Atlanta 2015 Infrastructure Bond

From this document you will learn the answers to the following questions:

What is the infrastructure issue in Atlanta?

How much did Bridge Replacement & maintenance cost?

What is the assumed length of time that an asset will remain viable without major maintenance?

Similar documents
Creating Off Leash Dog Parks A Step By Step Guide

Atlanta City Council. E-Newsletter

Mayors Welcome Strong Surrey Votes Yes Coalition Support. Yes Vote Would Vastly Improve Transit and Transportation in Fast Growing City

County of Fairfax, Virginia

Proposed Program of High Capacity Transit Improvements City of Atlanta DRAFT

Light Rail Transit in Phoenix

Road Repaving and Street Safety Bond Quarterly Status Report presented to the Citizens General Obligation Bond Oversight Committee As of March 2016

Entered sb CL 13L0053 APD/06 CLAUDE COLE

ATLANTA CITY COUNCIL ACTION MINUTES JULY 02, 2012

PUBLIC SAFETY & LEGAL ADMINISTRATION COMMITTEE

City of Auburn Summary of Capital Outlay by Fund and Department

Mid-Coast Corridor Transit Project San Diego, California New Starts Project Development (Rating Assigned November 2014)

CLAIM OF: Dwain Tharpe through his attorney Paul B. Mazur, P.C. Attorney at Law P.O. Box Atlanta, Georgia 30355

LEGISLATION HISTORY BLUE BACK

General Obligation Bond Projects FYE

Impact Analysis: The Atlanta Braves new Stadium Project. March A Cushman & Wakefield Research Publication

Community members had the oppor-

ADVERSE REPORT. Entered sb CL 12L0604 NA/05 - GWENDOLYN BURNS

Ne w J e r s e y Tr a f f i c Co n g e s t i o n :

Capital Improvement Program: Public Input and the Need for a Multi-year Plan

RESOLUTION NO

2015 STATE OF THE URBAN TRAILS. Accomplishments, Active Projects, and Next Steps

Indianapolis SDAT. Neighborhood Restoration

g061. IctiN LFLADV ER S E REPORT Entered 7/26/11 CL 11L DWM/11 - Janinie J. Edmonds

APPLICATION LAFAYETTE METROPOLITAN PLANNING ORGANIZATION (MPO) SURFACE TRANSPORTATION PROGRAM (STP) FUNDS TRANSPORTATION IMPROVEMENT PROGRAM (TIP)

EPA Technical Assistance for Sustainable Communities Building Blocks

Surface Transportation Program (STP) Projects

CLAIM OF: Garry Davis, through his attorney Neil Flit, Esq., Law Offices of Neil Flit 3355 Lenox Road, Suite 750 Atlanta, Georgia 30326

Alternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011

Pavement Management Program

City of Auburn Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN

BERNALILLO COUNTY CAPITAL IMPROVEMENT PLAN (CIP) & GENERAL OBLIGATION BOND

Profile of the Government

Q. What do you think the most important transportation issues are in this area with regard to east-west travel?

Entered 2/23/12 - sb CL 12L0158 -DWM/06 - Angelena Kelly

Public Works and Transportation Bus Service Hub Terminal HVAC, Canopy, AVL Sign Equipment

Moving Ruston Forward. City of Ruston Infrastructure Maintenance and Improvements

Downtown Tampa Transportation Vision

City of West Palm Beach Florida. Budget In Brief Fiscal Year 2015

Harlem River Bridges Access Plan

EXHIBIT A Accessible Truck Routes Map

PUBLIC RIGHT-OF-WAY ACCESSIBILITY TRANSITION PLAN

Florida Avenue Multimodal Transportation Study. June 19, 2013

Members of the City of Bloomington Common Council Susie Johnson, Director, Department of Public Works Date: July 20, 2009

AREA: 2.37 acres NUMBER OF LOTS: 1 FT. NEW STREET: 0 LF. Single-family, Non-conforming machine shop

CITY OF ROANOKE AND TOWN OF VINTON, VIRGINIA. RSTP Funds Joint Application FOR

Infrastructure Financing Programs

Goals & Objectives. Chapter 9. Transportation

FY 2011 OHIO SMALL CITIES COMMUNITY DEVELOPMENT BLOCK GRANT COMPREHENSIVE DOWNTOWN REVITALIZATION PROGRAM

SECTION D CAPITAL PROGRAM CAPITAL PROGRAM D 1 FEDERAL TAX LAW D 2 STATUTORY DEBT LIMIT D 2 FINANCING SUMMARY D 3 AGENCY DETAIL D 4

Examples of Transportation Plan Goals, Objectives and Performance Measures

Roadway Cost Per Centerline Mile Revised June 2014

BIKEWAY TYPOLOGIES COMPLETE STREETS WORKSHOP JULY John Cock, Principal/Planner Alta Planning + Design

GARFIELD BOULEVARD. concept planning 54TH PL CALUMET AVE ELLSWORTH DR CTA STATION STUDY AREA GAS STATION GARFIELD BLVD PRAIRIE AVE

POLLING PLACE CHANGES FOR THE UPCOMING AUGUST 27, 2013 CITY OF BIRMINGHAM ELECTIONS

City of Atlanta CLIMATE ACTION PLAN

Draft Goals and Objectives Wadena Comprehensive Plan City of Wadena, Minnesota. Land Use Goals:

CITY OF FLORENCE NEIGHBORHOOD REVITALIZATION STRATEGY SECOND PUBLIC MEETING

City Council Budget Worksession

Near Westside Neighborhood and University Avenue Corridor Transportation Study. Public Workshop #2. September 12 and 23, 2013

DEPARTMENT OF WATERSHED MANAGEMENT AN ENTERPRISE FUND OF THE CITY OF ATLANTA, GEORGIA

College of Southern Maryland. Hughesville Transportation Study

RPA 14/ATURA Surface Transportation Program (STP) APPLICATION FOR FUNDS

The Corporation of the District of Saanich. Introduction of the Draft Financial Plan

Cost and Financial Analysis

The City of Owen Sound Asset Management Plan

Questions and Answers about the Orange Bus/Rail Investment Plan

In 2005, the City of Pasadena, CA, USA, with the support of consultants,

STRATEGIC COMMUNITY PLAN

CITY COUNCIL WORKSHOP MAY 24, 2016

EXECUTIVE SUMMARY. Asset Management Relationships and Dependencies. Introduction

Executive Director s Recommendation Commission Meeting: March 5, 2015

MID-HUDSON SOUTH TRANSPORTATION COORDINATING COMMITTEE APRIL 6, TIP Public Review Meeting

The financial plan was prepared in conjunction with the Technical Working Group. Refer to Table 3-1: Funding and Implementation Plan.

Water Utility Strategic Planning From Concept to Implementation

CAPITAL PLANNING BEST PRACTICES

Transcription:

Investing in a commitment today to meet the infrastructure challenges of the future. Richard Mendoza, Public Works James Shelby, Planning & Community Development July 2014

Key Events June 2014: Public Information Meeting (1 st Round) September 2014: Public Information Meetings (2 nd Round) December 1, 2014: City Council Votes on Legislation January 2015: Public Information Meetings (3 rd Round) March 17, 2015: Residents Vote on Bond Referendum Please visit: www.atlantaga.gov/infrastructure 2

Meeting Agenda Opening Remarks Infrastructure Needs Horizontal (roads, sidewalks, bridges, etc) Vertical (fire stations, recreational centers, other facilities) Public Feedback / Q & A Breakout Opportunities 3

State of Atlanta s Infrastructure Nationwide economic downturn, the City has to do more with less. Fiscal strategy focused on stabilizing City services and increasing efficiencies: - Since 2007, City has cut over $125M from General Fund budget - But that means the City has under-invested in core infrastructure $1.02B infrastructure backlog Forecasted revenue growth of ~1% per year would bring in a total of $30-35M incremental revenue over the next 3 years, which is not enough. Ensuring fiscal stability in future years, requires that the City take dramatic steps to increase efficiencies and change the way we do business which we are doing. Tackling these problems will also require a significant cash inflow, which is best done through an infrastructure bond. 4

Why & How a Referendum An Infrastructure Bond Referendum is a vote by registered voters within the City of Atlanta to approve or reject a request from the City to borrow money to fund infrastructure projects. The bond refers to debt that is secured by the full faith, credit and taxing power of the City. Prior to a bond referendum, the Atlanta City Council must vote to authorize an election to be held for the purpose of determining whether bonds shall be issued for the stated amount and purpose. Mayor Reed intends to ask the City Council in late 2014 to authorize a bond referendum vote to be held in March 2015. 5

Impact on Atlanta Taxpayers Atlanta taxpayers will see no increase in their property or sales taxes as a result of the infrastructure bond. (see note below) Given the City s strong credit rating, we will be able to borrow money at historically low rates. The debt service on the bonds, estimated at $17 million annually, will be paid through revenue generated from operational efficiencies identified by the Mayor s Blue Ribbon Commission on Waste & Efficiency in Government. 6

The Problem An Aging Infrastructure I pledged during my inauguration to address Atlanta s infrastructure challenges in a meaningful way. The City faces a $1 billion infrastructure backlog, and I plan to seek a $150-$250 million bond referendum, possibly as soon as next year, to finance long overdue street improvements, bridge repairs, and other projects. - Mayor Kasim Reed 7

The 2010 State of the City s Transportation Infrastructure Report identified approximately $881M of transportation infrastructure The 2014 City s Facility Infrastructure Report identified $130.8M backlog of projects. $56.2M (~43%) ranks as High priority The total Infrastructure Backlog is $1.02B Without a well reasoned and diversified plan to maintain the transportation and fleet inventory, it will be difficult for the City of Atlanta to continue to provide a safe and efficient environment for the City s public to thrive. - 2010 State of the City s Transportation Infrastructure and Fleet Inventory Report 8

Greatest Assets by Backlog Cost: Bridge Replacement & Maintenance: $259M, 30% Street Resurfacing: $262M, 31% Sidewalks, Curbs, and ADA Ramps*: $204M, 24% Total Cost for Three Greatest Assets: $725M, 85% Remaining 15% includes: signals, street lights, signs, unpaved roads, school zone flashers, etc. *Repair of ADA Ramps is required by City s agreement with Department of Justice for streets paved since 1992 ($52M) 9

City of Atlanta & Department of Justice Agreement In 2009, the United States Department of Justice initiated a compliance review of the facilities and policies of the City of Atlanta related to the Americans with Disabilities Act (ADA) of 1990. Among other outcomes for City of Atlanta Departments, the Department of Public Works is required to identify and install ADA compliant curb ramps at sidewalk locations on streets resurfaced since January, 1992. The estimated backlog of noncompliant intersection nodes is 31,442 with an estimated construction cost of $52M. Intersection Node with Non-Compliant ADA Ramp Intersection Node with Missing ADA Ramp 10

Transportation Investment Act (TIA) 15% projects The City engaged in a robust public engagement process in preparation for the Transportation Investment Act referendum. Working with citizens in each quadrant of the city, $42M for local projects were identified. 11

Bridge Replacement and Maintenance Backlog Cost, $259M 30% of Transportation Backlog Annual Need after Reduction of Backlog: $5M FY11 Allocation: $0.8M Annual Funding Gap: $4.2M Overall System Condition 14 Bridges Fair to Poor 9% of Inventory Fair to Poor System Age Oldest 108 years old* Average Age - 57 years * MLK between Northside and Forsyth; Powers Ferry over Nancy Creek 12

Street Resurfacing Backlog Cost, $262M (1634 total miles of paved streets) 31% of Transportation Backlog Annual Need after Reduction of Backlog: $38.3M FY11 Allocation: $4.1M Annual Funding Gap: $34.2M Past Life Cycle: 51% of Paved Street Inventory 834 Miles of Paved Street Inventory Note: Life Cycle is defined as the assumed length of time that an asset will remain viable without major maintenance. 13

LIFE CYCLE Atlanta 2015 Infrastructure Bond Street Resurfacing Street Classifications: Includes arterials, collectors, residential, and industrial streets 2010 Paved Streets Backlog Inventory Life Cycle Example Type of Street Life Cycle (years) Total Past Life Cycle (miles) 10+ Years Past Life Cycle (miles) 5 to 10 Years Past Life Cycle (miles) 0 to 5 Years Past Life Cycle (miles) 0 to 5 Years to Life Cycle (miles) 5+ Years to Life Cycle (miles) Total Miles Past Life Cycle (%) Arterials 10 48 5 12 32 16 9 74 65% Collectors 15 102 11 29 62 48 80 230 45% Industrial 10 17 4 5 8 3 3 22 76% Residential 20 667 222 222 222 100 541 1,308 51% Totals 834 242 268 324 167 633 1,634 51% Note: All residential streets 10-20 years past their life cycles were evenly divided among High, Medium, and Low categories. 14

Sidewalks, Curbs, and ADA Ramps backlog cost, $204M 24% of Transportation Backlog Total Annual Need after Reduction of Backlog: $20M FY11 Allocation: $0.57M $19.4M Annual Funding Gap System Beyond Life Cycle, Estimated: 18% of Sidewalk Network 10% of Curbing 73% of ADA Ramps 15

Infrastructure Backlog Summary Asset Priority High (millions) Priority Medium (millions) Priority Low (millions) Totals (millions) Arterials Streets 1.74 4.99 15.85 22.58 Collector Streets 3.58 10.91 21.69 36.19 Industrial Streets 2.64 2.08 3.34 8.05 Residential Streets 64.90 64.90 64.90 194.70 Paved Streets Subtotals 72.85 82.89 105.77 261.52 Bridges 71.45 82.67 134.47 288.58 Sidewalks, Curbs and ADA Ramps 76.86 62.53 64.78 204.17 Traffic Signals 2.35 20.25 8.62 31.22 Street Lights 9.97 5.40 19.27 34.64 School Zone Flashers 0.50 0.00 0.00 0.50 Base 2008 Infrastructure Subtotals 233.97 253.73 332.92 820.62 Unpaved Streets 4.60 13.49 14.01 32.10 Reversible Lane System 1.34 1.21 0.00 2.55 Traffic Signage 4.30 12.09 5.17 21.56 Truck Route & Street Classification Study 0.36 0.00 0.00 0.36 COA Standard Specifications and Construction Detail Update 1.34 0.00 0.00 1.34 Street and Sidewalk Inventory and Condition Assessment 1.24 0.00 0.00 1.24 Signs and Markings Inventory and Condition Assessment 0.67 0.00 0.00 0.67 Street Light Assessment 0.41 0.00 0.00 0.41 Infrastructure Subtotals, Additional 2010 Items 14.25 26.80 19.18 60.23 Infrastructure Category Totals 248.22 280.53 352.10 880.85 16

Categories of Infrastructure Backlog Bridge Replacements ($259M) Unpaved Roads and Street Resurfacing ($293M) Signals, Signs and School Zone Flashers ($55.9M) Sidewalks, Curbing and ADA Ramps ($204M) TIA Referendum Projects ($42M) Street Lights ($34.6M) Fire Stations ($40.0M) Police Stations ($57.9M) Recreational Centers ($8.2M) Government Buildings ($24.7M) 17

Proposed Criteria to Prioritize Transportation Infrastructure Projects Infrastructure sustainability (How many years past lifecycle?) Provide for pedestrian and bike facilities (construct or upgrade bike/pedestrian facilities) Promote public health and safety (bike lanes, pedestrian lighting, ADA improvements) Leverage Federal/State funds (80% or more) Connection to transit (proximity to rail and bus routes) Green infrastructure innovation (recycled materials, rain gardens, etc.) Preservation of neighborhoods (connectivity to schools or historic venues) Connection to other projects (proximity to other projects) Part of Connect Atlanta or other COA plans/reports Part of Neighborhood/Development adopted plan 18

The Total Capital Improvement Needs for City Buildings is $130.8M. Building Improvement Projects by Priority: High Priority - Approximately $56.2M Medium Priority Approximately $71.9M Low Priority - Approximately $2.7M City Buildings consist of 120 properties with over 3.3M square feet of capital assets. The City has 93- Owned Properties and 27 -Leased Locations. Equaling approximately 6.1M square feet of building space combined. Average age of the Owned Building is 45 years (By industry standards for building the City s buildings are 7 years past there normal Life Cycle for a commercial building). Source: FY2013 State of the City s Facility Infrastructure & Fleet Inventory Report 19

APD and AFR represent ~$38M (~67%) of the High Priority Facility needs 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% Total = $130.8M $2.7M Low Medium $71.9M High $56.2M Facility Priorities High Priority = $56.2M $2.1M DPW DPR/PAL $16.2M APD $14.0M AFR $23.9M Department Values Industry Standards for Facility Run Rate Efficiencies: 1. Track maintenance costs per facility. 2. Maintain building level systems records with dates of installation, repair history, intended life, and manufacturer recommended maintenance frequency with estimated costs. 3. Perform a facility condition assessment on all capital assets by licensed building inspectors that will provide an official baseline for future improvements 4. Confirm that the facilities list is complete and accurate. 20

Top Ten Highest Priority Buildings Needing Improvements: Rank Asset Address Usage / Common Name Primary Department Repair or Replace 1 70 Boulevard, NE MLK North Natatorium DPR Replace 2 880 Cherokee Avenue SE Zone 3 Precinct APD Replace 3 1125 Cascade Circle SW Zone 4 Precinct APD Replace 4 1111 Hill Street Shop / Shed / Office DPW Replace 5 25 Claire Drive Tower AFR Repair 6 25 Claire Drive House AFR Replace 7 2349 Benjamin E. Mays Drive SW Fire Station 25 AFR Replace 8 2315 Donald Lee Hollowell Parkway NW Zone 1 Precinct APD Repair 9 1545 Howell Mill Road NW Fire Station 23 AFR Replace 10 1568 Jonesboro Road SE Fire Station 2 AFR Repair 21

Criteria used to Prioritize Facilities as High, Medium, or Low Facility Prioritization Criteria: Safety Enhancement Issue - Facility with features that may pose a risk in the future Core and Shell Systems Failure - Facility with a failure of base building elements (HVAC, etc.) Facility Functional Needs are Met - Provides for the daily requirements of the department Facility Condition Index - Industry-wide benchmark comparison tool and ratio (5% is Good, 5-11% is Fair, and greater than 11% is Poor) Years Past Life Cycle Years an asset is in service past its intended period of usefulness Funding for Facility Replacement - FY2013/FY2014 funding for new construction of a facility Facility Severity Ranking: High Priority - Facilities that had a Safety Enhancement Issue Medium Priority - Facilities that had Core and Shell System Failures but no Safety Issues Low Priority - All other facilities Source: FY2013 State of the City s Facility Infrastructure & Fleet Inventory Report 22

Proposed Criteria to Prioritize Facilities Infrastructure Projects Safety enhancement issues Core and shell system failures Facility functional needs are met Infrastructure sustainability (How many years past lifecycle?) Funding for facility replacement 23

Key Events June 2014: Public Information Meeting (1 st Round) September 2014: Public Information Meetings (2 nd Round) December 1, 2014: City Council Votes on Legislation January 2015: Public Information Meetings (3 rd Round) March 17, 2015: Residents Vote on Bond Referendum Please visit: www.atlantaga.gov/infrastructure 24

City of Atlanta Kasim Reed Mayor Thank You! Ceasar C. Mitchell President Michael Julian Bond Post 1 At Large Mary Norwood Post 2 At Large Andre Dickens Post 3 At Large Carla Smith District 1 Kwanza Hall District 2 Ivory Lee Young, Jr. District 3 Cleta Winslow District 4 Natalyn Archibong District 5 Alex Wan District 6 Howard Shook District 7 Yolanda Adrean District 8 Felicia A. Moore District 9 C. T. Martin District 10 Keisha Lance Bottoms District 11 Investing in a commitment today to meet the transportation challenges of the future. Joyce Sheperd District 12 25