1 Radioactive waste managment in Estonia past, present and future Ivo Tatrik
2 Content 1. Status of ALARA 2. Decomission of Paldiski Former Navy Submarine Training Centre 3. Decomission of Tammiku disposal site 4. Future tasks
3 Status of A.L.A.R.A. Estonian state owned radioactive waste management agency Established 1995 for decommission and clean up of Former Nuclear Submarine Trainig centre in Paldiski Operates modern Interim Storage in Paldiski and is involved with decomission of Tammiku ne-su disposal facility Emergency response for orphan sources
4 Radioactive waste storage facilities in Estonia Paldiski site Tammiku disposal site
5 Paldiski site history, present, future Start of the building 1960 Reactor characterisrics Unit 1 Unit 2 Thermal power 70 MW 90 MW Reactor type PWR / BM-A PWR / BM-4 Encasement (submarine hull segment) diam. 7.5 m 9.5 m Enrichment of fuel (in 235 U) 20 % 20 % Total energy load [MWh] First criticality April 1968 Feb 1983 Shut down Jan 1989 Dec 1989 Refuelling 1980 never Operating time h h second load h Fuel removed and sent back to Russia
6 Reactors condition after leaving of Soviet troops The reactors are closed with the standard lid welded to the reactor body, all holes in the reactor lid were plugged with welded plugs Absorbers have been removed from filters of the 1st, 2nd and 3rd loops All the systems of the components, pipelines and tanks have been drained All pipelines connected with the system of the 1 st loop and the draining system were plugged with welded plugs High-pressure gas and air have been removed from cylinders and systems of the reactor compartments
7 Reactors condition after leaving of Soviet troops After tightness testing, the outside surfaces of the body and the bulkheads of the reactor compartment and platforms were painted Durability of the reactor compartments bodies prepared for prolonged storage is designed for maximum design earthquake of magnitude 6,7 by Richter scale
8 Reactors condition after leaving of Soviet troops The systems were drained, but not dried. The equipment, pipelines and tanks contain dead remaining water stock in the 1st, 2nd, 3rd and 4th loops amounting to about 1370 litres for unit #1 (360 litres inside the primary circuit), and 2285 litres for unit #2 (600 litres inside the primary circuit) Risk of dispersion of radioactivity during the next 50 years can not be ignored presence of water in primary and secondary systems may trigger corrosion provisions that have been made against humidity effects regarding primary circuit and reactor compartments is not sufficient there are systems arranged for checking efficiency of radioactivity confinement provisions fire risk is not minimised
9 EC Project for Evaluation of Management Routes for the Paldiski Sarcophagi Main purpose of the project was to define the most feasible rational management route for the two submarine reactors at Paldiski regarding the cost and radiological impact to the public and the environment Contractors: Technicatome, France and BNFL, UK Subcontractors: ALARA Ltd. and VNIPIET, Russia Recommended option was full dismantling after safe storage of 50 years. Improvement of sarcophagi system had to be carried out as soon as possible.
10 Decommissioning of the Liquid Waste Store ( ) Two tanks contained about 120 m 3 waste in total - Sand, gravel, ion exchange resins, evaporation concentrates, flocculation slurry, etc. - The dominating radionuclides were 137 Cs, 90 Sr and 60 Co, total activity about 225 GBq Totally 104 waste packages produced Facility demolished 2004
11 Decommissioning of the Solid Waste Storage Cell 4A, mainly plastic sheets and sacks, buckets and small cans etc, filled up to the roof of the cell. Dose rate < 20 Sv/h Cell 1, miscellaneous material, 8 steam generators and 9 control rods. Dose rate 5-9 msv/h Cell 5, 11 control rods, some lead containers with sealed sources and a pile of miscellaneous waste. Dose rate from > 10 Sv/h at the bottom of the cell to 200 msv/h at the roof level of building.
12 Installation and waste retriewal from SWS Low-pressure in-drum compactor for soft waste Two radio-operated cranes Hydraulic cutter TV cameras and monitors
13 Waste packages from SWS 76 pcs 1 m 3 concrete containers; 3 Control Rod Containers (CRC); Wall thickness = 525 mm Outer diameter = 1200 mm Height = 2000 mm Weight = 7600 kg 8 Steam generators; 67 pcs 200 l drums (later placed into concrete containers).
14 Dismantling of Liquid Waste Treatment Facility ( ) 16 x 30 m, five floors above the ground level, two below Sand filter cartridges, ion exchange columns, flocculation tanks, evaporators, etc. Six waste receiving tanks Two control tanks for purified water prior discharge
15 Interim storage in Paldiski site Built 1997, beside reactor sarcophagi nr. 2; Made from ferroconcrete, wall thickness 25 cm; overall dimensions: length 13,25 m; width 11,8 m; height 10 m; 2 sections each for 301 standard containers; 50% filled Metal and concrete containers with outer dimensions1,2x1,2x1,2 m; useful volume of container 1 m 3. Wall thickness 10 cm; Fits all generated institutional and Tammiku waste but not RC waste
16 EU Phare project Safe long-term storage of Paldiski sarcophagi and related dismantling activities. During the period there were several (non radiological) works done on the site under EU Phare project Safe long-term storage of Paldiski sarcophagi and related dismantling activities. The main objective of the project was to guarantee the safe storage of the reactor compartments for a period of at least 50 years. By that time Estonia should have radioactive waste disposal facility, which could accommodate waste arising from decommissioning of the reactor compartments (approximately m3). Sarcophagis monitoring programme installed.
17
18
19 Future activities Site selection project for final repository Preliminary studies for decomissioning of reactor compartments (RC) Decomissioning of RC starting at least 2040
20 Operated ; Tammiku disposal site Radon type facility (near surface); For institutional waste; Solid waste storage outer dimensions 17,8 x 7,9 x 3,3 m (below ground). Contained about 110 m 3 waste. Liquid waste tank volume 600 m 3, filled capacity 200 m 3 ;
21 Decomission of liquid waste storage (2001) Approximately 200 m 3 of liquid waste; Solid material filtered out; Radiological and chemical tests: - main isotopes C-14 and H-3; - activity of isotopes below recommended clearance levels; - chemical composition and concentration suitable for free release Decision: release to Baltic Sea after recieving licence from regulatory body; Sludge fixed in concrete; Tank demolished
22 Reasons for solid waste storage decomission Study from University of Tartu demonstrated future problems if situation stays as it is (2002); - both in farm and road construction scenarios indicated possible accumulated effective doses will exceed up to two magnitudes (250 msv/y and 26 msv/y respectivly) of maximum allowed doses (0,3 msv/y) To avoid future problems and fulfil international requirements it was decided disposal wault should be emptied and demolished; EU membership; With the help of Swedish radwaste managment company SKB were estimated possible options for waste retrieval (2005); 4 options were considered. Selected one was retrieval of waste and temporary packing on site, transport to Paldiski site and sorting and final packaging in Paldiski site.
23
24 Challenges in Tammiku Estimated total activity of facility according to documents was 60 TBq (2005). Dominating radionuclides: 137 Cs, 90 Sr and 14 C. Section 6 contained 2 metal boxes with sealed sources with dose rate 1,5 Sv/h on the box surface. Based on documents 90% of facility s activity was in these boxes. Safe retrieval, packing and transport of these boxes was primary task. Other 99% of waste LLW and VLLW
25 Environmental impact asessment (EIA) was accepted in December Licence for waste removal issued in September Retrieval, packing and transport of 2 metal boxes was made in November 2008
26 LLW and VLLW will be preliminary sorted in Tammiku if possible. Complete sorting, characterization and conditioning will be made in Paldiski site where suitable facilities were built 2007.
27 Retrieval of LLW and VLLW started 2009 and will be finished 2011.
28 Waste sorting Sealed sources Compressable waste Concrete waste Contaminated wood Liquid waste Toxic waste Biological waste
29 After waste removal there is planned facility cleaning New licence needed! Facility demolishing Environmental monitoring Green field are 2015.
30 Thank You
Treatment Centers for Radioactive Waste
Treatment Centers for Radioactive Waste TREATMENT CENTERS FOR RADIOACTIVE WASTE Introduction Nuclear facilities such as nuclear power plants, reprocessing plants, nuclear fuel cycle production units, laboratories
the French experience
VLLW disposal and management of large volume of slightly contaminated materials the French experience Nicolas Solente Very Low Level Waste disposal in France The CIRES facility in Morvilliers VLLW waste
Application Note. ipix A Gamma imager to support various applications
Application Note ipix A Gamma imager to support various applications Introduction ipix is a unique gamma imager that quickly locates low level radioactive sources from a distance and estimates the dose
Developing a Safety Case for Ontario Power Generation s L&ILW Deep Geologic Repository
Developing a Safety Case for Ontario Power Generation s L&ILW Deep Geologic Repository T. Kempe, P. Gierszewski, R. Heystee, M. Jensen and H. Leung Ontario Power Generation, Canada NEA/EC/IAEA Symposium
Radioactive Waste Management at Paks NPP
1 Radioactive Waste Management at Paks NPP Content Introduction WAC in Hungary Waste classification and characterization Data collection Transport and Final disposal 2 Facilities and Activities in Hungary
Decommissioning situation of Nuclear Power Plant in Japan
Decommissioning situation of Nuclear Power Plant in Japan April, 2015 The Japan Atomic Power Co. The Kansai Electric Power Co., Inc. General Description 1 Operational years of commercial NPP in Japan 40
Andreeva Bay Facilities for SNF Management. CEG IAEA Workshop - February 2010
Andreeva Bay Facilities for SNF Management CEG IAEA Workshop - February 2010 Presentation Outline Technical challenges at Andreeva Bay Strategic objectives and principles applied to the solution Measures
Chemical Decontamination and Fluid Handling Services
Chemical Decontamination and Fluid Handling Services Westinghouse is a global industry expert in decontamination and fluid handling processes, with proven abilities in decontamination and remediation work.
7. Chemical Waste Disposal Procedures
7. Chemical Waste Disposal Procedures Substances that Can and Cannot be Disposed of via Sink Drains or in Regular Solid Refuse Containers 1. It is prohibited to pour down a sink or floor drain, or place
UDOT SPILL PREVENTION and RESPONSE PLAN for CONSTRUCTION SITES
UDOT SPILL PREVENTION and RESPONSE PLAN for CONSTRUCTION SITES February 2014 The plan contained in the following pages was developed in part from UDOT Construction Division s Safety and Health Manual,
Activities of Nuclear Damage Compensation & Decommissioning Facilitation Corporation (NDF) Yasuharu Igarashi
Nuclear Damage Compensation and Decommissioning Facilitation Corporation Activities of Nuclear Damage Compensation & Decommissioning Facilitation Corporation (NDF) June 3, 2015 Yasuharu Igarashi Executive
Overview of the Multi-nuclide Removal Equipment (ALPS) at Fukushima Daiichi Nuclear Power Station. March 29, 2013 Tokyo Electric Power Company
Overview of the Multi-nuclide Removal Equipment (ALPS) at Fukushima Daiichi Nuclear Power Station March 29, 2013 Tokyo Electric Power Company Purpose of Installing the Multi-nuclide Removal Equipment Installation
Nuclear Waste Management in Finland
Nuclear Waste Management in Finland Facts about Finland Independent Republic since 1917 Member State of the European Union since 1995 Capital: Helsinki Neighbouring countries: Estonia, Norway, Russia and
British Nuclear Group Reactor Sites Chemistry Issues NuSAC SCR Meeting - April 4 th 2006
British Nuclear Group Reactor Sites Chemistry Issues NuSAC SCR Meeting - April 4 th 2006 Presented by: Dr Malcolm Pick, Senior Engineering Consultant, Decommissioning Support Branch, Engineering and Technical
Mechanical Engineering and Material Handling Aspects of NSDF
Mechanical Engineering and Material Handling Aspects of NSDF R. K. Gupta and A. K. Singh BARC- IAEA Regional Training Course on Development of Near Surface Disposal Facility February 15-19, 2010 Mumbai,
GUIDELINE FOR SAFETY IN THE HANDLING OF FLAMMABLE LIQUIDS
GUIDELINE FOR SAFETY IN THE HANDLING OF FLAMMABLE LIQUIDS September 2007 Replaces the July 2004 edition 1. Purpose Purpose of present Guideline is to specify conditions for the safe handling of flammable
Liquid Effluent Treatment Plant (LETP) Land Clean-Up
Liquid Effluent Treatment Plant (LETP) Land Clean-Up Frequently Asked Questions What is proposed? Magnox Ltd is proposing to remove the redundant Liquid Effluent Treatment Plant (LETP) at Harwell and to
11. Radioactive Waste Management AP1000 Design Control Document
11.4 Solid Waste Management The solid waste management system (WSS) is designed to collect and accumulate spent ion exchange resins and deep bed filtration media, spent filter cartridges, dry active wastes,
February 19, 2014. Senior Fellow, Nuclear Energy Systems & Services Division Power Systems Company
JAPAN-U.S. DECOMISSIONING AND REMEDIATION FUKUSHIMA RECOVERY FORUM February 19, 2014 Senior Fellow, Nuclear Energy Systems & Services Division Power Systems Company Toshiba global formation Information
Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management
Provisional Translation Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management National Report of Japan for the Second Review Meeting October 2005 Government
WASTE WATER TREATMENT for surface treatment applications
WASTE WATER TREATMENT for surface treatment applications Effluent an important cost factor Effluent cannot be avoided Water and compound are essential for vibratory mass finishing. During the finishing
Replacement of steam generators at Ringhals nuclear power plant.
Decommissioning of nuclear power plants Replacement of steam generators at Ringhals nuclear power plant. Photo: Börje Försäter/Hallands Bild Repairs provide experience Swedish experience of complete dismantlement
TYPICAL FIRE SAFETY INSPECTION VIOLATIONS
TYPICAL FIRE SAFETY INSPECTION VIOLATIONS The following is a list of typical violations often found by inspectors and a generic solution. You can use this list to improve the safety of your facility, to
Waste Volume Reduction by Studsvik Nuclear AB. Anders Stenmark and Bo Wirendal September 16th, 2010
Waste Volume Reduction by Studsvik Nuclear AB Anders Stenmark and Bo Wirendal September 16th, 2010 Waste Streams from Industry The Nuclear Industry generates operational waste during its lifetime as well
APPENDIX CC NUCLEAR WASTE STORAGE
APPENDIX CC NUCLEAR WASTE STORAGE APPENDIX CC NUCLEAR WASTE STORAGE MICHIEL P.H. BRONGERS 1 SUMMARY Nuclear wastes are generated from spent nuclear fuel, dismantled weapons, and products such as radio
Disposal of chemical waste must be regarded as an integral part of all research projects and teaching programs involving chemical use.
1. Purpose and Objectives This procedure provides information on the generation, collection, storage and disposal of chemical waste to ensure: that the collection, storage and disposal of chemical waste
BECHTEL JACOBS COMPANY ORR WASTE CERTIFICATION PROGRAM DOCUMENT CONTROL SYSTEM
BECHTEL JACOBS COMPANY ORR WASTE CERTIFICATION PROGRAM DOCUMENT CONTROL SYSTEM If you print the following document, this page must be attached to the front of the document and you must fill in the information
Best Basement Water Management Practices
Best Basement Water Management Practices Guide written by Patrick Sluss Sluss Construction (330) 224 5394 When a home owner is faced with a leaking basement there is a way to correct the problem and a
Lessons learned from the radiological accident in Mayapuri, New Delhi, India
Lessons learned from the radiological accident in Mayapuri, New Delhi, India Rajoo Kumar Atomic Energy Regulatory Board Government of India Mumbai, India www.aerb.gov.in 1 Contents About Mayapuri, New
THE DECOMMISSIONING OF COMMERCIAL MAGNOX GAS XA9848063 COOLED REACTOR POWER STATIONS IN THE UNITED KINGDOM
THE DECOMMISSIONING OF COMMERCIAL MAGNOX GAS XA9848063 COOLED REACTOR POWER STATIONS IN THE UNITED KINGDOM G. HOLT Magnox Electric pic, Berkeley Centre, Berkeley, Gloucestershire, United Kingdom Abstract
Spill Containment. Contents
Contents IBC Bund, Spill Pallet or Sump Pallets 3-9 IBC Spill Containment Bund - User Healthy & Safety Instructions Spill Trays, Drum Bunds & Drum Pallets 11-18 Tank Bunds 19-21 Standard Sized Bunds 22
Attachment G-1: Pit Latrine Diagram. Fig E.1a: Pit Latrine. Fig E.1b: Plan View of Twin Pits
Attachment G-1: Pit Latrine Diagram Fig E.1a: Pit Latrine Fig E.1b: Plan View of Twin Pits Fig E.1c: Section of a water-sealed pan Fig E.1d: 3D view of Overflow Pipe Fig E.1e: 2D view of Overflow Pipe
Radiological mapping and characterization at the Barsebäck nuclear power plant
Radiological mapping and characterization at the Barsebäck nuclear power plant Leif Spanier, Scandpower AB Lars Håkansson, Barsebäck Kraft AB Radiological Characterisation for Decommissioning Workshop
Waste Handling & Disposal
Objectives Cover Contain Educate Reduce/Minimize Product Substitution Description Improper storage and handling of solid wastes can allow toxic compounds, oils and greases, heavy metals, nutrients, suspended
Office for Nuclear Regulation
ONR GUIDE CONTAINMENT: CHEMICAL PLANTS Document Type: Nuclear Safety Technical Assessment Guide Unique Document ID and Revision No: NS-TAST-GD-021 Revision 2 Date Issued: March 2013 Review Date: March
Hazard Classification of the Remote Handled Low Level Waste Disposal Facility
1 Hazard Classification of the Remote Handled Low Level Waste Disposal Facility Abstract Boyd D. Christensen Battelle Energy Alliance, Idaho National Laboratory P.O. Box 1625 Idaho Falls, Idaho 83415 208
DECOMMISSIONING OF THE GEORGIA TECH RESEARCH REACTOR. Steve Marske, Robert Eby, Lark Lundberg CH2M HILL
ABSTRACT DECOMMISSIONING OF THE GEORGIA TECH RESEARCH REACTOR Steve Marske, Robert Eby, Lark Lundberg CH2M HILL Nolan Hertel, Rod Ice Georgia Institute of Technology On July 1, 1997, the Georgia Institute
Minnesota Department of Transportation Best Management Practices (BMP) for Concrete Washout May 2009, v5
Best Management Practices (BMP) for Concrete Washout The NPDES permit requires that concrete washout be managed on all construction projects. This document is Mn/DOT s interpretation of MPCA s guidance
Basic principles of radioactive waste management
Title of publication Basic principles of radioactive waste management An introduction to the management of higher activity radioactive waste on nuclear licensed sites Joint guidance from the Office of
Position paper on the implications of deep sea disposal of radioctive waste
Agenda Item 4 English only OSPAR Convention for the Protection of the Marine Environment of the North-East Atlantic Meeting of the Radioactive Substances Committee (RSC) Stockholm (Sweden): 20-23 April
Checking of quality on production
Checking of quality on production Jean CORCOS Industrial Division Industrial Waste Management Solution Unit Waste Acceptance Department, and Major-Producer Relations Denis POMBET Risk Management Division
Mechanical Systems Competency 1.20
Competency 1.20 Mechanical systems personnel shall demonstrate a working level knowledge of the safety and health fundamentals of mechanical systems and/or components. 1. Supporting Knowledge and Skills
The integrity evaluation of the reactor building at unit4 in the Fukushima Daiichi nuclear power station
The integrity evaluation of the reactor building at unit4 in the Fukushima Daiichi nuclear power station May 2012 Government and TEPCO s Mid-to Long Term Countermeasure Meeting Management Council Outline
Proper Segregation and Disposal of Low-Level Radioactive Waste (LLRW) at Wayne State University
Proper Segregation and Disposal of Low-Level Radioactive Waste (LLRW) at Wayne State University Wayne State University-Office of Environmental Health & Safety (OEH&S) will collect and process the various
Spent Fuel Project Office Interim Staff Guidance - 17 Interim Storage of Greater Than Class C Waste
Spent Fuel Project Office Interim Staff Guidance - 17 Interim Storage of Greater Than Class C Waste Issue: Guidance is necessary on the interim storage of greater than Class C (GTCC) waste due to the revision
Azeri, Chirag & Gunashli Full Field Development Phase 3 Environmental & Socio-economic Impact Assessment. A10.1 Introduction...
APPENDIX 10 Normally Occurring Radioactive Material (NORM) Contents A10.1 Introduction... A10/3 A10.2 Occurrence & Concentration of NORM in Oil and Gas Operations... A10/4 A10.2.1 Probability of NORM formation
WASTE STREAM 2Y51 Analytical Services Process Facilities - North Labs
WASTE STREAM 2Y51 Analytical Services Process Facilities North Labs SITE SITE OWNER WASTE CUSTODIAN WASTE TYPE Sellafield Nuclear Decommissioning Authority Sellafield Limited LLW WASTE VOLUMES Stocks:
SOP 4: Spill Response and Cleanup Procedures SOP 4: SPILL RESPONSE AND CLEANUP PROCEDURES
SOP 4: SPILL RESPONSE AND CLEANUP PROCEDURES Municipalities are responsible for any contaminant spill or release that occurs on property they own or operate. Particular areas of concern include any facilities
WASTE STREAM 2F35 Excellox-Type Transport Flasks and French-Design Dry Flasks
SITE SITE OWR WASTE CUSTODIAN WASTE TYPE Sellafield Nuclear Decommissioning Authority Sellafield Limited LLW WASTE VOLUMES Stocks: At 1.4.2013... Future arisings - Total future arisings: 45.4 m³ Comment
RADIOACTIVE WASTE MANAGEMENT AND DECOMMISSIONING IN FINLAND
RADIOACTIVE WASTE MANAGEMENT AND DECOMMISSIONING IN FINLAND 1. NATIONAL FRAMEWORK FOR MANAGEMENT AND REGULATION OF RADIOACTIVE WASTE AND DECOMMISSIONING 1.1 National framework 1.1.1 Overview of national
Facility Support Services
Facility Support Services The Precision Group has a breadth of experience delivering innovative, first class facility support service solutions to clients across the public and private sectors. Our expert
Outdoor Storage of Raw Materials SC-33
Objectives Cover Contain Educate Reduce/Minimize Description Raw materials, by-products, finished products, containers, and material storage areas exposed to rain and/or runoff can pollute stormwater.
Cardok Sàrl CP37 CH-1295 Tannay Switzerland Phone: 0041 22 77 66 051 [email protected]
CARDOK CARLIFT Fast access to underground garages Fast, Silent, Discreet, Design, High-Tech Installation to replace an access ramp on private property Dimensions: (Built to measure, all dimensions can
Improper storage of fuel on construction sites will increase the risk of water pollution that may occur as a result of leaks or spills.
WQ-10 Best Management Practice (BMP) Water Quality Protection Guideline Secondary Containment Design Standards Fuel Storage on Construction Sites According to the EPA, the majority of water pollution in
Radiological characterisation by means of 3D-laser modelling and positioning of measurements
Radiological characterisation by means of 3D-laser modelling and positioning of measurements Robert Hedvall 1, Patrik Johansson 1, Peter Erixon 1, Fredrik Ekenborg 1, Feng Quanhong 2 and PA Andersson 3
RADIOACTIVE WASTE MANAGEMENT PROGRAMMES IN OECD/NEA MEMBER COUNTRIES MEXICO [2005] NATIONAL NUCLEAR ENERGY CONTEXT
RADIOACTIVE WASTE MANAGEMENT PROGRAMMES IN OECD/NEA MEMBER COUNTRIES MEXICO [2005] NATIONAL NUCLEAR ENERGY CONTEXT Commercial utilisation of nuclear power in Mexico started in 1990 and by 2002 there were
50AI01oe 02/15. Labko GRP cesspools. Instructions for installation, operation and maintenance
02/15 Labko GRP cesspools Instructions for installation, operation and maintenance Reliable solutions Wastewater treatment systems Contents 1 LABKO CESSPOOLS... 3 1.1 GENERAL... 3 1.2 IMPORTANT TO KNOW
SECTION 33 31 00.13 ABANDONMENT OF SEWER MAINS
SECTION 33 31 00.13 ABANDONMENT OF SEWER MAINS PART 1: GENERAL 1.01 SECTION INCLUDES A. Abandonment in place, by cutting and capping, of existing sewers, junction structures, manholes, service lines, and
Environmental Remediation Examples and Remediation Strategic Planning
Environmental Remediation Examples and Remediation Strategic Planning Yasuo Onishi ([email protected]) October 16, 2011 Pacific Northwest National Laboratory, and Washington State University, Civil
PRESENT ISSUES FOR CENTRE DE LA MANCHE DISPOSAL FACILITY
PRESENT ISSUES FOR CENTRE DE LA MANCHE DISPOSAL FACILITY M. DUTZER, J.P. VERVIALLE, P. CHARTON Andra - Agence Nationale pour la Gestion des Déchets Radioactifs 1-7 rue Jean Monnet, 92298 Châtenay-Malabry
Guide to nuclear decommissioning
Guide to nuclear decommissioning Contents: What is decommissioning? Stages of decommissioning Site restoration Waste management The UK decommissioning industry The international picture What is decommissioning?
PAINT REMOVAL SYSTEM PAINT REMOVAL SPECIFICATION SAFE WORK METHOD STATEMENT FOR LEAD PAINT REMOVAL
PAINT REMOVAL SYSTEM PAINT REMOVAL SPECIFICATION SAFE WORK METHOD STATEMENT FOR LEAD PAINT REMOVAL CONTENTS: 1.0 AWARENESS AND PRECAUTION 2.0 TEST SAMPLING & REMOVAL EVALUATION 3.0 SITE EVALUATION 4.0
Decommissioning and clearance of laboratories
Health and Safety Services Safety Note 65 Decommissioning and clearance of laboratories This Safety Note provides guidance to Schools on the decommissioning and clearance of laboratories prior to handing
PLUMBING MAINTENANCE WORK FOR TOILETS IN HEAD OFFICE, SUPPLYCO ESTIMATE
Sl.No. PLUMBING MAINTENANCE WORK FOR TOILETS IN HEAD OFFICE, SUPPLYCO ESTIMATE Description of item Qty Unit Rate Amount 1 Demolishing tile work/cement concrete/( carefully taking out the closet and other
PRESENTATION ON REPAIR AND REHABILITATION OF BUILDINGS DAMAGED IN EARTHQUAKE. By H P Gupta & D K Gupta
PRESENTATION ON REPAIR AND REHABILITATION OF BUILDINGS DAMAGED IN EARTHQUAKE By H P Gupta & D K Gupta DIFFERENT TYPES OF DAMAGES 1.Minor cracks 0.5 to 5 mm wide in load or non-load bearing walls 2.Major
Nuclear power plant systems, structures and components and their safety classification. 1 General 3. 2 Safety classes 3. 3 Classification criteria 3
GUIDE 26 June 2000 YVL 2.1 Nuclear power plant systems, structures and components and their safety classification 1 General 3 2 Safety classes 3 3 Classification criteria 3 4 Assigning systems to safety
VOLUME AND SURFACE AREAS OF SOLIDS
VOLUME AND SURFACE AREAS OF SOLIDS Q.1. Find the total surface area and volume of a rectangular solid (cuboid) measuring 1 m by 50 cm by 0.5 m. 50 1 Ans. Length of cuboid l = 1 m, Breadth of cuboid, b
WASTE STORAGE AND COLLECTION GUIDANCE FOR NEW DEVELOPMENTS
WASTE STORAGE AND COLLECTION GUIDANCE FOR NEW DEVELOPMENTS CONTENTS Page 1 Introduction 2 2 Planning Applications 3 3 Internal Segregation of Waste 3 4 Housing Developments 4 5 Apartment Developments 5-6
WWER Type Fuel Manufacture in China
WWER Type Fuel Manufacture in China Yang Xiaodong P.O. Box 273, CJNF, YiBin City, Sichuan, China, [Fax: (+86)8318279161] Abstract: At CJNF, a plan was established for implementation of technical introduction
Role and tasks of Arpa Piemonte in controlling and monitoring of ionizing and non ionizing radiation. G.. d Amored
Sino-Italian Cooperation Project Role and tasks of Arpa Piemonte in controlling and monitoring of ionizing and non ionizing radiation G.. d Amored Environmental Protection Agency of Piedmont Region (ARPA
SPILL PREVENTION, CONTROL, AND COUNTER MEASURES PLAN (SPCC)
SPILL PREVENTION, CONTROL, AND COUNTER MEASURES PLAN (SPCC) UNIVERSITY RISK MANAGEMENT Occupational and Health Programs 19 Hagood Avenue, Suite 908 Charleston SC 29425 843-792-3604 Revised: June 2015 Spill
Spanish Scenario for Spent Fuel Management
ENSA (Grupo SEPI) Spanish Scenario for Spent Fuel Management INMM Spent Fuel Management Seminar XXIX Arlington, VA January 14, 2014 David Garrido Design & Licensing Manager. Spent Fuel Cask Div. Equipos
Make Your Own SNOWBREEZE AC For Rs.1500 ($30) Can be converted into an energy saving and humidified room heater in winter
Make Your Own SNOWBREEZE AC For Rs.1500 ($30) Can be converted into an energy saving and humidified room heater in winter You can now assemble Snowbreeze, a mild air conditioner in your house with materials
Very low level waste management in Spain and in France
Very low level waste management in Spain and in France From safety to waste acceptance criteria Industrial experiences Elena Vico, Mariano Navarro ENRESA - Spain Michel Dutzer ANDRA - France Disponet Peine
THE MINISTRY OF ENVIRONMENTAL PROTECTION, PHYSICAL PLANNING AND CONSTRUCTION
THE MINISTRY OF ENVIRONMENTAL PROTECTION, PHYSICAL PLANNING AND CONSTRUCTION 1389 Pursuant to Article 104 paragraph 1 item 4 of the Waste Act (Official Gazette 178/04, 111/06), the Minister of Environmental
Chemical Storage and Spill Response Guidelines
Chemical Storage and Spill Response Guidelines 9TP-SD-066/3.0 Supporting Document Applicable to Transport Projects Delivery Office Quality Management System Status: Approved Version: 3.0 Branch: Business
15 April 2015 Nuclear Regulation Authority, Japan. 1. Overview
Evaluation of the report of the Tokyo Electric Power Company regarding the leakage from the double strainer differential manometer for the water transfer pipes of the desalination system at Fukushima Daiichi
IPR-02-64. Äspö Hard Rock Laboratory. International Progress Report. Temperature Buffer Test. Report for retaining plug and anchoring
International Progress Report IPR-02-64 Äspö Hard Rock Laboratory Temperature Buffer Test Report for retaining plug and anchoring Richard Bäck Äspö HRL September 2002 Svensk Kärnbränslehantering AB Swedish
March 2006 DIVISION 3 - CW 2140-R3 TABLE OF CONTENTS
March 2006 CW 2140 - SEWER AND MANHOLE CLEANING TABLE OF CONTENTS 1. DESCRIPTION... 1 1.1 General... 1 1.2 Definitions... 1 1.3 Referenced Standard Constructions... 1 3. CONSTRUCTION METHODS... 1 3.1 High
SEPTIC TANKS FOR THE COLLECTION & SETTLEMENT OF DOMESTIC SEWAGE
SEPTIC TANKS FOR THE COLLECTION & SETTLEMENT OF DOMESTIC SEWAGE Let us help! Free professional site visit with friendly support and advice. [email protected] to make the right decision or call
Successful Cesium Removal Campaign at the Loviisa NPP, Finland- 11002. Esko Tusa Fortum Power and Heat Oy POB 100 00048 Fortum, Finland
ABSTRACT Successful Cesium Removal Campaign at the Loviisa NPP, Finland- 11002 Esko Tusa Fortum Power and Heat Oy POB 100 00048 Fortum, Finland Selective removal of radionuclides from evaporator concentrates
Long Term Storage and Transportation Issues for Used Nuclear Fuel. Office of Used Nuclear Fuel Disposition R &D Mission
Long Term Storage and Transportation Issues for Used Nuclear Fuel Jeffrey Williams Deputy Director DOE-NE Office of Nuclear fuel Disposition Research & Development Presented to: US NRC Regulatory Information
Cavity Drain R20 is manufactured from1.0mm thick black high density polyethylene with studs approximately 20mm high.
CI/SfB Tn6 L6813 September 2013 RIW CAVITY DRAIN R20 R20 is manufactured from1.0mm thick black high density polyethylene with studs approximately 20mm high. Other systems are available for specific uses,
LABORATORY SAFETY INSPECTION CHECKLIST
LABORATORY SAFETY INSPECTION CHECKLIST As part of EH&S's laboratory safety survey program, we have compiled a list of the most common safety problems. This is not a list of every possible hazard, but can
Instruction manual of pumps WQ, WQF, SN, Furiatka, Furia, KRAKEN, BIG, IP, IPE, SWQ, CTR
CAUTION! Instruction manual of pumps WQ, WQF, SN, Furiatka, Furia, KRAKEN, BIG, IP, IPE, SWQ, CTR NOTE: read the manual prior to commencement of use. For safety reasons, the pump can only be operated by
Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries
Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries Introduction Wastewater of petrochemical industries and refineries contains high amounts of emulsified aliphatic or
Florida Department of Environmental Protection
Florida Department of Environmental Protection Background Mobile vehicle and equipment washing involves washing at a location where vehicles are based (such as a trucking company, warehouse, bus station,
ENVIRONMENTAL HEALTH & SAFETY/RISK MANAGEMENT Contractor Management (including Sub-Contractors)
ENVIRONMENTAL HEALTH & SAFETY/RISK MANAGEMENT Contractor Management (including Sub-Contractors) Contractors have the responsibility to ensure the health and safety of their workers and that their work
UK Strategy for the Management of Solid Low Level Radioactive Waste from the Nuclear Industry
UK Strategy for the Management of Solid Low Level Radioactive Waste from the Nuclear Industry August 2010 Executive Summary The UK strategy for the management of solid low level radioactive waste from
Extraction Oil and Gas, LLC. Diamond Valley Central Oil Terminal Waste Management Plan
Extraction Oil and Gas, LLC. Diamond Valley Central Oil Terminal Waste Management Plan Scope: This Extraction Oil and Gas Waste Management Plan has been prepared to provide operations personnel at the
SAVANNAH RIVER SITE S MACROENCAPSULATION PROCESSING OF LESS THAN 3700 BQ/GM1 TRU ISOTOPIC MIXED WASTE FOR DISPOSAL AT THE NEVADA TEST SITE
SAVANNAH RIVER SITE S MACROENCAPSULATION PROCESSING OF LESS THAN 3700 BQ/GM1 TRU ISOTOPIC MIXED WASTE FOR DISPOSAL AT THE NEVADA TEST SITE ABSTRACT Glenn W. Siry, Luke T. Reid Washington Savannah River
Hydraulic control unit series 0086-372-01
Technical Product Information No. 1290 EN Hydraulic control unit series 0086-372-01 Contents Page About this Technical Product Information (TPI) 2 The ORTLINGHAUS numbering system 2 About the product 3
Spill Containment. Contents
Contents IBC Bund, Spill Pallet or Sump Pallets 2-14 IBC Bunds - User Healthy & Safety Instructions 15-16 Spill Trays, Drum Bunds & Drum Pallets 17-25 Tank Bunds 26-28 Standard Sized Bunds 29 Custom Built
ANTEP 2015 Needs from China (NNSA)
ANTEP 2015 Needs from China (NNSA) 1 Content of training/education that Decommissioning plan and technologies 2 Background of above need 1. Design life of Qinshan NPP is 30 years, and it has been put into