information Page Revision Log SECTION DESCRIPTION 1.0 Introduction 2.0 Organization 3.0 Organization Chart 4.0
SECTION 18 - CAST IN PLACE HIGH PERFORMANCE CONCRETE (HPC)
SECTION 18 - CAST IN PLACE HIGH PERFORMANCE CONCRETE (HPC) 1.0 DESCRIPTION This section details the requirements for materials and methods in the proportioning, mixing, transporting, placing, finishing
BQ-9000 Quality Management System. Marketer Requirements
BQ-9000 Quality Management System Marketer Requirements Revision 5 Effective Date: February 1, 2009 2009 National Biodiesel Board This requirements document has been prepared by the National Biodiesel
PRODUCT CERTIFICATION REQUIREMENTS
PRODUCT CERTIFICATION REQUIREMENTS SIRIM QAS International Product Certification Page 1 of 14 QUALITY SYSTEM 1. GENERAL 1.1 This document defines the responsibilities and obligations of the Licensee with
QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC.
QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC. Hattiesburg, MS Revision E 01/19/11 Revised to ISO 9001:2008 on July 9, 2009 JPM OF MISSISSIPPI, INC. MANAGEMENT QUALITY POLICY It is the goal of JPM of
IMQ RULES. Contents. IMQ Rules - Product certification
IMQ RULES PRODUCT CERTIFICATION "ELECTRIC ENERGY METERS AND METER UNITS" PRODUCT OF NEW MANUFACTURING Contents IMQ Rules - Product certification Particular Rules for the Electric energy meters and meter
Quality Management System Manual
Quality Management System Manual Assurance ISO / AS Manual Quality Management System EXCEEDING ALL EXPECTATIONS Since our inception in 1965, Swiss-Tech has supplied the medical, aerospace, hydraulic, electronic
EMULSIFIED ASPHALT QUALITY CONTROL PLAN FOR XYZ EMULSION PRODUCERS
MODEL EMULSION QC PLAN EMULSIFIED ASPHALT QUALITY CONTROL PLAN FOR XYZ EMULSION PRODUCERS For (Insert State Name) For the Year 200X XYZ Emulsion Producers 000 Thermal Crack Road UpNorth, N.A. 00000 Phone:
Strength and Workability Characteristics of Concrete by Using Different Super Plasticizers
International Journal of Materials Engineering 12, 2(1): 7-11 DOI: 1.923/j.ijme.11.2 Strength and Workability Characteristics of Concrete by Using Different Super Plasticizers Venu Malagavelli *, Neelakanteswara
Contractor s Quality Program Manual
Contractor s Quality Program Manual March 2015 ILLINOIS STATE TOLL HIGHWAY AUTHORITY The CONTRACTOR S QUALITY PROGRAM MANUAL dated March 2015 replaces the previous version dated March 2014. Major Highlight
Surgi Manufacturing Quality Manual
Surgi Manufacturing Page 1 of 18 Approvals: QA: Eng. Mgt. : A Date: 18Aug98 1. Introduction... 4 1.1 Scope... 4 1.2 Purpose... 4 1.3 Authority... 4 1.4 Issue of the Manual... 4 1.5 Amendments... 4 1.6
ACCEPTANCE CRITERIA FOR QUALITY DOCUMENTATION (AC10) June 2014
ACCEPTANCE CRITERIA FOR QUALITY DOCUMENTATION (AC10) 1.0 INTRODUCTION June 2014 1.1 Purpose: The purpose of this acceptance criteria is to establish requirements for information that is provided to ICC-ES
CHAPTER 2 AGGREGATE TECHNICIAN TRAINING AND QUALIFICATION PROGRAM
Topic No. 700-000-001 Construction Training and Qualification Manual Effective: July 1, 2002 Aggregate Technician Training and Qualification Program Revised: DRAFT May 6September 3, 2008 CHAPTER 2 AGGREGATE
Quality Management System for Ready Mixed Concrete Companies
Quality Management System for Ready Mixed Concrete Companies Parts A and B prepared by: William C. Twitty, Jr., P.E. Part C Developed by the NRMCA P2P Steering Committee Reviewed and Approved by the NRMCA
MASONRY INFORMATION. Selecting and Specifying Mortar and Grout for Unit Masonry. Introduction. Desirable Mortar Properties. Selection of Mortar
Portland Cement Association MASONRY INFORMATION Selecting and Specifying Mortar and Grout for Unit Masonry Introduction Masonry mortar and masonry grout are key materials in unit masonry construction.
Scope of Work Construction Inspection and Materials Testing Services
Glenwood Resident Engineer 202 Centennial Drive Glenwood Springs, CO 81601 Scope of Work Construction Inspection and Materials Testing Services Estimated Start Date: November 1, 2015 Region 3 Project:
Guidelines for the Acceptance of Manufacturer's Quality Assurance Systems for Welding Consumables
(1987) Guidelines for the Acceptance of Manufacturer's Quality Assurance Systems for Welding Consumables 1. General 1.1 Introduction 1.1.1 The present guidelines are to serve as a supplement to the IACS
Section 5.6 QUALITY CONTROL PROGRAM
5.6.1 PURPOSE Section 5.6 QUALITY CONTROL PROGRAM This document describes activities for personnel who are involved with the Florida Department of Transportation s (Department) Quality Control (QC) Program,
Copies of this document shall be classified either as Controlled or Uncontrolled, and shall be identified as such on the cover sheet.
INTRODUCTION This document describes an inspection system broken down into four separate levels. When Inspection Level IV is invoked, this system meets the requirements of former MIL-I-45208A. The primary
Company Quality Manual Document No. QM Rev 0. 0 John Rickey Initial Release. Controlled Copy Stamp. authorized signature
Far West Technology, Inc. ISO 9001 Quality Manual Document No.: QM Revision: 0 Issue Date: 27 August 1997 Approval Signatures President/CEO Executive Vice President Vice President/CFO Change Record Rev
DMS - 7310 REINFORCED CONCRETE PIPE AND MACHINE-MADE PRECAST CONCRETE BOX CULVERT FABRICATION AND PLANT QUALIFICATION
DMS - 7310 REINFORCED CONCRETE PIPE AND MACHINE-MADE PRECAST CONCRETE BOX CULVERT FABRICATION EFFECTIVE DATE: APRIL 2012 7310.1. Description. This specification will govern for the fabrication of machine-made
PRE INSTALLATION MANUAL
REINFORCED CONCRETE PIPE PRE INSTALLATION INSPECTION & REPAIR MANUAL Kentucky Transportation Cabinet Kentucky Department of Highways Division of Materials 1227 Wilkinson Boulevard Frankfort, KY 40601 (502)
Properties of Fresh Concrete
Properties of Fresh Concrete Introduction The potential strength and durability of concrete of a given mix proportion is very dependent on the degree of its compaction. It is vital, therefore, that the
MATERIALS CERTIFICATION SCHOOLS
MATERIALS CERTIFICATION SCHOOLS Registration Process Online Registration Enrollment and payment for all personnel in the Materials Certification Schools must be done online through the VDOT University
MATERIALS CERTIFICATION SCHOOLS
MATERIALS CERTIFICATION SCHOOLS 2011, Virginia Department of Transportation Registration Process Online Registration Enrollment and payment for all personnel in the Materials Certification Schools may
UL Qualified Firestop Contractor Program Requirements April 2012
UL Qualified Firestop Contractor Program Requirements April 2012 For more information, please contact your local UL Field Representative INTRODUCTION: In order for a firestop systems installer/contractor
Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.
Design Guide Basis of Design This section applies to the design and installation of earthwork and backfill. Design Criteria No stockpiling of excavation materials is allowed unless the Geotechnical Engineer