Newtown and Holland Middle Schools Construction Project Bid Review



Similar documents
Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule

NORTH PENN HIGH SCHOOL RENOVATIONS

AGENDA. BUILDING AND GROUNDS COMMITTEE MEETING April 21, :30 PM School Board Room

DRAPER ELEMENTARY SCHOOL

DAVIESS COUNTY SCHOOLS DISTRICT FACILITIES PLAN

PATTERSON ELEMENTARY SCHOOL

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components

Bond Referendum Presentation. Dr. Ralph P. Ferrie, Superintendent of Schools May 12, 2014

Milestones Primary. Early Start. Orig Dur. Early Finish. Act ID. Description NOTICE TO PROCEED START CONSTRUCTION

CAPITAL EXPENDITURES

SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST

MONTHLY PROJECT CONSTRUCTION PROGRESS REPORT #5

PLUMMER ELEMENTARY SCHOOL

The work has continued on final Phase 4 and is nearing completion.

Cherokee Trail High School East Arapahoe Road Aurora, Colorado 80016

Lincoln Public Schools. 15 Attachments (separately bound) Schematic Design Schematic Design Project Manual

How To Install An Overhead Sewer

Board Seminar Facilities. School Year Submitted by Joseph L. Lisa-Director of Facilities

48. AQUARIUM. Aquarium. Classification: Cluster: Location: Close to junction of Inselrhue and Loiter Way, Belle Isle. Total Area: No.

Facilities Operations Customer Service Standards WORK ORDER PRIORITIES

Saint Cloud Business Center

Repair and Remodeling Estimating Methods. 4th Edition. RSMeans

Veterans Memorial Coliseum Options Study Appendix A - Deconstruction Scope of Work and Cost Estimate August 31, 2015

KIEWIT CM/GC Enabling/Utilities

INTRODUCTION COST AND FEASIBILITY OF RENOVATING OR REPLACING AN OLD SCHOOL BUILDING

Presentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals

Article 11. Window Replacement Project Norman E. Day & Col. John Robinson Elementary Schools

A Century of Progress with Pride

Building Condition Assessment Report

REQUEST FOR BOARD ACTION HENDERSON COUNTY BOARD OF COMMISSIONERS. ATTACHMENTS: 1. Construction Management Update

HOUSTON ELEMENTARY SCHOOL

DESIGN AND CONSTRUCTION DEPARTMENT - July 2014

Estimated Cost of Repair

HAMILTON SCHOOL Brentwood Parkway, N.E., Washington, DC INITIAL YEAR BUILT 1968 BUILDING AREA

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT

#1) BEFORE Purchasing Land Here Is A Checklist Of Things You Should Check

Town of Sandwich Facilities Department Summary of Building Repairs from Prior 5 7 Years List Updated August 7, 2015

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT

Schedule B to By-law

1. Maintenance. Mechanical, Electrical & Plumbing Improve ligh>ng control an sensoring $230,239

How to Estimate the Cost of Interior Building Finishes from Schematic Drawings. CPE Candidate No December 2014

SECTION TABLE OF CONTENTS. H Proposed Material, Product or Equipment Substitution Request

THIS ADDENDUM MUST BE ACKNOWLEDGED. THIS ADDENDUM SHALL BECOME A PART OF THIS SOLICITATION. Amend Invitation to Bid 14-MC-2194 as follows:

NAHB PRODUCT DEFINITION

BUNKER HILL ELEMENTARY SCHOOL

The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE

CLEANING FREQUENCIES FOR THE FOLLOWING AREAS

TechPractices: Home Front Homes:

Building Description Project Description Estimated Cost Notes Total Deferred

CHARLOTTE COUNTY Community Development Department

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.

PARKVILLE HIGH SCHOOL LIMITED RENOVATION

HOWARD UNIVERSITY. I. Policy Statement. II. Rationale. III. Entities Affected by the Policy. IV. Definitions. Policy Number:

Outline. Owner Perspective CM Definition Working Relationships Why CM? Project Approach Pre-construction Construction. Iowa League of Cities // 2011

Schematic Design: Quality Management Phase Checklist Project Phase Checklist Series

The Charter School Law establishes the following for charter schools with respect to school construction:

Seattle Public Schools Building Excellence IV Projects Under Construction

FLORIDA STATE UNIVERSITY INTERNATIONAL PROGRAMS VALENCIA "GOLD" STUDY CENTER

Project Management Division

BILL OF QUANTITIES Part No.: Part Description

MURCH ELEMENTARY SCHOOL

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT

Design and Construction Planning Process Strongsville City Schools

Construction Technologies Career Field Pathways and Course Structure

Renovations for a New 18 Bed Gero-Psych Nursing Unit August 7, 2014 Lower Bucks Hospital Second Floor 501 Bath Road, Bristol, PA Addendum No.

SPECIFICATIONS FOR VASWANI BRENTWOOD PROJECT. RCC Framed Structure confirming with zone II seismic detailing. Reinforced Cement Concrete

17,280 square feet Overview:

SEWER BACK UP PREVENTION PILOT PROGRAM

SEWER BACKUP PREVENTION PROGRAM

Public Building Commission of Chicago. Board Meeting August 20, 2013

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

Exterior Condition Report

This report presents the findings and recommendations of the assessment of energy use and

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE NOTICE TO PROPERTY OWNER

Presented by The Facilities Management Group TFMG / TFMG Architecture, PC. in conjunction with EMTEC Engineers, LLC

I. AMFITEATRU HOTEL ** For more details visit :

FORENSIC INVESTIGATION QUESTIONNAIRE

RFP # Request for Proposals. Case High School Fieldhouse and Locker Room Renovation and Renovation

How To Plan A Building

MARQUETTE UNIVERSITY: McCabe Hall

BUILDING PERMIT SPECIFICATIONS

Element D Services Heating, Ventilating, and Air Conditioning

Transcription:

Newtown and Holland Middle Schools Construction Project Bid Review *Includes clarifications requested at 30MAR16 FACCOM Meeting (italicized) Facilities Committee Meeting March 30, 2016 (Updated March 31, 2016)

AGENDA Facilities Improvements Update Newtown Middle School Bid Review/Recommendations Holland Middle School Bid Review/Recommendations Capital Improvements Project Update (20APR16 FACCOM Agenda Items) Final Accounting of NOC Construction 2016 Summer Projects Bid Review/Recommendations Holland ES Toilet Room Floor Tile Repairs Aramark Custodial Fees 1, 3, and 5 Year Proposal Public Comments

Facilities Improvements Update

Newtown Middle School Site Plan Sketch

Newtown MS 1st Floor Plan Sketch

Newtown MS 2nd Floor Plan Sketch

Newtown Middle School Construction Project Bid Review Bids opened March 1 & 3, 2016 Good competition Minimum 4 bids for each of the major contracts Project under budget and on schedule LEED Gold, sustainable, energy efficient building Value added alternates incorporated for durability and maintainability On track to receive $2M in ACE Grant Funds On track to receive PDE reimbursement

Newtown Middle School Project Bid Results

Newtown Middle School Project Budget vs. Bid Results Budget Actual Construction Costs $ 49,704,672 $ 46,298,250 Financing Costs $ 1,148,673 $ 917,899 Contingency for unforeseens $ 2,274,562 $ 2,191,275 Fees, Permits, Testing, etc. $ 5,054,403 $ 4,713,027 FF&E $ 400,000 $ 1,700,000 Project Budget without ACE Grant $ 58,582,310 $ 55,820,451 LEED Gold ACE Grant achievable though project design and construction $ 2,000,000 $ 2,000,000 Total Project Cost, Excluding Financing $ 55,433,637 $ 52,902,552

Bid Alternates Review Recommended Alternates Recommended Alternates Engineered stone fill for building pad Construction activities can continue following storm events. Clean, compacted fill beneath building slab. Alternate Garland roof w/ 25 yr. warranty Upgraded roof with additional 5 year warranty; LEED compliance Alternate building monitoring system controls and HVAC equipment BMS controls and equipment by JCI in lieu of Trane/Siemens Solar roof panels Offset 3% of building's electric use, teaching tool Extended warranty (all primes) Increase period from 1 year to 2 years value as there is complex equipment and BMS Install sod in lieu of grass in select areas Eliminates earth from entering the building and establishes lawn at building front where foot traffic is most anticipated Upgrade locker doors Durability and extended life of lockers Outdoor cafeteria seating Additional outdoor seating for students; program requirement that will provide for opportunities for the students Mill and Overlay Green Lane Road is deteriorated and will likely continue to do so during construction Sanitary line replacement (required) Required in order to obtain the proper approvals for the Project $ 320,000 $ 288,000 $ (110,000) $ 198,000 $ 102,000 $ 58,000 $ 2,800 $ 83,000 $ 87,000 $ 32,000 Lightning protection system $ 99,000 Protection for the building and expensive rooftop equipment Total Alternates $ 1,159,800

Bid Alternates Review Alternates Not Recommended Alternates Not Being Recommended Delete Four (4) Classrooms Base bid includes District requirement for 7 Learning teams Alternate Floor Finishes Less durable/lesser quality floor finishes with a shorter life cycle Alternate Light Fixtures Added cost with little value $ (391,000) Varies $ 19,900 Total Alternates Not Being Recommended $ (371,100)

General Construction Bids

Mechanical Construction Bids

Electrical Construction Bids

Plumbing Construction Bids

Environmental Abatement Construction Bids

Newtown Middle School Project Budget vs. Bid Results Budget Actual Construction Costs $ 49,704,672 $ 46,298,250 Financing Costs $ 1,148,673 $ 917,899 Contingency for unforeseens $ 2,274,562 $ 2,191,275 Fees, Permits, Testing, etc. $ 5,054,403 $ 4,713,027 FF&E $ 400,000 $ 1,700,000 Project Budget without ACE Grant $ 58,582,310 $ 55,820,451 LEED Gold ACE Grant achievable though project design and construction $ 2,000,000 $ 2,000,000 Total Project Cost, Excluding Financing $ 55,433,637 $ 52,902,552

Newtown Middle School Project Summary of Square Foot Costs

Newtown Achievements Project under budget and on schedule LEED Gold, sustainable, energy efficient building Value added alternates incorporated for durability and maintainability

Newtown MS Next Steps March 31, 2016: Award bids and alternates Approve PlanCon F, Attachment C, PlanCon G, and PlanCon H documents Award Construction Testing and Construction Waste Management Contracts May 2016 Ground breaking June 2016 Construction begins June 2018 New building complete August 2018 Students occupy new school June 2019 Demolition and fields complete

Newtown Discussion

Holland Middle School Site Plan Sketch

Holland MS 1st Floor Plan Sketch

Holland MS 2nd Floor Plan Sketch

Holland Middle School Construction Project Bid Review Bids opened March 29, 2016 Good competition Minimum 5bids for each of the major contracts Project under budget and on schedule LEED Gold, sustainable, energy efficient building Value added alternates incorporated for durability and maintainability On track to receive $2M in ACE Grant Funds On track to receive PDE reimbursement

Holland Middle School Project Bid Results

Holland Middle School Project Budget vs. Bid Results Budget Actual Construction Costs $ 43,488,168 $ 40,827,400 Financing Costs $ 1,045,526 $ 785,077 Reserve Contingency for unforeseens $ 3,482,930 $ 2,482,930 Reserve Fees, Permits, Testing, etc. $ 4,905,178 $ 4,905,178 FF&E $ 400,000 $ 1,700,000 Project Budget without ACE Grant $ 53,321,802 $ 50,700,585 LEED Gold ACE Grant achievable though project design and construction $ 2,000,000 $ 2,000,000 Total Project Cost, Excluding Financing $ 50,276,276 $ 47,915,508

Bid Alternates Review Recommended Alternates Recommended Alternates Alternate Garland roof w/ 25 yr. warranty Upgraded roof with additional 5 year warranty; LEED compliance Alternate building monitoring system controls and HVAC equipment BMS controls and equipment by JCI in lieu of Trane/Siemens Solar roof panels Offset 7% of building's electric use, teaching tool Engineered stone fill for building pad Construction activities can continue following storm events. Clean, compacted fill beneath building slab. $ (50,000) $ (115,000) $ 450,000 $ 150,000 Install sod in lieu of grass in select areas Eliminates earth from entering the building and establishes lawn immediately Upgrade locker doors Durability and extended life of lockers Outdoor cafeteria seating Additional outdoor seating for students; program requirement that will provide for opportunities for students Delete Wood Paneling at Lobby Area More durable, sustainable wall finish, with accessibility to utilities located in ceiling Use of Steel Railing System at Learning Stair More durable and less susceptible to damage/vandalism $ 22,000 $ 1,200 $ 32,000 $ (191,000) $ (45,000) Crosswalk at Buck Road $ 82,000 Must be accepted as this is a part of Land Development requirements Lightning protection system $ 75,800 Protection for the building and expensive rooftop equipment Total Alternates $ 412,000

Bid Alternates Review Alternates Not Recommended Alternates Not Being Recommended Delete Four (4) Classrooms Base bid includes District requirement for 7 Learning teams Alternate Floor Finishes Less durable/lesser quality floor finishes with a shorter life cycle Reduce the Size of Front Canopy Provides a dry zone for student drop off, demarcation for car stacking, and defines the school entry Remove Tablet Arms from Mezzanine Seating/LGI Area serves LGI keep tablet arms to provide a desk surface for students Salvage Existing Bleachers for Auxiliary Gym Bleachers are over 40 years old and at the end of their useful life Alternate Auditorium Seating Physical samples were unavailable for seating can be reconsidered at a later date $ (416,300) Varies $ (175,000) $ (7,400) $ (7,000) $ (14,000) Total Alternates Not Being Recommended $ (619,700)

General Construction Bids

Mechanical Construction Bids

Electrical Construction Bids

Plumbing Construction Bids

Environmental Abatement Construction Bids

Holland Middle School Project Budget vs. Bid Results Budget Actual Construction Costs $ 43,488,168 $ 40,827,400 Financing Costs $ 1,045,526 $ 785,077 Reserve Contingency for unforeseens $ 3,482,930 $ 2,482,930 Reserve Fees, Permits, Testing, etc. $ 4,905,178 $ 4,905,178 FF&E $ 400,000 $ 1,700,000 Project Budget without ACE Grant $ 53,321,802 $ 50,700,585 LEED Gold ACE Grant achievable though project design and construction $ 2,000,000 $ 2,000,000 Total Project Cost, Excluding Financing $ 50,276,276 $ 47,915,508

Holland Middle School Project Summary of Square Foot Costs

Holland Achievements Project under budget and on schedule LEED Gold, sustainable, energy efficient building Value added alternates incorporated for durability and maintainability

Holland MS Next Steps March 31, 2016: Award bids and alternates Approve PlanCon F, Attachment C, PlanCon G, and PlanCon H documents Award Construction Testing Contract May 2016 Ground breaking June 2016 Construction begins June 2016 to August 2018 Phased completion of building renovations and additions August 2018 Students occupy all new areas October 2018 Final sitework complete

Holland Discussion

Total Projects Comparison Budget vs. Bid Results Newtown Middle School Budget Actual Construction Costs $ 49,704,672 $ 46,298,250 Financing Costs $ 1,148,673 $ 917,899 Contingency for unforeseens $ 2,274,562 $ 2,191,275 Fees, Permits, Testing, etc. $ 5,054,403 $ 4,713,027 FF&E $ 400,000 $ 1,700,000 Project Budget without ACE Grant $ 58,582,310 $ 55,820,451 LEED Gold ACE Grant achievable though project design and construction $ 2,000,000 $ 2,000,000 Total Project Cost, Excluding Financing $ 55,433,637 $ 52,902,552 Holland Middle School Budget Actual Construction Costs $ 43,488,168 $ 40,827,400 Financing Costs $ 1,045,526 $ 785,077 Reserve Contingency for unforeseens $ 3,482,930 $ 2,482,930 Reserve Fees, Permits, Testing, etc. $ 4,905,178 $ 4,905,178 FF&E $ 400,000 $ 1,700,000 Project Budget without ACE Grant $ 53,321,802 $ 50,700,585 LEED Gold ACE Grant achievable though project design and construction $ 2,000,000 $ 2,000,000 Total Project Cost, Excluding Financing $ 50,276,276 $ 47,915,508 Budget Actual GRAND TOTAL: $ 105,709,913 $ 100,818,060 Difference: $ 4,891,853 Contingency Available for Both Projects: $ 4,674,205

Public Comments?