Expedited Bid Window Programme Access Risk Assessment



Similar documents
Introduction. Project Update. Issue 3 October Medupi power station Location: To the west of Lephalale, Limpopo Province

CURRICULUM VITAE Name Profession Name of Firm Present Appointment Years with Firm Date of Birth ID No. Nationality Education

AURORA-RIETVLEI SOLAR POWER (PTY) LTD.

COMPLIANCE REVIEW OF 2006/07 ASSET MANAGEMENT PLAN. Top Energy Limited

Gibson Bay Wind Farm. NERSA Hearings Cape Town. 20 February NERSA Hearing. 20 February 2014

Microgrid Building block for Smart Cities

FACT SHEET. BSES, Delhi - Distribution Network. Power Systems Consultancy from ABB

Integration Capacity Analysis Workshop 11/10/15 California IOU s Approach

System Protection Schemes in Eastern Denmark

EVN SMART GRID PLAN. Technical and Operational Dept., Vietnam Electricity Nguyễn Hải Hà

Study to Determine the Limit of Integrating Intermittent Renewable (wind and solar) Resources onto Pakistan's National Grid

RENEWABLES INTEGRATION IN TURKISH POWER SYSTEM

Grid Integration of Photovoltaic (PV) Systems

Generation Interconnection Feasibility Study Report-Web Version. PJM Generation Interconnection Request Queue Position Z1-055

CONGESTION MANAGEMENT POLICY

Network Consulting for Power Grid Optimization

Egypt Renewable energy Projects. Eng. Lamya Youssef Head Of FIT Unit Central Unit Egyptian Electricity Transmission Company EETC

EdM ZESA Eskom. Transaction Advisory Services for the

TRAFFIC MANAGEMENT PLAN

HYDRO ONE LIMITED REPORTS FOURTH QUARTER 2015 RESULTS

Tamil Nadu WiNd ENErgy ProfilE

ELECTRICITY SUPPLY CORPORATION OF MALAWI (ESCOM)

ESB Networks Response. ERGEG Consultation. Voltage Quality Regulation in Europe

Becoming an Electricity Retailer

Karnataka Electricity Regulatory Commission. Discussion note on

Phakwe group. Growing with Africa

Green Industries, Department of Trade and Industry

Overview of the Electricity Sector in Egypt

Joint Con Edison LIPA Offshore Wind Power Integration Project Feasibility Assessment

N O W A V A I L A B L E

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS FOR THE PROPOSED NEW COAL-FIRED POWER STATION IN THE LEPHALALE AREA, LIMPOPO PROVINCE

The Status of the Wind Power Market in Egypt. Dr. Walid El-Khattam Ain Shams University (Cairo, Egypt) The Egyptian Electricity Regulator (EgyptERA)

The Israel Electric Corp. LTD. Welcome To IEC. (Israel Electric Corporation)

Electronic Health Record for South Africa. ehr.za PEPFAR HMIS MAY 2008

THE ROLE OF DISTRIBUTED GENERATION IN ELECTRICITY SUPPLY IN AFRICA. Saliem Fakir & Tjaša Bole-Rentel Living Planet Unit WWF-SA South Africa

SOFTWARE FOR THE OPTIMAL ALLOCATION OF EV CHARGERS INTO THE POWER DISTRIBUTION GRID

16 West Coast Regional Plan

FIXED CHARGE: This is a cost that goes towards making the service available, including

Wind Cluster Management for Grid Integration of Large Wind Power

Recent Siemens HVDC Activities Yuriy Kazachkov Siemens PTI

Kent Active System Management (KASM) Oct 2015 / Matthieu Michel

COMPETITIVE ELECTRIC ENERGY MARKET IN GREECE

Developing Power Projects in Southern Africa. Cape Town Presentation 8 th February 2016

SOLAR POWER IN SANTA CLARA COUNTY MARKETS AND DEVELOPMENT TRENDS

Challenges to integrate Renewables In the French and European Power System. Michel Béna, SmartGrids Director

Nuclear Power Plant Electrical Power Supply System Requirements

RCP2 Portfolio Overview Document

WATER / WASTEWATER & POWER PROJECTS LAST 5 YEARS. No of Staff Provided by BCE. Overall Project Value (SR)

FRCC Standards Handbook. FRCC Automatic Underfrequency Load Shedding Program. Revision Date: July 2003

For the purpose of this Schedule the following words and phrases shall have the same meanings as assigned to them herein:

Grid connection of near shore wind farms

2012 San Francisco Colloquium

National Education Infrastructure Management System (NEIMS) September 2007

TDI's NYC Merchant CHPE Transmission Project with POI at Astoria (NYISO Queue #305) Deliverability Analysis

Operational perspective on the Electricity Distribution Industry (EDI) turnaround

Electric Power Systems An Overview. Y. Baghzouz Professor of Electrical Engineering University of Nevada, Las Vegas

Renewable Electricity and Liberalised Markets REALM. JOULE-III Project JOR3-CT GREECE ACTION PLAN. By ICCS / NTUA K. Delkis

Customer connection enquiry form (For the connection of loads and generators)

GENERAL 1. Is the insurer (itself or through an intermediary) deducting premiums from social assistance grant beneficiaries:

HTS Cables: Pitfalls and Potential LIPA Cable Project. J. Maguire American Superconductor. DOE Wire Workshop January, 2007 Panama City, FL

Corporate Profile EPE Power Switchgear Sdn. Bhd W

National Gambling Statistics Casinos, Bingo, Limited Pay-out Machines and Fixed Odds and Totalisator Betting

5/27/2015. Overview of Energy Storage Value Propositions and Business Cases. Utility Cost-Function: Foundation of Energy Storage Economics.

OFF-GRID SOLAR CASE STUDY AND OPPORTUNITIES IN KENYA J.M.P. MBITHI Deputy Director, Renewable Energy MINISTRY OF ENERGY AND PETROLEUM

SECTOR ASSESSMENT (SUMMARY): ENERGY Sector Performance, Problems, and Opportunities

PERFORMANCE AND PRIORITIES MARCH 2003

Tehachapi Wind Energy Storage Project (TSP)

Hydropower in Rwanda: Ongoing Initiatives & New Investment Opportunities. Yves Muyange Director General Energy Water & Sanitation Authority

Last revised: September 1, 2014 TRANSMISSION FUNCTION TITLES AND JOB DESCRIPTIONS

CLOUD COVER IMPACT ON PHOTOVOLTAIC POWER PRODUCTION IN SOUTH AFRICA

NERC Cyber Security Standards

Electricity market reform in Japan

About Southern California Edison

Smart solutions for fleets of all types & sizes of power generation. Marcus König, E F IE SGS / September 2013

National Fund for Environmental Protection and Water Management. activities in climate protection

Hybrid Renewable Energy Systems for North-Eastern Poland

ARRA Grant Case Studies SMUD s Smart Grid Program

The Electric Power System

USAID ENERGY POLICY PROGRAM SITE VISIT REPORT STATUS OF 4 RUN OF RIVER HYDROPOWER PROJECTS. October 2013

Generator Interconnection and Deliverability Study Methodology Technical Paper

Tehachapi Renewable Transmission Project (TRTP)

TARIFF AND GOVERNANCE ASSESSMENT

Memorandum. This memorandum requires Board action. Executive Summary

IESO Supply Deliverability Guidelines

Max. Length of HTS Cables in the Future

Syed Ahmed Richard Krause Southern California Edison

Title of presentation

LIGHTNING DETECTION IMPROVEMENT FALLS BROUGHT TO ESKOM S TRANSMISSION LINE DESIGN AND FAULT ANALYSIS

Brochure Introducing HVDC

Transcription:

Expedited Bid Window Programme Access Assessment (Regarding risk to connect to the transmission grid for respondents to the registration request) Eskom, Transmission, Grid Planning August 2015 This document provides a proactive network access risk assessment on the REBIB Expedited Bid Window programme. The high-level assessment of the risk of connection to the transmission grid for the IPP developers is based on the requested non-compulsory registration for the Expedited Bid Window programme from the IPP Office. The objective of the risk allocation is to inform IPP developers of the relative risk of infrastructure constraints and of being unable to connect within the programme target date. A request was issued by the IPP Office for registration of interested developers for an Expedited Bid Window programme in June 2015. The understanding is that the IPP projects must be connected by the end of December 2019 and will have to rely on the expected transmission and distribution infrastructure that will or could be in place by that time. The GCCA-2022 document has been used as a guideline only to determine the potential available connection capacity at the MTS substations by the end of 2019 as well as other project information which was not included in the GCCA-2022. Thus connection capacities indicated are likely to be different to the values provided in the GCCA-2022 and are only estimated values at present. The location and MW plant size only of the respondents were provided to Eskom. These were mapped and then allocated to the relevant MTS substation supply areas in order to identify the clustering and possible accumulative impact of the IPPs. The IPP developers must refer to the GCCA-2022 in order to identify under which MTS supply area their projects are likely to be allocated. Disclaimers There has been no proper capacity assessment of the sub-transmission or distribution network within the MTS supply areas to connect the IPPs. This is for the risk of the IPP developer to determine and mitigate by contact with the relevant distribution operator.

Allocation to an MTS supply area is done purely on engineering judgment based on a relative geographical allocation to the existing transmission MTS supply areas and may be different when the connection application is made. The ability to connect is classified by risk in terms of high, medium and low. The risk is considered in terms of the interest exceeding the available capacity or specific infrastructure constraints. Allocation of the risk does not imply that projects will be either automatically rejected or accepted for connection to the grid. The risk allocation is merely to inform the potential IPP developers of the level of potential competition and possible infrastructure constraints that should be taken into consideration in the preparation of their bids. Every connection request will be considered on formal application and the risk assessment will have no bearing on the response to the request. Summary of The bar graph below provides a summary of the risk assessment in terms of the MW value of interest against the MW available capacity in the MTS substation supply areas. Points of clarification The objective of the risk allocation is to inform IPP developers of the relative risk of infrastructure constraints and of being unable to connect within the programme target date.

Further extension of the 220 kv and 66 kv networks in the Namaqualand region of the Northern Cape and in the Eastern Cape is discouraged. The strategic intent is to phase out the 220 kv and 66 kv networks, which were originally selected to supply small loads over long distances and not for the collection and transport of generated power. These networks are planned to be upgraded to 400 kv and 132 kv, respectively, in order to facilitate the collection of large renewable energy generation over long distances and create power corridors for the transportation of the future generation to the load centres. The Assessment The risk assessment of the IPP response is shown in the table below, which is grouped by province alphabetically and then the MTS substation supply areas are listed alphabetically. The anticipated potential MW connection capacity by 2019 is given and the accumulated IPP interest in MW within that MTS supply area is given. The reason for the risk allocation is provided in the last column. Access Assessment Table Province MTS Substation Supply Area 2019 Potential Capacity in MW BW4 Accelerated Interest in MW Ability to Connect E Cape Delphi 138 392.5 High E Cape Grassridge 359 186.5 E Cape Jeffreys Bay Area 0 166.6 High E Cape Pembroke 436 34.5 Low E Cape Poseidon 95 415 High Comments on to Connect Interest exceeds capacity. Large cluster of interest around 80 km away. New 400/132 kv substation and 400 kv but access to substation may be constrained. No existing capacity. New 400/132 kv substation (Thyspunt) and new 400 kv Capacity available on 132 kv or 66 kv busbar. 400/132 kv substation (Poseidon B) closer to IPP clustering and 400 kv Free State Everest 980 150 Low Capacity available on 132 kv busbar. Free State Harvard 670 225 Low Capacity available on 132 kv busbar. Free State Leander 975 150 Low Capacity available on 132 kv busbar.

Free State Mercury 284 75 Low Capacity available on 132 kv busbar. Free State Theseus 975 150 Low Capacity available on 132 kv busbar. Gauteng Esselen 353 1.2 Low Capacity available on 132 kv Dx network KZN Bloedrivier 155 140 Low Capacity available on 88 kv busbar. KZN Impala 528 10 Low Capacity available on 132 kv Dx network KZN Tugela 344 4.1 Low Capacity available on 132 kv busbar. Limpopo Matimba 0 115 High May be able to connect via 132 kv even though a power station, but Matimba and Medupi voltage stability may be an issue. Limpopo Merensky 490 25 Low Capacity available on 132 kv busbar. Limpopo Spitskop 472 150 Low Capacity available on 132 kv busbar. Limpopo Tabor 953 75 but cluster +/-80 km away and 132 kv network may be limiting factor. Close to new Nzhelele 400/132 kv substation in 2022. Limpopo Warmbad 245 75 Low Capacity available on 132 kv busbar. Mpumalang a Mpumalang a Camden 320 10 Low Can connect via 88 kv even though a power station. Marathon 619 10 Low Capacity available on 132 kv busbar. Aggeneis 121 505 High Aries 0 520 High Boundary 266 1384 High Ferrum 882 525 Low Interest exceeds capacity and a high risk of throughput overload from the 220 kv network connected to Aggeneis (932 MW). Aggeneis will require 400/132 kv transformation and a possible 400 kv line. Limited to 30 MW capacity on 22 kv busbar. Aries will require 400/132 kv transformation if the level of interest is to be catered for. 400/132 kv substation and 400 kv but 132 kv equipment upgrade is required for fault level.

Gamma 0 115 High Garona 74 86 Gromis 78 140 Helios 146 360 Hydra - De Aar Area Hydra - Middelburg Area Kangas 107 120 Kronos 250 600 Nama 150 80 Nieuwehoo p 80 1084 High 0 300 High 245 225 Low Olien 54 816 High Oranjemum d Paulputs 69 67 100 140 High No existing capacity. New 400/132 kv substation and loop-in of 400 kv lines required. Interest just exceeds 132 kv capacity. May receive support from new Nieuwehoop 400/132 kv substation, otherwise 400/132 kv plus 400 kv loop-in at Garona required. Interest exceeds capacity. Limitation of 220 kv network will require acceleration of the 400 kv strengthening project and possible 132 kv busbar. Interest exceeds capacity, requires 2nd 400/132 kv transformer. 400/132 kv substation (Hydra B) closer to the IPP clustering and 400 kv No existing capacity. Large cluster of interest about 120 km away. New 400/132 kv substation (Hydra C) and loop-in of 400 kv New BW4 220/132 kv substation and line. Interest close to available capacity. is completion of substation. 2nd 400/132 kv transformer installed for BW4. Interest exceeds available capacity and 3rd transformer and 400 kv line may be required. Interest is less than substation capacity, but dependent on 220 kv network with Aggeneis 400/220 kv limit of 121 MW. but this is a new MTS substation and connection is dependent on completion. 400/132 kv substation and 400 kv Interest exceeds capacity. Dependent on 220 kv network and Aggeneis 400/220 kv limit of 121 MW. New 400/132 kv substation and 400 kv lines may be required. Interest is at substation capacity, but dependent on 2nd 200/132 kv transformer and 220 kv network with Aggeneis 400/220 kv limit of 121 MW.

Ruigtevallei 169 260 High Upington 6 955 High Substation has been downgraded to 132 kv and evacuation of power an issue. New 400/132 kv and 400 kv line may be required. New substation and 2nd transformer increases capacity to 483 MW. Less than interest and will require 3rd transformer and a 400 kv line to increase to 970 MW. North West Hermes 291 225 Low Capacity available on 132 kv busbar. North West Mookodi 485 460 Low Capacity available on 132 kv busbar. North West Watershed 172 300 Low Interest exceeds 172 MW 275 kv N-1 evacuation limit, but there is additional 353 MW capacity via the 132/88 kv if daytime PV generation. W Cape Aurora 735 321.4 Low Capacity available on 132 kv busbar. W Cape Bacchus 888 170 Low Capacity available on 132 kv busbar. W Cape Droërivier 234 355 Interest exceeds capacity. W Cape Juno 234 49.9 Low Capacity available on 132 kv busbar. W Cape Kappa (new) 380 281 W Cape Koeberg 490 90 Low W Cape Komsberg 69 140 New BW4 400/132 kv substation and line. Capacity will be available on 132 kv busbar. is completion of substation. Can connect via 132 kv even through a power station, but line access to substation may be an issue. New BW4 400/132 kv substation. Interest exceeds capacity and 2nd transformer may be required. W Cape Muldersvlei 729 4.4 Low Capacity available on 132 kv busbar. W Cape Proteus 485 80 Low Capacity available on 132 kv busbar.