Fire Alarm System Plans Submittal Guidelines For New and Existing Systems

Fire Alarm Systems Requirements by Occupancy Type

TAMARAC FIRE RESCUE INSTRUCTIONS FOR FIRE ALARM PRE-SUBMITTAL CHECKLIST

DELAWARE STATE FIRE MARSHAL FIRE ALARM SYSTEM CERTIFICATE OF INSTALLATION

FIRE ALARM AND DETECTION SYSTEMS SECTION 16721

FIRE ALARM AND EMERGENCY COMMUNICATION SYSTEM RECORD OF COMPLETION

FIRE ALARM SYSTEMS PERMIT APPLICATION, PLAN SUBMITTAL, DESIGN, INSTALLATION AND INSPECTION REQUIREMENTS Effective Date: January, 2011

FIRE ALARM SYSTEM RECORD OF COMPLETION

CHANGES IN NFPA 72 NATIONAL FIRE ALARM CODE

FIRE ALARM SYSTEM RECORD OF COMPLETION

Module 4, Lesson 12 Fire Alarm Systems

PLAN REVIEW GUIDE FOR FIRE ALARM

2012 Ontario Building Code Changes Affecting Fire Alarm Systems

Fire Alarm System Plans Review Checklist Property location Date of Review

FIRE ALARM SYSTEMS PERMIT APPLICATION, PLAN SUBMITTAL, DESIGN, INSTALLATION AND INSPECTION REQUIREMENTS Effective Date: January 2014

FireSeeker Fire Alarm Control Panel Model FS-250 Programming Manual

University Design Standard. Fire Alarm Systems

SARATOGA FIRE DISTRICT EARLY WARNING FIRE ALARM SYSTEM STANDARDS AND REQUIRMENTS CONTENTS

AETNA FIRE ALARM SERVICE CO., INC.

FIRE ALARM AND EMERGENCY COMMUNICATION SYSTEM INSPECTION AND TESTING FORM

CLARK COUNTY FIRE DEPARTMENT Fire Hazard & Prevention Services

FLORIDA ATLANTIC UNIVERSITY FIRE ALARM SYSTEM INSTALLATION MANUAL

NFPA 72. Exception No. 1: Where ambient conditions prohibit installation of automatic smoke detection, automatic heat detection shall be permitted.

FIRE ALARM SYSTEM SUBMITTAL CHECKLIST AND APPLICATION

CLASS TITLE: Two-Way Wired Emergency Communication Systems (ECS), and Wireless Emergency Responders Radio Coverage Systems (ERRCS)

FVSU REPAIR & UPGRADE FIBER OPTIC SECTION FIRE ALARM SYSTEM CONNECTIVITY

Original Document 10/16/07 Revised 01/30/09 2 nd Revision rd Revision- 12/18/14

2007 ICC FINAL ACTION AGENDA

INSTRUCTIONS FOR BUILDINGS WITH FIRE PROTECTION EQUIPMENT

FIRE ALARM SYSTEM PLAN SUBMITTAL CHECKLIST

Life Safety Code Enabling References

Mobile Fire Rescue Department Bureau of Fire Prevention

City of Riverside Building & Safety Division Phone: (951)

Rancho Cucamonga Fire Protection District Prevention Bureau Standard

Fire Alarm and Detection Systems And Central Station Monitoring Plan Submittal Guidelines

Fire Alarm Submittal Requirements and Acceptance Testing

Finance and Administration Department 907 Billy Mitchell Blvd. P: (210) Fire Alarm Permit Application

Low Frequency Notification Appliances

Emergency Voice Communication in High-Rise Buildings. Presented by: Michael J. Klemenz, PE, SFPE

1. The objective of this guideline is to provide minimum standards for design and installation of fire alarm systems for the University of Missouri.

EXHIBIT A SCOPE OF WORK

The Mission Critical Fire Protection Experts

CHAPTER. Fire Alarm Systems APPROVAL AND ACCEPTANCE. Shop Drawings

FIRE ALARM APPLICATION

General Safety & Health Standards Published by the Division of Building Safety In Cooperation with the Idaho Industrial Commission

City of Bettendorf Fire Alarm System Requirements

SCHOOL FIRE AND LIFE SAFETY INSPECTION CHECKLIST

Telluride Fire Protection District Fire Alarm Systems Policy Version 03/2007

City of Columbus Department of Building and Zoning Services

FIRE AND LIFE SAFETY REQUIREMENTS FOR CONVENTIONS, TRADE SHOWS AND EXHIBITS

MINNESOTA HEALTH CARE ENGINEERS IN ASSISTED LIVING FACILITIES

General Fire Code Requirements Within Commercial Tenant Spaces

Fire Alarm System Monitoring - CAN/ULC-S561-03

Commercial Fire Alarm Standards July 1, 2010 Edition Page 1 of 14

POSITION STATEMENT THE ENGINEER AND THE ENGINEERING TECHNICIAN DESIGNING FIRE PROTECTION SYSTEMS. July 28, 2008

LOUISVILLE FIRE PROTECTION DISTRICT 895 West Via Appia, Louisville, Colorado

c. As mandated by law, facilities must obtain and maintain valid zoning permits as well as permits for intended use.

Understanding Fire Alarm Requirements & Inspections. Presented By Bill Conroy Technical Sales For Briscoe Protective Systems Inc

Module 5. Fire and Emergency Alarm System Part I- Basics

NC State University Design and Construction Guidelines Division 26 Fire Alarm Systems

SECTION ( ) FIRE DETECTION AND ALARM SYSTEM

Fire Alarm Systems Certification

NATIONAL FIRE ALARM AND SIGNALING CODE

build safe live safe

How To Install A Carbon Monoxide Detector

Rhode Island State Fire Marshal Fire Protection Systems Narrative Reports. What is a Narrative Report?

OBOA 2009 Huntsville, ON Overview of ULC Standards Affecting Building Occupancy Alan Cavers Area Manager Fire & Security Systems Group

FIRE ALARM PLAN REVIEW. Office of the State Fire Marshal Massachusetts Department of Fire Services December 2009

SECTION FIRE ALARM AND DETECTION SYSTEM

527 CMR: BOARD OF FIRE PREVENTION REGULATIONS

SECTION FIRE ALARM AND SMOKE DETECTION SYSTEMS

Interfacing Elevators with Fire Alarm and Sprinklers

Electrical Contractors. and the. New Jersey. Rehabilitation Code

Fire Alarm Systems Permit Packet. City of Greer Fire Department

CHAPTER 9 FIRE PROTECTION SYSTEMS

COMMISSIONING OF FIRE ALARM SYSTEMS

MERCER ISLAND FIRE DEPARTMENT FIRE COMMERCIAL SPRINKLER STANDARDS

FIRE DETECTION AND ALARM

Division 21. Fire Suppression

CITY OF PHILADELPHIA DEPARTMENT OF LICENSES AND INSPECTIONS ANNUAL CERTIFICATION FOR FIRE ALARM SYSTEMS

SECTION FIRE ALARM AND DETECTION SYSTEMS

HERNANDO COUNTY FIRE ALARM GUIDELINES

C. Conform to requirements of Americans with Disabilities Act (ADA).

COMMONWEALTH OF MASSACHUSETTS STATE BUILDING CODE 780 CMR, 6 th Edition FIRE PROTECTION SYSTEMS CHAPTER 9

Sam Docknevich, PSP, Security Service Portfolio Manager. Are You Prepared? The impending impact of Code on Servicing Security Systems

FIRE ALARM SYSTEM. A. Shop drawings shall be submitted as follows: 1. Manufacturer's published literature. for aspproval.

BUILDING INSPECTORS INSPECTION FORM FOR CHILD CARE CENTERS

JULY 2013 UCB STANDARDS

FIRE SPRINKLER SYSTEM SUPERVISORY SERVICE User s Guide (DamarNet RAR Service)

Michael Catalano 24 Nassau Avenue, Islip NY Phone (631) Chief Fire Marshal Fax (631)

rpsa FIRE PROTECTION ENGINEERS

The replacement or modification of existing windows shall comply with the following requirements:

Educational. Educational-Existing 1/28/2014. OCCUPANT LOADS [no change] Application. Application

Approval Standard for Fire Alarm Signaling Systems

Bold items are particular to the City of Euless

TESTING, INSPECTION, AND MAINTENANCE FREQUENCIES FOR FIRE DETECTION AND ALARM SYSTEMS

SECTION DETECTION AND ALARM

Transcription:

IR F-1 Disciplines: Fire/Life Safety History: Revised 10-01-15 Issued 06-23-15 PURPOSE: This Interpretation of Regulations (IR) is being issued by the Division of the State Architect (DSA) to clarify when the installation of Fire Emergency Voice/Alarm Communication (EVAC) systems in public schools is required and what portions of the system/design DSA will plan review. BACKGROUND: The 2013 California Code of Regulations,Title 24 Part 2 California Building Code (CBC) Section 907 and Part 9 California Fire Code (CFC) Section 907 require EVAC systems in Group E occupancies and some specific Group A occupancies. INTERPRETATION: 1. GENERAL REQUIREMENTS: 1.1 EVAC systems are dedicated systems for originating and distributing voice instructions and alert/evacuation signals pertaining to fire emergencies. Alternate uses other than for fire emergencies are allowed in compliance with CBC/CFC 907.5.2.2.3. 1.2 EVAC systems shall be designed and installed in compliance with NFPA 72. 1.3 The EVAC voice instructions shall be automated when the EVAC is activated by fire/smoke detection devices, sprinkler waterflow devices or manual fire alarm boxes. There shall also be a manual override and live voice message capability in compliance with CBC/CFC 907.5.2.2.1 and 907.5.2.2.2. 2 REQUIREMENTS BY OCCUPANCY GROUPS: 2.1 Assembly Group A EVAC systems are required for Group A occupancies as follows: Any Group A occupancy with an occupant load of 1000 or more (CBC/CFC 907.2.1.1). Any Group A occupancy when located in a Group E occupancy campus or building (CBC/CFC 907.2.3.2). 2.2 Educational Group E EVAC systems are required for Group E occupancies as follows: Any Group E occupancy with an occupant load of 50 or more (CBC/CFC 907.2.3). Any Group E occupancy containing more than one room used for Group E, regardless of total occupant load (CBC/CFC 907.2.3). Any Group E occupancy containing more than one room used for Group I-4 day care, regardless of total occupant load (CBC/CFC 907.2.3). 2.3 Other Occupancy Groups EVAC systems are not required for other occupancy groups except as noted in Section 4 of this IR. 3. REQUIREMENTS FOR K-12 SCHOOLS 3.1 New Campuses All buildings or assembly uses (all occupancy groups) on a new campus, except as identified in Section 3.5 below, must comply with the EVAC requirements in Section 907 IR F-1 (rev 10-01-15) Page 1 of 5

of the CBC/CFC. 3.2 Existing Campuses EVAC requirements in Section 907 of the CBC/CFC are applicable to all existing buildings or assembly uses, except as identified in Section 3.5 below, on an existing campus as follows: 3.2.1 Conditions that require retrofit for EVAC compliance: Alterations or replacement of the entire campus-wide fire alarm system. 3.2.2 Conditions that do not require retrofit for EVAC compliance: entire campus wide fire alarm system. Reconstruction. Unless the reconstruction includes the alteration or replacement of the entire campus-wide fire alarm system. 3.3 New Buildings or Assembly Uses on Existing Campuses All new buildings or assembly uses, except as identified is Section 3.5 below, must comply with the EVAC requirements in Section 907 of the CBC/CFC. 3.4 Existing Buildings or Assembly Uses on Existing Campuses EVAC requirements in Section 907 of the CBC/CFC are applicable to individual buildings or assembly uses, except as identified is Section 3.5 below, as follows: 3.4.1 Conditions that require retrofit for EVAC compliance: Additions. The new area must comply but the existing area is not required to be retrofitted. Alterations. Only if the entire fire alarm system is being altered/replaced. Reconstruction. Only if the entire fire alarm system is being altered/replaced. Rehabilitation of non-conforming buildings/facilities. 3.4.2 Conditions that do not require retrofit for EVAC compliance: entire fire alarm system. Reconstruction. Unless the alteration includes the alteration or replacement of the entire fire alarm system. 3.5 Exceptions 3.5.1 The following are exempt from EVAC requirements and thus do not require EVAC systems: Short-term use relocatable buildings intended to be sited for less than three years. Buildings with no more than one classroom and an occupant load of 49 or less as long as the building has a minimum 20-feet separation from any adjacent building or can otherwise be considered a separate building by code analysis. Detached buildings used for non-instructional purposes or incidental to instruction purposes. Such buildings include but are not limited to: Concession stands, snack bars, ticket booths, press boxes, dugouts, batting cages, shade structures, storage buildings, agricultural buildings, barns, greenhouses, pump stations, mechanical buildings, and other similar buildings and areas. IR F-1 (rev 10-01-15) Page 2 of 5

3.5.2 The exception listed in CBC/CFC Section 907.2.3.3 (occurs in the 2013 CBC/CFC prior to July 1, 2015) is not applicable since the system listed therein was not explicitly DSA-approved. 4. REQUIREMENTS FOR COMMUNITY COLLEGES: 4.1 New Buildings or Assembly Uses Section 2 of this IR applies to new facilities/buildings. 4.2 Existing Buildings or Assembly Uses Section 2 of this IR is applicable to individual buildings or assembly areas as follows: 4.2.1 Conditions that require retrofit for EVAC compliance: Additions. The new area must comply but the existing area is not required to be retrofitted. Alterations. Only if the entire fire alarm system is being altered/replaced. Reconstruction. Only if the entire fire alarm system is being altered/replaced. Rehabilitation of non-conforming buildings/facilities. 4.2.2 Conditions that do not require retrofit for EVAC compliance: entire fire alarm system. Reconstruciton. Unless the alteration includes the alteration or replacement of the entire fire alarm system. 5. DSA PLAN REVIEW 5.1 Items DSA Will Plan Review DSA plan review will be limited to verifying the following are correctly shown/specified in the project drawings or specifications: 5.1.1 The Sequence of Operation matrix includes EVACS. EVACS shall be activated by any automatic fire detector, sprinkler waterflow device or manual fire alarm and shall sound an alert tone followed by voice instructions. (CBC 907.5.2.2) 5.1.2 EVACS notifications take priority over non-emergency notifications. (NFPA 72, 24.3.5.1) Using one speaker system for multiple communication systems is acceptable. Risk analysis may determine that an EVACS notification shall have priority over the fire alarm if, for example, there is an emergency event and the fire alarm system is in alarm mode when the EVACS is activated, the fire alarm system shall automatically return to alarm mode after EVACS notification is complete. The best place to show these items is on the Sequence of Operation matrix. 5.1.3 CSFM listing numbers are listed on the drawings for EVACS equipment, appliances and devices. They should match the CSFM listing sheets. 5.1.4 EVACS voltage drop/battery calculations are provided. NFPA 72, 10.6.7.2.1(2) requires emergency power backup capable of 24 hours quiescent load and 15 minutes connected load. 5.1.5 The plans show EVACS speaker locations and power settings. Although it is IR F-1 (rev 10-01-15) Page 3 of 5

important for EVACS speaker locations to provide a distributed sound level with minimal sound intensity variation to achieve an intelligible voice message, intelligibility is a design/inspection issue, not a plan check issue. The intelligibility of the system is required per NFPA 72, 24.3.1 and is the responsibility of the EVACS designer. DSA will not review or comment on intelligibility. 5.1.6 The plans show EVACS paging locations. (CBC 907.5.2.2) Paging locations must have, at a minimum, one speaker at: Elevator groups, i.e., elevators physically adjacent to each other that answer to common hall call buttons (but not elevator cabs; see NFPA 72, 24.4.2.8.4.1) Exit stairways (but not in enclosed stairways; see NFPA 72, 23.8.6.2) Each E and A occupancy room on each floor Areas of refuge At areas for Assisted Rescue, speakers in addition to those listed above may be required to achieve intelligibility but DSA will not review their number or location. 5.1.7 A permanent sign is affixed next to the microphone with instructions on its proper use. (NFPA 72, 24.3.2) 5.1.8 EVACS control location is indicated. (NFPA 72, 24.4.2.5.1) System controls must function properly during an emergency event. EVACS controls shall be located so they are accessible to authorized personnel and secure from damage due to tampering. 5.1.9 UL/CSFM listed wiring is provided. Shielded wire is required; fire protected wire is not required except to connect control equipment to Areas of Refuge and Areas for Assisted Rescue.(NFPA 72, 24.3.6.9) 5.1.10 A note is provided that all notification appliances within a signaling zone are synchronized. (NFPA 72, 24.4.2.9.2) 5.1.11 A note is provided that all System Documents must be collected and stored on site in a documentation cabinet. (NFPA 72, 7.7) 5.2 Items That Must Be Submitted As Supporting Documentation 5.2.2 The FACP has EVACS capability. Existing older model FACPs do not have this capability. 5.2.3 Cut sheets and CSFM Listing sheets are provided showing UL/CSFM approved EVACS equipment, appliances and devices. 5.3 Items DSA WILL NOT Plan Review 5.3.2 Risk Analysis report 5.3.3 Acoustics Report 5.3.4 Acoustically Distinguishable Space (ADS) locations 5.3.5 Speaker spacing DSA will not review speaker spacing and its impact on intelligibility. A proper design will depend on the engineer s clear understanding of the interior finish materials and the volumetric geometry of every space. IR F-1 (rev 10-01-15) Page 4 of 5

5.3.6 Circuit survivability Since schools are intended to be fully vacated, circuit survivability is not required except as noted in 5.1.9 above. (NFPA 72, 24.4.2.8) 5.3.7 Alternate uses of the EVAC system. DSA reviews for code minimum. Code minimum use for EVAC systems is for originating and distributing voice instructions and alert/evacuation signals pertaining to fire emergencies. Therefore, DSA will not plan review alternate uses of the system. 6. TESTING AND INSPECTIONS Testing and Inspection shall be as required by the NFPA-72. The System Record of Completion and other NFPA-72 forms and documents shall be utilized as applicable. The Inspector of Record shall witness the tests and sign forms as the AHJ representative. Noncompliant tests shall be reported by the Inspector of Record as a deviation. Documentation of the installation and testing of the EVAC, and Fire Alarm system, shall be attached to the NFPA-72 Record of Completion and a copy shall be placed in the Inspector of Record s job file. All documents shall be stored in the Documentation Cabinet as required by NFPA- 72. Documentation of the installation and testing is not required to be submitted to DSA unless requested in writing by a DSA supervising Structural Engineer or Supervising Architect. REFERENCES: 2013 California Code of Regulations (CCR) Title 24 Part 2, California Building Code, Section 907 Part 9, California Fire Code, Section 907 NFPA 72, Section 24 This Interpretation of Regulations (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the jurisdiction of DSA which includes State of California public elementary and secondary schools (grades K-12), community colleges, and state-owned or stateleased essential services buildings. This IR indicates an acceptable method for achieving compliance with applicable codes and regulations, although other methods proposed by design professionals may be considered by DSA. This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA website for currently effective IRs. Only IRs listed in the document at http://www.dgs.ca.gov/dsa/resources/irmanual.aspx at the time of plan submittal to DSA are considered applicable. IR F-1 (rev 10-01-15) Page 5 of 5