Regolith-Derived Heat Shield for Planetary Body Entry and Descent System with In-Situ Fabrication



Similar documents
Earth in the Solar System

Does currently available technology have the capacity to facilitate a manned mission to Mars?

Mars Sample Return Campaign: An Overview. Dr. Firouz Naderi Associate Director NASA s JPL

Solar Thermal Power System for ISRU Applications Field Deployment and Operation at Mauna Kea, HI

Geol 116 The Planet Class 7-1 Feb 28, Exercise 1, Calculate the escape velocities of the nine planets in the solar system

2. Orbits. FER-Zagreb, Satellite communication systems 2011/12

Use the following information to deduce that the gravitational field strength at the surface of the Earth is approximately 10 N kg 1.

THE SOLAR SYSTEM - EXERCISES 1

7. Our Solar System. Planetary Orbits to Scale. The Eight Planetary Orbits

Progress of MoonLITE Penetrators

The 2013 MAVEN Mission To Mars. Bruce Jakosky MAVEN Principal Investigator University of Colorado

Space Shuttle Mission SPACE SHUTTLE SYSTEM. Operation. Luca d Agostino, Dipartimento di Ingegneria Aerospaziale, Università di Pisa, 2010/11.

Can Hubble be Moved to the International Space Station? 1

Lab 7: Gravity and Jupiter's Moons

The µtorque Momentum-Exchange Tether Experiment

Technology & Innovation Committee

Solar System. 1. The diagram below represents a simple geocentric model. Which object is represented by the letter X?

The Apollo Program. PTYS 395 October 9, 2008 Sarah Mattson

Name: João Fernando Alves da Silva Class: 7-4 Number: 10

Solar System Overview

National Aeronautics and Space Administration. NASA s. Pioneering Next Steps in Space Exploration

Educator Guide to S LAR SYSTEM El Prado, San Diego CA (619)

Exam # 1 Thu 10/06/2010 Astronomy 100/190Y Exploring the Universe Fall 11 Instructor: Daniela Calzetti

Congresso della SAIT Museo della Scienza e della Tecnologia di Milano 15 Maggio 2014

engineering is out of this world

The Space Shuttle: Teacher s Guide

Space Technology Mission Directorate

How Rockets Work Newton s Laws of Motion

Meeting the Grand Challenge of Protecting an Astronaut s Health: Electrostatic Active Space Radiation Shielding for Deep Space Missions

Why Invest in Space Technology?

Solar System Fundamentals. What is a Planet? Planetary orbits Planetary temperatures Planetary Atmospheres Origin of the Solar System

Lecture L17 - Orbit Transfers and Interplanetary Trajectories

Astrodynamics (AERO0024)

Solar Thermal System for Lunar ISRU Applications: Development and Field Operation at Mauna Kea, HI

The Elwing Company THE ELWING COMPANY. EPIC Workshop Products and Systems

SpaceX Overview Tom Markusic Director, McGregor Rocket Development Facility 27 July, SpaceX

NASA Technology Roadmap Update Overview

Chapter 5 - Aircraft Welding

Space Technology Mission Directorate

PENETRATION TESTING FOR SUBSURFACE REGOLITH PROBES IN MARTIAN ANALOG MATERIAL

GLOBAL MANUFACTURING. ARAUJO, Anna Carla AUG, 2015 Mechanical Engineering Department POLI/COPPE/UFRJ


Welding of Plastics. Amit Mukund Joshi. (B.E Mechanical, A.M.I.Prod.E)

Science 9 Worksheet 13-1 The Solar System

Full credit for this chapter to Prof. Leonard Bachman of the University of Houston

Saturn V Straw Rocket

Hyperspectral Satellite Imaging Planning a Mission

UNIT 2 GCSE PHYSICS Forces and Energy 2011 FXA WORK DONE (J) = ENERGY TRANSFERRED (J) WORK

Name: Earth 110 Exploration of the Solar System Assignment 1: Celestial Motions and Forces Due in class Tuesday, Jan. 20, 2015

Chapter 7 Our Planetary System. What does the solar system look like? Thought Question How does the Earth-Sun distance compare with the Sun s radius

3 Nextel Textiles. Ceramic fiber products for outerspace applications.

APOPHIS 2029 A UNIQUE MISSION OPPORTUNITY

Free piston Stirling engine for rural development

Name Class Period. F = G m 1 m 2 d 2. G =6.67 x Nm 2 /kg 2

California Standards Grades 9 12 Boardworks 2009 Science Contents Standards Mapping

Science Standard 4 Earth in Space Grade Level Expectations

G U I D E T O A P P L I E D O R B I T A L M E C H A N I C S F O R K E R B A L S P A C E P R O G R A M

SPACE BASED SOLAR POWER IS FOR MARS

Robotic Pre-Cursor Contribution to Human NEA Mission. H. Kuninaka JSPEC/JAXA

Motions of Earth, Moon, and Sun

NASA Office of Inspector General

Teaching Time: One-to-two 50-minute periods

Chapter 7 Our Planetary System. Agenda. Intro Astronomy. Intro Astronomy. What does the solar system look like? A. General Basics

Automated Spacecraft Scheduling The ASTER Example

Earth Sciences -- Grades 9, 10, 11, and 12. California State Science Content Standards. Mobile Climate Science Labs

ROYAL CANADIAN AIR CADETS PROFICIENCY LEVEL TWO INSTRUCTIONAL GUIDE SECTION 6 EO C IDENTIFY PARTS OF A ROCKET PREPARATION

CHAPTER 6 THE TERRESTRIAL PLANETS

Solar and Hydroelectric Power. Abbie Thill Becca Mattson Grace Nordquist Keira Jacobs Miyabi Goedert

RAPID PROTOTYPING. Learning Objectives: By the end of the lecture the student should be able to: Explain the fundamentals of Rapid Prototyping

Spacecraft Power Systems

Presentation of problem T1 (9 points): The Maribo Meteorite

Quasi-Synchronous Orbits

The Solar System. Olivia Paquette

US ACTIVE DEBRIS REMOVAL (ADR) EFFORTS

MCQ - ENERGY and CLIMATE

Sustainable Energy Sources By: Sue Peterson

2007 Pearson Education Inc., publishing as Pearson Addison-Wesley. The Jovian Planets

MISSION DESIGN AND OPERATIONS CONSIDERATIONS FOR NASA S LUNAR RECONNAISSANCE ORBITER

Orbital Dynamics. Orbital Dynamics 1/29/15

Technical Information

Penetration Tests in a Mold on Regolith Quasi-Analogues at Different Relative Densities

Weld Cracking. An Excerpt from The Fabricators' and Erectors' Guide to Welded Steel Construction. The James F. Lincoln Arc Welding Foundation

Europa and Titan: Oceans in the Outer Solar System? Walter S. Kiefer, Lunar and Planetary Institute, Houston TX

Visualizing Wireless Transfer of Power: Proposal for A Five-Nation Demonstration by ISDC2012: Washington DC, May 26, 2012

Rapid Prototyping. Training Objective

CELESTIAL MOTIONS. In Charlottesville we see Polaris 38 0 above the Northern horizon. Earth. Starry Vault

Background Information Students will learn about the Solar System while practicing communication skills.

Penn State University Physics 211 ORBITAL MECHANICS 1

Interaction of Energy and Matter Gravity Measurement: Using Doppler Shifts to Measure Mass Concentration TEACHER GUIDE

Transcription:

Regolith-Derived Heat Shield for Planetary Body Entry and Descent System with In-Situ Fabrication Michael D. Hogue, NASA Kennedy Space Center Robert P. Mueller, NASA Kennedy Space Center Laurent Sibille, QNA ESC Kennedy Space Center Paul E. Hintze, NASA Kennedy Space Center Daniel J. Rasky, NASA Ames Research Center NIAC Symposium Pasadena, CA March 27-29, 2012 1

Introduction High-mass planetary surface access is one of NASA s Grand Challenges involving entry, descent, and landing (EDL). Heat shields fabricated in-situ can provide a thermal protection system for spacecraft that routinely enter a planetary atmosphere. Fabricating the heat shield from extraterrestrial regolith will avoid the costs of launching the heat shield mass from Earth. This project will investigate three methods to fabricate heat shield using extraterrestrial regolith. NIAC Symposium Pasadena, CA March 27-29, 2012 2

Fabrication Methods Being Investigated Sintering of regolith Furnace sintering Solar sintering Hot post-process regolith from in-situ resource utilization (ISRU) devices. ISRU processes to derive O 2 and other materials from regolith leaves a hot slag or glassy melt as a waste stream. This hot regolith can be poured into a heat shield mold form. High temperature polymer binder NIAC Symposium Pasadena, CA March 27-29, 2012 3

Sintering Process Temperature and heating time are crucial factors in resulting structure. Rocket plume exposed JSC-1A sintered tiles (Courtesy Dr. Phil Metzger/NASA KSC) NIAC Symposium Pasadena, CA March 27-29, 2012 4

ISRU Process Waste Use of waste stream from ISRU processes. Hot regolith can be poured into a heat shield mold. Saves energy by combining processes. Hot Hawaiian tephra output from the ROxygen generation I oxygen production reactor. NIAC Symposium Pasadena, CA March 27-29, 2012 5

High Temperature Polymer Binder A high temperature silicone RTV is being investigated as a binding agent for the regolith. Several RTV/regolith ratios will be fabricated. Regolith block made using a polymer resin. NIAC Symposium Pasadena, CA March 27-29, 2012 6

Progress to Date KSC has furnace sintered several 6 x 8 x 1 and 3 diameter x ½ test tiles using both JSC-1A Lunar and JSC-1 Martian regolith simulants. Solar sintering experiments have been deferred until summer when sunlight is stronger. These tiles will be evaluated by physical testing and subjected to flame impingement tests (via a welding torch). A high temperature, space rated, silicone based polymer has been identified for use as a binder agent. Regolith to binder ratios will be tested for strength and heat resistance. NIAC Symposium Pasadena, CA March 27-29, 2012 7

Arc-Jet Testing KSC will fabricate multiple regolith simulant coupons for testing at the arc-jet facility at ARC. The arc-jet facility can model the thermal and kinetic environment of atmospheric entry. Test coupon and back plate designs are complete. Mold plugs were fabricated to create molds for the coupons. NIAC Symposium Pasadena, CA March 27-29, 2012 8

Architecture Architecture benchmark is the Mars NASA Design Reference Architecture (DRA) 5.0 modified to use Mars entry heat shields fabricated on Phobos or Deimos. With a TPS mass of 40.7 metric tons and a gear ratio* of 5, the LEO to Mars Mass savings is 203.5 metric tons. Using expendable launch vehicles (~$8,800/kg) the cost savings per Mars mission is $1.79 Billion. With 10 crew rotations in a Mars campaign using the regolith heat shields, the total cost savings would be about $35.8 billion. * Gear ratio is the ratio of mass required in LEO to deliver one mass unit to Mars orbit. NIAC Symposium Pasadena, CA March 27-29, 2012 9

Mars Moons Taxi Architecture Deimos Operations Orbit: 20,063 km circular orbit 0.9 deg, 1.26 day period Notional Deimos Heat Shield Additive Fabrication Strategy OR Phobos Operations Orbit : 5981 km circular orbit 1 deg, 0.32 day period Notional Phobos Heat Shield Additive Fabrication Strategy 1. Capture into a 1-sol parking orbit with proper plane change to Deimos inclination 2. Lower Mars Transfer Vehicle to Deimos orbit (653 m/s delta-v required) 3. Prepare for orbital operations 4. Utilize a spacecraft to explore Deimos numerous times with an orbital survey and surface sampling 5. Spacecraft inserts four hard point anchors into the regolith 6. Counter Rotating Bucket Drum Surface Contour Excavator prepares an elliptical surface 7. One surface layer of regolith is hardened by spacecraft ops 8. Surface Excavator repeats step 6 to deposit another layer of loose regolith 9. Repeat Step 7 10. Repeat Steps 6-10 until Regolith Heat Shield thickness is achieved 11. Remove Heat Shield from the surface by attaching to hard point anchors, releasing anchors and thrusting off with the spacecraft 12. Install onto Mars Entry, Descent and Landing (EDL) Vehicle in Orbit 13. Proceed to Mars EDL with a De-Orbit Burn 14. Release Heat Shield after hypersonic entry, during Descent operations 15. Land on Mars 16. Launch from Mars to Deimos using ISRU propellants 17. Repeat steps 5-16 1. Capture into a 1-sol parking orbit with proper plane change to Phobos inclination 2. Lower Mars Transfer Vehicle to Phobos orbit (1,437 m/s delta-v required) 3. Prepare for orbital operations 4. Utilize a spacecraft to explore Phobos numerous times with an orbital survey and surface sampling 5. Spacecraft inserts four hard point anchors into the regolith 6. Counter Rotating Bucket Drum Surface Contour Excavator prepares an elliptical surface 7. One surface layer of regolith is hardened by spacecraft ops 8. Surface Excavator repeats step 6 to deposit another layer of loose regolith 9. Repeat Step 7 10. Repeat Steps 6-10 until Regolith Heat Shield thickness is achieved 11. Remove Heat Shield from the surface by attaching to hard point anchors, releasing anchors and thrusting off with the spacecraft 12. Install onto Mars Entry, Descent and Landing (EDL) Vehicle in Orbit 13. Proceed to Mars EDL with a De-Orbit Burn 14. Release Heat Shield after hypersonic entry, during Descent operations 15. Land on Mars 16. Launch from Mars to Phobos using ISRU propellants 17. Repeat Steps 5-16 NIAC Symposium Pasadena, CA March 27-29, 2012 10

Artist s Concept of a Regolith-Derived Heat Shield NIAC Symposium Pasadena, CA March 27-29, 2012 11

Summary Building a viable heat shield in-situ from regolith will greatly reduce the transport costs of Missions to Mars or other bodies where atmospheric entry is required. Three in-situ fabrication techniques are being investigated to build the heat shields. Optimal methodology, shield structure, density, and thermal conductivity are being developed. This technology can be applied to other regolith based structural components such as habitats, berms, and landing pads. NIAC Symposium Pasadena, CA March 27-29, 2012 12

We would like to acknowledge NIAC and the Kennedy Space Center for their support of this project. Questions? NIAC Symposium Pasadena, CA March 27-29, 2012 13