Technical requirements



Similar documents
Doc Ref: baselayer.com 2015 BASELAYER TECHNOLOGY, LLC

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.

JAWAHARLAL NEHRU UNIVERSITY

york air-conditioning products Residential & VRF News 2015

CoolTeg Plus Chilled Water (CW) version: AC-TCW

Technical specifications. Containerized data centre NTR CDC 40f+

Cardok Sàrl CP37 CH-1295 Tannay Switzerland Phone:

hong kong//china data center specifications tel: fax: internet + intellectual property + intelligence

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.

Visions become real. Temperature control and cooling systems. The innovative and reliable solution

EM6556 e-domotica Mini Switch

THE OPTIMAL SOLUTION FOR SMALL AND MEDIUM DATA CENTER

FULL DC INVERTER SYSTEMS

UniSas BA. Physical single-person detection. Models: UniSas BA9, UniSas BA12. Energy savings. Eco-design. Recyclable product. Manual Attack Resistance

IPSIP M series-m Modular Data Center

TIG INVERTER INSTRUCTION MANUAL

Fire & Security DETECTORS

Integrated Building Management and Security System. Building Automation & Security.

minova technology electronics

Rock-Ola Music Center Set-Up and Installation Guide For all Q-Series models 230V, Export

Retail & Commercial Solutions. Siemens EcoView. Energy Management Made Easier.

Sensor Monitoring and Remote Technologies 9 Voyager St, Linbro Park, Johannesburg Tel: ;

Technical Specifications

RELAX IT DOES THE REST GUEST ROOM CONTROL SYSTEM FOR HOSPITALITY BUILDINGS GLOBAL SPECIALIST IN ELECTRICAL AND DIGITAL BUILDING INFRASTRUCTURES

BARCODE TICKET SOLUTION RF CARD SOLUTION MAGNETIC TICKET SOLUTION

YO-301AP POE AP Datasheet

Liebert Hiross HPW The High Performance Wallmount Cooling Solutions for Telecom Mobile Remote Access Nodes

Replacement of Heating, Ventilation, Air Conditioning (HVAC) Units In Apartments Located at 641 Fifth Avenue. Photo Essay

Current valve. for AC 24 V pulse/pause control of electrical loads up to 30 kw

Lava. Precision Solutions. Site Planning and Installation Guide

PHOTOVOLTAIC (PV) solar panels. Specification. Electricity - CE & ISO 9000 certified. 83W panel. 180W panel Maximum power:

Our Hosting Infrastructure. An introduction to our Platform, Data Centres and Data Security.

Climasys Thermal Management System. Schneider Electric Universal Enclosures 2009

CE6500 Energy Recovery Ventilator

Energy Communication Unit (ECU)

STERILIZERS, LABORATORY DRYING OVENS

USER INSTRUCTIONS FOR GET PORTABLE 12k BTU AIR CONDITIONER MODEL No. GPACU12HR

Incubator with mechanical convection

Contents. Part 1 General Information Part 2 Outdoor Units Part 3 Installation Part 4 Troubleshooting 73

Unico Inverter. Unique and efficient.

Subtropical Cities September Design for Energy Efficiency in Commercial Buildings in Queensland

SHARKY 775 COMPACT ENERGY METER ULTRASONIC

Eaton 93PM UPS Where aesthetics meet intelligence.

Application. Key Features. Benefits. Contact us. Solution for Digital TV coverage. Multi DVB-T/-H/-T2 - & ISDB-T Gapfiller Nx1W

Liebert DCR Part of the SmartRow Offering. Installation Manual 3-6, Single/Redundant and 5-10 Racks Higher Capacity Cooling Units, 60Hz

The High Performance Floormount Indoor Package Cooling Solution. Precision Cooling for Business-Critical Continuity

Meaco 30L and Meaco 40L dehumidifier instruction manual

Technical Specification for Model RSK2503 (Z)-06A IR Belt Solar Cell Firing Furnace

Standard Comms Rooms Specification

SWIMMING POOL AIR-HANDLING UNITS KU-DB Series

City of Peterborough

3466 Building Energy Management Training Systems

Welcome to the presentation of the Hybrid Trolley-Bus

WALL TABLET. Smart Home Controller. make your home smart. Control your home from anywhere in the world

Ensto Chago Master EVM300 and EVM500 Operational description

NewAir AC-10100E / AC-10100H Portable Air Conditioner Owner s Manual PLEASE READ AND SAVE THESE INSTRUCTIONS

Home Passport Gateway Series Simplify your Life with Smart Solutions

Incubators, cooled incubators, drying ovens, sterilizers, climatic chambers

IP Villa System Quick Start Guide

USER S MANUAL HSC-24A

Strategic Data Centre Site Profiles. Data Centre Co-Location London East

Integrated Controls & Monitoring System for Apartments. Solution for southern countries.

LEVEL 3 DATA CENTER ASSESSMENT

Low Bay High Bay. Lighting. Industrial Series. The best lighting level for better working performance.

1-Way Chilled Water Cassettes KCO 60, 90 & 120. Technical Brochure. TM KCO-W.1GB Date : November 2005 Supersedes : None

Niko Home Control. Installation Manual

RVH/BCH Data Centres Proposals for Surge Protection and Ventilation

Chilled Water Precision Air Conditioner For Critical Application

CoolTop. A unique water cooled air-conditioning unit for server room cooling from the top AC-TOPx-CW-240/60

Data Center Security 100% UPTIME PUZZLE. Page 1

EKON BMS HVAC system. Simply Smart. Touch Screen Controller. Going green. Wireless. Wireless Thermostat with Light Switch

Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year

ABB i-bus KNX Security Solutions with KNX Security Terminal Product Information

User Guide. Linksys PLWK400. Powerline AV Wireless Network Extender Kit

Storage System. Planning Checklist. EC E1, First Edition

Power consumption (kw)

Fire. The Fire Installers Mate. A guide to fire alarm systems design

RRV934. Multi-controller. Synco living

SECTION DETECTION AND ALARM

INNOVATIVE SOLUTION OF DOMESTIC HEATING SPLIT TYPE SPLIT DHW INTEGRATED TYPE MONOBLOC TYPE

CHAPTER 3. BUILDING THERMAL LOAD ESTIMATION

ABB Stotz-Kontakt GmbH ABB safe&smart Project planning of security systems

SWIMMING POOL HEAT PUMP

Technical Specifications for West Campus Data Center HVAC System

AMS 120. EFT Guest Card Terminal & Refund unit

NewAir AC-10000E, AC-10000H Portable Air Conditioner Owner s Manual PLEASE READ AND SAVE THESE INSTRUCTIONS

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.

FIRE-FIGHTING DESIGN BRIEF REPORT

INTEGRAL REMOTE MANAGEMENT SOLUTION cirwatt b series

Automation's Modular Containerized Datacenter Solutions

DATACENTER ZURICH. Well Positioned for Security

Portable Air Conditioner. OWNER S MANUAL Read these instructions before use. Model: MN12CES / MN10CESWW

Installation Manual. Rental Services. Air Handling Units CHS-SVN01A-EN. July 2008

Weiss Mobile Air Conditioning Systems

AVR 158. Audio/video receiver. Quick-Start Guide ENGLISH

TYPICAL FIRE SAFETY INSPECTION VIOLATIONS

Transcription:

Technical requirements of site preparation for TF-T1 Module Project Manager / / Head of technical department /K. Nikitin/ St.-Petersburg 2009

Contents 1. Technical specification of TF-T1 module 2. Appearance and construction scheme 3. Requirements to the premises 4. Requirements for ventilation and air-conditioning 5. Requirement for electric power supply 6. Other requirements 2

1. Technical specification of TF-T1 module Height of the module in the up most position 3,5 m Diameter of the surrounding safety fence 4,4 m Full weight (without visitors) 1500 kg Full weight with 5 visitors 2100 kg Static floor load (without visitors) 98,62 kg/m 2 Static floor load with 5 visitors 138,07 kg/m 2 Maximum dynamic floor load with 5 visitors 215,20 kg/m 2 Electric power supply requirements 3-phase, 380 V, 50 Hz, 32 A Standby mode 3,3 kw, Average electric power consumption Operation mode up to 7,0 kw (operation cost calculation) Maximum (peak) load up to 11 kw Session cycle duration 3-6 minutes (adjustable) Capacity and throughput 5 visitors, up to 60 visitors per hour Operation temperature - +5 35 C; Environmental requirements Humidity 20-90% RH; No direct sunlight allowed. Air exchange is carried out from the surrounding Ventilation and air-conditioning environment. - Real internet IP address; - Connection speed at least 256Kbps in both directions; Internet connection - Wired or wireless Ethernet interface. WiMAX or GSM-GPRS connection is possible upon manufacturer s confirmation. 1. Operator one person for start up, operation and shut down of the module. 2. Technician one person for service, Staff maintenance and troubleshooting. 3.Administrator one person for periodical control. 3

2. Appearance and construction scheme Exterior appearance of TF-T1 module 4

Top view 5

3. Requirements to the premises Before premise preparation it is necessary to think over and define the primary entrance-exit zone of TF-T1 module. The entrance-exit zone is equipped by the touch screen and the bar code reader. TF-T1 module should take places so that from an outer side of electro-technical cabinet there was an easy approach for service of equipment TF-T1 module. Before TF-T1 module installation the premises should be completely prepared, all building, painting and decorating works should be finished. The following requirements should be taken in consideration: - Premise should correspond to dimensions of TF-T1 module (see technical specification). - Floor should be leveled and correspond to requirements of weight of the module (see technical specification). Decision on building of additional basic couplers or unloading frames is accepted by experts of the Customer depending on a premise. - Premises should be equipped by the fire alarm system and primary means of firefighting according to requirements for this type of premises. 2. Requirements for ventilation and air-conditioning Smoking is not recommended due to fire safety reasons. It is necessary to provide air exchange inside the premises for visitors comfort and equipment cooling. TF-T1 module is equipped with several fans to provide fresh air flow inside the cabin and the electro-technical cabinet from the surrounding environment. The temperature and humidity of the premises environment should correspond to the parameters specified in technical specification. 3. Requirement for electric power supply The power supply required for TF-T1 module is as follows: - 3 phase, 380V, 50Hz, up to 10kW. - Separate neutral and ground wires; Electric power supply cable should be provided to lower section of the electro-technical cabinet of TF-T1 module. It is recommended to implement buried laying or ceiling drop of the cable. Electric cable installation and connection should be carried out by a person with corresponding qualification (level of access for up to 1000V). 6

4. Other requirements For remote troubleshooting, software update and license control an internet connection should be provided to TF-T1 module. It is recommended to have unlimited tariff. Connection requirements are as follows: - Real internet IP address; - Connection speed at least 256Kbps in both directions; - Wired or wireless Ethernet interface. 7