Karnataka Electricity Regulatory Commission. Discussion note on
|
|
|
- Karin Harper
- 10 years ago
- Views:
Transcription
1 Karnataka Electricity Regulatory Commission Discussion note on Draft KERC (Forecasting, Scheduling, Deviation settlement and related matters for Wind and Solar Generation sources) Regulations, Preamble: a) The installed capacity of Renewable Energy generation in Karnataka was 5068 MWs as on , which accounts for 33.66% of the total installed capacity of MW including the State s share from CGS. The installed capacity of wind generation is about 2400 MW accounting to about % of Renewable Energy generation and is about % of total installed capacity in the State. b) A minimum load of 4125 MW was recorded in the State at about 3.0 AM on (with a peak load of 5878 MW on the same day and the peak demand of 9549 MW during FY-15). The wind generation was maximum from 30 th August, 2014 to 8 th September, There was a forced backing down of the wind generation ranging between 761 MW to about 1742 MW during the maximum wind generation period to maintain the frequency band within maximum permissible limit of 50.2 Hz, after taking all other possible measures like minimizing the thermal and hydel generation. In spite of backing down the wind generation, the RE generation was about 35 to 40 MU per day and wind generation was about MU to MU per day during these days. (The details are shown in annexure-a) c) The installed capacity of solar generation in the State is about 83 MW and about MW capacity is proposed to be added during FY16 and FY17. A big solar generation park of 2000 MW is proposed to be established in Pavagada Taluka of Tumukuru district. d) Renewable energy generation (wind and others) in the southern region as on was about MW which accounts for 23.20% of 1
2 total installed generation capacity of MW from all sources and about 80% of renewable energy sources in the region. e) Karnataka State is having substantial agricultural loads and these loads will be minimum (sometimes zero) during monsoon season when the wind generation will be maximum during this period. The system loads in the Karnataka will be minimum and also there will be substantial quantum of generation from the mini and major hydro plants from the water flows down stream of the pick-up dams and storage dams, under normal monsoon conditions. f) The Wind energy generation is found to be very consistent from year to year, but has significant variation over shorter time scales (high variability). Generally, the peak wind resource availability will not coincide with the system peak demand but coincides with light loads during night hours of monsoon period when the system demand is lowest during the year. The wind generation being infirm power, there will be frequent ramp up and ramp down in its generation due to varying wind speed. The thermal plants generation cannot be reduced below a certain capacity due to technical reasons. The load and generation balancing due to frequent ramp up and ramp down of wind generation is causing serious Grid operational problems. Grid operation becomes a big challenge for facilitating large scale integration of variable nature of Renewable Energy Sources (RES), like wind and solar without compromising on the stability and security of the Grid. Moreover, as the country is deploying strict grid disciplinary measures and moving towards a tighter operational frequency band, it becomes even more challenging to balance and operate with wide variability of wind generation. The wind and solar power penetration of more than 25 % to 30 % of system demand at any point of time will create operational and balancing issues. The variation in grid frequency and the ability of the conventional generators to respond in short 2
3 duration of time are the two main concerns arising out of the variable wind and solar generation. g) Generation of power from wind and solar is totally influenced by the nature, i.e. wind velocity and solar insolation, climatic changes and geographical condition, which are difficult to accurately predict /forecast. h) In the last two years, many of the wind generation plants are backed down in Karnataka during high wind and low load monsoon periods for the grid operational issues of high system frequency. The problem will become more acute during the subsequent years due to addition of more wind and large scale solar power generators in Karnataka. i) Adequate capacity of Hydro and Gas based generation capable of responding to quick ramp up and ramp downs of wind and solar generation will mitigate to some extent such problems caused by variable wind and solar generation. j) Access to transmission and proper evacuation to load centres another very important consideration in developing wind and solar energy. k) It is also important to note that uncertainty in wind and solar energy generation and the challenge to forecast. The complexity of weather related factors and geographical features make it difficult to predict wind velocity and potential for electricity generation at a location. Solar irradiance at a location is influenced by a number of factors, which include time of the day, temperature, cloud cover and particulate matter in the air. l) Most of the wind and solar energy generators are presently connected to intra-state network and in future are likely to be connected to the inter-state and inter-regional transmission system (ISTS & IRTS). As of now there is no power flow from wind and solar generations between interregions and inter-state since most of the wind and solar generators are tied up with respective State power distribution utilities and third party sales through Open access within the State boundaries. 3
4 m) Recently, the CERC has issued the amendment to the CERC DSM and related matter Regulations, 2014 for Forecasting, Scheduling and Imbalance handling of interstate transactions of Wind and Solar Generation. n) Hence it is found necessary to formulate Karnataka Electricity Regulatory Commission (Forecasting, Scheduling, Deviation settlement and related matters for Wind and Solar Generation sources) Regulations, 2015 for the optimal utilization of wind and solar generations Objective and Scope: a) The objective of this proposals is to formulate KERC (Forecasting, Scheduling, Deviation settlement and related matters for Wind and Solar Generation sources) Regulations, 2015 in order to facilitate large scale integration of Wind and Solar generating stations while maintaining the grid stability and security as envisaged under IEGC and KEGC, through forecasting, scheduling and commercial mechanism for deviation settlement of these generators. b) It is essential that the Grid operator has information in advance regarding the quantum of the wind and solar energy that is expected to be injected into the grid. This is especially critical for variable and infirm energy sources of such wind and solar. Forecasting and scheduling of these generators is critical to anticipate balancing requirements and establish requisite generation reserves to maintain load generation balance and grid reliability. At the same time, due to the intermittent nature of these sources, special provisions must be made so that the generators are not unduly penalized. 4
5 3.0. Forecasting Tools: a) Renewable Energy Management Centres (REMCs): REMS, equipped with advanced forecasting tools are being established in the country for forecasting wind and solar generation. b) M/s NIWE (National Institute of Wind Energy) have already taken up a pilot study for wind forecasting project by installing wind forecasting tools in all the wind mill locations in Tamil Nadu. The project envisages installing of wind forecasting tools and also collecting live energy data from wind energy pooling substations, installing equipments for real time measurement of wind generation with communicative ABT meters in all wind energy pooling substations and providing consolidated real time wind energy data on a dash board installed at Central Station in Chennai. In addition, the real time data will be fed into NIWE s forecasting system that can be used for scheduling and forecasting wind generation. The forecasting of 7480 MW wind installations is now operational and made available to Tamil Nadu SLDC and it is learnt that it is almost 85% near to actual Draft Frame work for Forecasting, Scheduling & Handling deviations from schedule for the infirm wind and solar generation Applicability : The proposed frame work is applicable to: a) All Wind Generators having a combined installed capacity of 10.0 MW and above at the pooling station whether they are supplying power to ESCOMs or to third party consumers through open access or for captive consumption through open access within or outside the State. b) All Solar Generators with installed capacity of 5.0 MW and above at the pooling station whether they are supplying power to ESCOMs or 5
6 to third party consumers through open access or for captive consumption through open access within or outside the State Fore casting: a) The forecasting is an estimation of probable generation of wind and solar power plants. Forecasting is an essential pre-requisite and shall be made mandatory for scheduling of the wind and solar generation. b) The existing wind and solar power plants shall either by themselves or through Qualified Coordinating Agency (QCA) or through an Aggregator shall establish forecasting tools within three months from the effective date of these Regulations and for new wind and solar generators they shall be established before commissioning of their plants. c) Alternately services of REMCs (Renewable Energy Management Centres) may be availed for installing forecasting tools and generation forecasting. d) The forecast by the wind and solar generators shall be wind-farm/solar facility centric and will form the basis of scheduling Scheduling ( Generation and Loads): a) Schedule details: i. The wind and solar power plants either by themselves or through Qualified Coordinating Agency (QCA) or through an Aggregator shall furnish weekly, day ahead and intraday generation schedules of 15 minutes interval block period to SLDC by using / establishing appropriate forecasting tools at their Wind-farm /Solar facility. ii. Forecasting and scheduling Point: The forecasting and scheduling of wind and solar generators shall be conducted at pooling station level which being a commercial metering point, though the forecasting tools are installed at wind-farm/solar facility. 6
7 b) Frequency of Revisions Considering the fact that wind and solar generation is intermittent and variable in nature and also taking into account the fact that accuracy of forecast improves as we move closer in time, the Wind and Solar energy generator shall be allowed more opportunities to revise the schedule. It is therefore proposed to provide an opportunity to the Wind and Solar generators to revise the day ahead schedules for a maximum of 16 revisions during the intraday, one each in one and half hour time slot starting from 00:00 hours during the day with prior notice of at least 60 minutes for each revision. c) The wind, solar power and other RES should be given first priority in generation scheduling and dispatching under normal power system operating conditions. d) Grid operator (SLDC) should consider forecasted generation schedule of wind and solar power in the midterm to long term, day-ahead and intraday operation planning processes of scheduling and fully make use of the flexibility from conventional power plants, as well as the capacity of inter grid tie-lines to accommodate the maximum wind and solar power while maintaining system security and reliability. e) The Principal generator/ QCA/ Aggregator involved for connectivity, long-term open access and medium-term open Access in intra-state transmission and related matters including long term agreements with ESCOMs shall undertake all operational and commercial responsibilities including forecasting and scheduling for the wind and solar generating station Computation of error quantity: % Error (deviation) = (Actual Generation - Scheduled Generation) X 100 (Scheduled Generation) 7
8 5.0. Metering, sharing of data and Telemetry. a) Metering: SEMs (Special Energy Meters 0.2s class of accuracy) shall be provided at the pooling station of wind and solar power plants, with a provision for recording and storing all the load survey and billing parameters for every 15 minutes interval block period. Monthly meter readings shall be forwarded to the SLDC in addition to data acquisition through SCADA, for energy accounting as per the existing practice b) Telemetry: Data telemetry shall be mandatorily adopted at the turbine/inverter level. Parameters such as turbine availability, power output and realtime weather measurements (wind speed, temperature, pressure etc) must be provided by each wind and solar Principal generator/ QCA /Aggregator. c) Communication: i. The wind and solar Principal generator/ QCA / Aggregator whose scheduling is done by the SLDCs, shall provide full data telemetry and communication facilities to the concerned SLDC. ii. A preparatory window shall be provided for the wind and solar Principal generator/ QCA /Aggregator to ensure installation of data measurement and telemetry equipment and for SLDCs to prepare their systems and teams for receipt of regular data and schedules. d) Procedure for data telemetry and communication requirements: The SLDC will evolve the detailed procedure for data telemetry and communication requirements solicit public comments and seek necessary approval of the Commission for such procedure within two month from the effective date of Regulation. 8
9 6.0. Implementation of Intra-State ABT and Imbalance Handling (Deviation Settlement Mechanism): 6.1. Methodology to account for and settle the deviations by wind and solar energy generators. a) The day ahead scheduling in the country is being done for all inter- State schedules as per the Indian Electricity Grid Code on the basis of 15 minutes interval time blocks except for RES. The deviation between schedule and actual power flow is called Unscheduled Interchange (UI) for which commercial settlement is done as per the Unscheduled Interchange (UI) rates specified by the Central Electricity Regulatory Commission (CERC). The UI rates are variable depending on the frequency and the quantum of drawal and they tend to discourage over drawal and under generation. The day ahead schedules can also be revised with prior notice of 60 minutes. b) KERC vide ORDER No.B/09/5 dated 20 th June 2006 have brought the following Users and Generators in the State under intra State ABT and deviation settlement mechanism: i. All ESCOMs and Hukeri Electricity Cooperative Society ii. All State owned generating stations 25 MW & above iii. IPPs of 25 MW & above iv. Bio-mass and Co-generation plants of 25 MW & above. v. CPPs supplying power to the grid - 25 MW & above c) The same is yet to be fully implemented. The Independent power projects (IPPs) like Ms UPCL, M/s Jindal, M/s Sathavahana Ispat etc which are interstate projects and CGS units in the State have been brought under ABT mechanism and deviation settlement mechanism and are being monitored by SLDC and SRLDC. But ABT mechanism and deviation settlement mechanism are yet to be adopted for M/s KPCL thermal and hydel units. 9
10 6.2. Tolerance limits and deviation bands: At present the wind, solar and other RES generators (excluding Bio-mass and Co-generation plants of 25 MW & above) are exempted from the purview of Unscheduled Interchange (UI) and Deviation Settlement Mechanism (DSM) within the State The wind and solar generators are now proposed to be brought under purview of DSM as detailed below: a) The permissible deviation for all the wind and solar plants shall be ± 15 % ( with in the limits of >85% & <115%) of schedule ie the actual generation shall be with in the premissible limits of 85% to 115% of schedule. b) There will not be any DSM charges. if the deviation of generation is within the specified limits of ± 15 % ( ie between - 85% to +115% of schedule). c) The energy charges will be paid to the generators as per the actual energy supplied, irrespective of the schedule quantum of energy DSM charges to DSM pool account for any deviations beyond the permissible limits a) Wind and Solar generators having PPA with ESCOMs or directly supplying power to consumers availing open access for wheeling the power within or outside the State, shall pay to DSM pool account for any deviations of the schedules at the rates show in the following table. Sl No Particulars Deviation range Payment to DSM pool account by generators For wind and solar Rs 0.50 per kwh for the quantum of 1 generators having PPAs with > ± 15 % ± 25 % short fall or excess of energy beyond ± 15 % and up to ± 25 % ESCOMs of deviation from the schedule 10
11 and for ( ie., ± 10% above tolerable limits of supplying power ±15%) to consumers availing open Rs 0.50 per kwh for the quantum of access facilities short fall or excess of energy for wheeling the beyond ± 15 % and up to ± 25 2 power within or outside the State > ± 25 % ± 35 % % of deviation + (plus) Rs 1.0.per kwh for the remaining quantum of short fall or excess energy for deviation from schedule beyond ± 25 % & up to ± 35 %. Rs 0.50 per kwh for the quantum of short fall or excess of energy for deviation from schedule beyond ± 15 % and up to ± 25 % + (plus) Rs 1.0.per kwh for the 3 more > ± 35 % than remaining quantum of short fall or excess of energy for deviation beyond ± 25 % up to ± 35 % + (plus) Rs 1.50 per kwh for the quantum of short fall or excess of energy deviation from schedule beyond ± 35 % The illustaration shown in Annexure-B b) The SLDC shall maintain the pool account of collection of the DSM charges. 11
12 7.0. Effective monitoring and compliance: The SLDC will be assigned the task of tracking and monitoring compliance by the wind and solar generators by making necessary provisions in the proposed Karnataka Electricity Regulatory Commission (Forecasting, Scheduling, Deviation settlement and related matters for Wind and Solar Generation sources) Regulations, Grid Strengthening for RES Evacuation: (Green Corridor). Provisions will be made in the Karnataka Electricity Grid Code 2005 for identifying the constraints in evacuation of wind & solar power locally as well as at grid level (upstream) during high wind and solar energy penetration and low local loads and take immediate measures for implementation of grid strengthening proposals by the Transmission utility A separate regulations called Karnataka Electricity Regulatory Commission (Forecasting, Scheduling, Deviation settlement and related matters for Wind and Solar Generation sources) Regulations, 2015 is proposed to be formulated. 12
13 Annexure: Annexure-A : Wind Generation Backing down due to operational problems Sl No Date Hrs of opening From To Maximum Backing Down of the wind generation in MW (installed capacity) Frequency HZ Minimum Load in MW during the day RE Generation during the day in MU Wind geeration during the day in MU Hrs Hrs Hrs Hrs Hrs Hrs /9/ Hrs 6.00 Hrs /9/ Hrs Hrs /9/ Hrs 7.00 Hrs /9/ Hrs 6.00 Hrs
14 Annexure-B: Illustration for computation of deviation charges for wind and solar generators Particulars Unit Scenario-1 with in permissible deviation range Scenario-2 Scenario-3 Scenario-4 % of deviations Rs < than ± 15 % > ± 15 % - < ± 25 % > ± 25 % - < ± 35 % more than > ± 35 % Schedule energy kwh Actual generation kwh Deviation energy quantum of kwh % of 1000 =150 % Deviation % 10% ie < 15% 20% ie > 15% & < 25% 30 % ie > 25% & <35% 40% ie > 35 % Quantum of deviation for which the charges to be levied kwh Nil up to 15 % ie = = =50 14
15 Rate of DSM Rs Nil Rs 0.50 per Rs 0.50 per kwhfor Rs 0.50 per kwhfor first charges kwh first 100 ( ) 100 ( ) kwh kwh + + Plus Rs 1.0. per kwh Plus Rs 1.0. per kwh ( ) for 100 ( ) for kwh energy + Plus Rs 50 kwh energy 1.50 ( )for deviation to remaining 50 kwh schedule deviation to schedule Permissible energy deviation kwh 15 % of 1000 = % of 1000 = % of 1000 = % of 1000 =150 Deviation energy above limits kwh Nil ( ) = 50 kwh = 150 kwh = 250 kwh DSM charges payable by Generator Rs Nil 50*0.5 = 25 [{(100*0.5}+ {50 *1.0}]= 100 [{(100*0.5}+ {100 *1.0} +50*1.5]=
Model Regulations on Forecasting, Scheduling and Deviation Settlement of Wind and Solar Generating Stations at the State level
Model Regulations on Forecasting, Scheduling and Deviation Settlement of Wind and Solar Generating Stations at the State level 2015 Contents MODEL REGULATIONS ON FORECASTING, SCHEDULING & DEVIATION SETTLEMENT
Indian Experiences on Promoting Renewable Energy DR SUSHANTA K CHATTERJEE JOINT CHIEF (REGULATORY AFFAIRS) CENTRAL ELECTRICITY REGULATORY COMMISSION
Indian Experiences on Promoting Renewable Energy DR SUSHANTA K CHATTERJEE JOINT CHIEF (REGULATORY AFFAIRS) CENTRAL ELECTRICITY REGULATORY COMMISSION Introduction Clean energy promotion in India Focus on
Model Renewable Energy Wheeling Agreement under Renewable Energy Certificate (REC) scheme
Model Renewable Energy Wheeling Agreement under Renewable Energy Certificate (REC) scheme This agreement made at on this day of two thousand between M/s. (Renewable Energy Generator name and address) hereinafter
Renewable Energy Certificate Mechanism for India. ABPS Infrastructure Advisory. Background
Renewable Energy Certificate Mechanism for India Background ABPS Infrastructure Advisory India is abundantly gifted with a variety of renewable energy (RE) sources. However, not all states are endowed
SCHEDULING AND DISPATCH CODE (Pursuant to section 33 of the State Grid Code)
MAHARASHTRA STATE ELECTRICITY TRANSMISSION COMPANY LIMITED MAHARASHTRA STATE LOAD DISPATCH CENTRE SCHEDULING AND DISPATCH CODE (Pursuant to section 33 of the State Grid Code) Operating Procedure No. -OP
Tamil Nadu WiNd ENErgy ProfilE
Tamil Nadu WiNd ENErgy ProfilE Wind energy in Tamil Nadu has witnessed tremendous growth propelling the State to the number one position in India in terms of renewables. However the challenge that remains
CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI NOTIFICATION. No. L-1/(3)/2009-CERC Dated the 7 th August 2009
CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI NOTIFICATION No. L-1/(3)/2009-CERC Dated the 7 th August 2009 In exercise of powers conferred by section 178 of the Electricity Act, 2003 and all other
Solar Resource Measurement Importance. Wil Grady P.E. Southern California Edison Power Supply NREL PV Solar Resource Workshop Denver 2015
Solar Resource Measurement Importance Wil Grady P.E. Southern California Edison Power Supply NREL PV Solar Resource Workshop Denver 2015 1 Overview of SCE Large service territory 14 million residents 4.9
Study to Determine the Limit of Integrating Intermittent Renewable (wind and solar) Resources onto Pakistan's National Grid
Pakistan Study to Determine the Limit of Integrating Intermittent Renewable (wind and solar) Resources onto Pakistan's National Grid Final Report: Executive Summary - November 2015 for USAID Energy Policy
Renewable Purchase Obligation (RPO) / Renewable Energy Certificates (REC) Advisory and Trading
Renewable Purchase Obligation (RPO) / Renewable Energy Certificates (REC) Advisory and Trading Target Clients v Renewable Energy Generators in India v RPO mandated entities in India v Investors seeking
Methodology for Merit Order Dispatch. Version 1.0
Methodology for Merit Order Dispatch Version 1.0 25 th April 2011 TABLE OF CONTENTS 1. OBJECTIVES... 1 2. ROADMAP FOR IMPLEMENTATION... 1 3. DEFINITIONS... 3 4. OPERATIONS PLANNING... 3 4.1. General Considerations...
DRAFT KERALA STATE ELECTRICITY REGULATORY COMMISSION, NOTICE. No. 442/CT/2014/KSERC Dated, Thiruvananthapuram 31 st March, 2015
DRAFT 31.3.2015 KERALA STATE ELECTRICITY REGULATORY COMMISSION, NOTICE 442/CT/2014/KSERC Dated, Thiruvananthapuram 31 st March, 2015 The Kerala State Electricity Regulatory Commission hereby publishes
Energy Storage for Renewable Integration
ESMAP-SAR-EAP Renewable Energy Training Program 2014 Energy Storage for Renewable Integration 24 th Apr 2014 Jerry Randall DNV GL Renewables Advisory, Bangkok 1 DNV GL 2013 SAFER, SMARTER, GREENER DNV
Draft Solar Energy Purchase Agreement (EPA) subject to approval by TNERC
Draft Solar Energy Purchase Agreement (EPA) subject to approval by TNERC This agreement made at on this day of Two thousand between M/s. (Solar Power Generator name and address) hereinafter called the
PROCEDURE FOR ISSUANCE OF RENEWABLE ENERGY CERTIFICATE TO THE ELIGIBLE ENTITY BY CENTRAL AGENCY
PROCEDURE FOR ISSUANCE OF RENEWABLE ENERGY CERTIFICATE TO THE ELIGIBLE ENTITY BY CENTRAL AGENCY 1. OBJECTIVE 1.1. This procedure shall provide guidance to the entities to implement Renewable Energy Certificate
Preparatory Paper on Focal Areas to Support a Sustainable Energy System in the Electricity Sector
Preparatory Paper on Focal Areas to Support a Sustainable Energy System in the Electricity Sector C. Agert, Th. Vogt EWE Research Centre NEXT ENERGY, Oldenburg, Germany corresponding author: [email protected]
G.O.MS.No. 8 Dated 12.02.2015 Read the following:-
GOVERNMENT OF ANDHRA PRADESH ABSTRACT ENERGY, INFRASTRUCTURE & INVESTMENT DEPARTMENT - Development of Solar Power in Andhra Pradesh Andhra Pradesh Solar Power Policy, 2015 Orders Issued. ------------------------------------------------------------------------------------------------------------
Value of storage in providing balancing services for electricity generation systems with high wind penetration
Journal of Power Sources 162 (2006) 949 953 Short communication Value of storage in providing balancing services for electricity generation systems with high wind penetration Mary Black, Goran Strbac 1
Sub: Scheduling and Dispatch Procedure under RERC (Intra-State ABT) Regulations, 2006.
Sub: Scheduling and Dispatch Procedure under RERC (Intra-State ABT) Regulations, 2006. 1. General a) Intra-State ABT as per RERC (Intra-State ABT) Regulations, 2006 has come into commercial operation w.e.f.
Existing Wind Power Policies and Incentives
Existing Wind Power Policies and Incentives Consultation on National Wind Energy Mission January 9, 2014 New Delhi Wind Power Progress (in MW) Potential (at 80 m) : 1,02,000 Achievement so far : 20,150
CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI. No. L-1/(2)/2009-CERC New Delhi, 24 th February 2009 NOTIFICATION
CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI No. L-1/(2)/2009-CERC New Delhi, 24 th February 2009 NOTIFICATION In exercise of powers conferred under Section 178 of the Electricity Act, 2003 (36
KERALA STATE ELECTRICITY REGULATORY COMMISSION
KERALA STATE ELECTRICITY REGULATORY COMMISSION Notification No. 2096/KSERC/CT/2014 Dated, Thiruvananthapuram 10 th June 2014. In exercise of the powers conferred under sections 66, 86 (1) (e) and 181 of
Overview of BNL s Solar Energy Research Plans. March 2011
Overview of BNL s Solar Energy Research Plans March 2011 Why Solar Energy Research at BNL? BNL s capabilities can advance solar energy In the Northeast World class facilities History of successful research
Procedures for Scheduling, Despatch, Energy Accounting, UI Accounting and Settlement System of Open Access Transactions
Procedures for Scheduling, Despatch, Energy Accounting, UI Accounting and Settlement System of Open Access Transactions 1.0 State Load Despatch Centre: The procedures for scheduling, despatch, energy accounting
INDEX S. No. PARTICULARS Note:
INDEX S. No. PARTICULARS T1 Profit & Loss Account - Transmission Business T2 Profit & Loss Account - SLDC Business T3 Annual Revenue Requirement - Transmission Business T4 Annual Revenue Requirement -
NV Energy ISO Energy Imbalance Market Economic Assessment
March 25, 2014 NV Energy ISO Energy Imbalance Market Economic Assessment NV Energy ISO Energy Imbalance Market Economic Assessment 2014 Copyright. All Rights Reserved. Energy and Environmental Economics,
Renewable Energy Certificate Mechanism
Opportunities in Financing Renewable Energy Projects focusing on FiT and RECs Balawant Joshi Director, [email protected], [email protected] In this presentation.. Investment Potential for Renewable
Solar Power Policy Uttar Pradesh 2012 Suggestions to be sent to : [email protected] [email protected]
Draft ver2 Solar Power Policy Uttar Pradesh 2012 Suggestions to be sent to : [email protected] [email protected] 1 TABLE OF CONTENTS S.No Contents Page No 1. PREAMBLE 3 2. OBJECTIVES 3 3. OPERATIVE
Multi-Faceted Solution for Managing Flexibility with High Penetration of Renewable Resources
Multi-Faceted Solution for Managing Flexibility with High Penetration of Renewable Resources FERC Technical Conference Increasing RT & DA Market Efficiency Through Improved Software June 24 26, 2013 Nivad
DELHI ELECTRICITY REGULATORY COMMISSION
DELHI ELECTRICITY REGULATORY COMMISSION DELHI ELECTRICITY REGULATORY COMMISSION (RENEWABLE PURCHASE OBLIGATION AND RENEWABLE ENERGY CERTIFICATE FRAMEWORK IMPLEMENTATION) REGULATIONS, 2011 No. Dated:. NOTIFICATION
RAJASTHAN ELECTRICITY REGULATORY COMMISSION JAIPUR
RAJASTHAN ELECTRICITY REGULATORY COMMISSION JAIPUR NOTIFICATION 23 rd December, 2010 No.RERC/Secy/Reg. 82 : In exercise of powers conferred under sections 61, 66, 86(1)(e) and 181 of the Electricity Act,
Wind Power Programme in India
Wind Power Programme in India Ministry of New & Renewable Energy 1 st August 2012, New Delhi 1 Renewable Power Sector in INDIA Share of Installed Renewable Capacity 13% 4% 13% 70% Wind Solar Hydro Biomass
Methodology for Solar Power Projects
Annexure E Methodology for Solar Power Projects This methodology is applicable to the solar power projects included in the composite policy for new and renewable (non-conventional energy sources) power
DRAFT REGULATIONS FOR ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION UNDER SECTION 86(1)(e) OF THE ACT NOTIFICATION
DRAFT REGULATIONS FOR ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION UNDER SECTION 86(1)(e) OF THE ACT No. Dated: -12-2011 NOTIFICATION In exercise of powers conferred under sections 61, 66, 86(1)(e)
Standard Operating Procedures. For
Standard Operating Procedures For Distribution Control Centres of MP [Insert logo of company] Distribution Control Centre,[ Insert company Name and address of DCC] [March] 2012 MADHYA PRADESH DISTRIBUTION
ANCILLARY SERVICES SUPPLIED TO THE GRID: THE CASE OF THISVI CCGT POWER PLANT (GREECE)
Claudio Cavandoli, Alessandro Crippa EDISON S.p.A., Engineering Department ANCILLARY SERVICES SUPPLIED TO THE GRID: THE CASE OF THISVI CCGT POWER PLANT (GREECE) 1 ANCILLARY SERVICES SUPPLIED TO THE GRID:
CHAPTER 1 INTRODUCTION
CHAPTER 1 INTRODUCTION Power systems form the largest man made complex system. It basically consists of generating sources, transmission network and distribution centers. Secure and economic operation
Making CfDs work for renewable generators
Making CfDs work for renewable generators This is in two parts. 1 st a brief introduction to the Green Power Auction Market. 2 nd gives more detail on the structure and follows on. We consider this a critical
The Impact of Wind Power on Day-ahead Electricity Prices in the Netherlands
The Impact of Wind Power on Day-ahead Electricity Prices in the Netherlands Frans Nieuwenhout #1, Arno Brand #2 # Energy research Centre of the Netherlands Westerduinweg 3, Petten, the Netherlands 1 [email protected]
Enterprise Integration and Energy Monitoring, Billing and Optimization Platform Solutions
Enterprise Integration and Energy Monitoring, Billing and Optimization Platform Solutions PartNo.: MPKLK-IEC61850-Integration Enterprise Integration, Billing and Optimization Solutions helps Integrated
Role of Power Traders in enhancing market dynamics
Role of Power Traders in enhancing market dynamics Date: 08 th March 2011 Sunil Agrawal (Head GMR Energy Trading) & Tanmay Pramanik (Assoc. Mgr GMR Energy Trading) Evolution of Power Trading business Internationally
UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION
UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Coordination between Natural Gas and Electricity Markets Docket No. AD12-12-000 Prepared Statement of Brad Bouillon on behalf of
KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM IN THE MATTER OF
KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM PRESENT: Shri. K.J.Mathew, Chairman Shri. C. Abdulla, Member Shri. M.P.Aiyappan, Member Petition No. CT/SOLAR JNNSM/KSERC/2010 August 4,
State of Renewables. US and state-level renewable energy adoption rates: 2008-2013
US and state-level renewable energy adoption rates: 2008-2013 Elena M. Krieger, PhD Physicians, Scientists & Engineers for Healthy Energy January 2014 1 Introduction While the United States power sector
ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION
ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION RENEWABLE POWER PURCHASE OBLIGATION (COMPLIANCE BY PURCHASE OF RENEWABLE ENERGY / RENEWABLE ENERGY CERTIFICATES) REGULATIONS, 2012 Regulation No. 1 of 2012
Demand Response Market Overview. Glossary of Demand Response Services
Demand Response Market Overview Glossary of Demand Response Services Open Energi has partnered with Tarmac to provide Demand Response What s inside... Market Overview Balancing Electricity Supply and Demand
Solar Power Plants FAQs
Solar Power Plants FAQs Solar Power industry in India is gaining more and more prominence with each passing day. The domestic/off-grid industry is picking up speed too. Owing to the queries we are receiving
PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO 220-221, SECTOR 34-A, CHANDIGARH. Petition No.26 of 2010 (Suo Motu) Date of Order: 7.7.
PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO 220-221, SECTOR 34-A, CHANDIGARH Petition No.26 of 2010 (Suo Motu) Date of Order: 7.7.2010 In the matter of : Determination of generic levellised generation
Analysis of state-wise RPO Regulation across India
The Renewable Purchase Obligations (RPO) has been the major driving force in India to promote the renewable energy sector. But the State Electricity Regulatory Commissions (SERCs) have defined their respective
EE and Reliability: SCE s LCR RFO and Preferred Resources Pilot. ACEEE Energy Efficiency as a Resource National Conference Mohammed Aliuddin
EE and Reliability: SCE s LCR RFO and Preferred Resources Pilot ACEEE Energy Efficiency as a Resource National Conference Mohammed Aliuddin 1 Several major drivers have led to initiatives that are changing
RENEWABLE ENERGY DEVELOPMENT IN LITHUANIA ACHIEVEMENTS AND DRAWBACKS
RENEWABLE ENERGY DEVELOPMENT IN LITHUANIA ACHIEVEMENTS AND DRAWBACKS Ieva Kuodė Ministry of Energy of the Republic of Lithuania SOLINVEST 2015-06-02 RES TARGETS BY 2020 23% the share of energy from renewable
Different types of electricity markets modelled using PLEXOS Integrated Energy Model The UK Balancing Market example
Different types of electricity markets modelled using PLEXOS Integrated Energy Model The UK Balancing Market example Peny Panagiotakopoulou, Senior Power Systems Consultant, Energy Exemplar Europe Overview
About Southern California Edison
About Southern California Edison One of the nations largest investorowned utilities with 125 years of service. Service Area 50,000 square miles Over 430 cities and communities Population Served Nearly
National Electricity Policy 03-Feb-2005
National Electricity Policy 03-Feb-2005 Under the provisions of section 3(1) of the Electricity Act, 2003, the Central Government is required to prepare the National Electricity Policy for development
TARIFF DETERMINATION METHODOLOGY FOR THERMAL POWER PLANT
TARIFF DETERMINATION METHODOLOGY FOR THERMAL POWER PLANT 1. Background The Electricity Act 2003 has empowered the Central Electricity Regulatory Commission (CERC) to specify the terms and conditions for
Smart Grid: Concepts and Deployment
Smart Grid: Concepts and Deployment Dr. S. Chakrabarti Department of Electrical Engineering IIT Kanpur email: [email protected] Smart Grid 1 Outline Defining the smart Grid Need for smart grid Smart grid
A new electricity market for Northern Ireland and Ireland from 2016 - Integrated Single Electricity Market (I-SEM)
A new electricity market for Northern Ireland and Ireland from 2016 - Integrated Single Electricity Market (I-SEM) Non-technical summary High level design Draft Decision Paper SEM -14-047 June 2014 1 INTRODUCTION
Guidelines for Solar Grid Power Projects
Guidelines for Solar Grid Power Projects NTPC Ltd. NTPC Vidyut Vyapar Nigam Ltd. AGENDA 1 2 3 NTPC / NVVN at a glance Broad Guidelines for Selection of Solar Power Developers Elements of PPA NTPC Limited
( Extract from Haryana Government Gazette, dated the 6 th December,2005) HARYANA GOVERNMENT
( Extract from Haryana Government Gazette, dated the 6 th December,2005) HARYANA GOVERNMENT RENEWABLE ENERGY DEPARTMENT NOTIFICATION The 23 rd November, 2005 POLICY FOR PROMOTING GENERATION OF ELECTRICITY
Renewable Energy on Regional Power Grids Can Help States Meet Federal Carbon Standards
FACT SHEET Renewable Energy on Regional Power Grids Can Help States Meet Federal Carbon Standards In June 2014, the U.S. Environmental Protection Agency (EPA) used its authority under Section 111(d) of
Glossary of Energy Terms. Know Your Power. Towards a Participatory Approach for Sustainable Power Development in the Mekong Region
Glossary of Energy Terms Know Your Power 2012 Towards a Participatory Approach for Sustainable Power Development in the Mekong Region List of terms Terms Page Terms Page Avoided cost 10 Installed capacity
Appellate Tribunal for Electricity (Appellate Jurisdiction) APPEAL No. 297 of 2013
Dated: 23 rd April, 2015 Appellate Tribunal for Electricity (Appellate Jurisdiction) APPEAL No. 297 of 2013 Present: Hon ble Mr. Rakesh Nath, Technical Member Hon ble Mr. Justice Surendra Kumar, Judicial
Initiatives by TEDA and
Initiatives by TEDA and Tamil Nadu Solar Policy 2012 1 POWER SECTOR AT A GLANCE (AS ON 30.09.12) INDIA TAMIL NADU Nuc2% Nuc3% RES 12% Hydro 19% RES 44% Thermal 41% Thermal 67% Hydro 12% Thermal Hydro 138806.18
Strategy for Providing 24x7 Power Supply. Forum of Regulators
Strategy for Providing 24x7 Power Supply Forum of Regulators December, 2014 Strategy for Providing 24x7 Power Supply Forum of Regulators December, 2014 Table of Contents 1. INTRODUCTION...12 2 POWER
Regulatory Environment and Electricity Tariff Design in Nigeria. Nigerian Electricity Regulatory Commission June, 2013
Regulatory Environment and Electricity Tariff Design in Nigeria By Nigerian Electricity Regulatory Commission June, 2013 Outline Functions of the Commission Tariff Regulation in Nigeria Methodology of
Annex B: Strike price methodology July 2013
July 2013 URN 13D/189 Contents Introduction... 3 Overview of methodology for deriving a CfD strike price... 3 Strike Prices during the cross-over period with the RO (2014/15 2016/17)... 4 Comparison of
Preparing for Distributed Energy Resources
Preparing for Distributed Energy Resources Executive summary Many utilities are turning to Smart Grid solutions such as distributed energy resources (DERs) small-scale renewable energy sources and energy
Grid of the Future. Integration of Renewables Energy Storage Smart Grid. Presentation by David Hawkins Lead Renewables Power Engineer Grid Operations
Grid of the Future Integration of Renewables Energy Storage Smart Grid Presentation by David Hawkins Lead Renewables Power Engineer Grid Operations Grid of the Future Current Power System Gen. Trans. Dist.Cust.
sink asset load power pool ISO pool participant bids operating constraints ancillary service declarations
G1 DEFINITIONS In the ISO rules: acceptable operational reason means with respect to a source asset, any one or more of the following: i) a circumstance related to the operation of the generating asset
SMART GRIDS PLUS INITIATIVE
Demand Response for residential customers -business opportunity for utilities ERA-NET SMART GRIDS PLUS INITIATIVE Sami Sailo, There Corporation Energy markets in Finland Supplier A Supplier B Settlement
Electricity Generation from Renewable Energy in Sri Lanka: Future Directions
Electricity Generation from Renewable Energy in Sri Lanka: Future Directions Presented by M.M.C. Ferdinando, Secretary, Ministry of Power and Energy R.J. Gunawardana, Additional General Manager (Transmission),
Electricity Exchanges in South Asia The Indian Energy Exchange Model
Electricity Exchanges in South Asia The Indian Energy Exchange Model 18 Mar 14 Rajesh K Mediratta Director (BD) [email protected] www.iexindia.com In this presentation Overview - Indian Market
RENEWABLE ENERGY WORKSHOP
RENEWABLE ENERGY WORKSHOP Development of Bankable PPAs and Opportunities for Cooperation with ECG GIZ House, Reichpietschufer, Berlin January 18, 2016 OUTLINE OF PRESENTATION Introduction and Overview
A Virtual Power Plant to balance wind energy - A Canadian Smart Grid Project. Number of customers
PowerShift Atlantic will demonstrate one of the world s first virtual power plants designed to allow for more effective integration and balancing of wind power onto the power grid. The project is a collaborative
Overview on SEA output
1 st SEA workshop of the revised PDP VII Overview on SEA output of Project N a t i o n a l P o w e r D e v e l o p m e n t P l a n p e r i o d 2 0 11-2 0 2 0, v i s i o n 2 0 3 0 ( P D P V I I ) P r e
Glossary of Terms Avoided Cost - Backfeed - Backup Generator - Backup Power - Base Rate or Fixed Charge Baseload Generation (Baseload Plant) -
Glossary of Terms Avoided Cost - The incremental cost Flint Energies would pay for the next kilowatt-hour of power in the open marketplace for energy. Flint Energies Board of Directors sets this Avoided
FIXED CHARGE: This is a cost that goes towards making the service available, including
ELECTRICITY BILL COMPONENTS FIXED CHARGE: This is a cost that goes towards making the service available, including installation and maintenance of poles, power lines and equipment, and 24-hour customer
To whom application is to be filed
SOUTHERN POWER DISTRIBUTION COMPANY OF TELANGANA LIMITED 6-1-50, Corporate Office/Mint Compound/Hyderabad 063. www.tssouthernpower.com, email:[email protected] As per TELANGANA SOLAR POWER POLICY
Ancillary Services and Flexible Generation
Ancillary Services and Flexible Generation Contents Ancillary Services Overview Types of Ancillary Services Market Impact Benefits of Medium Speed Solution Contact Information What are Ancillary Services?
Unlocking Electricity Prices:
Volume 2 A BidURenergy White Paper Unlocking Electricity Prices: A White Paper Exploring Price Determinants by: Mark Bookhagen, CEP pg. 2 Written by Mark Bookhagen, CEP Introduction In order to be classified
Enabling 24/7 Automated Demand Response and the Smart Grid using Dynamic Forward Price Offers
Enabling 24/7 Automated Demand Response and the Smart Grid using Dynamic Forward Price Offers Presented to ISO/RTO Council by Edward G. Cazalet, PhD The Cazalet Group [email protected] www.cazalet.com 650-949-0560
The Status of the Wind Power Market in Egypt. Dr. Walid El-Khattam Ain Shams University (Cairo, Egypt) The Egyptian Electricity Regulator (EgyptERA)
The Status of the Wind Power Market in Egypt Dr. Walid El-Khattam Ain Shams University (Cairo, Egypt) The Egyptian Electricity Regulator (EgyptERA) Berlin, June 11 th, 2013 1 Contents Key Challenges for