1 FY2015 2nd Quarter Earnings Results (April 1 September 30, 2015) Tokyo Electric Power Company October 29, 2015
2 Regarding Forward-Looking Statements Certain statements in the following presentation regarding Tokyo Electric Power Company s business operations may constitute forward-looking statements. As such, these statements are not historical facts but rather predictions about the future, which inherently involve risks and uncertainties, and these risks and uncertainties could cause the Company s actual results to differ materially from the forward-looking statements herein. (Note) Please note that the following to be an accurate and complete translation of the original Japanese version prepared for the convenience of our English-speaking investors. In case of any discrepancy between the translation and the Japanese original, the latter shall prevail.
3 Overview of FY2015 2nd Quarter Earnings Results
4 Key Points of FY2015 Q2 Earnings Results and Full-Year Forecasts 1 Ordinary income achieved profits in FY2015 Q2 for the third consecutive year. < FY2015 Q2 Earnings Results > - Operating revenues decreased compared to the corresponding period of the previous fiscal year mainly due to fuel cost adjustments. - On the other hand, ordinary income recorded billion yen and billion yen on consolidated and non-consolidated basis, respectively, due to decline in fuel prices and utmost cost reduction efforts, resulting in increase for three years in a row. In spite of the suspension of all nuclear power stations, using less expensive fuel as well as decrease in fuel price limited the influence of increasing fuel expenses resulted from yen depreciation. Extensive cost reduction efforts on a company wide level were implemented. < FY2015 Full-Year Earnings Forecasts > - FY2015 full-year forecasts is currently not able to be estimated due to the difficult situations that we can not expect when the nuclear power station will be resumed.
5 1. Consolidated Earnings Results - Year on Year Comparison 2 FY2015 Apr-Sep(A) FY2014 Apr-Sep(B) (Unit: Billion Yen) Comparison (A)-(B) (A)/(B) (% ) Operating Revenues 3, , Operating Income Ordinary Income Extraordinary Income Extraordinary Loss Net Income attributable to owners of parent Equity Ratio (% )
6 2.Non-Consolidated Earnings Results - Year on Year Comparison 3 FY2015 Apr-Sep(A) FY2014 Apr-Sep(B) (Unit: Billion Yen) Comparison (A)-(B) (A)/(B) (% ) Operating Revenues 3, , Operating Income Ordinary Income Extraordinary Income Extraordinary Loss Net Income Equity Ratio (% )
7 3. Power Demand and Supply - Year on Year Comparison 4 Electricity Sales Volume (Unit: Billion kwh) FY2015 FY2014 Comparison Apr-Sep(A) Apr-Sep(B) (A)-(B) (A)/(B) (%) Lighting Power Liberalized segment Decrease in demand of liberalized segment due to the delayed recovery of production level Total Total Power Generated and Purchased (Unit: Billion kwh) FY2015 FY2014 Comparison Apr-Sep(A) Apr-Sep(B) (A)-(B) (A)/(B) (%) Power generated by TEPCO Thermal power generation Adjust power supply to demand decline by using thermal power generation Power purchased from other companies Used at pumped storage Total
8 4. Key Factors Affecting Performance 5 - Year on Year Comparison FY2015 Apr-Sep(A) FY2014 Apr-Sep(B) (A)-(B) Foreign Exchange Rate (Interbank, yen/dollar) Crude Oil Prices (All Japan CIF, dollar/barrel) LNG Prices (All Japan CIF, dollar/barrel) <Fluctuation of Foreign Exchange Rate> (yen/dollar) (dollar/barrel) 2015 JCC 2014 JCC JLC 2014 JLC <Fluctuation of All Japan CIF> 95 Oct. Nov. Dec. Jan. Feb. Mar. Apr. May Jun. Jul. Aug. Sep 45 Aug. Sep. Oct. Nov. Dec. Jan. Feb. Mar. Apr. May Jun. Jul. Aug. Sep.
9 5. The Status of Income and Expenditure (Non-Consolidated) - Year on Year Comparison 6 (1) Revenues (Unit: Billion Yen) FY2015 Apr-Sep(A) FY2014 Apr-Sep(B) Comparison (A)-(B) (A)/(B) (%) (Operating Revenues) 3, , Electricity Sales Revenues 2, , Lighting 1, , Power 1, , Power Sold to Other Utilities and Suppliers Decrease in electricity sales volume Effect of fuel cost adjustments Renewable Energy Power Promotion Surcharge Other Revenues Ordinary Revenues , , Grant under Act on Procurement of Renewable Electric Energy +42.4
10 6. The Status of Income and Expenditure (Non-Consolidated) - Year on Year Comparison 7 (2) Expenditures Personnel Expenses Comparison (A)-(B) (A)/(B) (%) Fuel Expenses , Maintenance Expenses Depreciation Expenses Power Purchasing Costs Interest Paid Taxes,etc. Nuclear Back-end Costs Other Expenses Ordinary Expenses (Operating Income) Ordinary Income FY2015 Apr-Sep(A) FY2014 Apr-Sun(B) (Unit: Billion Yen) , , (368.3) (265.2) (103.1) (138.9) Decrease in thermal power generation Effect of fluctuations of exchange rate and CIF Increase in expenses for maintaining the stabilization status at Fukushima Daiichi NPS, and others Increase purchases of PV generation Payment of Act on Procurement of Renewable Electric Energy +80.6
11 7.Increase/Decrease of Consolidated Business Performance Ordinary Income increased billion yen to billion yen. - Year on Year Comparison 8 Ordinary Income (Unit: Billion Yen) Foreign Exchange Rate CIF yen/$ -50.6$/b FY2014 Apr-Sep Fuel cost adjustments Factors related to Power Supply and Demand (including renewable energy) Foreign exchange rate CIF Others related to power supply and demand Increase in Other expenses Others Increase in maintenance expenses and other expenses, etc. Decrease in Other expenses Decrease in personnel expenses, depreciation expenses and interest paid, etc billion yen Earnings Growth FY2015 Apr-Sep Affect of fuel cost Adjustment Net Income attributable to owners of parent decreased 10.6 billion yen to billion yen. Ordinary Income+122.2, Extraordinary income/loss , Income Tax,etc , and others
12 8. Extraordinary Income/Loss (Consolidated) 9 - Year on Year Comparison FY2015 Apr-Sep FY2014 Apr-Jun (Unit: Billion Yen) Comparison Extraordinary Income Grants-in-aid from NDF* Extraordinary Loss Expenses for Nuclear Damage Compensation Extraordinary Income/Loss Grants-in-aid from NDF Financial Support from NDF in June, 2015 Expenses for Nuclear Damage Compensation Increase in the estimated amount of compensation for opportunity losses on businesses and damages due to groundless rumor, etc. * Nuclear Damage Compensation and Decommissioning Facilitation Corporation
13 9.Consolidated Financial Position 10 - Total assets increased billion yen mainly due to increase in cash and deposits. - Total liabilities decreased 80.5 billion yen mainly due to decline in interest-bearing debt. - Equity ratio improved by 1.9%. Balance Sheets as of Mar.31, 2015 Liabilities 12,110.4 Total Assets billion yen 14,212.6 billion yen Net Assets 2,102.1 billion yen Equity Ratio: 14.6% Decrease in Liabilities billion yen Interest-Bearing Debt billion yen Increase in Net Assets billion yen Record Net Income billion yen Improve by 1.9% Balance Sheets as of Sep.30, 2015 Total Assets 14,448.4 billion yen Decrease in Assets billion yen <Breakdown> Cash and Deposits billion yen Grants-in-aid receivable from NDF billion yen etc Liabilities 12,029.9 billion yen Net Assets 2,418.4 billion yen Equity Ratio: 16.5%
14 10.Consolidated Cash Flow 11 Cash flow from operating activities increased billion yen mainly due to increase in electricity sales revenues. Cash flow from investing activities decreased billion yen mainly due to purchases of property, plant and equipment. Cash flow from financing activities decreased billion yen mainly due to redemption of bonds. As a result, cash and cash equivalents as of September 30, 2015 increased billion yen to 1,701.4 billion yen. (Unit: Billion Yen) Grants-in aid from NDF Cash flow from operating activities (Except comensation) Payments for Compensation Purchases of property, plant and equipment Proceeds from sales of fixed assets, etc Issuance of private bond Proceeds from loans Redemption of bonds Repayment of loans, etc Increase Cash and cash equivalents at beginning of the fiscal year 1,292.4 Cash flow from operating activities Cash flows from investing activities Cash flows from financing activities Cash and cash equivalents as of Sep. 30, ,701.4
15 Supplemental Material
16 Table of Contents Earnings Results Detailed Information Other Initiatives Consolidated Statements of Income 12 Implementation of the Streamlining Policy 28 Breakdown of Non-Consolidated Ordinary Revenues 13 Efforts towards Nuclear Reform Breakdown of Non-Consolidated Ordinary Expenses 14 Framework for Nuclear Reform 29 Year-on-Year Comparison of Non-Consolidated Ordinary Expenses (1) 15 Report on status of the Nuclear Safety Reform Plan 30 Year-on-Year Comparison of Non-Consolidated Ordinary Expenses (2) 16 TEPCO Group Company Branding for the New Holding Company System 31 Year-on-Year Comparison of Non-Consolidated Ordinary Expenses (3) 17 Operational Alliances with Other Companies in Retail Sector 32 Financial Impact of the Great East Japan Earthquake [Extraordinary Income/Loss, Non-Consolidated] 18 The Current Status of Fukushima Daiichi NPS and Future Initiatives Consolidated and Non-Consolidated Balance Sheets 19 Current Situation and Status of Units 1 through 4 33 Consolidated Statements of Cash Flows 20 Overview of the Mid-to-long Term Roadmap (1) 34 Segment Information 21 Overview of the Mid-to-long Term Roadmap (2) 35 [Ref] FY2015 Key Factors Affecting Performance and Financial Impact 22 Contaminated water management 36 [Ref] Seasonal breakdown of Electricity Sales Our Commitment to Nuclear Damage Compensation 37 Sales Volume, Total Power Generated and Purchased 23 Compensation Support by NDF 38 [Ref] Recent Demand Trend of Large-Scale Industries 24 [Ref] Fuel Consumption and Procurement 25 The Current Status of Kashiwazaki-Kariwa NPS and Future Initiatives [Ref] Historical Prices of CIF Crude Oil, Fuel Coal and LNG 26 Main Measures to Secure Safety [Ref] Schedules for Corporate Bond Redemption (Non-consolidated) 27 Outline 39 Implementation Status 40 Compliance Review under the New Regulatory Requirements(1) 41 Compliance Review under the New Regulatory Requirements(2) 42
17 FY2015 2nd Quarter Earnings Results Detailed Information
18 Consolidated Statements of Income 12 FY2015 Apr-Sep (A) FY2014 Apr-Sep (B) (Unit: Billion Yen) Comparison (A)-(B) (A)/(B) (%) Operating Revenues 3, , Operating Expenses 2, , Operating Income Non-operating Revenues Investment Gain under the Equity Method Non-operating Expenses Ordinary Income (Reversal of or Provision for) Reserve for Preparation of the Depreciation of Nuclear Plants Construction Extraordinary Income Extraordinary Loss Income Tax, etc. Net Income attributable to non-controlling interests Net Income attributable to owners of parent
19 Breakdown of Non-Consolidated Ordinary Revenues 13 Ordinary Revenues Operating Revenues Operating Revenues from Electric Power Business Electricity Sales Revenues (Unit: Billion Yen) (A)-(B) (A)/(B) (%) 3, , , , , , , , Lighting 1, , Power 1, , Power Sold to Other Utilities Power Sold to Other Suppliers Other Revenues Operating Revenues from Incidental Business Non-operating Revenues FY2015 Apr-Sep (A) FY2014 Apr-Sep (B) Comparison
20 Breakdown of Non-Consolidated Ordinary Expenses 14 FY2015 Apr-Sep (A) FY2014 Apr-Sep (B) (Unit: Billion Yen) Comparison (A)-(B) (A)/(B) (%) Ordinary Expenses Operating Expenses Operating Expenses for Electric Power Business 2, , , , , , Personnel Fuel Maintenance Depreciation Power Purchasing Taxes, etc , Nuclear Power Back-end Other Operating Expenses for Incidental Business Non-operating Expenses Interest Paid Other Expenses
21 Year-on-Year Comparison of Non-Consolidated Ordinary Expenses (1) 15 Personnel expenses ( billion to billion) Salary and benefits ( billion to billion) Retirement benefits ( 19.9 billion to 17.3 billion) Amortization of actuarial difference billion ( 7.2 billion to 5.7 billion) billion billion billion <Amortization of Actuarial Difference> Expenses incurred Charged (Unit: Billion Yen) in Apr-Sep in Apr-Sep FY FY FY Total Note: Actuarial gain and loss are amortized by the straight-line method over three years. Expenses/Provisions in Each Period FY2014 Of which charged Charged FY2015 Of which charged Amount Uncharged as of Sep.30, 2015 Fuel expenses ( 1,285.9 billion to billion) Consumption volume Decrease in total power generated and purchased, and others Price Increase due to fluctuations of foreign exchanges Decrease due to fluctuations of CIF crude oil price, and others billion Approx. - \72.0 billion Approx. - \72.0 billion Approx. - \362.0 billion Approx. +\113.0 billion Approx. - \475.0 billion
22 Year-on-Year Comparison of Non-Consolidated Ordinary Expenses (2) 16 Maintenance expenses ( billion to billion) Generation facilities ( 50.1 billion to 71.3 billion) Hydroelectric power ( 3.5 billion to 3.0 billion) T hermal power ( 35.3 billion to 43.1 billion) Nuclear power ( 11.1 billion to 25.0 billion) Renewable energy ( 0.1 billion to 0.1 billion) Distribution facilities ( 77.9 billion to 84.3 billion) T ransmission ( 10.0 billion to 9.4 billion) T ransformation ( 5.5 billion to 6.3 billion) Distribution ( 62.3 billion to 68.5 billion) Others ( 1.5 billion to 1.5 billion) Depreciation expenses ( billion to billion) Generation facilities ( billion to billion) Hydroelectric power ( 18.2 billion to 17.3 billion) T hermal power ( 82.1 billion to 82.2 billion) Nuclear power ( 36.9 billion to 37.6 billion) Renewable energy ( 0.2 billion to 0.4 billion) Distribution facilities ( billion to billion) T ransmission ( 76.8 billion to 74.6 billion) T ransformation ( 29.6 billion to 27.7 billion) Distribution ( 55.2 billion to 53.6 billion) Others( 4.9 billion to 4.5 billion) <Depreciation Breakdown> FY2014 Apr-Sep FY2015 Apr-Sep Regular depreciation billion billion Extraordinary depreciation billion T rial operations depreciation 3.5 billion 1.8 billion Main Factors for Increase/Decrease Nuclear: Increase in expenses for maintaining the stabilization status at Fukushima Daiichi NPS, and others billion billion billion billion billion billion billion billion billion billion billion billion billion billion billion billion billion billion billion billion billion billion
23 Year-on-Year Comparison of Non-Consolidated Ordinary Expenses (3) 17 Power purchasing costs ( billion to billion) Power purchased from other utilities ( billion to 96.3 billion) Power purchased from other suppliers ( billion to billion) Taxes and other public charges ( billion to billion) Enterprise tax ( 34.3 billion to 30.9 billion) Main Factors for Increase/Decrease Power purchased from other suppliers: Increase due to additional purchases from photovoltaic power generation facilities, and others billion billion billion billion billion Nuclear power back-end costs ( 33.0 billion to 28.7 billion) Expenses for reprocessing of spent nuclear fuel ( 23.4billion to 18.5 billion) Decommissioning costs of nuclear power units ( 8.2 billion to 8.7 billion) Other expenses ( billion to billion) Payment of Act on Special Measures Concerning Procurement of Renewable Electric Energy by Operators of Electric Utilities( 77.2 billion to billion) Outsourcing expenses ( billion to billion) Main Factors for Increase/Decrease Payment on Act of Renewable Electric Energy:Increase due to rise in the unit price of the renewable power promotion surcharge, and others billion billion billion billion billion billion Incidental business operating expenses ( 51.3 billion to 41.2 billion) Gas supply business ( 47.6 billion to 37.6 billion) Interest paid ( 51.5 billion to 44.3 billion) Decrease in average rate during the period (1.37% to 1.30%) Decrease in the amount of interest-bearing debt ( 7,326.1 billion to 6,890.7 billion) Other non-operating expenses ( 19.2 billion to 10.5 billion) Miscellaneous loss ( 19.1 billion to 10.4 billion) Main Factors for Increase/Decrease Gas supply business: Decrease due to LNG unit purchase price, and others billion billion billion - 0.7billion - 6.4billion billion billion
24 Financial Impact of the Great East Japan Earthquake [Extraordinary Income/Loss, Non-Consolidated] 18 Grants in-aid from Nuclear Damage Compensation and Decommissioning Facilitation Corporation [Extraordinary Income] (Unit: Billion Yen) FY 2010 to FY2015 Cumulative Item FY2014 FY2013 AprSep Amount - Grants-in-aid based on Nuclear Damage Compensation and Decommissioning Facilitation *1 *2 *3 *4 4, ,084.1 Corporation Act Note: Journal Entry: Grants-in-aid receivable from Nuclear Damage Compensation and Decommissioning Facilitation Corporation is debited on the balance sheet. *1,*2 and *4 Numbers above are those after deduction of a governmental indemnity of 120 billion yen, 68.9 billion yen and billion yen respectively. *2 -*4 Numbers above are those after deduction of Grants-in-aid corresponding to decontamination expenses of billion yen,523.4 billion yen and billion yen respectively. Loss on Disaster [Extraordinary Loss] and Gain on reverasal of provision for loss on disaster [Extraordinary Income] (Unit: Billion Yen) - Expenses and/or losses for Fukushima Daiichi Nuclear Power Station Units 1 through 4 - Other expenses and/or losses Loss on Disaster Sub Total (Extraordinary Loss):(A) , ,382.0 Gain on reversal of provision for loss on disaster (Extraordinary Income):(B) Difference of the restoration cost caused by re-estimation due to decommissioning of Fukushima Daiichi Nuclear Power Station Unit 5 and 6 Total: (A)-(B) 1, ,349.9 *5 Cumulative amount of restoration cost caused by the Tohoku-Chihou-Taiheiyo-Oki Earthquake is 1,364.2 billion yen (including 9.1 billion yen recorded as Non-operation Expenses for FY2014 and 5.0 billion yen of FY2015 Apr-Sep ) Loss on decommissioning of Fukushima Daiichi Nuclear Power Station Unit 5 and 6 [Extraordinary Loss] - Expenses and/or losses for decommissioning of Fukushima Daiichi Nuclear Power Station Expenses for Nuclear Damage Compensation [Extraordinary Loss] - Compensation for individual damages Expenses for radiation inspection, Expenses for evacuation, Expenses for temporary return, Expenses for permanent return, Mental distress, Damages caused by voluntary evacuations, and Opportunity losses on salary of workers - Compensation for business damages Opportunity losses on businesses, Damages due to the restriction on shipment, Damages due to groundless rumor, and Indirect business damages (Unit: Billion Yen) (Unit: Billion Yen) 2, , , , Other expenses Damages due to decline in value of properties, Housing assurance damages, Decontamination costs and Contribution to The Fukushima Pref. Nuclear Accident Affected People and Child Health Fund , Amount of indemnity for nuclear accidents from Government Grants-in-aid corresponding to decontamination expenses Total 5, ,143.7 *5
25 Consolidated and Non-Consolidated Balance Sheets (Upper and lower rows show consolidated and non-consolidated figures, respectively) (Unit: Billion Yen) Sep. 30 Mar. 31 Comparison 2015 (A) 2015 (B) (A)-(B) (A)/(B) (%) Total Assets Fixed Assets (Consolidated) 11, , , , (Non-consolidated) 11, , , , Electricity Business 7, , Incidental Business Non-Business (*) Construction in Progress Nuclear Fuel Others 2, , Current Assets Liabilities Long-term Liability Current Liability 2, , , , , , , , , , , , , , , , Reserves for Preparation of the Depreciation of Nuclear Plants Construction , , , , Shareholders' Equity 2, , , , Valuation, Translation Adjustments and Others Net Assets Non-controlling interests (*) Non-consolidated Note: Others in fixed assets include grants-in-aid receivable from Nuclear Damage Compensation and Decommissioning Facilitation Corporation of billion yen <Interest-bearing debt outstanding> Bonds Long-term debt Short-term debt Total 19 (Unit: Billion Yen) (A)Sep.30, (B)Mar.31, (A)-(B) 3, , , , , , , , , , , , Note:Upper and lower rows show consolidated and non-consolidated figures, respectively. <Reference> FY2015 FY2014 (A)-(B) Apr-Sep(A) Apr-Sep(B) ROA(%) ROE(%) EPS(Yen) Note:Upper and lower rows show consolidated and non-consolidated figures, respectivery. ROA: Operating Income/Average Total Assets ROE: Net Income/ Average Shareholders' Equity
26 Consolidated Statements of Cash Flows 20 FY2015 Apr-Sep (A) FY2014 Apr-Sep (B) (Unit: Billion Yen) Comparison (A)-(B) Cash flow from operating activities Income / loss before income taxes and minority interests Depreciation and amortization Interest expenses Grants-in-aid from Nuclear Damage Compensation and Decommissioning Facilitation Corporation Expenses for nuclear damage compensation Decrease (increase) in notes and accounts receivable trade* Increase (decrease) in notes and accounts payable trade** Interest expenses paid Payments for extraordinary loss on disaster due to the Tohoku-Chihou-Taiheiyou-Oki Earthquake Grants-in-aid from Nuclear Damage Compensation and Decommissioning Facilitation Corporation received Payments for nuclear damage compensation Others Cash flows from investing activities Purchases of property, plant and equipment Payments into time deposits Proceeds from withdrawal of time deposits Others Cash flows from financing activities Proceeds from issuance of bonds Redemption of bonds Repayment of long-term loans Proceeds from short-term loans Repayment of short-term loans Others Effect of exchange rate changes on cash and cash equivalents Net increase (decrease) in cash and cash equivalents** Cash and cash equivalents at beginning of the year 1, , Cash and cash equivalents at end of the quarter 1, , * Minus denotes an increase. ** Minus denotes a decrease.
27 Segment Information 21 (A) - (B) (A)/(B) (%) Operating Revenues 3, , Fuel & Power Company Power Grid Company Customer Service Company Corporate FY2015 Apr-Sep (A) FY2014 Apr-Sep (B) (Unit: Billion Yen) Comparison 1, , , , , , Operating Expenses 2, , Fuel & Power Company 1, , Power Grid Company Customer Service Company 3, , Corporate Operating Income Fuel & Power Company Power Grid Company Customer Service Company Corporate Note1: The lower row in operating revenues section represents revenues from external customers. Note2: Along with the latest reorganization intend to adjust to upcoming full liberalization of the retail market, Hydroelectricity and new energy generation involved segment of Power Grid have been modified to segment of Corporate. Accordingly, the segments for related companies was also amended. Note3: In response to the application for approval of the rule for wheeling service in July 2015, the energy wheeling cost will be revised in April Under the preparation process towards the transition to a holding company system, in order to improve the accuracy in business management, we reflected the impact in advance by changing intracompany transfer price since the first half of FY2015.
28 [Reference] FY2015 Key Factors Affecting Performance and Financial Impact 22 FY2015 Key Factors Affecting Performance First Half Full-year Projection Actual (As of Oct. 29) (As of Jul. 29) Electricity Sales Volume (billion kwh) Crude Oil Prices (All Japan CIF; dollars per barrel) Foreign Exchange Rate (Interbank; yen per dollar) Flow Rate (%) Nuclear Power Plant Capacity Utilization Ratio (%) [Reference] Electricity Sales Volume (billion kwh) Crude Oil Prices (All Japan CIF; dollars per barrel) Foreign Exchange Rate (Interbank; yen per dollar) Flow Rate (%) Nuclear Power Plant Capacity Utilization Ratio (%) First Half FY2014 Actual Performance Full-Year FY2015 (Unit:billion yen) [Reference] FY2014 Full-Year Actual Performance Financial Impact (Sensitivity) Full-year Projection (As of Oct. 29) (As of Jul. 29) Crude Oil Prices (All Japan CIF; 1 dollar per barrel) - - Approx.23.0 Foreign Exchange Rate (Interbank; 1 yen per dollar) - - Approx.23.0 Flow Rate (1%) - - Approx.2.0 Nuclear Power Plant Capacity Utilization Ratio (1%) Interest Rate (1%) - - Approx.23.0 Note: Crude oil prices, foreign exchange rate, flow rate and nuclear power plant capacity utilization ratio of financial impact reflect the impact on annual fuel expenses. Interest rate reflects the incremental amount of interest.
29 Regulated segment Lighting Low voltage Others Liberalized segment Commercial use [Reference] Seasonal Breakdown of Electricity Sales - Sales Volume, Total Power Generated and Purchased Electricity Sales Volume Industrial use and others Total electricity sales volume Ref. Average Monthly Temperature (Units: Billion kwh, %) FY2014 FY2015 Full-year Outlook for FY2015 Jul. Aug. Sep. 2nd 2nd Latest Projection Apr-Sep Full year Jul. Aug. Sep. Apr-Sep Quarter Quarter Projection (As of Jul. 29) (-1.4) (-4.9) (-18.4) (-8.5) (-5.3) (-4.3) (-6.7) (4.8) (2.0) (0.4) (0.9) (1.7) (1.1) (-1.1) (-4.7) (-18.0) (-8.3) (-5.0) (-4.1) (-6.3) (5.2) (2.4) (0.8) (1.0) (2.0) (1.6) (-2.8) (-5.2) (-23.3) (-10.9) (-7.2) (-6.0) (-10.3) (2.8) (-0.8) (-2.2) (0.0) (-0.7) (-2.9) (-9.6) (-9.0) (-5.7) (-8.4) (-8.1) (-7.0) (-7.7) (-2.0) (-3.7) (-4.5) (-2.8) (-3.0) (-1.3) (-3.3) (-2.8) (-7.1) (-4.4) (-2.8) (-3.2) (-4.7) (-4.3) (-5.9) (-4.9) (-4.4) (-1.2) (0.7) (-4.9) (-3.9) (-10.7) (-6.5) (-4.5) (-4.4) (-7.7) (-4.7) (-7.5) (-6.6) (-5.4) (-2.1) (-1.8) (-4.2) (-2.7) (-1.6) (-2.3) (-2.6) (-4.0) (-4.7) (-3.7) (-3.7) (-2.6) (-3.6) (-11.5) (-5.9) (-3.7) (-3.6) (-5.4) (-0.7) (-3.1) (-3.0) (-2.5) (-0.1) (0.9) (0.2 ) (-0.1 ) (0.3 ) Note: Figures in parentheses denote percentage change from the previous year. Rounded to the nearest decimal point. 23 FY2014 FY2015 Total Power Generated and 2nd 2nd Purchased Jul. Aug. Sep. Apr-Sep Full year Jul. Aug. Sep. Apr-Sep Quarter Quarter Total power generated and purchased (-4.1) (-6.6) (-8.9) (-6.5) (-4.3) (-3.9) (-1.2) (-3.4) (-3.3) (-2.6) (-2.7) Power generated by TEPCO Hydroelectric power generation Thermal power generation Nuclear power generation Renewable Energy Power purchased from other companies Used at pumped storage (-0.12) (-0.28) (-0.10) (-0.50) (-0.78) (-1.33) (-0.18) (-0.32) (-0.10) (-0.60) (-0.92) Note: Figures in parentheses denote percentage change from the previous year.
30 [Reference] Recent Demand Trend of Large-Scale Industries 24 - Electricity sales volume to large-scale industrial customers in the second quarter of fiscal 2015 decreased 3.8% due to decrease year-on-year sales growth in industries such as Paper & pulp, Chemicals, Ceramics & stone, Ferrous metals, Non-ferrous metals and Machinery. [Year-on-year Electricity Sales Growth in Large Industrial Customer Segment] 4.0% 2.0% (Unit: %) FY2014 FY2015 Jul. Aug. Sep. 2nd 2nd Apr-Sep Full Year Jul. Aug. Sep. Quarter Quarter Apr-Sep Paper & pulp Chemicals Ceramics & stone Ferrous metals Non-ferrous metals Machinery Other industries Total for LargeIndustrial Customers Ref. 10-company total Note: Preliminary figures for September and the first half of FY2015. [Contribution Analysis on Sales Volume Growth in Large Industrial Customers Segment] 1.3% 1.0% 2.0% 2.0% 0.7% 2.7% Paper & pulp Ceramics & stone Non-ferrous metals Other industries Chemicals Ferrous metals Machinery All industries 0.0% -0.1% -2.0% -1.0% -0.9% -2.3% -1.9% -4.0% -3.9% -3.6% -2.4% -2.6% -2.7% -2.6% -3.5% -3.5% -3.9% -4.6% -2.1% -4.5% -4.9% -6.0% Oct-13 Nov-13 Dec-13 Jan-14 Feb-14 Mar-14 Apr-14 May-14 Jun-14 Jul-14 Aug-14 Sep-14 Oct-14 Nov-14 Dec-14 Jan-15 Feb-15 Mar-15 Apr-15 May-15 Jun-15 Jul-15 Aug-15 Sep-15
31 [Reference] Fuel Consumption and Procurement 25 Fuel Consumption Data and Projection FY2012 Actual FY2013 Actual FY2014 Actual FY2015 Full-year Outlook Reference FY2015 Full-year Outlook (as of July 29) FY2015 Apr-Sep Actual Reference FY2014 Apr-Sep Actual LNG(million tons) Oil (million kl) Coal (million tons) Note: The oil data is total of crude oil and heavy oil, not including gas oil.the coal data is total of coal and biomass. Please visit our website for the monthly data. Click Here. Fuel Procurement Spot and short-term contract LNG of approx.2.70million tons included Oil LNG Coal Crude Oil (Unit:thousand kl) (Unit:thousand t) (Unit:thousand t) FY2012 FY2013 FY2014 FY2012 FY2013 FY2014 FY2012 FY2013 FY2014 Indonesia 1, Brunei 3,744 2,230 2,230 Australia 3,187 6,801 5,903 Brunei Das 4,804 4,684 4,972 USA Vietnam Malaysia 3,439 3,675 2,750 Canada Australia Papua New Guinea Indonesia ,458 Sudan Australia Total imports 3,351 7,776 7,454 Gabon Qatar 902 1,234 1,142 Chad Darwin 2,063 2,629 2,129 Other Qalhat Note: Totals in the tables may not agree with the sums of each column because of being rounded off. Total imports 3,328 1, Sakhalin 2,898 2,452 2,262 Heavy Oil (Unit:thousand kl) Spot contract 6,032 7,291 8,023 FY2012 FY2013 FY2014 Total imports 24,867 25,252 24,754 Total imports 7,454 4,750 2,440
32 [Reference] Historical Prices of CIF Crude Oil, Fuel Coal and LNG 26 ($/b t) ($/t) Crude Oil Fuel Coal LNG (Right-hand Scale) Note: Preliminary figures are used for August and September, 2015.
33 [Reference] Schedules for Corporate Bond Redemption (Non-consolidated) 27 (Billion Yen) * 2 *1 Foreign currency-denominated bond (Breakdown) *2 Private bond (Breakdown) * 1 * 2 * 2 * 2 * 2 * 2 * 2 Note: The amount redeemed for Apr-Sep of fiscal 2015 totaled billion yen. (FY)
34 FY2015 2nd Quarter Earnings Results Other Initiatives
35 Implementation of the Streamlining Policy 28 <Cost reduction> In the New Comprehensive Special Business Plan, TEPCO and its subsidiaries & affiliated companies will implement further cost cuts of 1,419.4 billion yen and billion yen, respectively from the previous Comprehensive Special Business Plan, and raise the target amount of ten years to 4,821.5 billion yen and billion yen, respectively. The targets of TEPCO and its subsidiaries & affiliated companies for FY2015 are billion yen and 34.3 billion yen, respectively. The prospect of achieving these targets will be determined around the end of The Productivity Doubling Committee works to accelerate activities for doubling TEPCO s productivity by focusing around the Productivity Doubling Projects directed by Mr.Uchikawa, Special Advisor of TEPCO, who was a former managing director at Toyota. <Asset disposal> Accumulated grand total of FY2011 to FY2013 regarding disposal of real estate, securities and subsidiaries & affiliated companies, which was the target set in the previous Comprehensive Special Business Plan, was achieved. Maximum efforts will continue to be made aiming most efficient business operation on the basis of growth strategies from the New Comprehensive Special Business Plan. <Streamlining Policy of New Comprehensive Special Business Plan (cost reduction)> TEPCO Subsidiaries & Affiliated Companies Plan from FY2013 to FY2022 4,821.5 billion yen to be reduced over ten years (including additional cost cuts from the previous Comprehensive Special Business Plan of 1,419.4 billion yen) billion yen to be reduced over ten years (including additional cost cuts from the previous Comprehensive Special Business Plan of billion yen) FY2014 FY2015 Plan Outcomes Plan Projection billion yen billion yen billion yen billion yen 51.1 billion yen 34.3 billion yen -
36 Efforts towards Nuclear Reform - 1 [Reference] Framework for Nuclear Reform Since April 2013, TEPCO has advanced the Nuclear Safety Reform Plan so that we may realize our determination that the Fukushima nuclear accident will never be forgotten and we will be a nuclear operator which continues to create unparalleled safety and increase the level of that safety to be greater today than yesterday and still greater tomorrow than today TEPCO reports the state of progress of the Reform Plan to the Nuclear Reform Monitoring Committee, approved The Reassessment of Fukushima Nuclear Accident and Nuclear Safety Reform Plan, on a regular basis. The Reform Plan is steadily implemented on the basis of the initiatives proposed by the Committee. <Framework for Nuclear Reform> Advice Supervise/Monitor Board of Directors Suggestion Nuclear Reform Monitoring Committee (Established in September, 2012) Monitoring and supervising efforts of nuclear reform, then reporting and suggesting to the Board of Directors Dale Klein, Chairman (former Chairman of the U.S. Nuclear Regulatory Commission) Barbara Judge, Vice Chairman (former Chairman of the U.K. Atomic Energy Authority) Kenichi Ohmae, committee member Masafumi Sakurai, committee member (former member of the Nation Diet of Japan Fukushima Nuclear Accident Independent Investigation Commission) Fumio Sudo, committee member (Chairman of TEPCO) Nuclear Safety Oversight Office(Established in May, 2013) On April 1,2015, the Nuclear Safety Oversight Office, which reports to the Board of Directors, was reorganized so that it now reports directly to the President. Dealing with nuclear safety through supervising and consulting activities, but from a much closer position to the front line of nuclear plants, and also involving more directly with the decision-making process on nuclear safety Report Nuclear Reform Special Task Force (Established in September, 2012) Implementing nuclear reform under the supervision of the Committee Social Communication Office (Established in April, 2013) Instilling corporate behaviors sensitive to social standards throughout TEPCO and promoting prompt and appropriate information disclosure through routinely collecting and analyzing information on potential risks Nuclear Power & Plant Siting Division Fukushima Daiichi Decontamination & Decommissioning Engineering Company (Established in April, 2014) An internal entity established for the purpose of clarifying the responsibilities allocation and focusing solely on handling of decommissioning and contaminated water Positioning Chief Decommissioning Officer (CDO) as Company President Assigning three experienced executives invited from nuclear power manufacturers to the Vice President. In addition, as of June 30,2015, Yoshikazu Murabe, a managing director at the Japan Atomic Power Company, was brought in to serve as Senior Vice President and his responsibilities will focus on waste measures, maintaining safety at Units 5 & 6, radiation & chemical management among other duties. 29
37 Efforts towards Nuclear Reform - 2 Report on status of the Nuclear Safety Reform Plan 30 The 9th Nuclear Reform Monitoring Committee meeting was held on August 24. The Committee s evaluation was that activities at all levels from TEPCO s top management, nuclear power leaders and management down to the individual personnel in charge are functioning and nuclear safety reform is steadily progressing. Meanwhile, with regard to work safety, the Committee commented as it is important to thoroughly ensure safety at Fukushima Daiichi and all those involved including contractors have an even higher level of safety awareness and instructed TEPCO to commit itself further. The next progress report on nuclear safety reform plan covering the 2nd quarter of FY2015 is scheduled to be released in November Implemented items in second quarter Future efforts to be implemented Reform of top management Enrichment of risk communication activities Strengthening emergency response capabilities and field personnel capabilities Nuclear power leaders utilized various means such as intranet or s to convey their messages with expectations and specific goals. KPIs for message communication and employees understanding have improved. Under the policy of making all the radiation data public, it has been successively released on the TEPCO s website since April 30, with all numerical data available from August 20. Operations for releasing data have been systematized and the reliability of operations improved. The positions of Corporate Functional Area Manager (CFAM; Head Office) and Site Functional Area Manager (SFAM; Power Stations) have been established to ascertain differences compared to the world s highest level, identify issues to be resolved, formulate improvement measures and initiate activities for implementing such measures. Management observations will be stepped up in which nuclear power leaders observe actual conditions on site regarding which expectations and goals are being realized, and they will ascertain the problems which will be improved in the future. Fukushima Daiichi leaders will periodically review the status of management of radiation data releases. As releasing the data, we plan to provide brief summaries of commentary and important points about topics of strong interest to public, then provide them in press conferences and the TEPCO s website. CFAMs and SFAMs will make use of assistance provided by expert teams abroad to get activities on track without delay and improve their own capabilities as well.
38 TEPCO Group Company Branding for the New Holding Company System 31 On August 18, 2015, TEPCO finalized the new brand for TEPCO Group after the transition to a holding company system. The new brand slogan is The Energy for Every Challenge. Challenge : TEPCO aims to be the chosen partner in this industry while remaining highly competitive and fulfilling its responsibility. TEPCO will continue to provide a stable supply of electricity and moreover contribute to improving the lives of our customers. In every business field, we pledge to pursue a higher goal. Energy : Refers not only to our business domain but to our passion and power to serve people. Holding Company Tokyo Electric Power Company Holdings *Effective from April 1st, 2016 upon the founding of the Holding Company Fuel & Thermal power generation company General power transmission and distribution company Electricity retail company TEPCO Fuel & Power, Incorporated TEPCO Power Grid, Incorporated TEPCO Energy Partner, Incorporated
39 Operational Alliances with Other Companies in Retail Sector 32 In order to win out over the competition after full liberalization of the electricity market in April 2016 and increase TEPCO s corporate value, product capability needs to be created so as to continually provided attractive services as well as sales capabilities enabling the roll out and marketing of products nationwide. To that end, it is essential that we form alliances with other companies which complement our companies capabilities, therefore we will advance operational alliances with a variety of companies. In the future as well, we will proceed to study operational alliances with various companies with which a synergistic effect can be generated while having an affinity with electric power. <Activities for Forming Alliances with Various Companies> Press Releases May 8: Basic agreement concluded with Recruit Holdings Co., Ltd. and Loyalty Marketing, Inc. on a business alliance for developing online services and the provision of point services May 20: Agreement concluded on a business alliance for providing a point service with Culture Convenience Club Co., Ltd. Jun.10: Oct.5: Oct.7: Oct.14: With USEN Corporation, a joint review was started with the aim of developing sets of products that combine electricity with products and services launched by USEN Corporation as well as sales of electricity to business customers around the country With Nippon Gas Co., Ltd., agreement was concluded on an operational alliance for combined sales of electricity and gas to households and business customers nationwide With Softbank Corporation, basic agreement was signed toward a business partnership in joint sales of electricity as well as telecommunications and internet services, and new business development With Tokai Holdings Corporation, agreement was concluded on an operational alliance for electricity sales to households and business customers nationwide Oct.27: With Yamanashi Prefecture, basic agreement was signed regarding a new brand Yamanashi Power to provide inexpensive electricity to companies founded in Yamanashi Prefecture which meet certain requirements.
40 The Current Status of Fukushima Daiichi Nuclear Power Stations and Future Initiatives
41 安 全 第 福 一 島 第 一 福 島 第 安 一 全 第 一 福 島 第 一 安 全 第 一 福 島 第 一 安 全 第 安 一 全 第 一 Current Situation and Status of Units 1 through At Units 1, 2 and 3, it was evaluated that the comprehensive cold shutdown condition had been maintained, judging from the temperatures of the reactors and spent fuel pools as well as the density of radioactive materials. To facilitate the removal of spent fuel, works to remove large rubble and decontaminate inside the reactor building are underway. - To formulate fuel debris removal plan, the position of melted fuel and the condition inside the Primary Containment Vessel are under investigation using robots, elementary particle derived from cosmic radiation and others. Current Situation Primary Containment Vessel Reactor Pressure Vessel Fuel debris Building cover Water Injection Unit 1 Reactor Building Spent Fuel Pool (SFP) Blowout panel (closed) Water Injection Unit 2 Please visit our website for the latest information. Click Here. Unit 3 Unit 4 Water Injection 構 台 Cover for fuel removal クローラクレーン Vent pipe Suppression Chamber Torus room Reactor* Temperature of the bottom of RPV: / Temperature of the inside of PCV: / / 28.8 No Fuel SFP* No Fuel Works towards spent fuel removal -Dismantling of the building covers towards fuel removal from the SFP was completed. Investigation at the operating floor started. - Fuel removal plan from the SFP will be made up approximately in two years. To ensure a work area for installing large heavy-duty machines, dismantling of interfering buildings around the Reactor Building is underway. - Towards fuel removal from the SFP, the largest piece of rubble inside the pool was safely removed. - Fuel removal from the SFP completed in December, *Temperature is as of October 27, :00
42 Overview of the Mid-to-long Term Roadmap towards the Decommissioning of Fukushima Daiichi Nuclear Power Station (1) 34 - TEPCO released Mid-to-long Term Roadmap towards the decommissioning of Fukushima Daiichi Nuclear Power Station Units 1 through 4 in December, Based on the continually-revised Roadmap, TEPCO, jointly with the national government, is advancing its efforts to maintain the units' stabilization and to decommission them in safe. - In June 2015, the third revision was made. - Decommissioning is expected to complete in 30 to 40 years from completion of Step2 (in December 2011), Release of radioactive materials is under control and radiation doses are being significantly held down. < Main Points of the third revision > 1. Emphasize on risk reduction 2. Make target process (milestone) clear 3. Strengthen trusting relationship with local people and others by thorough disclosure of information 4. Further reduction of the workers exposure dose level, and to strengthen the management of the workers safety and health environment 5. Enhancement of the role of Nuclear Damage Compensation and Decommissioning Facilitation Corporation in the strategy of decommissioning technologies < Target process of removal of fuel and fuel debris of each unit > Removal of fuel from spent fuel pool Start at Unit 1 Start at Unit 2 Start at Unit 3 Removal of fuel debris Decision on policy for each Unit Determination of methods for the first Unit FY2020 FY2020 FY years later First half of FY2018 Start of the removal at the first Unit The end of 2021 Source: Cabinet and other meetings concerning decommissioning and contaminated water countermeasures (June 12, 2015)
43 Overview of the Mid-to-long Term Roadmap towards the Decommissioning of Fukushima Daiichi Nuclear Power Station (2) <Main target process of the Decommissioning> Area Previous Future efforts efforts Phase 2 (until commencement of fuel debris removal) Phase 3 (until decommissioning completed) 35 Contaminated water measures Current FY2016 FY2017 FY2018 FY2019 FY2020 Completion of Phase 2 (December 2021) Eliminate Isolate Prevent leakage Complete of Retained water processing ALPS cleanup of contaminated water etc Pump up groundwater via groundwater bypass etc Increase tanks etc Surveys of retained water in buildings etc Complete further reductions in effective dose along perimeter boundary down to 1mSv/year Commence preparations for determining long-term handling of ALPS-treated water Complete freezing closure of impermeable land-side wall / complete facing of over 90% of planned area/ Curb inflow into buildings to less than 100m3/day Store all water treated for high-level contamination in welded tanks Lower building water level / sever from recirculating Complete treatment of water retained inside buildings cooling water line / clean up and remove retained water Halve the quantity of radioactive materials in retained water Fuel removal [Removal completed at Unit 4 (Dec. 2014)] Determine methods for treating and storing the fuel removed Unit 1 Building cover dismantled etc Remove large rubbles etc Install cover etc Remove fuel Preparation Work Disassemble and renovate upper part of buildings Unit 2 Determine scope of disassmbly and renovation Select plan Plan(1) Plan(2) Install containers etc Install cover etc Remove fuel Remove fuel Unit 3 Remove large rubbles etc Install cover etc Remove fuel Fuel debris removal Waste material measures Storage management Processing /disposal Store according to dose rate classification / formulate storage management plan etc Determine removal policy Finalize removal method for initial unit Ascertain status inside reactor containment vessel / review methods for removing fuel debris etc Implement storage management in accord with storage Install volume reduction & Erect No.9 solid waste repository treatment calcinater Coordinate basic approach to treatment and disposal Ascertain properties and survey existing technology / R&D through ascertainment of properties of solid waste etc Commence removal at initial unit Remove fuel debris / review treatment and disposal methods etc Conduct technical revision of treatment and disposal Source: Cabinet and other meetings concerning decommissioning and contaminated water countermeasures (June 12, 2015)
44 Contaminated water management 36 In December 2013, the government s Nuclear Disaster Response Headquarters arranged a set of preventative and multi-tiered measures based on the three basic policies for addressing contaminated water issues. In this quarter, the countermeasures for Isolate water from contamination and Prevent leakage of contaminated water including start of subdrain operation were significantly proceeded. TEPCO will continue to decrease the risk of increase and leakage of contaminated water. <Main countermeasures> 1.Eliminate contamination sources Multi-nuclide removal equipment (ALPS) Remove contaminated water in the trenches 2.Isolate water from contamination Pump up groundwater for bypassing Pump up groundwater near buildings Land-side frozen impermeable walls Waterproof pavement < Major Progress> Please visit our website for the latest information. Click Here. Start of Subdrain Operation Pumping up groundwater near building(subdrain system) started on Sep. 3. The water pumped up are discharged after purification by dedicated facilities and its quality verification from Sep.14. The volume of groundwater entering the reactor basement is expected to drop to 150 m 3 a day, together with bypassing. Land-side frozen impermeable walls From Apr. 30, the freezing functioning test is underway. On Sep. 15, preparation for freezing was completed on three mountain sides which will be frozen first. Sea-side impermeable walls The opening part that was left in the seaside impermeable walls was started to be closed on Sep. 10. (Completed on Oct. 26) 3.Prevent leakage of contaminated water Soil improvement by sodium silicate Sea-side impermeable walls Increase tanks (welded-joint tanks)
45 Our Commitment to Nuclear Damage Compensation 37 - To facilitate prompt and fair compensation for nuclear damages, TEPCO continues to set and announce its own detailed compensation guidelines and procedures to individuals and business entities based on Government s Interim Guideline which comprehensively clarify certain types and ranges of damages to be compensated. - Cumulative amount of compensations (including both permanent and temporary) already paid out totals approximately 5,418.3 billion yen as of October 16, <Types of damages presently compensated by TEPCO> Individual Business Entities Types of Damages - Expenses for radiation inspection - Expenses for evacuation - Expenses for temporary return - Expenses for permanent return - Physical damages - Mental distress - Opportunity losses on salary of workers - Losses or damages on tangible assets - Damages caused by voluntary evacuations - Housing assurance damages - Expenses for voluntary decontamination, etc. - Opportunity losses on businesses - Expenses for radiation inspection of commodity - Damages due to groundless rumor - Indirect business damages - Losses or damages on tangible assets -Expenses for voluntary decontamination,etc. (As of October 16, 2015) <Progress in Permanent Compensation Payout> Individual Individual (for voluntary evacuation) Business Entities Cumulative amount of permanent compensations Cumulative Number of Payouts for Permanent Compensation approx. 737,000 approx. 1,294,000 - approx. 314,000 (As of October 16, 2015) Payout as Permanent Compensation (billion yen) approx. 2,449.7 approx approx. 2,461.9 approx. 5,265.2 Note: Cumulative amount of compensations (including both permanent and temporary ) already paid out totals approximately 5,418.3 billion yen
46 Compensation Support by Nuclear Damage Compensation and Decommissioning Facilitation Corporation - After the enactment of the Nuclear Damage Liability Facilitation Fund Act, the Fund was officially established in September Due to the partial revision of the Nuclear Damage Liability Facilitation Fund Act in May 2014, the Fund is to be reorganized into the Nuclear Damage Compensation and Decommissioning Facilitation Corporation (NDF). - To receive a financial assistance of NDF, the nuclear operator is required to prepare/modify the special business plans jointly with NDF and receive the approval of the competent minister. 38 Government Guarantee Financial institutions Repayment Loan, etc. Repayment to Treasury Facilitating compensation payment, e.g. establishing a compensation information desk NDF Management Committee Compensation Department Engineering Committee for Decommissioning Decommissioning Department Government <Special financial assistance system> TEPCO 4. Provide special financial assistance NDF Granting Government bond Ensure implementation of special business plan 1. Jointly prepare and submit special business plan 2. Certify special business plan 3. Grant government bonds Gov t Note: When preparing a special business plan, NDF shall strictly evaluate TEPCO s assets, thoroughly review its business operations, and check that its request for cooperation of parties concerned is appropriate and sufficient. Affected people / businesses Framework of mutual support Granting of funds, etc. General & special contribution General contributions Compensation TEPCO Claim Other nuclear operators (Electricity utilities, etc.) Loan of Funds, Share Subscription, Acquisition of Bonds, etc. (for cost of settlement of the accident, capital investment for stable electricity supply, etc.) <Contents of special business plan> 1. Circumstances of nuclear damage 2. Forecast of compensation amount and compensation procedure 3. Mid-term Plans concerning the Business and the Balance of Payments 4. Measures for rationalization of management 5. Measures to request cooperation of relevant parties 6. Evaluation of assets and income/expenditure conditions 7. Measures to clarify management responsibility 8. Contents and amounts of financial assistance, etc. (Source) METI website
47 The Current Status of Kashiwazaki-Kariwa Nuclear Power Station and Future Initiatives
48 Main Measures to Secure Safety (1) [Outline] 39 We promote the following measures to secure further safety after the Tohoku-Chihou-Taiheiyo-Oki Earthquake. I. Installation of flooding embankment [banks] - Install flooding embankment (banks) to prevent Tsunami from invading the site and to protect light oil tanks, buildings and other facilities in the power station III. Further enhancement of heat removal and cooling function (5) Installation of alternative submerged pumps and seawater heat exchanging system - Install alternative submerged pumps and other equipments to continue to operate residual heat removal system even if cooling function of sea water system is lost Seawater To reactor buildings III. Further enhancement of heat removal and cooling function (8) Installation of top venting on reactor buildings - Install top venting system to prevent hydrogen from piling up in a reactor buildings Transmission 送 電 線 line 予 Spare 備 回 line 線 ( 東 北 電 力 殿 所 管 ) III. Further enhancement of heat removal and cooling function (1)Installation of water source - Install a freshwater reservoir in the power station to secure stable supply of coolant water for reactors and spent fuel pools 海 水 淡 水 熱 交 換 器 Pure Filtered water water 純 水 ろ 過 水 tank tank タンク タンク ろ 過 水 タンク Filtered water tank II. Countermeasures against Inundation into buildings (1) Installation of tide embankments (flood barrier panel included) - Install tide embankments around reactor buildings containing critical equipments in order to prevent Tsunami from damaging power facilities and emergency diesel generators and to secure safety of the power plant (Image of tide embankment and flood barrier panel) Tide embankment Heat exchanger 熱 交 換 器 building 建 屋 タービン 建 屋 Reactor 原 子 炉 building 建 屋 II. Countermeasures against Inundationinto buildings (2) Installation of water tight doors - Install water tight doors at reactor buildings and turbine buildings to protect equipments from water III. Further enhancement of heat removal and cooling function (12) Installation of warehouses for emergency on high ground - Install a warehouse for equipments and materials for emergency in case of Flood barrier panel Tsunami III. Further enhancement of heat removal and cooling function (7) Installation of filtered vent - Control of radioactive pollution emitted upon containment vessel venting - Installation of underground filtered vent for backfitting III. Further enhancement of heat removal and cooling function (11) Additional environment monitoring equipments and monitoring cars - Prepare additional monitoring cars to continuously measure radiation dose at the site III. Further enhancement of heat removal and cooling function (3) Additional installation of air-cooling gas turbine power generation cars - Install large capacity gas turbine power generation cars to supply electricity to residual heat removal 大 湊 側 system in case of outage of all AC power (4) Installation of high voltage power distribution board for emergency and permanent cables for reactor buildings - Install high voltage power distribution board for emergency and permanent cables for reactor buildings to secure power supply in case of station black out (losing all AC power), and to secure stable supply of power to residual heat removal system 荒 浜 側
49 Main Measures to Secure Safety (2) [Implementation Status] 40 As of October 21, 2015 Item Unit 1 Unit 2 Unit 3 Unit 4 Unit 5 Unit 6 Unit 7 I. Installation of flooding embankment [banks] Completed Completed II. Countermeasures against inundation into buildings (1) Installation of tide embankments (flood barrier panel included) Completed Completed Completed Completed (2) Installation of water tight doors on reactor buildings, etc. Completed Under consideration Under construction Under consideration Completed Completed Completed (3) Countermeasures against inundation into heat exchanger buildings Completed Completed Completed Completed Completed (4) Installation of tide barriers for switching stations *1 (5) Reliability improvement of inundation countermeasures (countermeasures against flooding inside buildings) III. Further enhancement of heat removal and cooling function (1) Installation of water source Under construction Under consideration Under construction Under consideration Under construction Under construction Under construction (2) Installation of storage water barrier Completed Under consideration Under consideration Under consideration Completed Completed Completed (3) Additional installation of air-cooling gas turbine power generation cars (4)-1 Installation of high voltage power distribution board for emergency Completed Completed Completed Completed All closed under 15 meters above sea level (4)-2 Installation of permanent cables for reactor buildings Completed Completed Completed Completed Completed Completed Completed - (5) Installation of alternative submerged pumps and seawater heat exchanging system Completed Completed Completed Completed Completed Completed Completed (6) Installation of alternative high pressure water injection system *1 Under construction Under consideration Under consideration Under consideration Under construction Under construction Under construction (7) Installation of aboveground filter vent Under construction Under consideration Under consideration Under consideration Under construction Termination of performance test* 2 Termination of performance test* 2 (8) Installation of top venting on reactor buildings Completed Completed Completed Completed Completed Completed Completed (9) Installation of hydrogen treatment system in reactor buildings Completed Under consideration Under consideration Under consideration Completed Completed Completed (10) Installation of facilities to fill water up to the top of containment vessels Completed Under consideration Under consideration Under consideration Completed Completed Completed (11) Additional environment monitoring equipments and monitoring cars (12) Installation of warehouses for emergency on high ground *1 (13) Improvement of earthquake resistance of pure water tanks on the Ominato side (14) Preparation of concrete pump cars, etc. (15) Reinforcement of access roads (16) Environmental improvement of the seismic isolated building (17) Reinforcement of the bases of transmission towers *1 and earthquake resistance of the switchboards *1 (18) Installation of tsunami monitoring cameras *1 TEPCO s voluntary safety measures *2 Peripheral works are ongoing. - Under construction Under construction Completed Completed Completed Under construction Completed Completed Under construction Completed
50 Compliance Review under the New Regulatory Requirements(1) 41 - In November 2013, the Nuclear Regulation Authority (NRA) started plant and earthquake/tsunami countermeasures reviews as to the compliance under the New Regulatory Requirements for the Kashiwazaki-Kariwa Nuclear Power Station Units 6 and 7. - TEPCO is planning to install underground filter vent facilities in addition to the aboveground filter vent facilities. On December 24, 2013, TEPCO submitted a revised version of the general outline of the plan regarding filter vent facilities to Niigata Prefecture and submitted documents seeking advance agreement to Kashiwazaki City and Kariwa Village concerning the underground filter vent facilities. After that, TEPCO received the advance agreement from Kariwa Village and Kashiwazaki city on February 3, 2014 and February , respectively. - TEPCO will comply with the Safety Agreement and will continue future discussion with Niigata Prefecture and the local governments and will make every effort to improve our delivery of easy-to-understand information. <Review Process> NRA 2013/7/8 Enforcement on New Regulatory Requirements TEPCO 2013/9/27 Submission of Application Application for permission for change in reactor installation license Application for approval of construction plan Application for approval of operational safety programs 2013/11/21~ Review Meeting( plant review / earthquake/tsunami countermeasures review) Present Draft permission report Permission Approval Inspection before reactor start-up Approval Application Application for permission for change in reactor installation license Application for approval of construction plan Application for approval of operational safety programs
51 Compliance Review under the New Regulatory Requirements(2) 42 - At Review Meeting on August 6, 2015, Kashiwazaki-Kariwa Nuclear Power Station Units 6 and 7 were selected as plants for intensive review. <Review Status regarding Plant Examination> Since the beginning, the reviews of five BWR plants had been conducted all together. However, at Review Meeting on August 6, 2015, NRA (Nuclear Regulation Authority) decided to select Kashiwazaki-Kariwa Nuclear Power Station Units 6 and 7 as plants reviewed intensively. Since the intensive review started, the speed of review has been accelerated. Currently, TEPCO is committed to explain about the findings put forth by NRA in Review Meetings. 64 Review Meetings and 214 hearings regarding plant examinations were held as of October 21, <Review Status regarding Earthquake/Tsunami Countermeasures Examination> As to the possibility for the activity of all the faults found beneath the power station site and its vicinity, NRA conducted the third field survey of TEPCO s additional investigations on March 17, ( First survey: Feb , 2014 Second survey: Oct , 2014) At Review Meetings, TEPCO has been reporting the assessment of geological condition/ground stability, earthquake ground motion, tsunami and volcano. 21 Review Meetings and 56 hearings regarding earthquake/tsunami countermeasures examinations were conducted as of October 21, 2015.
Financial Summary 3rd quarter of FY2012. January 29, 2013 Tohoku Electric Power Co., Inc.
Financial Summary FY2012 January 29, 2013 Tohoku Electric Power Co., Inc. Contents 1. Summary of the FY2012 Results 2. Electricity Sales 3. Large Industry Sector 4. Electricity Generated and Purchased,
FY2015 Financial Results
FY2015 Financial Results Supplemental Material April 27, 2016(Wed) Regarding Forward-Looking Statements(Performance Projections) Certain statements in the following presentation regarding Hokuriku Electric
Presentation on Results for the 2nd Quarter FY 2015. Idemitsu Kosan Co.,Ltd. November 4, 2015
Presentation on Results for the 2nd Quarter FY 2015 Idemitsu Kosan Co.,Ltd. November 4, 2015 Table of Contents 1. 2 nd Quarter FY 2015 Financials (1) Overview (2) Segment Information (3) Streamlining 2.
Consolidated and Non-Consolidated Financial Statements
May 13, 2016 Consolidated and Non-Consolidated Financial Statements (For the Period from April 1, 2015 to March 31, 2016) 1. Summary of Operating Results (Consolidated) (April 1,
Presentation on Results for FY 2015. Idemitsu Kosan Co.,Ltd. May 10, 2016
Presentation on Results for FY 2015 Idemitsu Kosan Co.,Ltd. May 10, 2016 Table of Contents 1. FY 2015 Financials (1) Overview (2) Segment Information 2. Forecast for FY 2016 Performance (1) Overview (2)
CHIYODA CORPORATION Financial Results for Fiscal 2004 Third Quarter Ended December 31, 2004
CHIYODA CORPORATION Financial Results for Fiscal 2004 Third Quarter Ended December 31, 2004 This document has been prepared as a guide to non-japanese investors and contains forwardlooking statements that
Brief Statement of the Third Quarter Financial Results for the Fiscal Year Ending March 2016 [Japanese GAAP (Consolidated)]
(Translation for reference only) In the event of any discrepancy between this translated document and the original Japanese document the original document shall prevail. Brief Statement of the Third Quarter
FOR IMMEDIATE RELEASE February 4, 2016
FOR IMMEDIATE RELEASE February 4, 2016 Toshiba Announces Consolidated Results for the First Nine Months and Third Quarter of Fiscal Year Ending March 2016 TOKYO Toshiba Corporation (TOKYO: 6502) today
November 4, 2015 Consolidated Financial Results for the Second Quarter of Fiscal Year 2015 (From April 1, 2015 to September 30, 2015) [Japan GAAP]
November 4, 2015 Consolidated Financial Results for the Second Quarter of Fiscal Year 2015 (From April 1, 2015 to September 30, 2015) [Japan GAAP] Company Name: Idemitsu Kosan Co., Ltd. (URL http://www.idemitsu.com)
Fiscal year ending March 2008 3rd Quarter Financial Results (cumulative)
Fiscal year ending March 2008 3rd Quarter Financial Results (cumulative) January 2008 Osaka Gas Co., Ltd 1 I. Consolidated results for 3rd quarter and full-year forecast Management information is available
New Comprehensive Special Business Plan. Tokyo Electric Power Company [January 15, 2014]
New Comprehensive Special Business Plan Tokyo Electric Power Company [January 15, 2014] INTRODUCTION The New Comprehensive Special Business Plan replaces the previous Comprehensive Plan. The new plan is
Financial Report for 1 st Quarter of FY2016.3 (April 2015 June 2015)
Financial Report for 1 st Quarter of FY2016.3 (April 2015 June 2015) July 2015 Osaka Gas Co., Ltd. 1 I. Business Results for 1 st Quarter of FY2016.3 Management information is available on Osaka Gas websites.
Consolidated Financial Results for the First Two Quarters of the Fiscal Year Ending March 31, 2016 (Japan GAAP)
Consolidated Financial Results for the First Two Quarters of the Fiscal Year Ending March 31, 2016 (Japan GAAP) Name of Listed Company: Yokogawa Electric Corporation (the Company herein) Stock Exchanges
Nippon Mining Holdings, Inc.
Supplementary Explanation for Financial Results for Fiscal 2008 - From April 1, 2008 to March 31, 2009 - April 30, 2009 Disclaimers concerning forward-looking statements are prepared on the last page of
2013 TEPCO ILLUSTRATED
2013 TEPCO ILLUSTRATED TEPCO ILLUSTRATED is an English translation of the Japanese original. If there are discrepancies between the translation and the original, the latter shall prevail. - CONTENTS -
Kurita Water Industries Reports Earnings for the First Half Ended September, 2004
FOR IMMEDIATE RELEASE Kurita Water Industries Reports Earnings for the First Half Ended September, Tokyo Japan November 4, Kurita Water Industries Ltd. (TSE Security Code 6370) announced revenue for the
of Fiscal 2006 (Consolidated)
Outline of Financial Results for the 3rd Quarter of Fiscal 2006 (Consolidated) Feb.3, 2006 For Immediate Release Company Name (URL http://www.fhi.co./jp/fina/index.html ) : Fuji Heavy Industries Ltd. (Code
Consolidated financial summary
1-8-1 Marunouchi Chiyoda-ku Tokyo 100-8289, Japan (URL http://www.daiwasmbc.co.jp/) Consolidated financial summary (For fiscal year ended March 31, 2005) April 27, 2005 (1)Consolidated Operating results
Tokyo Electric Power Company, Incorporated
TRANSLATION Please note that the following purports to be an accurate and complete translation of the original Japanese version prepared for the convenience of the Shareholders outside Japan. However,
Presentation on Results for the 1st Quarter FY 2014. Idemitsu Kosan Co.,Ltd. August 5, 2014
Presentation on Results for the 1st Quarter FY 2014 Idemitsu Kosan Co.,Ltd. August 5, 2014 Table of Contents 1. FY 2014 1 st Quarter Financials (1) Overview (2) Segment Information (3) Streamlining (4)
Notes to Consolidated Financial Statements Notes to Non-consolidated Financial Statements
This document has been translated from the Japanese original for reference purposes only. In the event of discrepancy between this translated document and the Japanese original, the original shall prevail.
Notes to the Consolidated Financial Statements for the 92nd Fiscal Term. Notes to the Non-Consolidated Financial Statements for the 92nd Fiscal Term
To Those Shareholders with Voting Rights Notes to the Consolidated Financial Statements for the 92nd Fiscal Term Notes to the Non-Consolidated Financial Statements for the 92nd Fiscal Term The above documents
February 2, 2016 Consolidated Financial Results for the Third Quarter of Fiscal Year 2015 (From April 1, 2015 to December 31, 2015) [Japan GAAP]
February 2, 2016 Consolidated Financial Results for the Third Quarter of Fiscal Year 2015 (From April 1, 2015 to December 31, 2015) [Japan GAAP] Company Name: Idemitsu Kosan Co.,Ltd. (URL http://www.idemitsu.com)
Diluted net income per share. Six months ended Sep. 30, 2012 0.40 0.39 Six months ended Sep. 30, 2011 (1.09) -
November 9, 2012 Summary of Consolidated Financial Results for the Second Quarter of Fiscal Year Ending March 31, 2013 (Six Months Ended September 30, 2012) [Japanese GAAP] Company name: Japan System Techniques
(2)Adoptions of simplified accounting methods and accounting methods particular to the presentation of quarterly financial statements: None
Financial Statement for the Six Months Ended September 30, 2015 Name of listed company: Mipox Corporation Stock Code: 5381 (URL http://www.mipox.co.jp) Name and Title of Representative: Jun Watanabe, President
Quarterly Securities Report
Quarterly Securities Report (The third quarter of the 39th fiscal year) ACOM CO., LTD. Quarterly Securities Report 1. This document has been outputted and printed by adding a table of contents and page
Overview of Business Results for the 2nd Quarter of Fiscal Year Ending March 31, 2012 (2Q FY2011)
November 8, 2011 Overview of Business Results for the 2nd Quarter of Fiscal Year Ending March 31, 2012 () Name of the company: Iwatani Corporation Share traded: TSE, OSE, and NSE first sections Company
Notes to Consolidated Financial Statements Notes to Non-Consolidated Financial Statements
This document has been translated from the Japanese original for reference purposes only. In the event of discrepancy between this translated document and the Japanese original, the original shall prevail.
Overview of Business Results for the Second Quarter of Fiscal Year Ending March 2015 [Japanese Standard Form] (Consolidated)
Overview of Business Results for the Second Quarter of Fiscal Year Ending March 2015 [Japanese Standard Form] (Consolidated) November 6, 2014 Name of the Company: Cosmo Oil Co., Ltd. Shares traded:tse
Summary of Financial Results for the Third Quarter of Fiscal Year Ending March 31, 2009 (Nine Months Ended December 31, 2008)
February 5, 2009 Summary of Financial Results for the Third Quarter of Fiscal Year Ending March 31, 2009 (Nine Months Ended December 31, 2008) Company name: KOSÉ Corporation Stock listing: Tokyo Stock
Consolidated Financial Results for the Six Months Ended September 30, 2013 Japanese Standards
Consolidated Financial Results for the Six Months Ended September 30, 2013 Japanese Standards October 31, 2013 Summary of Quick Financial Announcement of Consolidated Financial Information For the Second
Closing Announcement of First Quarter of the Fiscal Year Ending March 31, 2009
Member of Financial Accounting Standards Foundation Closing Announcement of First Quarter of the Fiscal Year Ending March 31, 2009 Name of Listed Company: Arisawa Mfg. Co., Ltd. Listed on the 1st Section
Activities of Nuclear Damage Compensation & Decommissioning Facilitation Corporation (NDF) Yasuharu Igarashi
Nuclear Damage Compensation and Decommissioning Facilitation Corporation Activities of Nuclear Damage Compensation & Decommissioning Facilitation Corporation (NDF) June 3, 2015 Yasuharu Igarashi Executive
Consolidated Financial Results (Japanese Accounting Standards) for the First Half of the Fiscal Year Ending February 28, 2013
Consolidated Financial Results (Japanese Accounting Standards) for the First Half of the Fiscal Year Ending February 28, 2013 September 27, 2012 Company name Aeon Mall Co., Ltd. Listings The First Section
Highlights of 1H FY2015 Results. November 18, 2015
Highlights of 1H FY2015 Results November 18, 2015 Table of Contents 1. Trend of business results 3. Domestic life insurance Summary of 1H FY2015 results 3 Overview of 1H FY2015 results Himawari Life 27
Consolidated Financial Results for the Six Months Ended September 30, 2015 [Japanese GAAP]
Consolidated Financial Results for the Six Months Ended September 30, 2015 [Japanese GAAP] November 6, 2015 Company name: Shibaura Electronics Co., Ltd. Stock exchange listing: Tokyo Stock Exchange Code
Consolidated Summary Report of Operating Results for the First Quarter of Fiscal 2011 (Year ending December 2011) [Japan GAAP]
April 26, 2011 Consolidated Summary Report of Operating Results for the First Quarter of Fiscal 2011 (Year ending December 2011) [Japan GAAP] Company name: Future Architect, Inc. Shares listed on: First
Consolidated Financial Results for the First Three Quarters of the Fiscal Year Ending March 31, 2016 (Japan GAAP)
Consolidated Financial Results for the First Three Quarters of the Fiscal Year Ending March 31, 2016 (Japan GAAP) Name of Listed Company: Yokogawa Electric Corporation (the Company herein) Stock Exchanges
Summary of Financial Statements (J-GAAP) (Consolidated)
Summary of Financial Statements (J-GAAP) (Consolidated) February 10, 2016 Company Name: Sodick Co., Ltd. Stock Exchange: Tokyo Stock Exchange, 1st Section Code Number: 6143 URL: http://www.sodick.co.jp
Consolidated Settlement of Accounts for the First 3 Quarters Ended December 31, 2011 [Japanese Standards]
The figures for these Financial Statements are prepared in accordance with the accounting principles based on Japanese law. Accordingly, they do not necessarily match the figures in the Annual Report issued
1. Highlights of Consolidated Results through Third Quarter of Fiscal Year ending March 31, 2010 (1) Statements of Income
Financial Results through Third Quarter of Fiscal Year ending March 31, 2010 (All financial information has been prepared in accordance with generally accepted accounting principles in Japan) English translation
Rating Methodology by Sector. Electric Power
Last updated: April 23, 2015 Rating Methodology by Sector Electric Power 1. Business base Vital to public interest, the electric power industry is regulated and protected by the government in its role
The integrity evaluation of the reactor building at unit4 in the Fukushima Daiichi nuclear power station
The integrity evaluation of the reactor building at unit4 in the Fukushima Daiichi nuclear power station May 2012 Government and TEPCO s Mid-to Long Term Countermeasure Meeting Management Council Outline
Summary Statement of Second Quarter Settlement of Accounts Fiscal Year Ending March 31, 2009
JASDAQ November 7, 2008 Summary Statement of Second Quarter Settlement of Accounts Fiscal Year Ending March 31, 2009 Listed Company Name: Plaza Create Co., Ltd. Listed Market: JASDAQ Code Number: 7502
Consolidated Financial Results for the First Quarter of the Fiscal Year Ending March 31, 2016 (Japan GAAP)
Consolidated Financial Results for the First Quarter of the Fiscal Year Ending March 31, 2016 (Japan GAAP) Name of Listed Company: Yokogawa Electric Corporation (the Company herein) Stock Exchanges Where
FINANCIAL RESULTS FOR THE THREE MONTH ENDED JUNE 2013
FINANCIAL RESULTS FOR THE THREE MONTH ENDED JUNE 2013 Based on US GAAP Mitsubishi Corporation 2-3-1 Marunouchi, Chiyoda-ku, Tokyo, JAPAN 100-8086 http://www.mitsubishicorp.com/ Mitsubishi Corporation and
FINANCIAL RESULTS FOR THE THREE MONTHS ENDED JUNE 2015
FINANCIAL RESULTS FOR THE THREE MONTHS ENDED JUNE 2015 Mitsubishi Corporation 2-3-1 Marunouchi, Chiyoda-ku, Tokyo, JAPAN 100-8086 http://www.mitsubishicorp.com/ FINANCIAL HIGHLIGHTS FOR THE THREE MONTHS
Financial Results for the First Quarter Ended June 30, 2014
July 28, 2014 Company name : Nissan Motor Co., Ltd. Code no : 7201 (URL http://www.nissan-global.com/en/ir/) Representative : Carlos Ghosn, President Contact person : Joji
Consolidated Financial Results for the Second Quarter of the fiscal year ending March 31, 2012
Consolidated Financial Results for the Second Quarter of the fiscal year ending March 31, 2012 November 1, 2011 Company name : NTT DATA Corporation Stock exchange on which the Company s shares are listed
Consolidated Financial Review for the Second Quarter Ended September 30, 2014
Consolidated Financial Review for the Second Quarter Ended September 30, 2014 TOKYO ELECTRON Oct 29, 2014 Company name: Tokyo Electron Limited URL: http://www.tel.com Telephone number: (03) 5561-7000 Stock
SUPPLEMENTAL INVESTOR INFORMATION. Fourth Quarter 2012
SUPPLEMENTAL INVESTOR INFORMATION Fourth Quarter 2012 Kevin Bryant Tony Carreño VP Investor Relations and Strategic Director Investor Relations Planning & Treasurer 816-556-2782 816-654-1763 [email protected]
Consolidated Financial Statements
Consolidated Financial Statements For the year ended February 20, 2016 Nitori Holdings Co., Ltd. Consolidated Balance Sheet Nitori Holdings Co., Ltd. and consolidated subsidiaries As at February 20, 2016
Consolidated Financial Results for the Fiscal Year Ended March 31, 2016 [under Japanese GAAP]
This English version is a translation of the original Japanese document and is only for reference purposes. In the case where any differences occur between the English version and the original Japanese
Materials for FY2015 1Q Results Briefing - Conference Call. Aug. 7, 2015 (Fri)
Materials for FY2015 1Q Results Briefing - Conference Call Aug. 7, 2015 (Fri) Contents Summary of FY 2015 1Q Results Consolidated Earnings for FY 2015 1Q Page 1-4 Domestic Non-life Insurance Companies
Consolidated Financial Summary under IFRS for the fiscal year ending March 31, 2015 (April 1, 2014 - March 31, 2015)
Monex Group, Inc. Consolidated Financial Summary under IFRS for the fiscal year 2015 (April 1, 2014 - March 31, 2015) This is an English translation of Japanese report of the consolidated financial summary
INFORMATION DEVELOPMENT CO., LTD.
INFORMATION DEVELOPMENT CO., LTD. Financial results of Apr. 2014-Mar. 2015 June 2015 President and Representative Director Masaki Funakoshi TSE 1st section Code:4709 1 Today s Presentation 1. Performance
26 October 2005 Summary of Non-consolidated Financial Statements for the First Half of the Financial Year Ending 31 March 2006
26 October 2005 Summary of Non-consolidated Financial Statements for the First Half of the Financial Year Ending 31 March 2006 Listed company s name: Shinko Securities Co., Ltd. Listing stock exchanges:
REFERENCE: Concept of Total Cost Calculation
REFERENCE: Concept of Total Cost Calculation 0 Total Cost is the total value of s required to provide all customers with power including regulated and deregulated sectors in the calculation period *1 based
The Sumitomo Warehouse Co., Ltd.
Consolidated Financial Results for the Year Ended March 31, 2014[ Japan GAAP ] May 13, 2014 The Sumitomo Warehouse Co., Ltd. Securities code: 9303 Stock exchange listings: URL: Representative: Inquiries:
Comprehensive Special Business Plan (Outline)
This is the English translation of the original Japanese version. If there are any discrepancies, the Japanese version shall prevail. Comprehensive Special Business Plan (Outline) May, 2012 This Plan has
Notes to Consolidated Financial Statements Year ended March 31, 2014
Notes to Consolidated Financial Statements Year ended March 31, 2014 Mitsui Oil Exploration Co., Ltd. and Consolidated Subsidiaries 1. Basis of Presenting Consolidated Financial Statements The accompanying
(2) Adoption of special accounting methods for preparing quarterly consolidated financial statements: No
Consolidated Financial Results for the 1st Nine Months of FY 2012 [Japanese GAAP] February 6, 2013 Listed company name EDION Corporation Listed on first sections of Tokyo and Nagoya Stock Exchanges Code
Consolidated Financial Results for Fiscal Year 2013 (April 1, 2013 March 31, 2014)
Consolidated Financial Results for Fiscal Year 2013 (April 1, 2013 March 31, 2014) 28/4/2014 Name of registrant: ShinMaywa Industries, Ltd. Stock Exchange Listed: Tokyo Code number: 7224 (URL: http://www.shinmaywa.co.jp
Mitsubishi Electric Announces Consolidated Financial Results for the First 9 Months and Third Quarter of Fiscal 2016
MITSUBISHI ELECTRIC CORPORATION PUBLIC RELATIONS DIVISION 7-3, Marunouchi 2-chome, Chiyoda-ku, Tokyo, 100-8310 Japan FOR IMMEDIATE RELEASE No. 2989 Investor Relations Inquiries Investor Relations Group
FY 2012 SECOND QUARTER (CUMULATIVE) CONSOLIDATED FINANCIAL RESULTS (April 1, 2012 to September 30, 2012)
FY 2012 SECOND QUARTER (CUMULATIVE) CONSOLIDATED FINANCIAL RESULTS (April 1, 2012 to September 30, 2012) 1.Company Name : SANKEN ELECTRIC CO., LTD. 2.Code NO : 6707 3.Headquarters : 363 Kitano, Niizashi,
Summary of Consolidated Financial Statements for the Second Quarter of Fiscal Year Ending March 31, 2012 (Japanese GAAP)
This document is a translation of the Japanese financial statements and is not in conformity with accounting principles of the United States. Summary of Consolidated Financial Statements for the Second
The 14th Ordinary General Meeting of Shareholders Matters for Internet Disclosure
To Shareholders The 14th Ordinary General Meeting of Shareholders Matters for Internet Disclosure The 14th Business Period from April 1, 2015 to March 31, 2016 Notes to Consolidated Financial Statements
Consolidated results for the third Quarter Period in FY2014
Consolidated results for the third Quarter Period in FY2014 2014/2/7 Company Name Watami Co., Ltd. Listing: First Section of Tokyo Stock Exchange Code Number 7522 URL http://www.watami.co.jp/ Representative
Mitsubishi Electric Announces Consolidated Financial Results for the First Quarter of Fiscal 2017
MITSUBISHI ELECTRIC CORPORATION PUBLIC RELATIONS DIVISION 7-3, Marunouchi 2-chome, Chiyoda-ku, Tokyo, 100-8310 Japan FOR IMMEDIATE RELEASE No. 3040 Investor Relations Inquiries Investor Relations Group,
(Consolidated) Gas sales volume 8,459 million m 3 (+1.8%) Electricity Sales Volume 8,242 million kwh(-2.4%)
Osaka Gas Group s Business Plan for March 11, 2015 Osaka Gas Co., Ltd. 1. Priority issues in In FY2016.3, we intend to steadily implement Catalyze Our Dreams, our Medium-term Business plan announced in
March 10, 2011 Company name:
Second Quarter Financial Results For the Six Months Ended January 31, 2011-[Japanese Standards]Consolidated March 10, 2011 Company name: Dr. Ci:Labo Co., Ltd. Shares listed on: The First Section of the
Interim Consolidated Financial Statements (Unaudited)
Interim Consolidated Financial Statements (Unaudited) For the Six Months Ended, NTT FINANCE CORPORATION This document has been translated and reclassified from a part of the Japanese
Japan Exchange Group, Inc. and Consolidated Subsidiaries Consolidated financial results for nine months ended December 31, 2012, unaudited
January 3, 213 Japan Exchange Group, Inc. and Consolidated Subsidiaries Consolidated financial results for nine months ended December 31, 212, unaudited Company name: Japan Exchange Group, Inc. (Previous:
Financial Highlights for the Fiscal Year Ended March 31, 2016 May 13, 2016
Financial Highlights for the Fiscal Year Ended March 31, 2016 May 13, 2016 Japan Post Holdings: Financial Highlights Results of Operations for the Fiscal Year Ended March 31, 2016 Japan Post Holdings (Consolidated)
Consolidated Financial Results for the Third Quarter Ended December 31, 2014
Consolidated Financial Results for the Third Quarter Ended February 3, 2015 SHARP CORPORATION Stock exchange listings: Tokyo Code number: 6753 URL: http://www.sharp.co.jp/ Representative: Kozo Takahashi,
(2) Application of special accounting treatments for quarterly financial statements: Yes
Name of listed company: JSR Corporation Code # 4185 Representative: Mitsunobu Koshiba, President Consolidated Business Results for the 1st Half, FY March 2015 Stock Exchange: Tokyo URL http://www.jsr.co.jp
Materials for FY2015 3Q Results Briefing - Conference Call. Feb. 15, 2016 (Mon)
Materials for FY2015 3Q Results Briefing - Conference Call Feb. 15, 2016 (Mon) Contents Summary of FY 2015 3Q Results Consolidated Earnings for FY 2015 3Q Page 1-4 Domestic Non-life Insurance Companies
Notes to Consolidated Financial Statements Notes to Non-Consolidated Financial Statements
[Translation: Please note that the following purports to be a translation from the Japanese original Notice of Convocation of the Annual General Meeting of Shareholders 2013 of Chugai Pharmaceutical Co.,
Net income Per share (diluted)
July 31, 2015 Consolidated Financial Results (Japanese Accounting Standards) for the Three Months Ended June 30, 2015 (Q1 FY2015) (English Translation) Company name: KAMEDA SEIKA CO., LTD. Stock exchange:
Financial Results for the Nine-Month Period Ended March 31, 2013
Financial Results for the Nine-Month Period Ended March 31, 2013 May 14, 2013 Company name: ZERO CO., LTD. Code No: 9028 Tokyo Stock Exchange (Second Section) (URL http://www.zero-group.co.jp/) Representative:
Data Compilation Financial Data
Data Compilation Financial Data CONTENTS 1. Transition of Significant Management Indicators, etc. Japan Post Group (Consolidated) 122 Japan Post Holdings Co., Ltd. (Non-consolidated) 122 Japan Post Co.,
FINANCIAL SUMMARY. (All financial information has been prepared in accordance with U.S. generally accepted accounting principles)
FINANCIAL SUMMARY FY2015 First Quarter (April 1, 2014 through June 30, 2014) English translation from the original Japanese-language document TOYOTA MOTOR CORPORATION FY2015 First Quarter Consolidated
Financial Results for the Six Months Ended December 31, 2015 [Japanese GAAP] (Non-consolidated)
Financial Results for the Six Months Ended December 31, 2015 [Japanese GAAP] (Non-consolidated) Company name: WELLNET CORPORATION Stock exchange listing: Tokyo Stock Exchange Code number: 2428 URL: http://www.well-net.jp
Consolidated Financial Summary for the Six Months Ended September 30, 2008
Member of Financial Accounting Standards Foundation Consolidated Financial Summary for the Six Months Ended September 30, 2008 Date: November 11, 2008 Name of Listed Company: NOK Corporation Securities
Consolidated Financial Statements for the Third Quarter of the Fiscal Year Ending March 31 st, 2016 (FY2016), Japan GAAP February 9 th, 2016
Consolidated Financial Statements for the Third Quarter of the Fiscal Year Ending March 31 st, 2016 (FY2016), Japan GAAP February 9 th, 2016 Company Name Tokyo Seimitsu Co., Ltd. Stock Listing: First Section,
Consolidated Management Indicators
Consolidated Management Indicators Isetan Mitsukoshi Holdings Ltd., Consolidated Subsidiaries and Affiliated Companies Net sales Gross profit Selling, general and administrative expenses Operating income
Damage of Fukushima Nuclear Accident and a new compensation scheme
Damage of Fukushima Nuclear Accident and a new compensation scheme Kenichi Oshima College of International Relations, Ritsumeikan University SPRU, University of Sussex [email protected] 1 Contents
Consolidated Financial Results
May 19, 2006 Consolidated Financial Results for the Year Ended March 31, 2006 Company name: C. Uyemura & Co., Ltd. Stock code: 4966 Stock Exchange listing: Osaka Securities Exchange, 2 nd Section Address:
1. CONSOLIDATED OPERATING RESULTS
1. CONSOLIDATED OPERATING RESULTS (1) Qualitative Information of Consolidated Performance 1. Overview of Consolidated Performance Three months ended June 30, 2014 (From April 1, 2014 to June 30, 2014)
Consolidated Financial Report for the Third Quarter of Fiscal Year Ending March 31, 2011 [Japan GAAP]
Note) This translation is prepared and provided for readers' convenience only. In the event of any discrepancy between this translated document and the original Japanese document, the original document
Rating Methodology by Sector. Electric Power
Last updated: July 13, 2011 Rating Methodology by Sector Electric Power 1. Business base Vital to public interest, the electric power industry is regulated and protected by the government in its role as
CANON REPORTS RESULTS FOR FISCAL 1999
February 14, 2000 CANON REPORTS RESULTS FOR FISCAL 1999 1. CONSOLIDATED RESULTS Millions of yen (except per share amounts) Actual Projected 1999 1998 Change(%) 2000 Change(%) Net sales 2,622,265 2,826,269-7.2
The Kansai Electric Power Company, Incorporated and Subsidiaries
The Kansai Electric Power Company, Incorporated and Subsidiaries Consolidated Financial Statements for the Years Ended March 31, 2003 and 2002 and for the Six Months Ended September 30, 2003 and 2002 The