Best Practices and Approaches to Supply Chain Management

Similar documents
The Supply Chain for a UK Nuclear New Build Programme

Olkiluoto 3 Project. AREVA Suppliers Day Warsaw October 4, 2011

The World Nuclear Supply

AREVA: supply chain network principles and company s vision

Introductions: Dr. Stephen P. Schultz

Join the UK Nuclear Renaissance. Procurement & Quality Process

Olkiluoto 3 Project June 2010

Nuclear Consultancy & Engineering Services

Ensuring Quality Going Down the Supply Chain

SPANISH NUCLEAR INDUSTRY. Antonio Cornadó Quibus President Spanish Nuclear Industry Forum

Accenture Management Consulting. Open Roles

NUCLEAR POWER OVERALL GOOD FOR THE SOCIETY Finnish German Energy Day, 7th November 2012

MAGA Engineering Sri Lanka Economic benefits of standards. October 2011 March 2012

AREVA, an unparalleled experience in building nuclear reactors

NOT PROTECTIVELY MARKED

Rosatom Integrated NPP Construction Solution

This is a Master s degree level apprenticeship which includes academic learning combined workplace learning and training.

Open Government Status: FULLY OPEN. NuSAC/SCR/07/9 HEALTH AND SAFETY COMMISSION NUCLEAR SAFETY ADVISORY COMMITTEE SUB-COMMITTEE ON RESEARCH

Utilities Engineering Technician Trailblazer Assessment Plan ASSESSMENT PLAN. Utilities Engineering Technician

Building New Generation Nuclear Plants Worldwide : AREVA's Experience

Power Island. Industrial Power Plants. / energy

Waste Volume Reduction by Studsvik Nuclear AB. Anders Stenmark and Bo Wirendal September 16th, 2010

Safely delivering excellence in decommissioning, waste management and reprocessing

ACCREDITATION. APM Corporate CASE STUDY

Horizon NSL Pre-Application Intervention Strategy

Westinghouse AP1000 PWR and the Growing Market for New Nuclear Power Plants

Westinghouse and the AP1000 Offering Great Opportunity for the Czech Republic

What will it be; define the value

Swiss media visit to Olkiluoto August 15, 2014

NUCLEAR SOLUTIONS FOR HEALTH, ENVIRONMENT & ENERGY

AP1000 Technology: Passive & Proven

EDUCATION AND TRAINING OF OPERATORS AND MAINTENANCE STAFF AT COMMERCIAL NUCLEAR POWER STATIONS IN JAPAN

Pulp & Paper Mills Value and Sustainability

Product Marketing Guide Energy+ Program

HOISTING AND TRANSFER EQUIPMENT OF A NUCLEAR FACILITY

Nuclear Technology Management Professional Development Programme

Delivering Engineering Services to UK Infrastructure through our branded businesses nationwide

Responsibility Deal between Government and the waste and resource management sector. June 2011

FWK Contract - Support for safety and accident analyses

PRIORITIZING CYBERSECURITY

OVERVIEW OUR MISSION PROJECT IMPLEMENTATION PLANT MANAGEMENT INFORMATION SYSTEMS

Contents Company overview Partnering with CCE Service offerings Accreditations Service coverage ISO compliance

Strengthening UK Based Supply Chains: Construction and Infrastructure

Qualification of Auditor and Lead Auditor to perform an assessment according NSQ-100

International Safeguards Infrastructure Development

Government Degree on the Safety of Nuclear Power Plants 717/2013

Experience and Qualifications of PROCESS PLANTS CORPORATION

THE DECOMMISSIONING OF THE UK NUCLEAR INDUSTRY S FACILITIES

POWER & RENEWABLE ENERGY SERVICES

Advanced automation and real-time business intelligence Solutions for the Energy & Utilities markets M A N A G I N G T H E E S S E N T I A L S

Proud to be here, since 1853

The Essential Guide to the new build nuclear supply chain

Plumbing Industry Snapshot

The Price-Anderson Act and the Three Mile Island Accident

A guide to our company and our services.

Outlook for RWE s nuclear operations. Prof. Dr. Gerd Jäger London, 16 January 2012

Developing a framework model of Supply Chain Management : A case study on a Mega construction project in Myanmar.

BANGLADESH POWER DEVELOPMENT BOARD. Consulting Services for Ghorasal 365 MW Combined Cycle Power Plant Construction Project

GAO. NUCLEAR REGULATION Regulatory and Cultural Changes Challenge NRC. Testimony

CAPABILITY BROCHURE. FORGACS Marine and Defence Brochure 1

Assessment of the Economic Benefits of Offshore Wind in the Mid-Atlantic

Liquid Effluent Treatment Plant (LETP) Land Clean-Up

Management and Leadership. Level 5 NVQ Diploma in Management and Leadership (QCF)

Technologies & Management Systems that Work: Current Best Practice in Nuclear New Build

Australian Industry Participation (AIP) Plan for Midal Cables Aluminium Rod and Conductor Facility Tomago NSW

SNC-Lavalin Group Inc. (SNC) - Financial and Strategic SWOT Analysis Review

Public-Private Partnership in Exporting Waste Management Services

Håkan Lorentz Barsebäck Kraft AB Box 524, SE Löddeköpinge, Sweden

MISSION REPORT ON THE INTEGRATED NUCLEAR INFRASTRUCTURE REVIEW (INIR)

Enhanced calibration High quality services from your global instrumentation partner

PLANT LOCATION AND LAYOUT

Windows Server 2003 migration: Your three-phase action plan to reach the finish line

TURKISH NUCLEAR POWER PROGRAMME NUCLEAR ENERGY PROJECT IMPLEMENTATION DEPARTMENT

Campbell Facilities Management Ltd Profile. Providing Facilities Management Services in Ireland.

Skoda Supercritical Steam Turbine 660 MW

POWER & RENEWABLE ENERGY SERVICES

Steelmaking Technology Consulting

Alain Nifenecker - General Electric Manager Controls Engineering

Nuclear Technology Management Professional Development Programme

CONSTRUCTION EXPERIENCE FROM MODULAR NUCLEAR POWER PLANTS

Strengthening Technical Specialist Training for an Expanding Nuclear Power Programme in the UK

Piping Systems for Nuclear Power Industry. Prague, October 2011

Module 1: Supply Chain Design

Policy Profession. Skills and Knowledge framework. Find out more now by going to

Complex engineering objects construction using Multi-D innovative technology

Industry Solutions Process Manufacturing Flexible and Agile Engineering Document Control for Efficient, Safe and Compliant Plants

Fuji Electric. (Edition 5.0) Green Procurement Guideline. April Fuji Electric Co., Ltd.

DRAFT. Appendix E-1 Proposal Evaluation Process Description For 2006 Request For Proposals (RFP) For Long-Term Supply-Side Resources

Prospect of Hitachi Nuclear Business (Boiling Water Reactor)

New units at the Paks NPP background of the project and human resource issues

May 23, 2011 Tokyo Electric Power Company

ADVANCED CONTROL TECHNIQUE OF CENTRIFUGAL COMPRESSOR FOR COMPLEX GAS COMPRESSION PROCESSES

Implementation of the Best in Class Project Management and Contract Management Initiative at the U.S. Department of Energy s Office of Environmental

Announcement on Providing Guarantee for the Subsidiary Company - Offshore Oil Engineering (Qingdao) Co., Ltd. by Offshore Oil Engineering Co., Ltd.

RENEWABLE ENERGY IN FIFE Skills and Supply Chain

Why Smart Water Networks Boost Efficiency

Global Medical Aesthetics Market 2015 Industry Trends and Forecast to 2020

Loviisa 3 unique possibility for large scale CHP generation and CO 2 reductions. Nici Bergroth, Fortum Oyj FORS-seminar

LONG INTERNATIONAL. Andrew Avalon, P.E., PSP and Curtis W. Foster

OH&S MANAGEMENT SYSTEM CHECKLIST - AS 4801:2001 (STATUS A = Acceptable; N = Not Acceptable; N/A = Not Applicable)

Transcription:

Best Practices and Approaches to Supply Chain Management ATOMEX Forum 2012 Moscow 12.12. 14.12.2012 AF-Consult Switzerland Ltd Jan Kocourek 1

Objectives Provide information available regarding both the capability and capacity of the supply chain(s) relevant to new civil nuclear build programs, including aspects of the planning, construction, operation, maintenance, waste management, and decommissioning of a nuclear power plant or nuclear industry Aditionally, indicate: where some of the more valuable elements of the SC may lie, for both a new build program and for opportunities for export the potential issues within SC, both local and global, which may threaten a new build program 2

The major aims to identify the scope (capability & capacity) of the nuclear SC to give an initial view of expertise and/or the potential to complete new nuclear build (local and overseas nuclear builds) to give a preliminary, qualitative assessment of some of the most valuable elements of the SC (e.g. identify the value chain) to give brief view of the critical points (gaps or pinch-points ) within SC, both local and global, which could threaten new build program 3

The major aims at identifying: where the country has either existing expertise and resources, or potential opportunity, to support a nuclear new build program the value chain in a nuclear new build program i.e., what is the value of each element of the SC, in a rank order of what adds most value where and how local companies can best obtain market share in a new build program which aspects of a new nuclear build program will provide the best community benefit through, e.g. the creation of incremental skills and high value, sustainable jobs based within the country what can the country best export to other new nuclear power programs, either new build or decommissioning what would be the need to develop or produce, which currently (or in future) cannot be obtained from overseas suppliers without long delays, which could ultimately threaten both the security and affordability of energy supplies what investment is needed in any capability and capacity 4

SC elements considered (greater or lesser extent): Planning & licensing Up-front services - infrastructure, professional services (legal, insurance, finance, etc.) Engineering and design services (Nuclear) consultancy services Project management Civil construction On-site erection/fabrication Nuclear island plant and equipment (e.g. RPV, SG, heavy forgings, pressure piping, pumps, valves, etc.) Non-nuclear island plant and equipment (e.g. steam turbines, generators, switch gear, transformers, etc.) Balance of Plant (BOP) Nuclear fuel supply Plant commissioning Plant operation Nuclear waste management and disposal (and/or recycling) Plant decommissioning Skills (or skilled workforce), which underpins all other SC elements 5

SC elements considered (greater or lesser extent): PRE-BUILD DESIGN Planning & Licensing Legal & Financial Services Nuclear Consultancy Services Engineering & Design Services CONSTRUCTION Project Management Building & Construction Plant & Equipment On-site Erection / Fabrication Nuclear Fuel Supply Commissioning OPERATION Operation & Site Management Nuclear Fuel Supply Engineering / Technical Services Waste Management & Disposal DECOMMISSIONING Planning & Licensing Decommissioning 6

General summary of the status of the country nuclear industry and its supply chain for nuclear new build program To carry careful survey for significant opportunities for country s companies to supply into, and provide services to, a nuclear new build and global new build programs, and the SC capability in most of the areas required to support such programs To extend of the country s company involvement in the SC which will depend on the structure of new build consortia and the choice of reactor design. Additional opportunities to become part of the vendor s global supply chains! Local companies can provide services which cover all aspects of the Pre-Build (Design) phase of a nuclear new build program Identify local based companies which could provide Project Management Services for individual projects forming the overall new build program All elements of civil construction (i.e., Building & Construction of the nuclear and turbine islands, BOP and supporting infrastructure) and On-site Fabrication could be undertaken by local companies Manufacturing facilities and experience capable of supplying a large number of components (Plant & Equipment) required for NPP 7

General summary of the status of the country nuclear industry and its supply chain for nuclear new build program (cont d) There is a number of SC issues (pinch-points), related to global capacity, e.g. in case of ultra-large forgings for manufacture of NSSS equipment and turbine generator rotors, and the fabrication of NSSS equipment itself. This relates to both new build projects and to nuclear life time extension programs which require replacement parts To identify significant issues associated with the availability of skilled workers, across the whole SC, and considering strong competition from overseas new build programs for nuclear skills (i.e., in engineering/technical consultancy) Significant major threats currently to SC development, are those related to the timeliness of the various Government facilitative actions, in particular licensing assessment process In addition, clear signals are needed by the SC before investment in capability and capacity, and skills development will be made Elements of Operation and Decommissioning of NPP can be provided by local companies, although some investment would be needed 8

External origin environment to organisation Internal origin organisation s objectives Best Practices and Approaches to Supply Chain Management SWOT Analysis of SC Helpful Harmful S W Strengths Weaknesses O T Opportunities Threats 9

SWOT Analysis for SC Strengths, Weaknesses, Opportunities and Threats of/for the SC could be given as shown below (not exhaustive!): Strengths (could be considered as important) A highly skilled and experienced resource base, active across all aspects of the nuclear energy sector Proven major project management and engineering capability Expertise in operating nuclear assets (for power generation and nuclear processing) and in life time extension Design, manufacture and installation of advanced components and equipment World renowned academic institutions, leading-edge research and development Strong link between energy sector and main financial and trading center, which together with a full range of professional services, would make the country a key location for new energy development 10

SWOT Analysis for SC Strengths, Weaknesses, Opportunities and Threats of/for the SC could be given as shown below (not exhaustive!): Weaknesses (that shall be considered) Number of country s based Engineering, Procurement & Construction (EPC) contractors with recent new nuclear power plant experience Availability of local capability for the production of the largest forgings required for the manufacture RPVs, SG and primary piping, as well as large steam turbine and turbine generator rotors Availability of local civil NSSS manufacturing capability Availability of local supply of major equipment for the non-nuclear (turbine) island Relatively high labor costs labor content greater than in other regions of the world There is currently still a nuclear engineering skills gap 11

SWOT Analysis for SC Opportunities (could be included, some require investment) Consultancy: technical and commercial feasibility studies and evaluation Detailed understanding and development of the Nuclear Safety case Project management of new plant construction (which can account for up to 15% of overall project value) Supply of raw materials (e.g., steel, cement, etc.) Civil engineering and construction (accounting for up to 25% of project value) On-site erection / installation Reactor plant sub-system module and product definition Supply chain management Specialist equipment supply (I&C, and electrical) Electrical, on-site installation Supply of large forgings for NSSS Supply of other forgings and castings for the nuclear island Specialist component supply (valves, pumps, cables, piping, etc.) Manufacture of nuclear island equipment, including SG, pressurizer and primary piping, and ist engineering support (with some investment) Manufacture RPV internals (with some investment) 12

SWOT Analysis for SC Opportunities (could be included, some require investment). Manufacture RPV internals (with some investment) Operational and asset management and plant life extensions Integrated decommissioning project management and site management Decommissioning specialist equipment Integrated fuel and waste management / services and disposal 13

SWOT Analysis for SC Threats (or risks) (could be included) The one of the major threats to SC for a new build program are those related to the timeliness of the various Government facilitative actions Shortage of skilled inspectors and engineers engaged in the process (within regulatory body), such that delays in the completion of this process and the possible knock-on effects of delays in the planning and licensing processes would affect confidence throughout the SC Significant and early activity in other markets which could result in resources and skills required for a country s nuclear new build program being pulled from the resource pool The growing skills gap in the nuclear industry not being closed or narrowed within the required timescale (for new build start) Delays in strategic siting assessment and subsequent identification of suitable sites may also affect supply chain development, as utility companies and vendors may seek alternative markets 14

Recommendations for SC SC development activities should be initiated, which make potential SC companies aware of the opportunities of a nuclear new build program, and help companies develop capability and capacity to relieve SC pinch-points Additional SC mapping should be carried out, including to lower areas of SC, to understand where the country has the expertise and/or the potential to complete for nuclear new build and in overseas nuclear builds To provide certainty to the nuclear industry and development of the SC, the Government impacts must remain on schedule to ensure that the indicative timelines are met. Recruitment of the appropriate number of skilled inspectors will be important to ensure that the licensing process runs to time Targeted support should be provided to companies seeking nuclear accreditation and qualification. Thus, the companies seeking accreditation or, as will be the case in a considerable number of cases, seeking to re-establish lapsed accreditations will need to commit considerable resources, both in terms of time and money, to secure nuclear qualification Companies must have access to education and training programs, and a supply of high quality graduates, which meet their needs in the development of a skilled workforces across all aspects of the nuclear supply chain, which will include the development of non-nuclear specific skills. 15

Supply Chain Assessment (3 4 months) Supply Chain Improvement Best Practices and Approaches to Supply Chain Management Representative new plant pre-construction timeline Plant construction timeline Lead times Y-6 Y-5 Y-4 Y-3 Y-2 Y-1 Y-0 Combine construction & operation license 42 months Order RPV and steam turbine & generator 36 months Order main pumps and pressurizer Order main condenser Order valves and pipe supports Order heavy forgings, plant simulator, I&C HW and transformer Order pipe & fittings 33 months 24 months 21 months 18 months 15 months 16