Architecture Design: The Bank a Convention Center for Alexandria



Similar documents
Lille.Projects. Gare de Lille-Europe Lille, France. Tour de Lille. Espace Piranesien. EuraLille masterplan. EuraLille shopping mall.

Commerzbank Head Office. Frankfurt am Main

FOR SALE. The Friedman Building th Avenue South, Seattle Nicholas T. Gill Allan Friedman

john jay college of criminal justice

New Trends in Station Design

PRESERVATION PLANNING ASSOCIATES 519 Fig Avenue, Santa Barbara, CA Telephone (805)

EGERAAT. heart of Budapest, new National Gallery and Ludwig Museum ERICK VAN. designed by. galvanizing the city: one building, two museums and more

A SHORT HISTORY OF CHURCH BUILDING

DIVISION STREET CORRIDOR STRATEGY Arlington, Texas May 17, 2012

28.0 Development Permit Area #2 (Neighbourhood District)

Welcome to our exhibition

Alternatives and Design Evolution: Planning Application 1 - RBKC

ALVAR AALTO. Sofia Boschetti Giorgia Zini Liceo Artistico A. Venturi 5H Architettura e Ambiente

Ohio Department of Transportation. Lytle Tunnel Rehabilitation Phase 2 Public Information Meeting

DISCOVERY HALL, UNIVERSITY OF WASHINGTON BOTHELL Bothell, Washington 78,200 sf

Bornholms Kunstmuseum

Scheme 3: Rehabilitation of Heritage Building and Redevelopment

THE HAGUE CONVENTION BUREAU NEW BABYLON THE NEWEST MEETING SPOT OF THE HAGUE 2014/ 2015

Sustainable urban mobility: visions beyond Europe. Brest. Udo Mbeche, UN-Habitat

GRAIL-2. Final Workshop

Glossop Design & Place Making Strategy

Kilkenny Castle Trail Background Information

Los Angeles Union Station, CA Sustainable Neighborhood Assessment. April 22-23, 2014

RDA Development Opportunities

Shaping Whanganui. Have your say, korero mai

Sydney's most unique and versatile venue. 14,000m 2 of infinitely flexible event space set in stunning historic Locomotive Workshops

FRANCIS L. CARDOZO HIGH SCHOOL 1200 CLIFTON STREET NW WASHINGTON, DC 20009

BASSETT CREEK VALLEY MASTER PLAN OPEN HOUSE

Kirkland Zoning Code

OMC Study Group MEETING 3: NOTES. Section 1: Building Design Page 2 Section 2: Site Layout Page 9 Section 3: Summary Page 16

Finegold Alexander Architects / LIBRARIES

ARTS. presented by: TOM SHERRY HAMILTON ANDERSON ASSOCIATES

BROWNSVILLE STRUCTURES STUDY. July Prepared by. LDA ARCHITECTS 33 Terminal Way, Suite 317 Pittsburgh, Pennsylvania

Design Guidance for Perimeter Fencing at Schools for Nottinghamshire County Council

Urban planning proposal for areas surrounding Shibuya Station (plan)

FAUQUIER HIGH SCHOOL FAUQUIER HIGH SCHOOL 200 E MARKET STREET, CHARLOTTESVILLE, VA PH : WWW VMDO.COM

Sergison Bates architects. 90 Masterplan for landscape and urban housing, Newham, London

NEW BLUE LINE CONNECTIONS

THE DEVELOPMENT OF THE CITY IN CO EXISTENCE WITH THE CYPRUS UNIVERSITY OF TECHNOLOGY

Ministry of the Environment Decree. on housing design

SECTION XI OPINION OF PROBABLE COST

Planning of the Pre-Concept Architectural Design For the McGill University Health Centre, Montreal

How To Develop A City Centre

Downtown East Lansing

THE NATIONAL LIBRARY of Finland Bulletin 2014

SELECTED SPECIAL EVENTS PROJECTS

Breakaway Walls

New Waterloo. Transforming the Elizabeth House site

Introduction. Welcome London Road, Mitcham

Destination Facts. 1. Taxes a. How much is the total cumulative hotel tax? 14.5% c. How much is the average F&B gratuity? 24%

Location Amenities HVAC Parking Technology Security and Life Safety Elevators Ownership and Management

San Jose Convention Center

Wenatchee Valley College Music and Arts Center Wenatchee, Washington 27, 696 SF

Revere Beach Transit-Oriented Development Parcels Revere, Massachusetts. Design and Development Guidelines. Part Two.

Ward: Purley DELEGATED BUSINESS MEETING Lead Officer: Head of Planning Control week of 23/03/2009

05 AREA/SITE SPECIFIC GUIDELINES

HUDSON YARDS PROJECT. G r e g K e l l y P r e s i d e n t a n d C E O, U. S., C e n t r a l a n d S o u t h A m e r i c a

Friday, March 9, Grant Street, 1st Floor conference room

Cambridge House, Henry Street, Bath BA1 1UR

THE LEONARDO BUILDING crawley business quarter gatwick THE LOWEST COST PER WORK STATION IN THE SOUTH-EAST

Heavy Metro Systems Light Rail Systems Automated Metros APMs Airport Link/City Shopping New & Retrofit Installations. w w w. platformscreendoors.

BIM-based falling prevention planning

423 NORTH HOWARD ST. VISUAL STRUCTURAL ASSESSMENT

Specifications for Lightning Protection. ASAE Engineering Practice

Appendix C Related Studies

How do we plan for the future Øresund region?

PLANNING FOR NEW DEVELOPMENT AT THE COTTONWOOD MALL SITE

THE MARIA REGINA DELLA PACE CHURCH IN PERUGIA: ACOUSTIC MEASUREMENTS AND CORRECTION DESIGN

Workshop in Pori, Finland June 2013

plan AMSTERDAM RAI CONVENTION CENTRE

CONFERENCES & EVENTS WITH HONOURS

Claude Monet S. house and gardens. activity booklet. 5/8 years. This booklet belongs to: ... I am... years old I visited Giverny on: ...

HOLLAND HALL DESIGN UPDATE. Design Team

FIRST STREET NORTH CREATING PLACES FOR PEOPLE

Projects. Cultural centre in Jinan. Europaconcorsi Beta. Grand Theatre. JINAN, China. Publications Jinan Cultural Centre

THE SKYSCRAPER MUSEUM DBQ DOSSIER 2. tools for teaching student guide BOOM & BUST: SKYSCRAPERS & SPECULATION s HISTORICAL CONTEXT TASK

Texas Main Street. Design Services: Case Studies from Main Street Cities

HYBRID TERRITORIES - A4 Motorway Between Dalmine to Bergamo, Lombardy, Italy What Destiny? Around - Below - Above the Infrastructure

Dal segno alla costruzione La genesi dell opera architettonica

ASYMPTOTE ARCHITECTURE / GENT SINT-PIETERS GENT SINT-PIETERS PRE-DESIGN : SITE B1 KLANKBORDGROEP JUNE 2012

TABLE OF CONTENTS. Executive Summary 1-3. Introduction 4-6. Illustrative Site Plan 7. East-West Streets 8. Cooper Street Market Street 11-14

Riverside Community College District / Renaissance Block

IRON STORM (WALKTHROUGH)

Candidate 2016 Finland ESOC & EYSOC

Householder Applications: Supplementary Planning Guidance GENERAL POINTS

Europol headquarters EisEnhowErlaan 73 nl-2517 KK den haag the netherlands

Transcription:

Architecture Design: The Bank a Convention Center for Alexandria

Architecture Design: The Bank a Convention Center for Alexandria Premise Any building in the urban context can be seen as inbetween collective and individual interests, abstract concept and empirical experience. It is at the same time an object and part of the texture of the city, so it fits within an order of hierarchies and has its own order. Herein lies the conflict. Oda Pälmke 1 The goal of this architectural design was to create a place of interaction within the rule set by the previous urban design. Within the vision for the urban design phase, I drew upon two main points for this phase: 1. To provide a face to the area; consideration of the Wall Building: a part of the whole - alignment of the wall to Eisenhower Avenue to form urban density and a memorable collective image 2. To provide a convention and conference facility by the proposed Metro station at the eastern end of the area; consideration of the architectural project as the initial action among the whole proposal: a catalyst 15,000~20,000m 2 (161,000~215,000sf) exhibition space 1,200~1,500m 2 (13,000~16,100sf) conference space I needed to address the problem of locating a large enclosed space in an urban context. The key concern was how to provide diversity, flexibility, and human scale. existing condition Railroad Cameron Run Metro line Wall Building Eisenhower Avenue Proposed Site for New Metro Station Capital Beltway I-495 Eisenhower Avenue Connector N 1:6,000 48

Scale and Capacity Phase I (1989) (above) Phase I (below) Messe Phase II Makuhari Messe (1989/1997) Chiba, Japan Fumihiko Maki, Maki and Associates Phase II (1997) Phase I: exhibition space: 54,000m 2 (581,000sf) conference space: 1,390m 2 (15,900sf) Phase II: exhibition space: 18,000m 2 (194,000sf) Total exhibition space: 72,000m 2 (775,000sf) Lille Grand Palais, Congrexpo (1994) Lille, France Rem Koolhaas/OMA exhibition space: 20,000m 2 (215,000sf) conference space: 1,800m 2 (194,000sf) Washington Convention Center (1982) Washington D.C., USA exhibition space: 35,400m 2 (381,000sf) conference space: 8,280m 2 (89,000sf) 1:6,000 49

Programming Several programatic combinations were put to the test. Each program was translated into form and material: Exhibition was oak, Conference was acrilic, Wall was birch plywood, and Parking was redwood. The schemes with the interpretation of the Wall idea and its proportional distance to the Metro station. Reading the gesture of the form was a useful tool for the evaluation of each scheme throughout the process. How a festive place should be, as opposed to a mundane place, generated the spatial relationship between people to see and to be seen. 50

Accumulated programs are in a cube and above a base. Primary room, the exhibition hall, is at the center of attention. This idea was carried into the final proposal. All schemes were questioned on its treatment of the corner enclosed by Eisenhower Avenue and the Cameron Run and the railroads. After many attempts, I decided the character of the controversial corner would be the ideal challenge as the site for the convention center. The corner was also appropriate to begin with because of its location at the very edge of the area Eisenhower Avenue West. The site I was working on remained for the phase II of the convention center. 51

First Proposal In following the rules set by the urban proposal, moving the site to the triangular corner forced the design to befriend a particular situation. The uniqueness of the site was its surroundings which included Eisenhower Avenue, the railroads, and Cameron Run. Among these three lines, I gave the most importance to the railroad because a direct connection with the Metro station brought people and activity to the convention center. This proposal celebrated the integrity of the Metro line and the convention center to generate possibility of interaction. The exhibition hall and the grand entrance hall sandwiched the Metro line. The auditorium was raised above the Metro line and the hotel rooms were located on the river side. But this proposal was abandoned mainly because of the strategy to the site. This proposal contained all the particularities under one big roof. I tried to mediate the difference of the surroundings at the three sides with one general structural system. The perimeter of the building showed an inadequate engagement to the site. Steven Holl states in his book Anchoring, Building transcends physical and functional requirements by fusing with a place, gathering the meaning of a situation. Architecture does not so much intrude on a landscape as it serves to explain it. 2 Choosing the regulating lines by the river (above), by the river and railroad (middle), by the the railroad (bottom). View from the Metro station to the entrance 52

View of the grand entrance hall. It accomodates conference facilities as well as a way to the exhibition hall on the other side of the railroad. Underground parking space is visualy connected. Section through Metro line 1:2,500 Section through the exhibition hall 1:2,500 1st floor plan 1:2,500 N 53

Site Revisited The sense of gravity is the essence of all architectonic structures and great architecture makes us aware of gravity and earth. Juhani pallasmaa 3 What made this site unique was having Cameron Run behind it. The presense of water had been completely ignored until this site visit. I attempted to approach the site from a different point of view from the previous schemes. What I found striking was the presence of a water tunnel under the rail tracks. This was my moment of inspiration. It had neccesary size and slope to fight against water pressure during flooding as well as support the load of the train bed above. The bank of the site was also treated in the same way. The exciting architectural potential became apparent. 54

The departure from the new phase came with the transformation of the architectural potential residing in the site. In Vittorio Gregotti s view: Project design as modification...must instead transform a place into an object of architecture, must reestablish the original and symbolic act of making contact with the earth, with physical environment, with the idea of nature as totality of all existing things, through the constitution and reconstitution of a principle of settlement. 4 55

Study of Structure: body as tool The failure of the first proposal urged the next proposal to strengthen the engagement with the site. It was obvious that a large content needed a large container. First, I explored the possibility of formally relating to the site through the structure of the exhibition hall. Carlo Scarpa s drawing for the study of Santa Maria delle Rose suggested the use of body as tool. Pallasmaa points out, When experiencing a structure, we unconsciously mimic its configuration with our bones and muscles...the structures of a building are unconsciously imitated and comprehended through the skeletal system. 5 Study of Santa Maria delle Rose, Rovigo, Italy, Carlo Scarpa (1977) Structural gesture implies bones and muscles. (left) Kansai International Airport, Osaka, Japan, Renzo Piano (1995) (bottom left) Washington Dulles International Airport, Virginia, USA, Eero Saarinen (1962) (right) Helsinki Institute of Technology, Helsinki, Finland, Alvar Aalto (1964) 56

The section became a part of the human body. Plan grew like an insect or a fish. It had an antenna, arms, a tail to to be sensitive to the environment. 57

Second Proposal The river side became an important facade. The spacious corridor along Cameron Run would be a place for people to relax in the intermission of the trade show. The overall sectional configuration showed the architectural force lifted along the river side wing and flowed towards Eisenhower Avenue like a cascade. The roof structure rested on the Wall on the both side. Both wings of the river side and the park side were not only independent buildings but also a part of the structure. The Wall idea survived as a programming device. Section through the exhibition hall 1:1200 Section through Metro line 1:1200 (right) Study of roof structure and skylight (below) Light study 58

View from river side. The corridor on the second floor has a band of opening and stairs to the river. View from park side through Eisenhower Avenue. The hotel wing is equipped with three slopes: to the hotel rooms and to each side of the exhibition hall. 59

The exhibition space is divided into three rooms. Cameron Run originates the building and the Metro line orients it. The hotel wing is located the further side of the Metro line, and the conference hall connects the phase I and the phase II of the convention center. Exhibition hall B Conference hall Wall detail 1:60 Exhibition hall A Entrance plaza 1st floor plan 1:2,000 View of the plaza to the entrance 60