4 Alternatives and Design Evolution
|
|
|
- Maria Tyler
- 10 years ago
- Views:
Transcription
1 4 Introduction 4.1 This Chapter describes the considerations and constraints influencing the siting, layout and massing of the Development. It also describes the main alternatives to the Development that were considered, including alternative sites and the No Development option. A detailed description of the Development is provided in ES Chapter 5. Background to the Development 4.2 The Site currently comprises the Park Lane College building (partly in use as the Bridge Street Church Centre) and residential units, managed by the Riverside English Churches Housing Group (ECHG), with associated access roads, gardens and landscaped areas. 4.3 The Site is not designated for any particular purpose within the Leeds City Council (LCC) Unitary Development Plan (UDP) and whilst it falls within the boundary of the Eastgate and Harewood Quarter, the Supplementary Planning Document (SPD) does not specify land uses for particular areas of the quarter. 4.4 There are no adopted policies within the UDP or in any LCC planning guidance that direct the development of decentralised energy facilities to particular sites or locations. However, the emerging Local Development Framework (LDF) does include policies that encourage such developments. 4.5 This is supported by existing policies at both regional and national level requiring a reduction in carbon emissions, efficient resource use and sustainable development. For example Policy YH2 of the Regional Spatial Strategy (RSS) (Ref. 4.1), Climate Change and Resource Use, states that resource demands from development should be minimised. The RSS also acknowledges that in delivering the core strategy more energy will need to be provided by combined heat and power, from renewable and more efficient energy sources. In addition, new developments are required to meet increasingly stringent targets with regards to renewable energy generation and Building Regulations. 4.6 A more detailed review of relevant policy and strategy for the Development is provided in the Planning Statement (EC3) and the Sustainability Statement (EC6). The nature of the Development is such that it should assist Leeds, and existing and proposed developments in the central Leeds area, in meeting policy requirements, Building Regulations and renewable energy targets. Alternatives 4.7 Under the EIA Regulations, an Environmental Statement (ES) is required to provide an outline of the main alternatives studied by the applicant or appellant and an indication of the main reasons for his choice, taking into account the environmental effects. The following sections review those alternatives to the proposed Development which have been considered by the applicant, including: 4-1
2 Option 1 - the No Development alternative; Option 2 - St. Mary s Road site; Option 3 - Leyland Road site; Option 4 - Park Lane College site; and Option 5 - Bridge Street site (Park Lane College and additional area). 4.8 In addition, the detailed design has gone through a number of iterations before reaching the Development that is the subject of the full planning application. The design evolution is discussed in greater detail below. Option 1 - 'No Development' Alternative 4.9 The No Development alternative refers to the option of leaving the Site in its current state. This option would be likely to result in the following impacts: A missed opportunity to redevelop this city centre Site, as part of the comprehensive regeneration of the EHQ area, that includes underutilised buildings and land; Not helping to meet emerging planning policy objectives for decentralised energy; No help in meeting renewable energy targets at a local and regional level; No low carbon heating, cooling and power for the proposed Eastgate Quarters development and other existing and proposed developments in the locality; Visual impacts to residents of Ladybeck Close would be avoided (refer to Chapter 8: Townscape and Visual Amenity); and Conversely, townscape benefits would not be achieved Overall, it is considered that the benefits of redeveloping the Site outweigh any adverse impacts that would arise. The proposed development of the Site accords with planning policy objectives as described above and in Chapter 7: Planning and Land Use. Option 2 St. Mary s Road Site 4.11 Option 2 comprised a previously developed but currently landscaped area, located adjacent to the north of the A64(M). Whilst the Site is suitable in terms of its location close to the city centre and potential clients for the LCEC, there were significant constraints for access and construction due to the local topography, and infrastructure to clients would have required routing beneath the A64(M). There would also have been a loss of local greenspace, which is limited in this area of the city. For these reasons this option was discounted. Option 3 Leyland Road Site 4.12 Option 3 is located approximately 420m to the north of the chosen LCEC site, in the Mabgate area of the city. This site is currently occupied by a derelict warehouse and a surface car park, and surrounding land use generally comprises commercial or light industrial uses, with the exception of the Leeds College of Building i.e. sensitive receptors are limited. The site offers plenty of space 4-2
3 for potential expansion of the building and convenient access. However, its distance from the city centre and potential clients would result in additional cost for infrastructure (laying pipe work to client sites) and a loss of transmission efficiency. This option was therefore discounted. Option 4 Park Lane College Site 4.13 Option 4 comprised the Park Lane College building, located on Bridge Street. The city centre location would ensure the site is suitable in terms of its proximity to LCEC potential clients. However, the small size of the site would present a significant constraint there would be insufficient space for a primary substation and insufficient space to allow delivery vehicles to turn. This option was not feasible. Option 5 Bridge Street Site (Park Lane College plus additional land) 4.14 The final site selected for the LCEC was the enlargement of the Park Lane College site, to encompass some of the transitional housing managed by the Riverside English Churches Housing Group (ECHG). The site location is close to a number of a potential LCEC clients, without prohibitive infrastructure cost implications and there is sufficient space for both access and the building footprint. Design Evolution 4.15 The design team identified the constraints and opportunities associated with the Site, and used the results of this exercise to develop a layout and design for the Development. A number of workshops were subsequently attended with key officers from Leeds City Council (LCC), to discuss the site layout and access, massing, façade design, and specific technical issues such as noise and air quality, and the scheme was revised according to the conclusions of the discussions. Key design changes were as follows: Site Layout: Options that did not require the realignment of Ladybeck Close were discounted as the demolition of 1-2 Ladybeck Close would still have been required, due to potential daylight impacts and Rights of Light issues. Realignment of Ladybeck Close created a larger potential area for the building footprint; Building Layout: Options were considered with the energy plant located in the northern or north west area of the LCEC building, with the transformers in the central section or along the eastern edge of the building respectively. These layouts were discounted primarily due to noise issues, though potential visual and daylight and sunlight impacts on the hostel also played a part. The transformers, which architecturally are of very little interest, were finally sited adjacent to the northern edge of the building, where they would effectively be concealed from almost all visual receptors (this is also the least sensitive façade in relation to noise); Massing: The building massing evolved to reflect the changes in plant layout and preferred choice of façade materials. Clusters of blocks of different height and a simple box (with variations in roof parapet height) were considered before the final design was fixed; Façade Materials: A solution was required that would provide the necessary visual interest at both a distant and near view level, that would help to recognise the development as an 4-3
4 industrial feature in the city centre townscape, create a new landmark building, and on a practical level could be easily maintained. Materials options included concrete panels and pipework cladding. Further detail on the options considered is provided in the Design and Access Statement (EC2); and Access: A delivery point on the Bridge Street western façade was considered to reduce potential noise impacts, but discounted due to transport and access constraints The Development has been designed to respond to a range of planning, commercial, technical and environmental issues. The design response to the identified constraints and opportunities is set out in Table 4.1 below. Table 4.1: Design Considerations and Constraints Issue Specific Considerations and Constraints Design Response Built Environment Adjacent Land Uses Noise and Air Quality The buildings on and in the immediate vicinity of the Site are not of architectural or historic interest and the existing local built environment generally lacks interest and continuity, though this area of the city has a relatively strong industrial heritage. There is therefore an opportunity to continue the tradition of interesting industrial architecture, and create a new landmark for the city. The scale of existing buildings around the Site is uneven - there are difficulties in responding to both the adjacent transitional residential units, and the scale of existing and proposed development in the city centre e.g. office tower block to north, Eastgate Quarters, Lunar Properties Ltd scheme and developments on Quarry Hill. Groups who would view or experience the LCEC would generally comprise local residents, pedestrians and motorists. The design of the LCEC building has therefore had to consider both near and distance views. With the land parcel to the east of Bridge Street remaining in its current use, sensitive residential receptors are located close to the Site, which have already been impacted by construction of the elevated A64(M) to the north and the Eastgate Loop Road to the east (and associated traffic noise). Background noise levels are relatively high due to traffic noise from the local highway network. An Air Quality Management Area is located across The design evolved to create a modern industrial, visually striking building at all levels. Whilst the building shape remains relatively simple, almost rectangular, the choice and mix of façade materials creates visual interest and texture, in addition to allowing views into the building, of the plant. The LCEC building responds both to the scale of existing development on the Site, and the scale of future development in the city centre. The Park Lane College building on-site is five storeys high. The new LCEC would have a larger massing than the college building and be more visually imposing at this intimate scale, given the proposed façade construction, colour and materials. The hostel provides only temporary accommodation, but it is acknowledged that there would be a visual impact to residents of both the hostel and housing on Ladybeck Close. Landscaping would be located along the eastern Site boundary to mitigate such impacts. Silver birch has been used in the landscape strategy since trees of this species can be planted very close together, to provide some screening even during winter when without leaves. Whilst there would be impacts to residents, there is also the wider context to consider and the opportunity to create a new landmark feature for the city centre site, as a symbol of sustainable development. The LCEC building has been located on the western edge of the Site to maximise the distance between the development and the hostel, and thus 4-4
5 Issue Specific Considerations and Constraints Design Response parts of Ladybeck Close to the east of the Site. reduce potential noise impacts. The chimney stack has been set at a sufficient height, and detailed dispersion modelling has been completed to ensure that there would be no significant impact to air quality (including local air quality for residents of Ladybeck Close). The façade design would meet stringent functional criteria, to provide the required level of noise attenuation and thus avoid noise impacts to local residents. Biomass fuel deliveries (a potentially noisy, albeit temporary and very infrequent activity) would be during daylight, non-peak hours to reduce noise impacts. The biomass fuel could be pumped into the storage silo from the delivery vehicle, but the decision has been taken to site a vacuum pump beneath the silo. This would be used instead of the vehicle pump, to reduce potential noise impacts. Microclimate Daylight levels at local residential properties have already been impacted to some level due to the Park Lane College building. The LCEC building has been located on the western edge of the Site to maximise the distance between the Development and the hostel, reducing potential daylight and sunlight impacts. Detailed wind and daylight and sunlight assessments have been completed to ensure no significant adverse environmental impact to local receptors. 4-5
Alternatives and Design Evolution: Planning Application 1 - RBKC
3 Alternatives and Design Evolution: Planning Application 1 - RBKC Design Freeze Draft One (January 2011) Figure 3-19 3.82 The design freeze draft one was a point in time in the evolution of the Masterplan
APPLICATION FOR PLANNING PERMISSION FOR A SOIL TREATMENT FACILITY AT KINGS CLIFFE LANDFILL SITE, STAMFORD, NORTHAMPTONSHIRE
APPLICATION FOR PLANNING PERMISSION FOR A SOIL TREATMENT FACILITY AT KINGS CLIFFE LANDFILL SITE, STAMFORD, NORTHAMPTONSHIRE DESIGN AND ACCESS STATEMENT Report Reference: AU/KC/SPH/1449/01/D&A/FIN Baddesley
Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT
Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT MAY 2015 1 Contents 1 INTRODUCTION 3 2 DRAFT NEW MUSEUMS SITE SPD 4 3 STRATEGIC ENVIRONMENTAL
21 Plumbers Row, London, E1 1EQ
Committee: Development Date: 19 th October 2011 Classification: Unrestricted Agenda Item No: Report of: Corporate Director of Development and Renewal Case Officer: Shahara Ali-Hempstead Title: Planning
Richmond upon Thames College. Draft Planning Brief. May 2008
Richmond upon Thames College Draft Planning Brief May 2008 1. Introduction 1.1 The purpose of this Planning Brief is to establish a development framework for the proposed comprehensive redevelopment of
Development proposals will require to demonstrate, according to scale, type and location, that they:-
Appendix 2 : Relevant Development Plan Policies Angus Local Plan Review 2009 Policy S1 : Development Boundaries (a) Within development boundaries proposals for new development on sites not allocated on
Development Brief for New Lodge, Bank Mill Lane Berkhamsted. Adopted November 2007
Development Brief for New Lodge, Bank Mill Lane Berkhamsted Adopted November 2007 This publication seeks your opinions about the design, layout and requirements for new housing development at New Lodge,
Development Management Officer Report Committee Application. Summary
Development Management Officer Report Committee Application Summary Committee Meeting Date: 15 Dec 2015 Item Number: Application ID: Z/2014/0978/F Target Date: 31 st October 2014 Proposal: Single storey
WELCOME PROPOSALS FOR PENTAVIA RETAIL PARK WELCOME TO OUR EXHIBITION WHICH SETS OUT OUR PLANS TO DEVELOP THE PENTAVIA RETAIL PARK SITE.
WELCOME WELCOME TO OUR EXHIBITION WHICH SETS OUT OUR PLANS TO DEVELOP THE PENTAVIA RETAIL PARK SITE. The purpose of the exhibition is to provide the community with the opportunity to view our initial ideas
Relevant Planning History P/2006/1070: Demolition of building and construction of supermarket and 14 2 bed flats. Withdrawn.
P/2010/1404/MPA St Marychurch Ward Former G A Insurance Buildng, Greenway Road/St Marychurch Road, St Marychurch Torquay Demolition of former G A building; formation of up to 7 retail units for purposes
K M D Hire Services, LONDON ROAD, NANTWICH, CW5 6LU
Application No: 11/2196N Location: Proposal: Applicant: Expiry Date: K M D Hire Services, LONDON ROAD, NANTWICH, CW5 6LU Extension and New Store Mr Dan Mellor 17-Aug-2011 SUMMARY RECOMMENDATION Approve
05 AREA/SITE SPECIFIC GUIDELINES
05 AREA/SITE SPECIFIC GUIDELINES Site 1 - Glass Yard The leisure centre that is currently located on this site should move to a more central location in the town centre close to the existing public squares.
Recycling & Energy Recovery Facility
Recycling & Energy Recovery Facility Cross Green Industrial Estate Leeds Environmental Statement Volume 1: Non-Technical Summary The Proposed Development Project Background Leeds City Council (LCC) intends
Palmer Street/Great Barr Street, (former MacDermid warehouse), Digbeth, Birmingham, B9 4AY
Committee Date: 23/01/2014 Application Number: 2013/09236/PA Accepted: 16/12/2013 Application Type: Full Planning Target Date: 17/03/2014 Ward: Nechells Palmer Street/Great Barr Street, (former MacDermid
28.0 Development Permit Area #2 (Neighbourhood District)
28.0 Development Permit Area #2 (Neighbourhood District) Goals and Objectives To provide a guide for infill and new development in the Neighbourhood District. To outline the nature, form and character
Site Deliverability Statement Alternative Site at: Bridge Road, Old St Mellons
Site Deliverability Statement Alternative Site at: Bridge Road, Old St Mellons Representor Number 1135 AS(N)4 Persimmon Homes 9 th February 2015 Contents Site Deliverability Statement Alternative Site
6 CONSIDERATION OF ALTERNATIVES
6 CONSIDERATION OF ALTERNATIVES 6.1.1 Schedule 4 of the Town and Country Planning (Environmental Impact Assessment) (Scotland) Regulations 2011 sets out the information for inclusion in Environmental Statements
redland house, bristol - public consultation exhibition
Preliminary proposals for a new office building on Simplyhealth Stoford Redland Hill Simplyhealth propose to build a new office building on Redland Hill to expand the company and its existing links with
VALIDATION REQUIREMENTS FOR PLANNING APPLICATIONS
Planning Services, Civic Offices, New Road, Grays, Essex RM17 6SL VALIDATION REQUIREMENTS FOR PLANNING APPLICATIONS Checklists to ensure prompt validation: Checklist 1 for ALL applications for planning
Development Management Report
Committee and Date Central Planning Committee 5 th April 2012 Item 13 Public Development Management Report Responsible Officer: Stuart Thomas email: [email protected] Tel: 01743 252665 Fax:
Planning should achieve high quality urban design and architecture that: Contributes positively to local urban character and sense of place.
15 BUILT ENVIRONMENT AND HERITAGE 15/07/2013 VC100 Planning should ensure all new land use and development appropriately responds to its landscape, valued built form and cultural context, and protect places
Subject: APPLICATION 10/02650/CA. DEMOLITION OF YOUTH CLUB, DEEPDALE LANE, BOSTON SPA, WETHERBY.
Originator: Victoria Hinchliff Walker Tel: 39 51343 Report of the Chief Planning Officer PLANS PANEL EAST Date: 28 th October 2010 Subject: APPLICATION 10/02650/CA. DEMOLITION OF YOUTH CLUB, DEEPDALE LANE,
KINGSTON TOWN PLANNING SUB-COMMITTEE 23 MARCH 2005. YELLOW BOX STORAGE 163-165, LONDON ROAD AND 50, GORDON ROAD, Application Number: 05/12156
APPENDIX C KINGSTON TOWN PLANNING SUB-COMMITTEE 23 MARCH 2005 YELLOW BOX STORAGE 163-165, LONDON ROAD AND 50, GORDON ROAD, Application Number: 05/12156 REPORT BY HEAD OF PLANNING AND DEVELOPMENT SUMMARY
23.1 RENEWABLE ENERGY
Proposed Hastings District Plan as Amended 23.1 Renewable Energy 23.1 RENEWABLE ENERGY 23.1.1 INTRODUCTION The use of energy is of fundamental importance to the function and development of our society.
Department of State Development, Infrastructure and Planning. State Planning Policy state interest guideline. State transport infrastructure
Department of State Development, Infrastructure and Planning State Planning Policy state interest guideline State transport infrastructure July 2014 Great state. Great opportunity. Preface Using this state
HurlinghamRetailPark. Aerial view of site. Welcome to our exhibition of proposals for the redevelopment of the Hurlingham Retail Park.
HurlinghamRetailPark Aerial view of site Welcome Welcome to our exhibition of proposals for the redevelopment of the Hurlingham Retail Park. Londonewcastle, a specialist residential developer, has been
Key Facts. Passenger growth at the airport is projected to grow to approximately 3 million passengers per annum by 2030.
Bournemouth Airport & Business Park 7 7 Bournemouth Airport & Business Park Introduction 7.1 Bournemouth Airport is a key asset for the region, one of the UK s fastest growing regional airports and is
1 Welcome. The exhibition comprises a series of boards which provide some background information to show you our initial ideas for the site.
1 Welcome Thank you for taking the time to attend this public exhibition of our proposals for residential development on Land at Daws Farm, Back Road, Writtle (site shown opposite). The exhibition comprises
Za abeel Energy City Master Plan. Dubai, United Arab Emirates
Dubai, United Arab Emirates Dubai, United Arab Emirates The Energy Master Plan is uniquely positioned as a center for both commerce and residential development. The project will embody modern, sustainable
WELCOME TO OUR EXHIBITION
WELCOME TO OUR EXHIBITION The purpose of the exhibition is to provide you with the opportunity to view our proposals and give feedback prior to the submission of a planning application to the London Borough
Perth and Kinross Council Development Control Committee 18 March 2009 Recommendation by Development Quality Manager
Perth and Kinross Council Development Control Committee 18 March 2009 Recommendation by Development Quality Manager 4(9) 09/161 Alteration and Extension to Existing Public House to Provide a New Bookmakers
K M D Hire Services, LONDON ROAD, NANTWICH, CW5 6LU
Application No: 11/2196N Location: Proposal: Applicant: Expiry Date: K M D Hire Services, LONDON ROAD, NANTWICH, CW5 6LU Extension and New Store Mr Dan Mellor 17-Aug-2011 SUMMARY RECOMMENDATION Approve
Design & Access Statement : Proposed Internal Devlopment & External Plant to Data Centre Facility, 35 Imperial Way, Croydon.
Design & Access Statement : Proposed Internal Devlopment & External Plant to Data Centre Facility, ARC-RP-A-002 Prepared by ARCMC Ltd July 2012: Issue A Contents 1. Introduction 2. Application Proposal
R&S. August 2014 Prepared by RandS Associated Srl. 1. Introduction
Building Engineer UK Registration Board n.075077h Design and Access Statement for Application for Planning Permission for demolition of a garage and construction of an extension to an existing Victorian
291 Harrow Road / 1-2 Elmfield Way and adjoining land, London W9
291 Harrow Road / 1-2 Elmfield Way and adjoining land, London W9 planning brief Supplementary Planning Document Adopted November 2011 Document title: 291 Harrow Road, 1-2 Elmfield Way and adjoining land
Guidance on Householder permitted development rights
FORWARD CONTENTS CLOSE Guidance on Householder permitted development rights Circular 1/2012 CONTENTS BACK FORWARD CLOSE 1. INTRODUCTION 04 2. BEFORE STARTING 05 3. MAIN CONCEPTS 07 Principal elevation
THE ROYAL BOROUGH OF KENSINGTON AND CHELSEA PLANNING APPLICATIONS COMMITTEE 16/06/2015
THE ROYAL BOROUGH OF KENSINGTON AND CHELSEA PLANNING APPLICATIONS COMMITTEE 16/06/2015 REPORT BY THE EXECUTIVE DIRECTOR, PLANNING AND BOROUGH DEVELOPMENT Application: /PP/15/02000 Agenda Item: N34 Address:
Welcome & background. www.theperfumefactory.info
Welcome & background Essential Living welcomes you to this community involvement event introducing the proposed redevelopment of The Perfume Factory, North Acton. EXISTING SITE PLAN AERIAL VIEW OF SITE
Construction Traffic Management Plan
Introduction This (CTMP) has been prepared in order to discharge Condition 20 of planning permission ref 07/02879/EFUL for the enabling site works associated with the wider Bath Western Riverside development.
Manchester City Council Planning and Highways Committee 2 June 2011
Application Number 095804/FO/2011/N1 Date of Appln 21st Mar 2011 Committee Date 2nd Jun 2011 Ward Cheetham Ward Proposal Location Applicant Agent Installation of 929 square metre mezzanine floor area to
PLANNING STATEMENT. Somerset House / 14 Elmtree Road Teddington. on behalf of Ashill Developments Ltd. May 2010
PLANNING STATEMENT Somerset House / 14 Elmtree Road Teddington on behalf of Ashill Developments Ltd May 2010 2827 UK House, 82 Heath Road, Twickenham, Middlesex TW1 4BW T 020 8843 8211 F 020 8843 8219
Land at Cofton Lake Road Cofton Hackett
Land at Cofton Lake Road Cofton Hackett Prepared by Pegasus Planning Group Richborough Estates February 2009 Bir.3085 1 2 Introduction This Background Document has been produced on behalf of Richborough
Chapter 12: Impacts, Mitigation, Cumulative Impacts and Residual Effects
Chapter 12: Impacts, Mitigation, Cumulative Impacts and Residual Effects REnescience Northwich Quality Management Prepared by: Tom Dearing Senior Environmental Consultant 02/10/15 Reviewed & checked by:
Kings Road, Beith. Development Brief. Part 1: Site Specific Information
Kings Road, Beith Development Brief Part : Site Specific Information Introduction Kings Road is a greenfield site on the north west edge of Beith and is currently let for grazing. The site is roughly rectangular
"Description of the urban and architectural development conceptual design of the historical city centre of Gorzow Wlkp. R3DC4T
"Description of the urban and architectural development conceptual design of the historical city centre of Gorzow Wlkp. R3DC4T Gorzów Wielkopolski Gorzów Wielkopolski is an important regional city centre
Manchester City Council List Item 10 Planning and Highways Committee 15 March 2012
Application Number 097574/FO/2011/N1 Date of Appln 30th Jan 2012 Committee Date 15 th March 2012 Ward Cheetham Ward Proposal Location Applicant Agent Retrospective Application for the continued use of
AGRICULTURAL BUILDING WITH PHOTOVOLTARIC SOLAR PANELS TO SOUTH FACING ROOF
DC/2015/00494 AGRICULTURAL BUILDING WITH PHOTOVOLTARIC SOLAR PANELS TO SOUTH FACING ROOF LAND AT ONEN, ADJACENT TO B4233, NP25 5EN. RECOMMENDATION: APPROVE Case Officer: Elizabeth Bennett Date Registered:
Advice can also be sought from specific specialist officers in the Council.
Canterbury City Council Validation of Planning Applications Guidance note 2010: Introduction Up to date advice on the validation of planning applications is contained in the CLG Guidance on information
Glossop Design & Place Making Strategy
Supplementary Planning Document to the High Peak Local Plan June 2011 Design Brief for the Town Hall Complex GILLESPIES I GERALD EVE Reproduced from the Ordnance Survey map with the permission of Ordnance
SCHEDULE 16 TO THE SPECIAL USE ZONE. Shown on the planning scheme map as SUZ16. BALLARAT RAILWAY STATION PRECINCT. Purpose
SCHEDULE 16 TO THE SPECIAL USE ZONE Shown on the planning scheme map as SUZ16. BALLARAT RAILWAY STATION PRECINCT Purpose To facilitate the revitalisation of the Ballarat Station Precinct in accordance
AGENT(S) / APPLICANT(S): AGENT Dave Dickerson, DK Architects. APPLICANT Halton Housing Trust. DEVELOPMENT PLAN ALLOCATION: Greenspace.
APPLICATION NO: 14/00168/FUL LOCATION: Land to the west of 19 Crow Wood Lane, Widnes. PROPOSAL: Proposed erection of 10 no. 1 bedroom apartments with individual access doors arranged in 2no. 2 storey height
Planning Brief for the Ashmount Primary School site. June 2012. Ashmount Primary School site planning brief June 2012 1
Planning Brief for the Ashmount Primary School site June 2012 Ashmount Primary School site planning brief June 2012 1 Ashmount Primary School site planning brief June 2012 2 1. Introduction 5 1.1 Purpose
Mount Browne (Surrey Police Head Quarters), Sandy Lane, Guildford Vision Statement. November 2013. with
Mount Browne (Surrey Police Head Quarters), Sandy Lane, Guildford Vision Statement November 2013 with Tibbalds Planning & Urban Design 19 Maltings Place 169 Tower Bridge Road London SE1 3JB Telephone 020
Site Deliverability Statement Development at: Beech Lane, Kislingbury. Persimmon Homes Midlands March 2015
Site Deliverability Statement Development at: Beech Lane, Kislingbury Persimmon Homes Midlands March 2015 Contents Site Deliverability Statement Development at: Beech Lane, Kislingbury 1.INTRODUCTION 1.1
2.50 Retirement villages - section 32 evaluation for the Proposed Auckland Unitary Plan
2.50 Retirement villages - section 32 evaluation for the Proposed Auckland Unitary Plan 1 OVERVIEW AND PURPOSE...2 1.1 Subject Matter of this Section...2 1.2 Resource Management Issue to be Addressed...2
Gold Property Developments welcomes you to this exhibition of the draft plans for the regeneration of the Holborn Studios site on Eagle Wharf Road.
WELCOME Gold Property Developments welcomes you to this exhibition of the draft plans for the regeneration of the Holborn Studios site on Eagle Wharf Road. The site covers approximately 0.37 hectares and
Sector Design Concepts
Section C Sector Design Concepts C7 Sector 7 Great North Road Underpass 6 6 6 C7. Existing situation Sector 7 refers to the cut and cover section of the project linking the northern end of the deep tunnels
Tall Buildings in the City of London
Tall Buildings in the City of London Published by the City of London Corporation, Department of the Built Environment, February 2015 Part 2 of 3: Sections 3 & 4 The report is divided into 3 parts, all
Report to Planning applications committee Item Date 6 March 2014 Head of planning services
Report to Planning applications committee Item Date 6 March 2014 Report of Head of planning services 4(7) Subject 13/02051/F Former Wellesley First School Wellesley Avenue North Norwich NR1 4NT Description:
Welcome to our exhibition
Welcome to our exhibition Welcome to this public exhibition for Cherry Park, Westfield, Stratford. This exhibition has been organised to update residents on Cherry Park, the next phase of development in
Design and Access Statement. 141-145 Earls Court Road London SW5 9RH
J U L I A N A R E N D T A S S O C I A T E S 1 7 a P i n d o c k M e w s L i t t l e V e n i c e L o n d o n W 9 2 P Y F + 4 4 2 0 7 2 8 6 9 9 0 1 Design and Access Statement T + 4 4 2 0 7 2 8 6 9 9 9 1
Welcome Welcome to the public exhibition for development at Bowman Field. This exhibition provides an overview of the proposals for the site.
Welcome Welcome to the public exhibition for development at Bowman Field. This exhibition provides an overview of the proposals for the site. Background & Planning Context The Site The site is an area
Walsall Council Validation Guide for submitting a Householder Planning Application
Walsall Council Validation Guide for submitting a Householder Planning Application Householder Planning Application Guide Introduction This guide offers help to people who are submitting a Householder
WELCOME. www.firstbase-haslemere.london
Aerial view of the existing site Welcome to the second public exhibition on our ideas for the future of the Haslemere Industrial Estate. We held our first public exhibition in June where we set out our
Orchard Barn, Newcastle Road, Blakelow, Cheshire, CW5 7ET. New Detached Double Garage Block with Integrated Garden Store and Loft Storage Area.
Application No: 13/2596N Location: Proposal: Applicant: Expiry Date: Orchard Barn, Newcastle Road, Blakelow, Cheshire, CW5 7ET New Detached Double Garage Block with Integrated Garden Store and Loft Storage
www.thefurlongphase2.co.uk
Welcome Thank you for coming along today to view our plans for Phase 2 of The Furlong Shopping Centre. We are undertaking a consultation programme that will run up to and beyond submission of the planning
The Future of Airport Design.. Sara Beardsley, AIA, LEED AP Senior Architect
The Future of Airport Design.. Sara Beardsley, AIA, LEED AP Senior Architect Form follows PerFormance FKI Headquarters Tower Exterior Wall FKI Headquarters Tower Exterior Wall Energy Collection FKI Headquarters
Permitted Development Rights: Non-Domestic Solar Panels and Domestic Air Source Heat Pumps Consultation
Permitted Development Rights: Non-Domestic Solar Panels and Domestic Air Source Heat Pumps Consultation Contents Introduction... 2 Responding to the Consultation... 3 Contact for Questions... 4 Permitted
Supplementary Guidance Stiùireadh Leasachail. Managing Waste in New Developments A Stiùireadh Sgudal ann an Leasachaidhean Ùra
Supplementary Guidance Stiùireadh Leasachail Managing Waste in New Developments A Stiùireadh Sgudal ann an Leasachaidhean Ùra March 2013 Managing Waste in New Developments Supplementary Guidance Contents
Manchester City Council Item 6 Planning and Highways Committee 8 May 2014
Application Number 104843/FO/2014/N1 Date of Appln 28th Feb 2014 Committee Date 8th May 2014 Ward Moston Ward Proposal Location Applicant Agent Change of use of ground floor to a hot food takeaway (Fish
Taylor Wimpey UK Ltd. December 2007
Taylor Wimpey UK Ltd December 2007 QM Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks Draft For Planning Date 3 August 2007 20 December 2007 Prepared by D Gooding P Barton Signature Checked
A new Garden Neighbourhood for West Guildford An opportunity for Smart Growth. university of surrey November 2013
A new Garden Neighbourhood for West Guildford An opportunity for Smart Growth university of surrey November 2013 A new Garden Neighbourhood for West Guildford Preface Since the County and Borough Councils
Development Brief Erskine Lodge Site, Great Whelnetham
Development Brief Erskine Lodge Site, Great Whelnetham Development Brief Contents 1.0 Introduction 2.0 Site Context 3.0 Development Constraints 4.0 Whelnetham Context Analysis 5.0 Development Opportunities
Ward: Purley DELEGATED BUSINESS MEETING Lead Officer: Head of Planning Control week of 23/03/2009
Ward: Purley DELEGATED BUSINESS MEETING Lead Officer: Head of Planning Control week of 23/03/2009 Application No. 09/00389/LP - 51-61 Whytecliffe Road South, Purley, CR8 1. SUMMARY 1.1 This report concerns
OMC Study Group MEETING 3: NOTES. Section 1: Building Design Page 2 Section 2: Site Layout Page 9 Section 3: Summary Page 16
OMC Study Group MEETING 3: NOTES Section 1: Building Design Page 2 Section 2: Site Layout Page 9 Section 3: Summary Page 16 Section 1 Building Design Page 2 of 16 General Comments during Building Design
Sergison Bates architects. 90 Masterplan for landscape and urban housing, Newham, London
90 Masterplan for landscape and urban housing, Newham, London 1 Client Barratt East London / London Development Agency Project duration: 005-1 Contract value: 10 million Gross internal area: 71,000m Housing
Erection of replacement warehouse building and erection of two buildings in connection with builder s merchants
Plan: O 02/00708/FUL Thames Ward (A) Address: Development: Applicant: London Works, Ripple Road, Barking Erection of replacement warehouse building and erection of two buildings in connection with builder
DEVELOPMENT BRIEF FOR LAND AT ALLOA ROAD, TULLIBODY
DEVELOPMENT BRIEF FOR LAND AT ALLOA ROAD, TULLIBODY 1.0 Introduction and Purpose 1.1 Clackmannanshire Council is seeking to dispose of a site at Alloa Road, Tullibody for redevelopment. The site extends
urban living and contributes positively to the character of
chapter six objective four Recognise the varied character of Hounslow s districts and seek to protect and improve their special qualities, heritage assets and overall townscape quality and appearance.
PLANNING APPLICATION: 12/00056/APP
PLANNING APPLICATION: 12/00056/APP In the event that a recommendation on this planning application is overturned the Committee is reminded of the advice contained on the front page of the agenda for Reports
Page 117. DEVELOPMENT CONTROL COMMITTEE - Date:1 September 2010. Report of the Executive Head of Planning and Transportation.
Page 117 Agenda Item 10 DEVELOPMENT CONTROL COMMITTEE - Date:1 September 2010 Report of the Executive Head of Planning and Transportation. Ref: A2010/63099/ADV WARD: A03 / STONECOT Time Taken: 5 weeks,
LILAC MILL AND BRIAR MILL, SHAW, OLDHAM
JD WILLIAMS LILAC MILL AND BRIAR MILL, SHAW, OLDHAM ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY SEPTEMBER 2010 CONTENTS 1. Introduction 1 2. EIA Approach 3 3. Description of Site, Surroundings and Proposed
The purpose of this meeting is to inform the public of the updates to the project, and to get input before the finalization of the project.
The purpose of this meeting is inform the public of the updates the project, and get input before the finalization of the project. The following panels describe the purpose and hisry of the project, along
POLICY DP6 Mitigating the impacts of development
POLICY DP6 Mitigating the impacts of development 1 Purpose of policy To ensure that developments provide appropriate mitigation for any negative impacts that they may have and additional needs that they
Development Layout Design
Development Layout Design General Design Considerations for Adoptable Highways Version 1 June 2012 Transportation, Waste and Environment Service Issue and Revisions Record Revision Date Originator Purpose
Council Policy for New Telecommunication Facilities
Council Policy for New Telecommunication Facilities 1. Purpose To establish policies and procedures for the installation of new telecommunication antennas, towers and related structures which emphasize
approval of matters specified in conditions; and The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013
Application for: planning permission; planning permission in principle; further applications; approval of matters specified in conditions; and mineral workings (if the planning authority do not have a
SOLAR ENERGY FACILITIES ZONING AMENDMENTS
SOLAR ENERGY FACILITIES ZONING AMENDMENTS 1. In Section 10, Special Regulations, of the Zoning Bylaw, insert a new Section 10.06, to be entitled Solar Energy Facilities and to read as follows: SECTION
Contents Planning statement
Contents Planning statement 1 Introduction 1 2 The form of the planning application 5 3 The Site and surrounding area 7 4 The proposed development 17 5 Implementation 27 6 Regeneration benefits 31 7 Consultation
Recommendations for future developments
C Recommendations for future developments C.1 Reducing flood risk through site layout and design C.1.1 C.1.2 Flood risk should be considered at an early stage in deciding the layout and design of a site
On the instruction of Ros Goode & Roland Morgan, Joint Fixed Charge Receivers
FOR SALE On the instruction of Ros Goode & Roland Morgan, Joint Fixed Charge Receivers Land at Teville Gate, Teville Road, Worthing, West Sussex BN11 1AZ ibrochure - www.cbre-ibrochure.co.uk/worthing ENTER
Decision Due Date: 15 April 2015. Site visit date: 12 & 25 March 2015
App.No: 150172 (PPP) Officer: Toby Balcikonis Decision Due Date: 15 April 2015 Site visit date: 12 & 25 March 2015 Ward: Upperton Type: Planning Permission Site Notice(s) Expiry date: 21 March 2015 Neighbour
13 Oakleigh Gardens London N20 9AB
Location 13 Oakleigh Gardens London N20 9AB Reference: 15/00608/HSE Received: 2nd February 2015 Accepted: 2nd February 2015 Ward: Oakleigh Expiry 30th March 2015 Applicant: Mr A Peqini Proposal: Single
COUNTY OF LAMBTON OFFICIAL PLAN UPDATE BACKGROUND REPORT NO.
COUNTY OF LAMBTON OFFICIAL PLAN UPDATE BACKGROUND REPORT NO. 6 RENEWABLE ENERGY Image Source: (Word Clip Art Stock Photo, 2011) Date: May, 2015 BACKGROUND PLANNING AND DEVELOPMENT SERVICES DEPARTMENT 789
LONDON ROAD SEVENOAKS
WELCOME TO THE BERKELEY HOMES EXHIBITION Train Station Gr anv i ll e Dar tford Road Lo ad Ro nd on ad Ro Eard SITE Th ed riv e ley R oad on R oad A 224 Gord Pem b rok e Roa d Site Location Since the submission