Pre-installation Manual. CONCEPT Processor 305 DW / 405 DW / 505 DW 505 DW XP



Similar documents
Please also see 10 golden rules for correct Saniflo installation on

AIR-CONDITIONER SPLIT TYPE

ARCO Electric Products Installation and Maintenance Manual Low Voltage Automatic Power Factor Correction Capacitor Systems 2013

This unit is a pump that will clear the waste from a domestic shower and washbasin, bath, washing machine, glass washer and a sink.

Lava. Precision Solutions. Site Planning and Installation Guide

1. Description. 2. List of Accessories included A B C F G H

SunMaxx Solar Filling Station Operating Instructions

Vision Engravers and Routers PRE-Installation Guide Vision Engraving & Routing Systems

REGULINE 600VA / 1000VA REGULATOR USER MANUAL

Dehumidifier Users manual. For Models: DH45S DH65S

USER S MANUAL HSC-24A

ELECTRIC INSTANTANEOUS WATER HEATER

BUILT-IN DISHWASHER INSTALLATION INSTRUCTIONS

USER MANUAL Stand Alone Power Supply PSQ 2909 / PSQ 3909 / PSQ 4909 PSQ 2920 / PSQ 3920 / PSQ 4920

GenStore Archive Cabinet

Electrically operated valves Series M-05, 3/2-, 5/2- and 5/3-way G1/8 650 and 750 Nl/min (0.661 and Cv)

Bubble King. User Manual

Current valve. for AC 24 V pulse/pause control of electrical loads up to 30 kw

HP Designjet L65500 printer series Site preparation checklist (second edition)

Installation Manual. Rental Services. Air Handling Units CHS-SVN01A-EN. July 2008

NewAir AC-10100E / AC-10100H Portable Air Conditioner Owner s Manual PLEASE READ AND SAVE THESE INSTRUCTIONS

CONTOIL DFM 8EDM. Table of contents. Mounting and operating instructions

USER INSTRUCTIONS FOR GET PORTABLE 12k BTU AIR CONDITIONER MODEL No. GPACU12HR

Convection Ovens. BX Classic. Models BX4 / FG 189C, BX / FG 158C, BX10 / FG 180C. Operator's Manual

Power supply unit Model: PAC-SC50KUA

V94 BULK TAPE DEGAUSSER

SERVICE MANUAL. Room Air Conditioner Multi Split Wall-Mounted Type Indoor. FSAI-Pro-91AE2 FSAI-Pro-121AE2 FSAIF-Pro-181AE2

Installation and User Instructions Unvented Electric Storage Water Heater Models: S10UNV, S15UNV.

NewAir AC-10000E, AC-10000H Portable Air Conditioner Owner s Manual PLEASE READ AND SAVE THESE INSTRUCTIONS

Installation, operation and maintenance manual TX 35A

Programmable Room Thermostat 7 Day (5-2 Day) Models: / Power Supply: Battery / Mains

18. CARGO TROLLEYS, LIFTING TABLES, HYDRAULIC TABLE TRUCKS, HAND TROLLEYS

Portable Air Conditioner

Operating Instructions Split System Air Conditioner

3.1.1 Full Type Tests & Routine Tests according to Clause 8 2 & Instructions For Installation, Operation & Maintenance

Wiser Panel Meter, Model Number WISERCTPM200 Installer s Guide

Daker DK 1, 2, 3 kva. Manuel d installation Installation manual. Part. LE05334AC-07/13-01 GF

S WORK CATALOGUE FAA29100H_BWC

Model UT713 OPERATING MANUAL

Use and Care Manual. Model CPA12KH AIR CONDITIONER

TECHNICAL DATA & SERVICE MANUAL SPLIT SYSTEM AIR CONDITIONER INDOOR UNIT: AW52AL AW64AL AW52AL AW64AL /05

Valve series MN-06 acc. to NAMUR, 3/2-way G1/4 750 Nl/min (0.762 Cv)

Installation Guide Smart-UPS X Tower/Rack-Mount 2U 2000/2200/3000 VA

Heating oven with mechanical control

ECOCIAT. Domestic hot water heat recovery unit

Max primary circuit temperature 90ºC Max primary circuit temp. 90ºC Max secondary circuit temperature 45ºC Max secondary circuit temp.

OWNER S MANUAL DRAINVAC ATOMIK PRINTED APRIL

36G22, 36G23, 36G24 & 36G52 36J22, 36J23, 36J24 & 36J52 DSI and HSI Single Stage Combination Gas Valve

Use & Care Manual. Electric Tankless Water Heaters. With Installation Instructions for the Installer AP15447 (10/10)

Infrarot-Bewegungsmelder IP44

User's Guide. True RMS Industrial Multimeter

INSTRUCTION MANUAL CIRRO MK 3/TYPE 2 MIST GENERATOR

PORTABLE AIR CONDITIONER

ROUGHNECK II Pumpless Drain

EPM3. Phase Sequence and Motor Rotation Tester. Users Manual

RE-3 : SOLID TOP RANGE RANGE TOP ONLY

Manual Ranging MultiMeter

Heating oven with mechanical convection

ELECTRIC CONVECTION BUILT-IN OVEN

50AI01oe 02/15. Labko GRP cesspools. Instructions for installation, operation and maintenance

USER INSTRUCTIONS FOR 10 LITRE PORTABLE DEHUMIDIFIER MODEL NO. DHMD102

42U/45U 28" Wide Rack Installation & Service Guide

LIEBERT VNSA Installation Sheet

Ceiling Mount Air Handler Manual

OPL BASIC. Dosing System for Professional Laundry machines. Contents

data sheet ECRM MAKO 2/4 IMAGELINE PLATE TYPE ILP 68 FP/OL for Photopolymer CtP - Printing Plates page 1 / 6 document no.: G4-29_0.

Meaco 30L and Meaco 40L dehumidifier instruction manual

User Guide. 4 wire Earth Resistance Tester Model GRT300

! WARNING. McDonnell & Miller Installation & Maintenance Instructions MM-217(I) Series 150S and 157S (Snap Switch, All Models except 157S-RB-P)

CoolTop. A unique water cooled air-conditioning unit for server room cooling from the top AC-TOPx-CW-240/60

Cardok Sàrl CP37 CH-1295 Tannay Switzerland Phone:

33.6W Power over Ethernet Waterproof Adapter PoE Plus Single Port Injector for Outdoor Application

Roof Top Air Conditioner INSTALLATION AND OPERATING INSTRUCTIONS

FT-100 Fire Training Fog Machine User Manual English

THE BOILING WATER DISPENSER INSTALLATION & OPERATING INSTRUCTIONS

INFRARED QUARTZ WALL HEATER

INSTALLATION MANUAL. SAILOR 5080 AC Power Supply

How To Test A Power Distribution Unit

PORTABLE AIR CONDITIONER

Overheating limit control

=============================== WARNING

Installation Guide. 5 Series 15 W. Undercounter/Freestanding Nugget Ice Machine

HP switch LP switch Discharge thermo Comp. Surface thermo

APC Step-Down Transformer. User s Manual

Installation and Service Instructions. Neutralization System Part no Grünbeck part no

Outdoor 33.6W Dual Port Passive Power-over-Ethernet Midspan For External Security Cameras and Wireless Access Points

Portable Air Conditioner. OWNER S MANUAL Read these instructions before use. Model: MM14CHCSCS

Georgia Tech Aerospace Server French building Server Room. Server Room Policy Handbook: Scope, Processes and Procedure

Introduction. Page 2 / 9

Calor de Hogar. Av Tecnológico 735, PB. San Salvador Tizatlalli. Metepec, 52172, Edo de México. Teléfono (722) (55)

Single-Phase AC Synchronous Generator

NÜVE SANAYİ MALZEMELERİ İMALAT VE TİCARET A.Ş. OT 020 BENCH TOP STEAM STERILIZER USER S MANUAL

SITE REQUIREMENTS AND INSTALLATION INSTRUCTIONS

Manual Code VR

Features. High Brightness LED Light source

TIG INVERTER INSTRUCTION MANUAL

Portable Air Conditioner. OWNER S MANUAL Read these instructions before use. Model: MM14CCS. Voltage rating: 115V~60Hz Power rating : 1400W

Five9NS R2100RS Rack Mount Server. Installation Manual

Series P215PR/RM Direct- and Remote-Mount Pressure-Actuated Condenser Fan Speed Controllers for Single-Phase Motors

Transcription:

Pre-installation Manual CONCEPT Processor 305 DW / 405 DW / 505 DW 505 DW XP

Pre-installation Manual CONCEPT Processor 305 DW / 405 DW / 505 DW / 505 DW XP T11336 Edition AA, April 2013 This book has part No 10070284

0-2 This manual is published by: Degraf S.p.A. Il Girasole - Palazzo Donatello 8/03b 20084 Lacchiarella (MI) Italy Internet: www.degraf.com Copyright 2013 by Degraf S.p.A. Pre-installation Manual - CONCEPT Processor DW / DW XP 1315

Introduction 0-3 Part 0: Introduction Reservations This manual was written and illustrated using the best possible information available at the time of publication. Any differences between this manual and the equipment reflect improvements introduced after the publication of the manual. Changes, technical inaccuracies and typographic errors will be corrected in subsequent editions. As a part of our policy of continuous improvement, we reserve the right to alter design and specifications without further notice. Pre-installation instructions The instructions in this Pre-installation Manual allow the customer and the Service Technician to prepare the installation site for the unit and for the installation itself. Never install the unit in explosive environments. It is the responsibility of the owner and operator/s of the unit that the installation is made in accordance with local regulations, and by engineers authorized to carry out plumbing and electrical installations. The manufacturer cannot be held responsible for any damage caused by incorrect installation of the unit. Only qualified Service Technicians are allowed to unpack and install the equipment. When preparing the installation site please take into consideration that this equipment is for restricted access locations only! Notes, cautions, and warnings! Throughout the manual warnings, cautions, and notes are written in bold like the example below: Electrical installation must conform to local regulations and guidelines. Symbol Meaning Explanation Note Caution Warning The operator should observe and/or act according to the information in order to obtain the best possible function of the equipment. The operator must observe and/or act according to the information in order to avoid any mechanical or electrical damage to the equipment. The operator must observe and/or act according to the information in order to avoid any personal injury. 1315 Pre-installation Manual - CONCEPT Processor DW / DW XP

0-4 Introduction Table of contents Table of contents Part 0: Introduction... 0-3 Reservations...0-3 Pre-installation instructions...0-3 Notes, cautions, and warnings!.... 0-3 Part 1: Transportation... 1-1 When the unit arrives...1-1 Storing the unit before installation...1-1 The crate....1-1 Checking the crate for damage....1-1 Handling the crate...1-1 Dimensions and weight....1-2 Transporting the unit....1-3 Lifting the crate...1-3 Available width for transport...1-3 Part 2: Installation requirements... 2-1 Environmental requirements...2-1 Accesories needed for the connections...2-1 Installation kit...2-1 Space requirements...2-2 Free space around the unit...2-2 Unit dimensions and connection locations....2-4 Compressed air supply...2-8 Solvent connection...2-8 Exhaust....2-8 Electrical requirements...2-9 Main power connection....2-9 Main power outlet...2-9 Power supply cable...2-9 Electrical specifications....2-10 Fuses...2-10 Power consumption...2-10 Part 3: Pre-installation checklist... 3-1 Pre-installation Manual - CONCEPT Processor DW / DW XP 1315

Transportation When the unit arrives 1-1 Part 1: Transportation When the unit arrives Storing the unit before installation The crated unit will usually be delivered some time before the arrival of the Service Technician. In which case you should prepare an appropriate place indoors to store the crated unit. The crate Checking the crate for damage Check if the crate is damaged at the time of delivery. Take note of the damage before you allow the Service Technician to unpack the unit. Provide a detailed description or take a photograph of the damage. Report any damage to the crate to the transport company. Handling the crate The icons on the crate indicate how to handle the crate during transport and storage: Ensure that the side indicated by the arrows is always up Handle the crate with care. Never expose the crate to water, or place it in a highhumidity area. Do not stack the crates. Do not tilt the crate. 1315 Pre-installation Manual - CONCEPT Processor DW / DW XP

1-2 Transportation The crate Dimensions and weight L W H T32328 305 DW 405 DW 505 DW 505 DW XP Width (W) 1950 mm (76.8") 2220 mm (87.4") 2400 mm (94.5") 2400 mm (94.5") Length (L) 2900 mm (114.2") 2780 mm (109.5") 3000 mm (118.1") 4300 mm (169.3") Height (H) 1750 mm (68.9") 1750 mm (68.9") 2000 mm (78.7") 1750 mm (68.9") Weight, crated (± 5%) approx. 1400 kg (3086 lb) approx. 1690 kg (3726 lb) approx. 1650 kg (3638 lb) approx. 2180 kg (4806 lb) Weight, unit approx. 1070 kg (2359 lb) approx. 1290 kg (2844 lb) approx. 1340 kg (2954 lb) approx. 1730 kg (3814 lb) Pre-installation Manual - CONCEPT Processor DW / DW XP 1315

Transportation Transporting the unit 1-3 Transporting the unit Lifting the crate The unit is supplied in a wooden crate. The unit is very heavy equipment. To lift the crate a fork-lift truck is required. T32327 Available width for transport Depending on the width of the door(s) through which the unit has to be transported to the installation site, the Service Technician may have to perform the actions described in the table below: If width of the door is 305 DW 405 DW 505 DW 505 DW XP Then > 1970 mm (77.6") > 2240 mm (88.2") > 2420 mm (95.3") > 2420 mm (95.3") No action is required as the crated unit can be transported immediately to the installation site. > 1700 mm (66.9") > 1980 mm (78") > 2100 mm (82.7") > 2170 mm (85.4") The Service Technician has to unpack the unit. 1315 Pre-installation Manual - CONCEPT Processor DW / DW XP

1-4 Transportation Transporting the unit Pre-installation Manual - CONCEPT Processor DW / DW XP 1315

Installation requirements Environmental requirements 2-1 Part 2: Installation requirements This unit must be installed in restricted access locations only. Environmental requirements Provide a heating and ventilating system capable of maintaining room temperature between 17 and 25 C (63 and 77 F) and relative humidity between 40 and 60%. For heat emission see Power consumption on the page 2-10. Accesories needed for the connections Compressed air supply Exhaust Solvent Power supply hose, ø6 hose, ø140 solvent resistant hose, ø20 see page 2-10 for recommended cable type Installation kit Installation kit is included with the unit. It comprise the parts necessary to make the installation. See Service Manual for installation part list. The processor is delivered with the necessary parts to have both washout solvent and pre-washing solvent drains connected together. 1304 Pre-installation Manual - nyloflex NExT FIII/FV

2-2 Installation requirements Space requirements Space requirements Free space around the unit Decide where the unit shall be placed and make sure that the free space around the machine makes servicing possible. The recommended minimum free space around the unit is: 1200 mm (47.2") in front and at the back of the unit, 750 mm (29.5") on the sides of the unit. > 6230 mm (245.3") > 750 mm (29.5") > 3180 mm (125.2") > 1200 mm (47.2") CONCEPT 305 DW > 1200 mm (47.2") > 750 mm (29.5") > 6750 mm (265.8") > 750 mm (29.5") > 3460 mm (136.2") > 1200 mm (47.2") CONCEPT 405 DW > 1200 mm (47.2") > 750 mm (29.5") Pre-installation Manual - CONCEPT Processor DW / DW XP 1315

Installation requirements Space requirements 2-3 > 6995 mm (275.4") > 750 mm (29.5") > 3580 mm (140.9") > 1200 mm (47.2") CONCEPT 505 DW > 1200 mm (47.2") > 750 mm (29.5") > 8775 mm (345.5") > 750 mm (29.5") > 3650 mm (143.7") > 1200 mm (47.2") CONCEPT 505 DW XP > 1200 mm (47.2") > 750 mm (29.5") 1315 Pre-installation Manual - CONCEPT Processor DW / DW XP

2-4 Installation requirements Space requirements Unit dimensions and connection locations CONCEPT 305 DW Side view 3686 mm 30 mm 2420 mm 1266 mm 115 mm Rear view 1680 mm 240 mm 1200 mm 240 mm 26 mm plate out 200 mm 170 mm 90 mm 40 mm 1150 mm 670 mm 496 mm 754 mm 970 mm 290 mm 182 mm 318 mm 400 mm 260 mm 100 mm Exhaust - hose ø140 mm Compressed air - hose ø6 mm Power supply Dirty solvent level Fresh solvent level Solvent in - hose ø20 mm Pre-washing solvent out - hose ø20 mm Washing solvent out - hose ø20 mm T11337 Pre-installation Manual - CONCEPT Processor DW / DW XP 1315

Installation requirements Space requirements 2-5 CONCEPT 405 DW Side view 4150 mm 30 mm 2420 mm 1730 mm 115 mm Rear view 1960 mm 240 mm 1480 mm 240 mm 26 mm plate out 200 mm 170 mm 140 mm 90 mm 40 mm 1430 mm 670 mm 496 mm 756 mm 970 mm 290 mm 182 mm 318 mm 400 mm 260 mm 100 mm T11338 Exhaust - hose ø140 mm Compressed air - hose ø6 mm Power supply Distillation unit Dirty solvent level Fresh solvent level Solvent in - hose ø20 mm Pre-washing solvent out - hose ø20 mm Washing solvent out - hose ø20 mm 1315 Pre-installation Manual - CONCEPT Processor DW / DW XP

2-6 Installation requirements Space requirements CONCEPT 505 DW Side view 4450 mm 30 mm 2420 mm 2030 mm 115 mm Rear view 2080 mm 240 mm 1600 mm 240 mm 26 mm plate out 200 mm 170 mm 90 mm 40 mm 1550 mm 670 mm 496 mm 754 mm 970 mm 290 mm 182 mm 318 mm 400 mm 260 mm 100 mm Exhaust - hose ø140 mm Compressed air - hose ø6 mm Power supply Dirty solvent level Fresh solvent level Solvent in - hose ø20 mm Pre-washing solvent out - hose ø20 mm Washing solvent out - hose ø20 mm T11339 Pre-installation Manual - CONCEPT Processor DW / DW XP 1315

Installation requirements Space requirements 2-7 CONCEPT 505 DW XP Side view 6230 mm 30 mm 4110 mm 2120 mm 115 mm Rear view 2150 mm 275 mm 1600 mm 275 mm 26 mm plate out 235 mm 205 mm 175 mm 125 mm 75 mm 1500 mm 680 mm 590 mm 530 mm 844 mm 1070 mm 290 mm 182 mm 375 mm 350 mm 262 mm 100 mm T11340 Exhaust - hose ø140 mm Compressed air - hose ø6 mm Power supply Distillation unit Dirty solvent level Fresh solvent level Solvent in - hose ø20 mm Pre-washing solvent out - hose ø20 mm Washing solvent out - hose ø20 mm 1315 Pre-installation Manual - CONCEPT Processor DW / DW XP

2-8 Installation requirements Compressed air supply Compressed air supply The compressed air supply connection is located on the rear side of the unit. The supply air pressure must be min. 6 bar (87 psi). Solvent connection If the solvent barrels are more than 5 meters from the processor and the piping is lifted higher that the solvent tanks, it is recommended to mount a nonreturn valve at the barrels to prevent backlash of solvent/air in the hoses during process. In case of need to turn off the solvent supply to the processor, it is recommended to install handvalves in the end of the solvent installation. Never lead solvent out - hose into a drain, as most solvents are strong pollutants. It is also illegal to empty these types of chemicals into the public sewer system. Under all circumstances local regulations applying to the treatment of (chemical) waste must be followed strictly. Exhaust All the exhaust must be connected to the appropriate location (directly to the outside or to the building exhaust installation). Make sure that the airflow is correct. Minimum exhaust of the machine is 600 m 3 /h. Pre-installation Manual - CONCEPT Processor DW / DW XP 1315

Installation requirements Electrical requirements 2-9 Electrical requirements Electrical installation must conform to local regulations and guidelines. Main power connection The main power connection must be made to the main connector located at the back of the unit. Main power outlet Provide a main power outlet close to the installation site. The table on the next page indicates the applicable power supply types and to which unit model they apply. Power supply cable The cable/plug required for main power connection is not delivered with the unit. The power supply table on the next page shows recommended power supply cable for unit. The conductors in the power supply cable must be of copper. When deciding what type of cable to use take into account the mechanical resistance (operator may step onto cable). Provide for additional cable protection, e.g. cable covers, if cable is exposed to heavier transport such as fork-lift trucks etc. The unit is Class 1 equipment. Therefore, the unit must be connected to earth to avoid electrical shocks. Please be aware of double pole/neutral fusing. 1315 Pre-installation Manual - CONCEPT Processor DW / DW XP

2-10 Installation requirements Electrical requirements Electrical specifications Installation requirements for power supply EUR US Supply / fuse Recom. cable type 305 DW 3Ph+N+PE,400VAC 3 x 13 Amps, 50-60 Hz 3Ph+N+PE,400VAC 3 x 16 Amps, 50-60 Hz 3Ph + PE, 230 VAC 3 x 24 Amps, 50-60 Hz 3Ph + PE, 230 VAC 3 x 28 Amps, 50-60 Hz 405 DW 505 DW Min.5x6mm 2, type H07RNF Min.5x6mm 2, type H07RNF Min.4x10AWG, type SJO or better Min.4x10AWG, type SJO or better 505 DW XP All Voltage tolerance ± 10% Fuses The fuses must have a breaking capacity of min. 100kA. If using automatic circuit breakers make sure that they are Type D. Power consumption Power consumption at 305 DW 405 DW 505 DW 505 DW XP All 230/400 VAC operation: approx. 8.5 kw 8.5 kw 8.5 kw 10 kw Pre-installation Manual - CONCEPT Processor DW / DW XP 1315

Pre-installation checklist 3-1 Part 3: Pre-installation checklist Please ask the customer to answer the following questions in order to ensure a trouble-free installation of the unit: 1. Delivery of the crate and transport to the installation site YES NO A. Is there a place indoor where the crated unit can be stored temporarily? B. Is there a hand-powered pallet mover, a fork-lift truck or any other lifting device available? C. Can the crate be transported directly to the installation site? See minimum width specifications on page 1-3. D. Is it sufficient to unpack the unit before it is transported to the installation site? See minimum width specifications on page 1-3. E. Are there other factors (stairs, elevators, corners, obstacles, etc.) which should be taken into account when transporting the crate or unit? If so, explain:............ 2. Power supply A. Make a note of the present supply specifications: No. of Phases... Voltage... V Fused by... Amps Neutral Wire?... Earth Wire?... Frequency... Hz YES NO B. Has a connection box been provided to connect the unit to the mains? C. Is the customer aware that he/she should provide (or order) all supplies (cables, fuses, etc.) necessary to connect the unit to the mains? D. Is there a house electrician available? E. Are there any known problems in the building where the unit will be installed? If so, explain:............... 1315 Pre-installation Manual - CONCEPT Processor DW / DW XP

3-2 Pre-installation checklist 3. Connections YES NO A. Capacity of air condition/ventilation adequate with regard to power consumption as specified on page 2-10? B. Is there a compressed air supply available? C. Can a hose (6 mm diameter) be connected to the compressed air supply? D. Is the supply air pressure 6 bar (87 psi)? E. Is there a exhaust system available? F. Can a hose (140 mm diameter) be connected to the exhaust system? G. Is there a solvent installation available (diameter 20 mm)? H. Availability of warm water for cleaning of unit? 4. Disposition of the various supplies and equipment on the installation site: Pre-installation Manual - CONCEPT Processor DW / DW XP 1315