Preparation for fuel removal from the spent fuel pool in Unit 3 reactor building at Fukushima Daiichi Nuclear Power Station



Similar documents
Seismic Damage Information (the 231st Release) (As of 14:00 August 16, 2011)

The integrity evaluation of the reactor building at unit4 in the Fukushima Daiichi nuclear power station

Activities of Nuclear Damage Compensation & Decommissioning Facilitation Corporation (NDF) Yasuharu Igarashi

Three Mile Island Unit 2 Overview and Management Issues

Fukushima Daiichi Nuclear Power Station Unit 1-3 Evaluation method of the present amount of radioactive material released from the Reactor Building

Overview of the Multi-nuclide Removal Equipment (ALPS) at Fukushima Daiichi Nuclear Power Station. March 29, 2013 Tokyo Electric Power Company

February 19, Senior Fellow, Nuclear Energy Systems & Services Division Power Systems Company

Used Nuclear Fuel Receipt, Shipping and Disposition at Savannah River Site (SRS)

May 23, 2011 Tokyo Electric Power Company

Matching Capabilities to Needs, Creating a Timely Solution for an Emergency Water Cleanup John Raymont, President and CEO

Great East Japan Earthquake and the seismic damage to the NPSs

Andreeva Bay Facilities for SNF Management. CEG IAEA Workshop - February 2010

15 April 2015 Nuclear Regulation Authority, Japan. 1. Overview

Knowledge Domain: Plumbing Unit: Leaking Skill: Epoxy

THE REPORT ON THE INVESTIGATION OF THE REACTORS AT FUKUSHIMA DAIICHI NUCLEAR POWER STATION (NO. 1)

Roadmap towards Restoration from the Accident at Fukushima Daiichi Nuclear Power Station, TEPCO. Progress Status

Retrieval of Damaged Components form Experimental Fast Reactor Joyo Reactor Vessel

Mechanical Engineering and Material Handling Aspects of NSDF

July 30, 2012 Nuclear Emergency Response Headquarters Government-TEPCO Med-and-long Term Response Council

IAEA INTERNATIONAL FACT FINDING EXPERT MISSION OF THE NUCLEAR ACCIDENT FOLLOWING THE GREAT EAST JAPAN EARTHQUAKE AND TSUNAMI

BREEZE XLS ROBOTIC POOL CLEANER SETTINGS AND TROUBLESHOOTING GUIDE

Decontamination Project in Fukushima Prefecture Conducted by Japanese Government

IAEA Action Plan on Nuclear Safety 1

The ACR : Advanced Design Features for a Short Construction Schedule

Buildings Construction Procurement Strategy

Holtec International. Multi-Purpose Canisters for Long-Term Interim Storage. June 17, Rick Springman, Ph.D. Director of International Projects

Fukushima Fukushima Daiichi accident. Nuclear fission. Distribution of energy. Fission product distribution. Nuclear fuel

Hanson Building Products. precast basement solutions

Draft IAEA Action Plan on Nuclear Safety

Damage of Fukushima Nuclear Accident and a new compensation scheme

Advanced Construction Methods for New Nuclear Power Plants

( 1 ) Overview of Safety Measures ( 2 ) Overview of Measures for Attaining Greater Safety and Reliability

EXCHANGE OF STEAM GENERATORS IN PRESSURIZED WATE R REACTOR POWER PLANT S ABSTRACT

LG G5 Chassis Brace Gen 5 Camaro THE MOST POWERFUL HEADERS ON THE PLANET Brought to you by LG Motorsports

TUTORIAL. REbUILdING. REAR CALIpER O-RING CONVERSION CORVETTE Part #: HT-2

TUTORIAL. REbUILdING. front CALIpER O-RING CONVERSION CORVETTE Part #: HT-1

GNS Activities - Solutions for Russian Spent Fuel -

Moving Forward to Ensure People s Safety and Security

Fukushima & Three Mile Island Reactor Accidents: Recovery, Cleanup, Lessons, & Future

Unit 4. Storage and handling. Fuel debris removal. Scenario development & technology consideration. Design and manufacturing of devices/ equipment

APPENDIX C. Accident Cleanup

Radioactive waste managment in Estonia past, present and future

INTERIM WASTE STORE OPERATING LICENCE DESCRIPTION OF THE STRUCTURES, COMPONENTS, SYSTEMS AND EQUIPMENT

Hinomiyagura 2014 TDP: Diffraction mode in Wireless Communication Simulation

D Krefeld, Germany, D Eggenstein-Leopoldshafen, Germany,

Safety and Environmental Information for External Companies Koehler Oberkirch

GET A GRIP TO AVOID INJURIES

Decommissioning situation of Nuclear Power Plant in Japan

Results of Airborne Monitoring by the Ministry of Education, Culture, Sports, Science and Technology and the U.S. Department of Energy

Wanner,M.C. (IPA-Stuttgart), Baumeister,K. (IPA-Stuttgart), Kohler,G.W. (KFK-Karlsruhe), Walze,H. (KFK-Karlsruhe)

INTRODUCTION. Three Mile Island Unit 2

Compound Machine: Two or more simple machines working together to make work easier. Examples: Wheelbarrow, Can Opener, Bicycle

Long Term Storage and Transportation Issues for Used Nuclear Fuel. Office of Used Nuclear Fuel Disposition R &D Mission

Whiting Equipment Canada Inc. Whiting Overhead Cranes

Hazard Classification of the Remote Handled Low Level Waste Disposal Facility

8 / 89. Vacuum - Material - Handling

CEP Discussion: AREVA s SONGS-Specific Used Fuel Solution

IRON STORM (WALKTHROUGH)

11. Radioactive Waste Management AP1000 Design Control Document

Introduction of the education and training courses to support emerging countries

ROYAL REHAB COLLEGE AND THE ENTOURAGE EDUCATION GROUP. UPDATED SCHEDULE OF VET UNITS OF STUDY AND VET TUITION FEES Course Aug 1/2015

Questionnaire: Physical-Ergonomic Workplace Evaluation The University of Aarhus 2008

Treatment Centers for Radioactive Waste

2010 APPLICATION REFERENCE GUIDE

Solar energy and power

How To Decontaminate A Special Decontamination Area

(888) T H E E Q U I P M E N T M O V I N G S P E C I A L I S T S

Fukushima Accident: Radioactive Releases and Potential Dose Consequences

UK Distributor & Stockist of OMNI CUBED Product Range

FY2015 2nd Quarter Earnings Results (April 1 September 30, 2015)

New Providence Wharf, London, E14 Price: 449,888 Tenure: Leasehold Lease 999 from 2004

Post Fukushima Off Site Radiological Monitoring Enhancements. January, 2015 Fuji Electric Corp. of America

Memberships. W.F. Welding & Overhead Cranes Ltd. Since W.F. Welding & Overhead Cranes Ton Overhead Cranes. Jib Cranes.

Flocking of textiles. Flocked shirt 13. flocking drying cleaning. adhesive. application. creation

Building and Construction

THE DECOMMISSIONING OF COMMERCIAL MAGNOX GAS XA COOLED REACTOR POWER STATIONS IN THE UNITED KINGDOM

STANDARD CONTAINER DETAILS 20' GENERAL PURPOSE / DRY VAN. Door Opening. Weight 40' GENERAL PURPOSE / DRY VAN. Internal Dimensions.

Progress on Off-site Cleanup and Interim Storage in Japan

HOSPITALITY RISK FACTORS & BEST PRACTICES - LAUNDRY

HealthandSafetyOntario.ca. Hazards. Introduction. Legislation

Provisional Translation Basic Policy for the Contaminated Water Issue at the TEPCO s Fukushima Daiichi Nuclear Power Station

Operation manual and Spare parts list EL PUMP. November

STREAMLINE. Products for the Pure Water Cleaning Industry INSTRUCTION MANUAL

Academy for Global Nuclear Safety and Security Agent

Safety and Environmental Information for External Companies

Renewals, and GL Implementation of AMPs

Lessons learned from the radiological accident in Mayapuri, New Delhi, India

ERIKKILA INDUSTRIAL CRANES

SCOOP: The Future of NDBC Real-Time Data Collection and Reporting

DECOMMISSIONING THE BROOKHAVEN NATIONAL LABORATORY BUILDING 830 GAMMA IRRADIATION FACILITY

This unit is a pump that will clear the waste from a domestic shower and washbasin, bath, washing machine, glass washer and a sink.

IV. Occurrence and Progress of Accidents in Fukushima Nuclear Power Stations and Other Facilities

The following assumptions are to be considered when reviewing this model procedure:

39HQ Airovision Air Handling Units

THE PARTNER FOR EFFICIENT AND FLEXIBILE LOGISTICS

March 13 th of March, 2014

Depending on your facility and the equipment contained within, all or part of the checklists/logs can be printed for use.

Cranes and Forklift Trucks - Material Handling Systems

AGV / Lift AGV. Automated Container Transport Proven Technology from Gottwald

SEPAR FILTER SEPAR 2000 SEPAR 2000

Transcription:

Preparation for fuel removal from the spent fuel pool in Unit 3 reactor building at Fukushima Daiichi uclear Power Station Demonstration of fuel handling machine and crane January 18, 2016 Tokyo Electric Power Company

1. Outline of Fuel Removal at Unit 3 in Fukushima Daiichi Preparation for and Implementation of Fuel Removal MAJOR MILESTOES Step 1 Removal of large pieces of rubble 1 Step 2 Decontamination & shielding Step 3 Installation of cover & fuel handling system Step 4 Fuel removal Cover for spent fuel removal at Unit3

2. Removal of large pieces of rubble on the operating floor Complete view of operating floor Complete view of north side of reactor building 2 Before removal 撮 影 :2011 年 3 月 24 日 撮 影 :2012 年 2 月 21 日 After removal 撮 影 :2013 年 10 月 11 日 Completion of removal on the operating floor (Oct. 11, 2013) 撮 影 :2013 年 10 月 11 日

2. Removal of large pieces of rubble from the spent fuel pool Spent fuel pool 3 Before removal Started operations on Dec. 17, 2013 Removal of the remaining fuel handling machine, the largest piece of rubble (25t) on Aug. 2, 2015 Completion of rubble removal with a crane on ov. 21, 2015 Fuel handling machine 撮 影 :2014 年 1 月 31 日 After removal Removal operation (Aug. 2, 2015) 撮 影 :2015 年 11 月 3 日

3. Decontamination and shielding(in progress) 4 Oct. 15, 2013 - Started decontamination(collecting and suction of, cutting of small rubble) of operating floor by remote-controlled, unmanned, heavy machinery Decontamination Main devices used for decontamination Rubble accumulation Small rubble suction Cutting & suction Cutting with highpressure water & suction Rubble collection Decontamination devices Shielding shield

4. Cover used for fuel removal 5 Cover Crane Fuel Handling Machine Cover for fuel removal at Unit 3 Gateway for transportation cask Spent fuel pool Crane Fuel handling machine Supporting Base for cover Fuel DSP ウェル 使 用 済 燃 料 プール 使 用 済 燃 料 プール Transportation Cask GL Spent Fuel Pool Unit 3 Reactor building orth-south cross section East-west cross section Operation of fuel removal at Unit 3

5. Cover, fuel handling system and other procedures 6 Step Ⅰ- Planning to install shield on the operating floor by remote control Steps Ⅱ~Ⅲ- Main work spaces on operating floor with high radiation doses Step Ⅳ onwards -Operating floor and approx. 6m high space will be the main work spaces Shield installation Ⅰ Installation of transportation cask supporting base Ⅱ Installation of girder for fuel handling machine Ⅲ Installation of pool curing Working Space Ⅳ Curved roof installation Ⅴ Curved roof installation Ⅵ stairs Lifting fuel handling machine Ⅶ Curved roof installation Ⅷ Ⅸ

6. Cover Installation Training 7 Conducted at Onahama Bay Installation of roof parts 撮 影 :2014 年 10 月 11 日 Installation of girder 撮 影 :2014 年 6 月 23 日

7. Rubble removal and fuel removal 8 Rubble removal Crane Basket Containing rubble Fuel Handling Machine Rubble sucking device Fuel removal Basket containing rubble Manipulator Transportation cask fuel Cutting & moving Small rubble removal Sucking Filling cask after removal First lid Putting on the first lid Confirmation of a tight seal Washing the surface of cask & drying Loading the cask onto a truck, putting on the second lid & transporting to the common pool manually

8. Fuel handling machine remote control training 9 At Fukushima Daiichi, fuel removal will be conducted by a remote control system using cameras. Therefore, remote control training was conducted at the factory in advance(feb. through Dec. in 2015). Fuel handling training Transportation cask handling training Rubble removal training Fuel gripping device Mock rack Remote control room Mock fuel Fuel removal training

9. Timeline for fuel removal 10 2012 2013 2014 2015 2016 2017 2018 Removal of large pieces of rubble on the operating floor Decontamination & shielding Fuel removal Removal of large pieces of rubble from the spent fuel pool Cover installation training at Onahama Bay Installation of cover and fuel handling system Removal of small pieces of rubble Fuel handling training using remote control system at the factory Fuel handling training using remote control system at Unit 3