APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND TELECOMMUNICATION CABLES IN THE VICINITY OF TRANSPORTATION FACILITIES



Similar documents
APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE

Guidelines for Fiber Optic Cable Permits

Permit No. Permit Fee: $ Permit Expires (D+90 days): Business Name: Applicants Name: Telephone Number: Address:

CHAPTER 10 PERMIT PROCEDURES AND BONDING REQUIREMENTS FOR CONTRACTORS

DESCRIPTION OF WORK:

CONSTRUCTION PERMIT REQUIREMENTS

CHAPTER 10 - PERMIT PROCEDURES AND BONDING REQUIREMENTS

Trenching and Excavation Safety

The Manitoba Water Services Board SECTION Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11

ffi"*:::,.,il#ft 1. Submission of an Application on Forms supplied by 2. Payment of the application fee.

Right-of-Way Permit Application Process (Plans that affect District owned or maintained right-of-way)

APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT

A POLICY FOR ACCOMMODATION OF UTILITIES STATE HIGHWAY RIGHT-OF-WAY

GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables

CHAPTER 17: STORM SEWER STANDARDS Introduction Administration Standards 17.1

FIBER-OPTIC CABLE PLAN CHECK

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile

The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm:

SIERRA LAKES COUNTY WATER DISTRICT P.O. Box 1039, Soda Springs, CA (7300 Short Road, Serene Lakes)

IAC 7/2/08 Utilities[199] Ch 9, p.1 CHAPTER 9 RESTORATION OF AGRICULTURAL LANDS DURING AND AFTER PIPELINE CONSTRUCTION

BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY

Mandatory Part 1.4 BUILD OVER OR NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS

CHAPTER 8 CIVIL DESIGN

Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.

Safe & Sound Bridge Terminology

Guidelines for Excavations

SECTION POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.

San Antonio Water System Standard Specifications for Construction ITEM 866 SEWER MAIN TELEVISION INSPECTION

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT

EXHIBIT "A. Technical Specifications for Water and Sewer Service Lines

SECTION STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

CHAPTER 1181 Improvements

SECTION GRAVITY SANITARY SEWERS

SECTION REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

Nebraska Department of Roads Drainage and Erosion Control Manual December 2011 Appendix C: Pipe Material Policy Page C-1 PIPE MATERIAL POLICY

GUIDE FOR ACCOMMODATING UTILITIES WITHIN RIGHT-OF-WAY FOR COUNTIES & SMALL CITIES IN KANSAS

Specifications for Residential Property Owners Connection to New Public Sewer

Optical Cable Pre-Construction Survey. Keywords Stationary Reel Method, empty innerducts, sub-ducts, microducts, Intermediate-feed manholes

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

Let Us Give Utilities the Respect that they Deserve.

Guidelines for Rights of Way

CITY OF ST. CA THARINE S. cn- Olc.4 BY-LAW NO. WHEREAS the Council of the Corporation of the City of St. Catharines, is

PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE

Urban Vehicle Crossing Application To be completed and fees paid for prior to approval

San Antonio Water System Standard Specifications for Construction ITEM NO POINT REPAIRS AND OBSTRUCTION REMOVALS

OSU Extension FACT SHEET

Electric Engineering Division FIBER CONDUIT RULES AND REGULATIONS

DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS

The Bond Release Process for New Subdivision Developments: An Overview for Homeowners Associations DRAFT Revised

SECTION SITE PREPARATION

June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL

SHALLOW UTILITIES JOINT PROVISIONING GUIDELINES SCOPE

SEPARATION OF WATER MAINS, SEWERS, STORM DRAINS, AND UNDER DRAINS

720 Contour Grading. General. References. Resources. Definitions

Section 402. STORM SEWERS

1. It would create hazardous effects of storm water run-off. 3. It would increase hazardous driving conditions on the public road.

Geotechnical Building Works (GBW) Submission Requirements

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.

Unit Price Averages Reports

Underground Commercial Electric Service

Excavation Procedure. MIDGA Reviewed: 07/29/14 Effective: 06/20/09 Supersedes: Original Preparer: Owner: Approver: Safety Safety Safety

EXCAVATION AND PILING NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS

Homeowner s Guide to Drainage

SECTION 7- STORM SEWER

Permit Number: Date Issued: Permit Fee: Invoice Number:

Wellesley Municipal Light Plant. Standard Requirements for Electric Service

A. In this chapter, the following terms have the meanings indicated.

Borough of Matawan 201 Broad Street, Matawan, New Jersey 07747

Business Entire Plumbing Contractions And Reviews

Right-of-Way Use Permit Application Instructions

TOPOGRAPHICAL SURVEY REPORT - PART OF L.R No. 7413/11 Done on February 2015 at International Union for Conservation of Nature (IUCN) Eastern African

Building over or close to a public sewer

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

SECTION 5 DRAFTING STANDARDS

SECTION IX SLIP LINING PIPELINES

SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS

Bethel Township Municipal Authority (BTMA) RESIDENTIAL SEWER CONNECTION MANUAL

SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE

GUIDE TO SETTLEMENT OF CANTERBURY FLAT LAND CLAIMS

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

REQUIREMENTS AND SPECIFICATIONS FOR HIGH VOLTAGE CUSTOMER BUILT FACILITIES PEPCO ENGINEERING

SANITARY SEWER SERVICE CONNECTION INSTRUCTIONS

SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION

Floodplain Development Land Use Review

Utilities and existing services

BUILD OVER SEWER (BOS) ASSESSMENT MANUAL

PIPELINE ROUTING PERMIT. For A NATURAL GAS PIPELINE DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY

RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas

There is no water, surface tension cracks, nor other environmental conditions present that reduce the stability of the excavation.

Exhibit A. Rules and Regulations for House Connections and Sewer Extensions

SECTION STORM DRAINAGE TABLE OF CONTENTS

CONFORMITY WITH PLANS; DRAINAGE.

Bond Release Process for New Subdivision Developments in Fairfax County

City of Valdosta Land Development Regulations. Table of Contents

Beacon Hill Sewer District Standard Specifications

SECTION 1 GENERAL REQUIREMENTS

DELAWARE DEPARTMENT OF TRANSPORTATION

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE

TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe

ENGINEERING DESIGN GUIDELINES. for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS

Transcription:

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND TELECOMMUNICATION CABLES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE JURISDICTION OF ALBERTA TRANSPORTATION 1.0 Application Procedures 2.0 General Construction Guidelines June, 2012

Telecommunications Facilities General Procedures 1.0 APPLICATION PROCEDURES Application for telecommunication lines paralleling and/or crossing highways under the jurisdiction of Alberta Transportation shall be submitted to the appropriate District Office. Application for telecommunication lines paralleling and/or crossing public roads other than highways within the boundaries of any Municipal District or County should be submitted to the appropriate Municipality. The applicant shall allow up to 30 working days for application processing. Applications shall be submitted for any work related to construction and/or modification of the existing and planned telecommunication lines which: a) cross the highway right-of-way, or b) parallel an existing within the highway right-of-way. Alberta Transportation will not be responsible for any cost of cable repairs if accidentally damaged during highway related works and/or relocation, if the cable is located in areas not complying with the conditions covered in these requirements and guidelines and/or the plans attached to and supporting the application for the telecommunication line. 1.1 APPLICATION REQUIREMENTS The applicant shall clearly state the purpose of the application and the type of facility. The applicant must provide highway number(s), legal land description and particulars of the contact person responsible for the application. Incomplete applications without proper documentation will be returned without review. A copy of the consent issued shall be provided to the contractor and made available for verification at the construction site at all times. No construction may be undertaken without a valid consent. Only work covered by the original consent can be performed at the site. Any additional work, significant variation or change from the original consent also requires additional approval(s). Each of the drawings submitted with the application shall have a number for reference purposes. June, 2012 2

Telecommunications Facilities General Procedures 1.1.1 The Conventional Buried Cable (not fibre optics) Applications shall be supported by an overall plan or a key map of the facility, with suggested scale of 1:20,000 showing clearly, in colour, the extent of the proposed line and any associated facilities (e.g. pedestals) and end points. Attached to the application is a sample plan. 1.1.2 Fibre Optic Cables Applications shall be supported by an overall plan or a vicinity map with suggested scale 1:20,000 showing clearly, in colour, the extent of the proposed line and any associated facilities (e.g. splice bunkers) including location of starting and end points, and: 1) Two (2) copies of engineering plan(s) for each highway crossing showing precise crossing location, a highway crosssection at the crossing and highway profile for a minimum 400 metres in each direction of the crossing. The profile shall be drawn in the horizontal scale of 1:5000 and vertical of 1:200, the cross-section shall be drawn in the horizontal scale of 1:2500 and vertical of 1:200. 2) The cross-section drawing shall contain legal crossing description, method of construction, depth of cover, extent of casing, cable profile through the crossing, right-of-way boundaries and type of highway surface as well as the marker location; and 3) One typical drawing of the types of manholes or bunkers, if used. 1.1.3 Application For Drops Application for drops, if highway crossing is intended, shall be supported with a sketch outlining the extent of the intended work. 2.0 GENERAL CONSTRUCTION GUIDELINES 2.01 CONSTRUCTION COMMENCEMENT AND COMPLETION The applicant shall contact the appropriate Operations Manager or the Development and Planning Technologist at least two working days prior to commencement of construction to review the project. June, 2012 3

Telecommunications Facilities General Procedures The applicant shall contact the appropriate Operations Manager or Development and Planning Technologist at least two working days prior to construction completion to allow for site inspection. 2.02 USAGE OF THE OPEN CUT METHOD The open cut method for installation of a telecommunication cable(s) at any developed public roadway is not permitted. 2.03 PARALLEL CABLE LOCATION WITHIN HIGHWAY RIGHT-OF-WAY Telecommunication lines paralleling a highway surface shall not be installed closer to the highway driving surface than the toe of sideslope. The sideslope shall not be disturbed during cable installation. 2.04 CROSSING INSTALLATION PRACTICES IN HIGHWAYS AND PUBLIC ROADWAYS Buried cables crossing highways or public roadways shall be constructed by a push pipe or boring method. Private Driveways and Undeveloped Road Allowances Buried cable crossings of private unpaved driveways and/or undeveloped road allowances may be constructed by open cut method provided full restoration of the crossing area is carried out as soon as is reasonably practicable following construction completion. Minimum Offset Between Highway Crossings and Private Driveways Minimum offset between the location of the highway cable crossing and private driveways or accesses shall be 10 metres. 2.05 MINIMUM DEPTH OF COVER The minimum depth of cover over the telecommunication line, if it is placed in the right-of-way of a highway, shall be a) 1.0 metre for conventional (copper) toll buried cable, b) 0.6 metre for all other conventional (copper) cables, and c) 1.0 metre for fibre optic cable. For the purpose of a crossing, the minimum depth of cover is understood as minimum depth under the lowest point in the cross-section and shall be a minimum of 1.4 metres for all types of cable. June, 2012 4

Telecommunications Facilities General Procedures 2.06 INTERSECTION ANGLE OF TELECOMMUNICATION LINE CROSSING OF THOROUGHFARE The desirable angle of crossing is between 70 and 90 degrees; however, other angles may also be accepted in special circumstances. 2.07 CASED CROSSING The casing shall be inserted by boring or jacking or other approved method. Casing shall be designed to be of an equal or greater life span than the carrier line/cable. 2.08 EXTENT OF THE CASING Casing shall extend under the road surface between the toes of the sideslopes. 2.09 BORED OR AUGURED CROSSING Casing shall be fitted into a bored or augured hole in such a way as to provide a snug fit for the casing. 2.10 DRAINAGE STRUCTURE A permanent telecommunication line shall not be permitted inside a culvert or drainage structure or closer than a minimum distance of 2.5 times the culvert diameter, or 5 metres beyond the limits of any existing bank or bed rip-rap protection, whichever distance is greater. 2.11 LINE ATTACHMENTS TO BRIDGE STRUCTURES Telecommunication cable shall not be attached to a bridge structure without the written consent of the appropriate Regional Bridge Engineer. 2.12 LINES IN THE VICINITY OF BRIDGE STRUCTURES Telecommunication cables shall be located at the minimum offset of 15 metres from bridge footings and abutments. Should placement under a guidebank, riprap, slope protection, retaining wall and/or river training works be required, consent shall be obtained from the appropriate Regional Bridge Engineer. 2.13 TRANS CATHODIC PROTECTION BEDS No cable installation shall be installed in the vicinity of marked Alberta Transportation cathodic protection beds. June, 2012 5

Telecommunications Facilities General Procedures 2.14 OPEN EXCAVATION, MATERIAL AND EQUIPMENT STORAGE No open excavation shall take place, nor shall any material or equipment be deposited or stored any closer than 6 metres of a bridge to earth retaining structure (without special consensus of the appropriate Regional Bridge Engineer), and 4 metres from the shoulder break of a highway, or a toe of sideslope, whichever distance is greater. 2.15 EXCAVATION IN CENTRAL MEDIAN No excavation or any other type of work is permitted in the central median of the highway without the approval of the appropriate Operations Manager. 2.16 BACKFILLING OF OPEN TRENCHES The backfilling of all open trenches in the highway or public road rights-of-way or within 6 metres of a bridge pier or earth retaining structure shall be undertaken immediately after the installation has been placed and passed any necessary inspection. Backfill materials shall be thoroughly compacted with mechanical compactors and the owner of the telecommunication line will be held responsible for any settling in backfill for a period of one year after the completion of the work or period thereafter until backfill settlement and erosion have stabilized. 2.17 WASTE MATERIAL All waste material shall be removed and all disturbed areas shall be leveled and trimmed in an approved manner and re-seeded where necessary to restore the right-of-way to the original or better conditions. 2.18 MANHOLES, BURIED SPLICE BOXES OR VAULTS Manholes, buried splice boxes or vaults located within the highway right-of-way shall be placed "flush" with the adjacent ground. 2.19 MANHOLES IN THE ROADWAY SIDESLOPES No manholes shall be placed in the sideslopes unless special approval is obtained from the appropriate Operations Manager. 2.20 MANHOLES IN THE MEDIAN No manholes shall be located within the centre median of multi-lane highways unless a special permit is obtained from the appropriate Operations Manager. June, 2012 6

Telecommunications Facilities General Procedures 2.21 CONSTRUCTION SAFETY All reasonable precautions shall be undertaken during construction to protect and safeguard public safety and property owners. This includes barricading, signing and flagperson(s) as required, to protect and safeguard the lives and property of the travelling public and adjacent property owners. At no time shall the highway or public roadway be closed to traffic. Where normal traffic patterns are to be interrupted due to ditching or other operations, prior approval must be first obtained. Suitable signs shall be erected and if required, a flagperson(s) shall be used to direct traffic through the disrupted area as approved by the appropriate Operations Manager. All flagperson(s) shall be properly certified. The signs required shall be provided by the proponent or the contractor responsible for the cable installation. No work is to be conducted during darkness or reduced visibility. 2.22 CONSTRUCTION SIGNING Contractors are to meet the requirements of the latest edition of the Traffic Accommodation in Work Zones 2008 (1 st Edition) manual published by Alberta Transportation. The manual is available on the internet at www.transportation.alberta.ca/3815.htm. If the signing requirements are not met, the appropriate Operations Manager or his representatives have the right to halt all construction until proper signing is erected. The signs are to be removed immediately following construction completion. June, 2012 7