Hybrid Planning Application for mixed use development at North West Cowbridge



Similar documents
(Part 2 of 2) February /JG/AJk

Vale of Glamorgan Local Development Plan Contents. Page. 2. Infrastructure Requirements Site Viability 4

January Kath Lawless Assistant Director of Planning Newcastle City Council, Civic Centre, Barras Bridge, Newcastle upon Tyne, NE1 8QH

Assessment of Site Deliverability in the Market Towns

COPCUT RISE COPCUT RISE DROITWICH SPA CONSULTATION STATEMENT. November Prepared by Capita Lovejoy on behalf of William Davis Limited

Manchester City Council Planning and Highways Committee 2 June 2011

FULL APPLICATION FOR ERECTION OF GARAGE MAINTENANCE UNIT AND PORTABLE OFFICE CABIN

Development Management Report

Site Deliverability Statement Alternative Site at: Bridge Road, Old St Mellons

Alternatives and Design Evolution: Planning Application 1 - RBKC

Millennium Quarter Public Realm Guidance Manual 2008

DEVELOPMENT BRIEF FOR LAND AT ALLOA ROAD, TULLIBODY

Matthew Halstead. Alder King Planning Consultants

WILTSHIRE CORE STRATEGY EXAMINATION - LAND AT STATION ROAD, WESTBURY.

Reference: 05/00928/FUL Officer: Mr David Jeanes

Development Brief Erskine Lodge Site, Great Whelnetham

4 Alternatives and Design Evolution

Subject: WW Resp II 15/04430/FUL & 15/04715/FUL The Royal High School

Key Facts. Passenger growth at the airport is projected to grow to approximately 3 million passengers per annum by 2030.

Pre-Application Planning Advice

Guidance on Non-Material Amendments and Minor Material Amendments

The land is allocated within the Westbury on Trym Conservation Area and the land is protected by a blanket TPO 340.

Mount Pleasant Sorting Office

Delivered by . Sian Waters Programme Officer PCC LDP Examination County Hall, Freemans Way, Haverfordwest, Pembrokeshire SA61 1TP.

LEWES DISTRICT AND SOUTH DOWNS NATIONAL PARK AUTHORITY LEWES DISTRICT JOINT CORE STRATEGY INDEPENDENT EXAMINATION

Chapter 2 Spatial Portrait

Town and Country Planning Act 1990 Section 78 Summary Proof of Evidence

Richmond upon Thames College. Draft Planning Brief. May 2008

Development Layout Design

Site Assessment for Neighbourhood Plans: A toolkit for neighbourhood planners

Site Specific Policies Local Plan

Carmarthenshire LDP Site Assessment Proforma

Relevant Planning History P/2006/1070: Demolition of building and construction of supermarket and 14 2 bed flats. Withdrawn.

AGENT(S) / APPLICANT(S): AGENT Dave Dickerson, DK Architects. APPLICANT Halton Housing Trust. DEVELOPMENT PLAN ALLOCATION: Greenspace.

Sustainability Appraisal of the Lichfield Local Plan: Strategy

St Athan. Aerospace Business Park. Sustainability statement

A Guide to the Fees for Planning Applications in England

Site Alternative Deliverability Report. SALT 033 Former Mid Wales Hospital, Talgarth Resubmission: Undeliverable. Local Development Plan

LANDSCAPE AND DEVELOPMENT CHECKLIST FOR MONMOUTHSHIRE COUNTY COUNCIL

There are several options you can use to pay for your Planning and Building Control Fees or documents.

Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT

Site Specific Policies

A23 CHEQUERS ROUNDABOUT, HORLEY: PREDESTRIAN AND CYCLING CROSSING IMPROVEMENTS

1 Welcome. The exhibition comprises a series of boards which provide some background information to show you our initial ideas for the site.

Advice can also be sought from specific specialist officers in the Council.

The Road to Growth Is transport the driver of local economic development?

Land at Cofton Lake Road Cofton Hackett

A Guide to Pre-Application Advice and Fees and Planning Performance Agreements

Manchester City Council Item 6 Planning and Highways Committee 8 May 2014

SCHEDULE 16 TO THE SPECIAL USE ZONE. Shown on the planning scheme map as SUZ16. BALLARAT RAILWAY STATION PRECINCT. Purpose

PLANNING APPLICATION: 12/00056/APP

ENVIRONMENTAL IMPACT ASSESSMENT

THE ROYAL BOROUGH OF KENSINGTON AND CHELSEA PLANNING APPLICATIONS COMMITTEE 16/06/2015

Site Deliverability Statement Development at: Beech Lane, Kislingbury. Persimmon Homes Midlands March 2015

Ward: Purley DELEGATED BUSINESS MEETING Lead Officer: Head of Planning Control week of 23/03/2009

OVERARCHING SPATIAL POLICIES

Draft Site Development Brief: Land at HM Stanley Hospital, St Asaph

Manchester City Council List Item 10 Planning and Highways Committee 15 March 2012

WELCOME PROPOSALS FOR PENTAVIA RETAIL PARK WELCOME TO OUR EXHIBITION WHICH SETS OUT OUR PLANS TO DEVELOP THE PENTAVIA RETAIL PARK SITE.

Coventry Development Plan 2016 Appendix 89. Glossary of Key Terms

KINGSTON TOWN PLANNING SUB-COMMITTEE 23 MARCH YELLOW BOX STORAGE , LONDON ROAD AND 50, GORDON ROAD, Application Number: 05/12156

Development Management Officer Report Committee Application. Summary

PLANNING SUPPORT STATEMENT. 29 Fernshaw Road, London SW10 0TG MRS. GAIL TAYLOR & MRS. KAREN HOWES. Prepared For TR/6570

The Northumberland Estates Proposed Residential Development, Prudhoe Town Centre D/I/D/63558/603. Framework Residential Travel Plan

Site Alternative Deliverability Report. SALT 034 Ty Nant, Groesffordd Resubmission: Deliverable. Local Development Plan

In accordance with the provisions of the Town and Country Planning Act, 1990 and the Orders made thereunder, and with regard to your application at:

Construction of a pedestrian footbridge between Chiswick Business Park and Bollo Lane/Colonial Drive.

an Inspector appointed by the Secretary of State for Communities and Local Government

Development Strategy Spatial Policy 7 Supporting the Location of New Development

Welcome Welcome to the public exhibition for development at Bowman Field. This exhibition provides an overview of the proposals for the site.

Originator: Tel: Report of the Chief Planning Officer CITY PLANS PANEL. Date: 7 th JULY 2016

Proposal for a Demonstration Exemplar at British Sugar, York

Neil Taylor Programme Manager Royal Borough of Kingston

HurlinghamRetailPark. Aerial view of site. Welcome to our exhibition of proposals for the redevelopment of the Hurlingham Retail Park.

Mount Browne (Surrey Police Head Quarters), Sandy Lane, Guildford Vision Statement. November with

Page 117. DEVELOPMENT CONTROL COMMITTEE - Date:1 September Report of the Executive Head of Planning and Transportation.

WEST OF WATERLOOVILLE FORUM. 10 April Councillors: Winchester City Council. Councillor Clohosey (Standing Deputy for Councillor Chamberlain)

Dar es Salaam Masterplan Ministry of Lands, Housing and Human Settlements Development

Councillor Richard Blunt

The subject matter of this report deals with the following Council Objectives

RE: CONSULTATION ON THE DEVELOPMENT MANAGEMENT AND THE SITE ALLOCATIONS DPD CONSULTATION DOCUMENT REPRESENTATIONS MADE ON BEHALF OF SAFESTORE.

BELVEDERE EMPLOYMENT AREA LINK ROAD SCHEME, ERITH COMPULSORY PURCHASE ORDER

3.0 Planning Policies

Planning Brief for the Ashmount Primary School site. June Ashmount Primary School site planning brief June

Basics of Sustainability. Environmental Impact Assessments (EIA)

BASILDON BOROUGH COUNCIL

A Guide to the Fees for Planning Applications in England

Rural dwellings including bed and breakfast accommodation

Road Safety Auditor Certification Compliance with EC Directive 2008/96/EC

05 AREA/SITE SPECIFIC GUIDELINES

Application No : 13/01609/FULL1 Ward: Cray Valley East. Applicant : Honda (UK) Ltd Objections : YES

There are access points readily available into the site.

1.2 This technical note provides a preliminary investigation into the Flood Risk and provides outline drainage strategies.

73 MAIN STREET SHIRLEY SOLIHULL

Kelham Hall. Nottinghamshire NG23 5QX. To.: Agenda. South of

Corporate Director Environment and Community Services

FLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES

LONDON BOROUGH OF TOWER HAMLETS MINUTES OF THE DEVELOPMENT COMMITTEE HELD AT 7.30 P.M. ON WEDNESDAY, 22 AUGUST 2007

Recommendations That the Committee approve the North London Business Park draft Planning Brief for consultation

Pre Application Engagement A guide to best practice

Transcription:

Jane Crofts Development Management Vale of Glamorgan Council Civic Offices, Holton Road, Barry CF63 4RU. Helmont House Churchill Way Cardiff CF10 2HE 029 2043 5880 cardiff@nlpplanning.com nlpplanning.com Date 7 September 2015 Our ref 31131/02/GW/JMi/9544173v1 Your ref 2014/01505/OUT Dear Jane Hybrid Planning Application for mixed use development at North West Cowbridge On behalf of our client, Commercial Estates Group (the developer) and Mr JGR Homfray (the landowner ) (together the applicant ), we are pleased to enclose documents and plans in support of amendment to the current hybrid planning application (reference: 2014/01505/OUT) for residential-led mixed use development at North West Cowbridge. The amendments to the current application are proposed to address comments from Officers at VoGC/statutory consultees and in light of the Focused Changes to the Deposit Local Development Plan (LDP), which were published in July 2015. They are summarised as follows: 1 A reduction in the extent of built development; 2 An increase in the average net density from 25.5 dwellings per ha (dph) to 30 dph; 3 An increase in the maximum number of units that could be accommodated on the site from 390 to 475; 4 A proposed increase in the provision of affordable housing from 35% to 40%; 5 An increase in the amount of open space provided on site in order to meet policy requirements associated with the proposed increase in the number of residential units; and 6 The inclusion of a footpath within the site to the south of the safeguarded primary school site. The boundary of the application site remains unchanged. Furthermore, there is no change to the disposition of land uses across the site and provision is still made for a 2ha primary school site and a link road in accordance with emerging policy in the Deposit LDP. The proposal continues to demonstrate that the development will create a highly desirable environment and an attractive place to live. Nathaniel Lichfield & Partners Limited 14 Regent s Wharf All Saints Street London N1 9RL Registered in England No. 2778116 Regulated by the RICS Offices also in Leeds London Manchester Newcastle

The Amount of Housing The Focused Changes increase the area proposed to be allocated for housing from 17ha to 27ha such that the boundary of the proposed allocation more closely reflects the extent of built development proposed by the current application. Despite this 10ha increase in site area, the Focused Changes have not made a corresponding increase in site capacity which remains at 390 units. This presents a conflict with Policy MD7 (Housing Densities) of the Deposit LDP, which requires that residential developments should meet a minimum density requirement of 30 dwellings per hectare ( dph ), because the development of 390 units across a 27ha site would fall short of this target. The average net density of the residential development proposed within the current application is 25.5 dph. This is below the minimum net residential density of 30dph. Following discussions with Officers at VoGC, the application has been amended to increases the maximum number of units to 475 in order to meet density requirements. Whilst this exceeds the 390 units assumed in the Deposit LDP, it represents the most efficient use of land and assists in delivering much needed housing. The Planning Statement Addendum and the documents that accompany this submission confirm that the increase in the number of units will not undermine the acceptability of the proposal. Amended Plans and Addenda to Reports The following plans and documents are submitted in support of this submisison: 1 Amended Parameter Plans 2 ES Addendum (August 2015) 3 ES Non-Technical Summary (August 2015) 4 Planning Statement Addendum (August 2015) 5 Design and Access Statement Addendum, including revised Illustrative Masterplan (July 2015) A full list of the plans and documents that form part of this submission is attached at Appendix 1. Appendix 1 also confirms which previously submitted documents remain extant and those which have been superseded. Amendments to the Description of Development The proposed amendments to the current application mean that the description of development needs to be revised to reflect the proposed increase in the number of units. Amendments are highlighted below for ease of reference: 1 Detailed permission for the construction of a link road connecting the Cowbridge Bypass (A48) with Llantwit Major Road (B4270) and associated highway works including footpaths/cycleways, landscaping and associated engineering/ infrastructure works. 2 Outline permission for a mixed use residential-led development, including; 3 Preparatory works including demolition of existing farm buildings as necessary; P2/6 9544173v1

- Approximately 390 residential units Up to 475 residential units (Use Class C3, including affordable homes); - A minimum 2 hectare reserve site for a primary school with playing fields (Use Class D1); - Associated car parking, landscaping works and public realm; - Open space including parks, natural and semi-natural green spaces, amenity green spaces and facilities for children and young people; - Associated infrastructure works including internal access roads, public realm, footpaths/cycleways and vehicular accesses; and - Associated engineering, and landscape works including surface water drainage, SuDs, a pumping station and levelling/creation of earth bunds/mounds. The Outline Part of the Planning Application The Illustrative Masterplan, Parameter Plans and Landscape Framework Plan have been updated to reflect the proposed amendments. The revised Parameter Plans set a framework for the detailed design of the scheme and establish the following: 1 Development extents (and the extent of built development has reduced); 2 Land uses (there is no change to the disposition of land uses across the site and provision continues to be made for a 2ha primary school site and a link road in accordance with emerging policy in the Deposit LDP); 3 Maximum building heights (this submission does not propose and change to maximum building heights); 4 Principal pedestrian/cycle links (which have been improved through the introduction of an additional pedestrian footbath to the south of the primary school site); and 5 Strategic open spaces (which has been increased to reflect the increase in the number of residential units and the need for wider landscape buffers in certain locations). 6 The DAS Addendum explains how the revised Illustrative Masterplan and Parameter Plans respond more positively to the site s context, constraints, opportunities and other influences. 7 There has been no need to revise the detailed highway plans already submitted for approval at the outline stage. The Detailed Part of the Planning Application Plans relating to the detailed part of the application i.e. the new link road, which will run north to south providing a link between the A48 and Llantwit Major Road B4270, remain unchanged. Conclusion The amendments to the current application do not materially change the planning considerations relevant to its determination. The proposal is still a departure from the UDP but there continue to be other material considerations which should be afforded significant weight and which indicate P3/6 9544173v1

that the application can be determined otherwise than in accordance with the development plan. Notably: 1 The proposal still accords with PPW; 2 The proposal still accords with emerging LDP development management policies (accepting that that the number of units is now higher than that proposed by the site allocation in order to resolve the conflict with emerging policy on residential density); 3 The benefits that the proposed development will bring to the area are still significant and greatly outweigh any adverse impacts arising; and 4 The proposal will still amount to sustainable development and the scheme is acceptable in all other respects. In summary, the amendments to the current application needto be considered in the context of a time expired UDP, the sustainable nature of the development and the inclusion of the site as a housing allocation within the Deposit LDP. Moreover, given that the benefits of the development would significantly and demonstrably outweigh any adverse impacts, it is clear that that the scheme should be approved without delay. We look forward to receiving confirmation that the additional information has been received and consultation has begun. We will contact you shortly to discuss the progress of the planning application. Please do not hesitate to contact me or Sophie White should you require clarification on any aspect of the application. Yours sincerely Gareth Williams Senior Director Copy J Allen Commercial Estates Group P4/6 9544173v1

Appendix 1: Plan and Document List Enclosed Plans and Documents (August 2015) 1. Planning Statement Addendum (August 2015) 2. Design and Access Statement Addendum (August 2015) 3. Environmental Statement (ES) Addendum (August 2015), comprising: - ES Addendum Volume 1 Non-Technical Summary; - ES Addendum Volume 2 Technical Assessment; - ES Addendum Volume 3 Appendices and Figures; 4. Parameter Plan 1: Extent of Development and Land Uses (Drawing Reference PS31131-12.1 Rev K) 5. Parameter Plan 2: Open Space and Accessibility (Drawing Reference PS31131-12.2 Rev K) 6. Parameter plan 3: Heights (Drawing Reference PS31131-12.6 Rev J) 7. Illustrative Masterplan (PS31131-21 Rev F) 8. Landscape Framework Plan (Ref: 2147/P35a) Previously submitted plans and documents which remain extant 1. Design & Access Statement (December 2014) 2. Site Location Plan (Ref: IL31131-024) 3. Application Boundary (Ref: IL31131-014 Rev B) 4. Hybrid Application Boundaries (Ref: IL31131-023 Rev A) 5. Statement of Community Involvement (December 2014) 6. Cowbridge Pattern Book Mapping the DNA of Place (July 2014) 7. Service Supply Statement (December 2014) 8. Waste Assessment (December 2014) 9. Planning Statement (December 2014) 10. Environmental Statement (ES) (December 2014), comprising: - Volume 1: Non-Technical Summary - Volume 2: Main Technical Studies P5/6 9544173v1

- Volume 3: Appendices to the Main Technical Studies (including): 11. Environmental Statement (ES) Addendum (June 2015), comprising: - ES Addendum Volume 1 Non-Technical Summary; - ES Addendum Volume 2 Technical Assessment; - ES Addendum Volume 3 Appendices and Figures; 12. Proposed Link Road Between A48 and Llantwit Major Road Sheet 1 (Ref: JNY8187-12 Rev G) supersedes previously submitted plan ref: JNY8187-12 Rev F; 13. Proposed Link Road Between A48 and Llantwit Major Road Sheet 2 (Ref: JNY8187-13 Rev D) supersedes previously submitted plan ref: JNY8187-13 Rev C; and 14. Overall Plan of Proposed Link Road between A48 and Llantwit Major Road (Ref: JNY8187-14 Rev D) supersedes previously submitted plan ref: JNY8187-14 Rev C. 15. Long Sections Sheet 1 (Ref: JNY8187-36) 16. Long Sections Sheet 2 (Ref: JNY8187-37) 17. Typical Cross Sections (Ref: JNY8187-38) 18. Proposed Improvements at Llantwit Major Road and B2468 (Nash) Junction (Ref:JNY8187-39) Superseded Plans 1. Parameter Plan 1 (Ref: PS31131-12.1 Rev E) 2. Parameter Plan 2 (PS31131-12.2 Rev E) 3. Parameter Plan 3 (PS31131-12.6 Rev E) 4. Illustrative Masterplan (PS31131-21 Rev E) 5. Landscape Framework Plan (Ref: 2147/P26b) 6. Proposed Link Road Between A48 and Llantwit Major Road Sheet 1 (Ref: JNY8187-12 Rev F); 7. Proposed Link Road Between A48 and Llantwit Major Road Sheet 2 (Ref: JNY8187-13 Rev C; and 8. Overall Plan of Proposed Link Road between A48 and Llantwit Major Road (Ref: JNY8187-14 Rev C. P6/6 9544173v1