Peace River Project Water Use Plan



Similar documents
June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL

Table 4.9 Storm Drain Inlet Protetion Applicable for

Index. protection. excavated drop inlet protection (Temporary) Block and gravel inlet Protection (Temporary)

Failing Coastal Wood Infrastructure on the Great Lakes

Emergency Spillways (Sediment basins)

Unit Price Averages Reports

LOWER WEST PEACE SUBDIVISION GROUNDWATER MITIGATION

Chaudière Crossing Bridge Rehabilitation

COASTAL DAMAGE INSPECTION SOUTHWEST VITI LEVU, FIJI AFTER CYCLONE SINA

BRIDGES ARE relatively expensive but often are

Outlet stabilization structure

Safe & Sound Bridge Terminology

IH-635 MANAGED LANES PROJECT, SEG. 3.2

US Army Corps of Engineers BUILDING STRONG

SECTION 5. Sediment Control Measures

Report to INFRASTRUCTURE SERVICES Committee for noting

Block and Gravel Inlet Protection (BIP)

BRIDGE RESTORATION AND LANDSLIDE CORRECTION USING STRUCTURAL PIER AND GRADE BEAM

Evaluating the Condition of Seawalls/Bulkheads

The Manitoba Water Services Board SECTION Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11

Ross River Suspension Bridge Ross River, Yukon. Life Cycle Cost Analysis

BMP-7. A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet.

Section 2100-Trenching and Tunneling

STATUS REPORT FOR THE SUBMERGED REEF BALL TM ARTIFICIAL REEF SUBMERGED BREAKWATER BEACH STABILIZATION PROJECT FOR THE GRAND CAYMAN MARRIOTT HOTEL

C-2 Construction, Inc. - NAICS Codes

Flood mitigation program for Gatun lake. Programa de mitigación de inundaciones del lago Gatún

Managing Our Water Retention Systems

CITY OF TRAIL MEMORANDUM

Tobique Employment & Training

MLD: Domestic Maritime Transport Project

CHAPTER 9 LONG TERM MONITORING AT THE ROUTE 351 BRIDGE

NEWS RELEASE. Government takes action on Chief Inspector of Mines recommendations

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT

Description Quantity Cost Total Cost

PART E SPECIFICATIONS

NRC INSPECTION MANUAL

SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM

CBJ DOCKS AND HARBORS 1% Special Projects Sales Tax Request

Guidelines for Rights of Way

Stormwater/Wetland Pond Construction Inspection Checklist

Facing an Uncertain Future: Increasing Resilience at Marinas and Harbors. Recreational Boating Educational Conference December 11, 2014

HYDRAULICS. H91.8D/C - Computerized Open Surface Tilting Flow Channel - 10, 12.5, 15 and 20 m long

SECTION 6A STORM DRAIN DESIGN Mar S E C T I O N 6A STORM DRAIN - DESIGN

SEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST

Rehabilitation of Locks on the Kentucky River

Temporary Erosion-Control Measures

Lower Breton Sound Sediment Diversion Conceptual Engineering Design Presentation

HOUSE BUILDING DIGEST

How Did These Ocean Features and Continental Margins Form?

RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas

MHD BRIDGE SECTION WEIGHTED AVERAGE UNIT PRICES GUIDELINES FOR THE USE OF THE WEIGHTED AVERAGE UNIT PRICE TABULATION SHEETS

201 WATER STREET FORWARDERS MUSEUM AND VISITORS INFORMATION CENTRE

EXHIBIT A SCOPE OF WORK Montgomery Reservoir Improvements

CONSTRUCTION PERMIT APPLICATION CITY of HEATH LAKE STRUCTURE LAKE RAY HUBBARD

A CASE-STUDY OF CUA_DAT CFRD IN VIETNAM

Dock Hardware & Accessory Products Catalog

Solar PV panels fitted to roofs. Solar PV panels produce electricity from energy provided by sunlight. 3.5 MWh per system

SE-10 STORM DRAIN INLET PROTECTION. Objectives

Building Your Interlocking Concrete Pavement to Last a Lifetime

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE

Emergency repair of Bridge B421

Storm Drain Inlet Protection

Source: Port Mann Bridge Plans Unveiled Today, CBC News, February 4, 2009.

PLAN VIEW FOR LAKE OR MARSH FRONT VIEW FOR FLOTATION SILT CURTAIN

CHALLENGES AND INNOVATIVE SOLUTIONS FOR BRIDGE FOUNDATION REPAIRS

Schlüter -KERDI-BOARD Substrate, structural panel, bonded waterproofing

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION STORM DRAIN SYSTEMS PART 1 - GENERAL

How To Retaining Wall Guide

CLIFTY CREEK PLANT MADISON, INDIANA

How To Fix A Creek In Sandon

14. ENGINEERING AND CONSTRUCTION SCHEDULES Preparation of Schedules ALASKA ENERGY AUTHORITY AEA ENGINEERING FEASIBILITY REPORT

MEMORANDUM West Swann Avenue, Suite 225 Tampa, Florida Phone (813) Fax (813)

Residential Deck Safety, Construction, and Repair

THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP LAWS OF SARAWAK, 1958 Ed.)

Prattsville Berm Removal Project. 1.0 Project Location

Moving Small Mountains Vesuvius Dam Rehab

SEAPRO has both foam filled flotation boom and inflatable boom systems.

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth

Final. Contact person: Colin Whittemore Aurecon Centre 1 Century City Drive Waterford Precinct, Century City Cape Town, South Africa

Chapter 3 Pre-Installation, Foundations and Piers

West London Dyke Flood Control Structure Master Plan Appendix A

1,045 m length of the Deh Cho Bridge

SECTION 104 PREVENTION, CONTROL, AND ABATEMENT OF EROSION AND WATER POLLUTION

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

Cultus Lake Park Board Bylaw No. 1056, 2014 BOATING BYLAW. A Bylaw to regulate boating and boat moorage within the Cultus Lake Park foreshore.

A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems.

1 Introduction 1 CIRIA C683 1

Introduction to Minimal Excavation Foundations

2011 Annual Inspection Report

Georgia State University. Urban Life Building Roof Replacement

C. Remove all existing asphalt shingles, underlayment and any loose debris into contractor provided dumpsters.

BEACH NOURISHMENT COMBINED WITH SIC VERTICAL DRAIN IN MALAYSIA.

BEFORE THE HEARING EXAMINER FOR THURSTON COUNTY

Prefill and Water Balance Criteria. Division of Water Quality Municipal Wastewater Treatment

GRAVITY BASE FOUNDATIONS

City of Shelbyville Site Inspection Checklist

Amendment to OPSS 415 (Nov 2008) Construction Specification for Pipeline and Utility Installation by Tunnelling

Small Dam Repair The Stone Lake Dam Story. Joe Barron, P.E. SynTerra formerly the Fletcher Group, Inc. 148 River St. Suite 220 Greenville, S.C.

CITY UTILITIES DESIGN STANDARDS MANUAL

Transcription:

Peace River Project Water Use Plan Boat Ramp Hudsons Hope Reference: GMSWORKS-51 Dinosaur Boat Ramp Replacement Project Study Period: Sep 4, 2012 Jun 28, 2013 Christine Boehringer, MBA, PMP Project Manager C. Boehringer & Associates May 16, 2013

BC Hydro PROJECT COMPLETION REPORT Dinosaur Boat Ramp Replacement Project Dinosaur Lake Campground, Hudson Hope BC Project Start: September 4, 2012 In-Service: November 22, 2012 Project Close-out: June 28, 2013 Prepared for: BC Hydro, Water Licence Requirements 6911 Southpoint Drive Burnaby, BC Prepared by: Christine Boehringer, MBA, PMP Project Manager C. Boehringer & Associates Date on Document: 2013-05-16 Page 1 of 16

Printed copies of this document are not controlled Table of Contents EXECUTIVE SUMMARY... 3 PROJECT... 4 1.1. BACKGROUND... 4 1.2. LOCATION... 5 1.3. PROJECT OBJECTIVES... 5 1.4. PROJECT SCHEDULE... 6 TABLE 1 SCHEDULE MILESTONES... 6 1.5. SITE OVERVIEW... 7 1.5.1. Dredged Basin... 7 1.5.2. Double Lane Concrete Boat Ramp... 7 1.5.3. Rubble Mound Breakwater... 8 1.5.4. Dock and Gangway... 8 1.5.5. Navigation Day Marks... 8 1.6. PROJECT ORGANIZATION... 9 1.7. STATUS... 10 APPENDICES... 10

Executive Summary This completion report is limited to the work undertaken to complete construction on Dinosaur Lake Boat Ramp replacement following the user requirements and feasibility design resulting from the Peace Water Use Planning (WUP) process which was completed between 2001 and 2003. The implementation plan was time bound to see completion of the replacement ramp beginning in September 2012 and completing prior to winter conditions at the site and for upland work at the site to be complete prior to boating season opening on Dinosaur Reservoir in May 2013. In order to achieve this schedule, demolition and construction work needed to be complete before winter conditions made further work impossible. Construction of the boat ramp, rubble mound breakwater and test installation of the dock and gangway was complete on November 22, 2012 while parking lot completion, site seeding, signage installation and navigational buoy installation was completed May 17, 2013. The user requirements for the replacement project specified the following: Removal and disposal of the existing single lane concrete ramp, dock and steel piles supporting the existing wooden gangway to the dock Dredging and disposal of material from the boat basin Install a new 25 year, double lane concrete ramp with a grade between 12% and 15% Purchase and install a new metal gangway and composite floating dock Refurbish the upstream breakwater Install navigational signage Supply and install slope protection along foreshore Complete landscaping and parking lot improvements on completion of ramp work The project met the following objectives: - Replacement of the existing boat ramp, dock and gangway, dredging of the boat basin and erosion control in order to provide: o Access to the full dock at all water levels o Two ramp launching lanes o Tie up points around all sides of the dock to accommodate the size of watercraft specified in the user requirements o Larger floating dock o Extension and reconstruction of the rubble mound breakwater o Minimizing erosion and ice scour at the site through placing rip rap along the impacted shoreline areas and in front of the new foreshore site A key constraint during ramp construction was associated with water levels in Dinosaur Reservoir. With some variation, Dinosaur Reservoir goes through a daily cycle of lowest water to full pool with a difference of approximately 3 meters from lowest level to highest level. The highest water level in the reservoir is 502.98 meters above sea level (MASL) and this peak is generally achieved by 8:00 a.m. while the lowest operating level is 500.39 MASL achieved at 1:00 a.m. Ramp design to support boat launching across all operating water levels required the toe of the ramp to be installed at elevation 498.8 which required excavation to 497.8 to place fill to support the concrete ramp structure. Resulting from the need to access elevations approximately 5 meters below peak daily water levels the project team worked with Generation Resource Management to hold reservoir levels to Date on Document: 2013-05-16 Page 3 of 16

500.7 MASL over the course of construction and installed a temporary coffer dam to hold water out of the construction area. 4Evergreen Resources, a Saulteaux First Nation owned company, was contracted to develop their environmental protection plan, safety management plan and to implement the designed works. Environmental monitoring was undertaken daily throughout the construction period by Ecofor Consulting while BC Hydro provided construction management services. Engineers drawings were developed by Moffatt and Nichol Engineering while Owner s Engineer reviews were completed by Klohn Crippen, on contract to BC Hydro. Site inspections prior to, during and at completion of the works were conducted by Moffatt and Nichol. Project 1.1. Background Pursuant to direction from the BC Comptroller of Water Rights, BC Hydro has carried out a province wide Water Use Planning (WUP) process for most of its existing hydroelectric facilities. The Peace Water Use Plan Consultative Committee recommended a package including scientific studies and physical works for the Peace Hydroelectric System that would result in enhanced recreational access to Williston Reservoir, Dinosaur Reservoir, and the Peace River below Peace Canyon Dam. In response to Schedule B, Clauses 2 (a) and 4 of the Peace Water Use Plan implementation order, BC Hydro carried out a feasibility study to review options and to provide recommendations for such physical works. The Deputy Comptroller of Water Rights reviewed this feasibility study and instructed BC Hydro to proceed with, among other boat ramp projects, upgrading the existing Dinosaur Reservoir Campground Public Boat Launch Site. This project was a condition of the Water License as well as being ordered by the Comptroller of Water Rights. It was implemented in accordance with the Order to Implement the Peace Project Water Use Plan dated August 9, 2007 (the Order); and letters to BC Hydro dated May 7, 2010 and April 3, 2012 (the Letters) issued by the Deputy Comptroller of Water Rights instructing BC Hydro to commence the detailed design, costing, construction and maintenance for various boat access facilities, specifically Hudson s Hope/Dinosaur Reservoir (GMSWORKS #51and #53). 1.2. Planning A site visit was conducted in July 2012 with the Project Manager, Construction Manager, Engineer of Record, Environmental Manager, Environmental Monitor, Safety Management, the Ministry of Environment, Department of Fisheries and Oceans Canada and the Construction Contractor. During the site visit all aspects of the project were discussed including permit requirements, site layout, environmental and safety protection planning. A second pre-construction site visit was undertaken in August 2012 with Construction Management, Environmental Management, Environmental Monitor and the contractor. The combined agency site visit was an excellent way to familiarize everyone with the project at the same time and to exchange thoughts and requirements in a meaningful way. As a result, during construction, there were no lost time safety incidents and only a few minor environmental incidents that were quickly Date on Document: 2013-05-16 Page 4 of 16

handled. There was one larger environmental incident involving the turbidity curtain which broke during a high wind, high wave event. Site work was suspended and turbidity monitoring was undertaken while the curtain was quickly repaired. The incident was reported to the appropriate agencies and work was authorized to continue to completion. 1.3. Location The Dinosaur Lake boat launch facility is located on the North Shore of the section of the Peace River between the WAC Bennett Dam and the Peace Canyon Dam as shown below. Site Location (Source: Google Earth) 1.4. Project Objectives Replacement of the existing boat ramp, dock and gangway, dredging of the boat basin and erosion control in order to provide: Date on Document: 2013-05-16 Page 5 of 16

o o o o o o Access to the full dock at all water levels Double lane ramp Tie up points around all sides of the dock to accommodate the size of watercraft specified in the user requirements Larger floating dock Extension and reconstruction of the rubble mount breakwater Minimizing erosion and ice scour at the site through placing rip rap along the impacted shoreline areas and in front of the new foreshore site 1.5. Project Schedule Project schedule objectives included ensuring the development of contingency plans for key issues including: Public safety through excluding access during construction Site security to prevent theft and vandalism Post construction public safety by utilizing Safety by Design during construction which resulted in the addition of a new sign on the access gangway and an increase in the size of the upstream rubble mound breakwater to ensure it remained visible at all water levels Environmental protection through the use of a turbidity curtain during dredging activities Other schedule objectives are summarized in the table below: Table 1 Schedule Milestones Date Key Milestone Dates and Decision Points July 30, 2012 Secure Site Tenure August 31, 2012 Definition Phase Complete September 5, 2012 Contract Awarded for Construction November 22, 2012 In Service June 28, 2013 Project Completion/Documentation Close-out Date on Document: 2013-05-16 Page 6 of 16

1.6. Site Overview The following figure shows the general arrangement of refurbished works juxtaposed onto the original site works. Source: Extracted from Moffatt and Nichol s drawing 1007-C09-00024 General Arrangement 1.6.1. Dredged Basin The dredge basin is approximately trapezoidal shaped in plan with an approximate overall area of 2,788 sq. metres. The plan dimensions of the dredged basin are approximately 50m by 56m. The design dredged depth is El. 498.5m excluding an over dredge allowance of 0.3m. During the dredging works, a rock shelf on the north-eastern side of the basin was discovered which extended from the shore into the lake. As a result, the outer perimeter of the northern dredge cut was confined to extent of the east-west alignment of the rock shelf. 1.6.2. Double Lane Concrete Boat Ramp A new 12m wide double lane concrete surfaced boat ramp was installed at the vicinity of the existing boat ramp. Two rows of concrete panels each 6m wide x 2m long x 200mm thick with V-grooves on the surface were placed on two sets of a steel grade beams founded on a 300mm thick foundation of base Date on Document: 2013-05-16 Page 7 of 16

course gravel and geotextile. The toe and sides of the ramp were protected with 250kg riprap and filter stone. 1.6.3. Rubble Mound Breakwater The existing rubble mound breakwater was reconstructed with a constant crest at El. 503.5m. The first section from the shore to halfway along the total length was founded on a geotextile layer, and filled with a core made of filter stone overlain with 250kg riprap. The outer breakwater section comprised of a core layer with 5kg quarry stone, an under layer with 25kg armour rock and cover layer of 250kg riprap. 1.6.4. Dock and Gangway The 6.7m by 3m wide float modules are timber framed and fitted with expanded polystyrene filled polyethylene shell Ace Roto-mold float billets and support a Moisture Shield composite decking. The overall dimensions of the assembled main float dock are 20m long and 3m wide. The dimensions of the landing float that supports the sliding end of the gangway are 3.9m by 3.9m. The float is tethered with 19mm diameter hot dip galvanized mooring chains fixed to concrete anchor blocks (two anchor blocks are located offshore and two are located on shore.) The 10m long by 1.5m wide aluminum gangway is supported on a precast concrete abutment at the shore end and rests on a sliding plate on the landing float. The walkway surface of the gangway is fitted with a Thru-flow fiberglass reinforced polypropylene deck complete with transition plates at both the shore and float ends of the gangway. 1.6.5. Navigation Day Marks Two day marks are provided to demark the navigation entrance to the boat ramp and the dredge area. A piled day mark is installed at the off shore end of the rubble mound breakwater and the other day mark is a floating buoy sited on the northern side of the dredged basin. Date on Document: 2013-05-16 Page 8 of 16

1.7. Project Organization The project was organized with a mix of BC Hydro staff and contractors. The following list identifies all personnel involved in project identification, definition and implementation activities. Personnel Type Project Sponsor Project Delivery Team Lead WLR Team Lead Initiator Project Manager Engineer of Record Geotechnical Engineer of Record Owner s Engineer Construction Officer Construction Manager Construction Manager Environmental Monitor Construction Contractor Community Relations Procurement Description of Availability / Constraints Edie Thome BC Hydro Mark Leng BC Hydro Aileen Grant BC Hydro Christine Boehringer, C. Boehringer & Associates Paul Hoo Moffatt Nichol Walt Dengler EXP Environmental Geoff Cooper Klohn Crippen Dave McLorie Randy Grelson - Randstad Wayne Clarke BC Hydro Kevin Wilson Ecofor Blair Smith 4Evergreen Resources LP Bob Gammer BC Hydro Grant Grinnell/Barb Trathen BC Hydro Safety Tom Hansen, Tyler Grohs BC Hydro Chris Caryula - Contractor Contract Management Environment Properties Commercial Manager Aboriginal Relations Naveed Nadri - Contractor Cindy Powell BC Hydro Allison Elliott/Holly Pommier BC Hydro Brad Samis BC Hydro Stewart Dill BC Hydro Date on Document: 2013-05-16 Page 9 of 16

1.8. Status The replacement Dinosaur Boat Ramp has been successfully completed in accordance with the Project Management Procedures of BC Hydro and went into service on November 22, 2012 while signage and landscaping was complete May 17, 2013. Appendices Document Reference Date on Document Project Documentation Construction Photographs Various Record Drawings January 14, 2013 Date on Document: 2013-05-16 Page 10 of 16

Turbidity curtain install around site Dredging the boat basin Date on Document: 2013-05-16 Page 11 of 16

View of double lane ramp behind coffer dam during construction Date on Document: 2013-05-16 Page 12 of 16

Foreshore preparation Date on Document: 2013-05-16 Page 13 of 16

Breakwater Date on Document: 2013-05-16 Page 14 of 16

Dock and gangway Date on Document: 2013-05-16 Page 15 of 16

Daymarks Site overview with dock and gangway removed to winter storage Date on Document: 2013-05-16 Page 16 of 16