164,491 SF Food Production Facility Situated on 10 Acres Available in



Similar documents
Office Space for Lease th St, DeWitt

May 5, Client Client Address. Re: Inspection Address, Chicago, Illinois. Dear Mr. Client,

October 5, 2015 Dear Client,

LogisticsCentre IV Distribution Center

Applications for building permits will not be reviewed until all of the required information has been submitted.

Building Condition Assessment Report

How To Get A Building Permit In Florida

HOMEOWNER S PERMIT GUIDE

Property Condition Assessment

MURCH ELEMENTARY SCHOOL

FOR SALE Office Building

Building Condition Assessment Report

Guidelines for energy efficient heating, ventilation and air conditioning (HVAC) systems

Board Seminar Facilities. School Year Submitted by Joseph L. Lisa-Director of Facilities

Nominal Life Expectancy for Building Components

INDUSTRIALS COLD STORAGE FACILITIES

LITITZ MUTUAL INSURANCE COMPANY 2 North Broad Street Lititz, Pennsylvania - MAIN OFFICE -

Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa Phone: Fax:

Data Center Components Overview

City of Elk River BASEMENT Office Use Only

Elevating Your House. Introduction CHAPTER 5

Commercial Building Valuation Report

C I T Y O F P E A R S A L L

Cold Room & Refrigeration System (Casserole Assembly) No of units: 1

Data Center Due Diligence List

SECTION MORTUARY REFRIGERATORS

USDA FROZEN FOOD PLANT

New River Valley Commerce Park Virtual Shell Building

LogisticsCentre IV Distribution Center

2. What building projects are exempted? (permit not required)

Saint Cloud Business Center

INDUSTRIAL FACILITY FOR SALE SUBLEASE 400 INDUSTRIAL DRIVE BIRMINGHAM, AL

SWIMMING POOL HEAT PUMP

Basement Moisture Problems

Self-Home Inspection Checklist

Home Inspection Report

For Lease or Sale. Landmark Campus. Route 2 Commerce Park 100 Simplex Dr Westminster, MA. 474,105 SF for Lease (easily divisible) World-class Campus

Veterans Memorial Coliseum Options Study Appendix A - Deconstruction Scope of Work and Cost Estimate August 31, 2015

29 Broadway- 14 th Fl Tel: New York NY Fax: Due Diligence Report. New York, New York

INVESTMENT OFFERING QUALITY MULTI-TENANT FLEX BUILDING N. CORRINGTON AVENUE KANSAS CITY, MO 38,954 TOTAL SF ASKING PRICE: $2,700,000

BUNKER HILL ELEMENTARY SCHOOL

Element D Services Plumbing

Xcel Business Customers: Program and Rebate Summary

APPLICATION FOR NEW CONSTRUCTION

Integrated Solar Radiant Systems

CLIENT. Inspection Report. 271 Front St. Alert Bay, B.C. Island Building Inspections V ANCOUVER I SLAND B. C.

Solving Persistent Moisture Problems and Moisture Damage

48. AQUARIUM. Aquarium. Classification: Cluster: Location: Close to junction of Inselrhue and Loiter Way, Belle Isle. Total Area: No.

TOWN of NEW BOSTON. Bid Package. Refurbishment and Upgrade of Basement of the New Boston Town Hall

Executive Flight Office & Hangar

Commercial Building Valuation Report

100 Locust Avenue, Berkeley Heights, New Jersey P R O P E R T Y O F F E R I N G

University of Vermont

DIVISION 1 THIRD FLOOR COUNTY ATTORNEY. Remediation Plan Remove approximately 6 SF of mold impacted drywall Remove all carpeting in hatched.

SANITATION AND PEST CONTROL INSPECTION REPORT INSPECTOR: BUSINESS NAME:

AVAILABLE FOR LEASE ±6,500 Sq. Ft. Fully Furnished Office Space and ±6,300 Sq. Ft. Industrial Space

HAMILTON SCHOOL Brentwood Parkway, N.E., Washington, DC INITIAL YEAR BUILT 1968 BUILDING AREA

BUILDING PERMIT SPECIFICATIONS

NORTH PENN HIGH SCHOOL RENOVATIONS

Renovating Your Basement

Subpart 1. Installation. All plumbing systems must be. installed and tested according to this chapter and chapter 4715,

ABSTRACT. aspects of potential waste heat recovery systems and the economics of installing them at selected survey factories.

2014 British Columbia Building Code Changes

American Safety Insurance Company

AVAILABLE WORLD CLASS AIRCRAFT MANUFACTURING & MAINTENANCE COMPLEX. 46,000 + to 1,200,000 + SF Available

EFFECTIVE FEBRUARY note: drainage permit required to call for a dampproof inspection

Building Condition Assessment: North Howard Street Baltimore, Maryland

CONDENSATION IN REFRIDGERATED BUILDINGS

PLANT LOCATION AND LAYOUT

SECTION TABLE OF CONTENTS. H Proposed Material, Product or Equipment Substitution Request

Summit Series Single Section and Double Section Homes

Land Use and Environmental Service Agency (Code Enforcement) NC Plumbing Code. Table of Contents

AT&T Internet Data Center Site Specification New York III (Secaucus, NJ)

COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES

Building Code Clarifications - 7. Fire Resistance

APPLICANT: ORANGE COUNTY, NEW YORK

Oil Spill Clean-up by Homeowner in Ohio *

Replacement of Heating, Ventilation, Air Conditioning (HVAC) Units In Apartments Located at 641 Fifth Avenue. Photo Essay

NIAGARA Niagara Blower Heat Transfer Solutions

Chapter 2: Foundations

C-2 Construction, Inc. - NAICS Codes

This report presents the findings and recommendations of the assessment of energy use and

Building Owners Guide to a Duro-Last System!

Vision Home Inspection

AVAILABLE FOR LEASE ±6,500 Sq. Ft. Fully Furnished Office Space and ±6,300 Sq. Ft. Industrial Space

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE NOTICE TO PROPERTY OWNER

For Sale N. Knox Ave., Chicago, IL $1,350,000 27,600 sq.ft.

CERTIFICATE OF COMPLIANCE Prescriptive Residential Re-roof Project Name:

EXPECTED USEFUL LIFE TABLE

Holz Choices & Specifications

Topics for Today. Order of Magnitude Mechanical Estimating. Order of Magnitude Estimate Goal. Project Delivery Methods. Questions for Client

PLUMBING, HEATING & AIR CONDITIONING, REFRIGERATION & BOILER INSTALLATION CONTRACTORS QUESTIONNAIRE

NYC Department of Education Building Condition Assessment Survey BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 10004

Air Conditioning. The opportunity for energy efficiency. Low cost actions to reduce energy usage now

TARRANT COUNTY PUBLIC HEALTH DEPARTMENT fax FOOD ESTABLISHMENT REVIEW APPLICATION

Physical Address/Intersection: Name of Project: Within a NFIP 100/500yr Floodzone:

Industrial Suburban District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations

31 Linden Lane Kirby Muxloe Leicestershire LE9 2EG

Commercial Portable Air Conditioners

CONSTRUCTION SPECIFICATIONS

Transcription:

164,491 SF Food Production Facility Situated on 10 Acres Available in Buffalo, New York CONSTRUCTION Acid resistant brick and coated floors in the production area with drains; clear ceiling heights from 10 8-29 ; combination of tile, non-porous plastic wall liners, IMP and brick walls in production area and combination of block, tilt and IMP exterior walls LOCATION Ideally located in the City of Buffalo and less than ½ mile from I-190 with high visibility from this roadway TRUCK LOADING Sixteen (16) total doors including thirteen (13) dockhigh loading doors with levelers and three (3) drivein doors that provide access to the compressor, electrical and boiler rooms LIGHTING Mostly high efficiency T5 lights, encased in the production areas as per food safety regulations. UTILITIES Power supplied by National Grid; water supplied by Buffalo Water; sewer supplied by Buffalo Sewer Authority (handling effluent discharge with minor pre-treatment); natural gas supplied by National Fuel REFRIGERATION Production and warehouse areas supported by an ammonia refrigeration system featuring blast freezers, spiral freezers, refrigerated production space and warehouse space The information contained herein is from sources deemed reliable, but no warranty or representation is made as to the accuracy thereof and no liability may be imposed.

TYSON FOODS 665 PERRY STREET BUFFALO, NEW YORK 14210 SIZE: Office (lockers, café, welfare): 22,950 sq. ft. Production: 69,883 sq. ft. Refrigerated Storage: 27,977 Frozen Storage: 9,132 sq. ft. Dry Storage: 12,125 sq. ft. Mechanical/Support: 22,424 sq. ft. Total: 164,491 sq. ft. GROUND: NUMBER OF BUILDINGS: NUMBER OF FLOORS: DIMENSIONS: 10.27 acres One (1) single story food processing building One (1) with some mezzanine and penthouse space Irregular CONSTRUCTION: Floor: Office: Combination of tile and carpet over concrete slab Production: Combination of acid resistant brick flooring and coated, slip and acid resistant flooring. All production areas have floor drains or trench drains. Refrigerated Storage: Ventilated concrete slab Frozen Storage: Ventilated concrete slab Dry Storage: +/-6 concrete slab Mechanical/Support: +/-6 concrete slab

Walls: Office: Combination of sheet rock, decorative tile and brick Production: Combination of tile, nonporous plastic wall liners, insulated metal panels and brick Refrigerated Storage: Insulated metal panels Frozen Storage: Insulated metal panels Mechanical/Support: Masonry block and insulated metal panels Columns: Production: Many clear span areas with 12 concrete columns in Cooler 5, Kitchen 1, Grinding Room, Stuffing Room and Cooler 6. 8 steel columns in the Slicing Room Refrigerated Storage: Finished Goods 1 has 10 steel H columns; Finished Goods 2 has 9 steel columns; Receiving has 8 steel H columns DATE OF CONSTRUCTION: CONDITION OF PROPERTY: PLANS AVAILABLE: CEILING HEIGHTS: Originally constructed in the mid-1950s and expanded in 1980, 1985 and 1996 Excellent Yes Office: 8 9 ceilings Production: Varies by room from 10 8 clear to 24 9 Refrigerated Storage: 24 29 clear Frozen Storage: Varies from 12 6 29 clear Mechanical/Support: 12 6 15 7 clear COLUMN SPACING: Many clear span areas located throughout the Production Area and various columns spacing as noted below in distinct areas: Cooler 5: 19 x19 Cooler 6: 19 x11 Kitchen 1: 19 x19 2

Grinding Room: 19 x19 Stuffing Room: 19 x19 Kitchen 2: 24 x30 Slicing Room: 24 x30 Finished Goods 1: 19 x48 Finished Goods 2: 24 x44 Receiving and Maintenance: 22 x19 WINDOWS: TOILET FACILITIES: Perimeter windows located in the main office area Toilet facilities are located in the Men s and Lady s locker rooms and contain the following units: Men s: Lady s: Toilets: 4 Toilet: 4 Lavatories: 8 Lavatories: 3 Urinals: 5 LIGHTING: ROOF: POWER: HEAT: WATER: SEWER: GAS: Mostly high efficiency T5 lights, encased in the production areas as per food safety regulations Rubber Membrane with a ballasted section over the Dry Storage and Receiving/Maintenance areas Supplied by National Grid via two (2) feeds with 4,160 Volts; 3 phase service; several transformers owned by Tyson located on-site Several areas of the plant are heated including the Side-Dock area (radiant heat) and the Bin Wash area (air makeup unit); heating fuel is natural gas Supplied by Buffalo Water; two (2) mains service the property with 4 lines entering the building on the East and West sides respectively Supplied by Buffalo Sewer Authority; effluent is pre-treated to remove solids and some greases in a 2,050 sq. ft. facility; the Buffalo Sewer Authority accepts the balance of the effluent stream discharge Supplied by National Fuel COMPRESSED AIR: Two (2) Ingersoll Rand compressor (1-200hp & 1-75hp) supported by an air dryer; piping located throughout the facility 3

OFFICE FACILITIES: Located primarily at the front (North Side) of the building and comprised of a reception area, seven (7) private offices, three (3) conference rooms, one (1) computer/data room, open cubicle/bullpen space, hallways and an employee break area/limited service (vending machines) café TRUCK LOADING FACILITIES: Sixteen (16) total doors including Thirteen (13) dock-high loading doors with levelers; three (3) drive-in doors that provide access to the compressor, electrical and boiler rooms AIR CONDITIONING: REFRIGERATION: Office area is provided with air conditioning via roof-top units Production area is supported by an ammonia refrigeration system and features blast-freezers, spiral freezers, refrigerated production space and storage space. Five (5) rotary screw compressors as follows: RC1: 500hp installed in 1997 RC2: 300hp installed in 1997 and rebuilt in 2012 RC3: 350hp installed in 1999 RC4: 500hp installed in 1999 RC5: 1000hp installed in 2005 Refrigeration system also features Hi-Temperature Liquid Recirculator, Condenser Tanks, Cooling Towers, Evaporators, a Refrigeration Temperature Control System and a Defrost Control System FENCING: LIQUID STORAGE FACILITIES: ZONING: Perimeter chain-link fencing encloses the property except for the parking areas Four (4) liquid storage tanks with delivery systems located on the Southeast corner of the property and used to store Sucrose, Brine, Dextrose and Corn Syrup M2 ASSESSMENT: $5,000,000 TAXES: RESTRICTIONS IN DEED: 2014: $137,715.35 or +/-$0.83/sq.ft. No meat processing, kill/slaughter use 4

POSSESSIONS: LABOR FORCE: LOCATION DESCRIPTION: PREVIOUS USE: Immediate Non-union factory workforce Ideally located in the City of Buffalo and less than ½ mile from I-190 with high visibility from this roadway Further processing, packaging and shipping of bulk and sliced cold cuts, hams, sausages, sticks, loaves and hotdogs INSPECTIONS: By Appointment/Contact: Jim Panczykowski (716) 866-2902 5