FIT TIER 2 Application



Similar documents
Effective: September 10, 2006 Vermont Attachment 1 to Rule Public Service Board Page 1 of 6

PacifiCorp Original Sheet No. 476 FERC Electric Tariff, Substitute 6 th Rev Volume No. 11 APPENDIX 2 TO SGIP

Physical Address: City: State: Zip Code:

ATTACHMENT F. Electric Utility Contact Information Utility Name. For Office Use Only

Application for Small Generator Facility Interconnection Tier 2, Tier 3 or Tier 4 Interconnection

Rule Fast Track Analysis for National Life Insurance Co.

Request for Payment Instructions Wholesale Distribution Access Tariff (WDAT) Attachment I - GIP

HOLYOKE GAS & ELECTRIC DEPT S Distributed Generation Policy Effective: September 18, 2012

TERMS AND CONDITIONS

Simple Methods for Calculating Short Circuit Current Without a Computer By Dennis McKeown, PE GE Senior System Application Engineer

Interconnection of Generators to EDI s Distribution System

Dakota Energy Cooperative, Inc. POLICY STATEMENT

LEHI CITY POWER NET METERING STANDARDS For Customer-Owned Electric Generating Systems

MicroFIT Connection Application Guidelines

Appendix N: GENERATOR DATA SHEET FOR SYNCHRONOUS GENERATORS CONNECTED TO PG&E ELECTRIC SYSTEM

SOLARCARE SERIES PRODUCT AND APPLICATION GUIDE

AUSTIN ENERGY INTERCONNECTION GUIDE FOR CUSTOMER-OWNED POWER PRODUCTION FOR FACILITIES UP TO 10MW A INTERCONNECTION CLASSIFICATIONS...

Unitil Energy Systems, Inc. Interconnection Standards For Inverters Sized Up To 100 kva

TABLE OF CONTENTS 1.0 INTRODUCTION PURPOSE DEVIATION INTERTIE PROTECTION REQUIREMENTS... 4

Green Power Connection Net Energy Metering Engineering Review Process in Delaware and Speeding Up the Application Fee Process

Inverter / Charger Installation General Operations and AC and DC Connections

SECTION POWER MONITOR FOR ELECTRICAL, STEAM CONDENSATE, AND WATER PART I - GENERAL

PI144K - Winding 311 APPROVED DOCUMENT. Technical Data Sheet. Generator Solutions AS

PI044E - Winding 311 APPROVED DOCUMENT. Technical Data Sheet

Solar Power Plant Design and Interconnection

SPECIFICATION COG-2007

..OR How To Protect your 3-Phase Equipment Investment with 3-Phase Monitors from Time Mark...

Modeling and Testing of Unbalanced Loading and Voltage Regulation

Residential Solar Service Agreement (RSSA) Customer Sited Solar Photovoltaic Systems

3. TYPES OF SERVICE AVAILABLE. 3.1 Scope

Request for Proposals for Photovoltaic System Installation

UCI274C - Technical Data Sheet

UCI274H - Technical Data Sheet

TECHNICAL INTERCONNECTION REQUIREMENTS FOR DISTRIBUTED GENERATION. Micro Generation & Small Generation, 3-phase, less than 30 kw

City of Riverside Building & Safety Division Phone: (951)

Enphase Microinverters and Ungrounded Renewable Energy Systems: Canadian Electrical Code Compliance

Generation Interconnection System Impact Study Report. For. PJM Generation Interconnection Request Queue Position X1-114.

SECTION VARIABLE FREQUENCY DRIVES

PI734D - Technical Data Sheet

PI734B - Technical Data Sheet

N.J.A.C. 14:8-4 NET METERING FOR CLASS I RENEWABLE ENERGY SYSTEMS

Application of Four-Pole Circuit Breakers within Data Centers

Title 20 PUBLIC SERVICE COMMISSION. Subtitle 50 SERVICE SUPPLIED BY ELECTRIC COMPANIES. Chapter 02 Engineering

SOLAR PV STANDARD ELECTRICAL PLAN Microinverter Systems for Single Family Dwellings

PM734F - Technical Data Sheet Winding 28

Interconnection Application For Residential and Commercial Power Systems 10 kw or Smaller

Rotary Phase Converters

Technical Requirements for Renewable Energy Systems Connected to the Low Voltage (LV) Network via Inverters

DC disconnects for solar photovoltaic installations. Connecting the. power of the sun

How To Choose A Transformer

BCI184E - Technical Data Sheet

Connecting the Power of the Sun. DC Disconnects for Solar Photovoltaic Installations. DC disconnects for. solar photovoltaic installations

What are the basic electrical safety issues and remedies in solar photovoltaic installations?

Photovoltaic Incentive Program

4.5 Transformer Connections

HCM434F - Winding 311 APPROVED DOCUMENT. Technical Data Sheet

PSEG-LONG ISLAND SMART GRID SMALL GENERATOR INTERCONNECTION SCREENING CRITERIA FOR OPERATING IN PARALLEL WITH LIPA S DISTRIBUTION SYSTEM

HPS Universal. Single and Three Phase Potted. Buck-Boost Transformers. Buck-Boost Applications & Standard Specification... 80

SUBJECT: How to wire a motor starter Number: AN-MC-004 Date Issued: 2/08/2005 Revision: Original

Equipment: Power Supply, DAI, Variable resistance (8311), Variable inductance (8321)

Buck - Boost Transformers

NOTICE OF INTENT Department of Revenue Policy Services Division. Income Tax Credits for Wind or Solar Energy Systems (LAC: 61:I.

County of Riverside Building and Safety Department

Size template. Grid Connection Masterclass Energex John Lansley Senior Network Solutions Engineer

Three-phase AC circuits

GENERATOR SELECTION. a. Three phase - 120/208V, 3 phase, 4W wye; 277/408, 3 phase, 4W wye; * 120/240V 3 phase, 4W Delta

ACCURACY OF POTENTIALTRANSFORMERS

VOLTAGE REGULATOR AND PARALLEL OPERATION

Fronius inverters named on the "Go Solar California Eligible Inverter listing

Current Transformers

OVERCURRENT & EARTH FAULT RELAYS. To study the protection of equipment and system by relays in conjunction with switchgear.

JEA Net Metering Policy Tiers 1-3

Session 10: General Overview of Interconnection Standards & Grid Codes for High Penetration PV October 21, 2015 Santiago, Chile

Isolated-Parallel UPS Configuration

User Manual of Grid Tie Inverter with Limiter

How To Plan Out An Array Of Solar Panels

DHANALAKSHMI COLLEGE OF ENGINEERING DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING EE ELECTRICAL MACHINES II UNIT-I SYNCHRONOUS GENERATOR

Short Circuit Current Calculations

Power Electronics. Prof. K. Gopakumar. Centre for Electronics Design and Technology. Indian Institute of Science, Bangalore.

APPLICATION NOTE. Increasing PV Hosting Capacity on LV Secondary Circuits with the Gridco System empower TM Solution

Understanding Power Factor and How it Affects Your Electric Bill. Presented by Scott Peele PE

100% Stator Ground Fault Detection Implementation at Hibbard Renewable Energy Center. 598 N. Buth Rd 3215 Arrowhead Rd

Chapter 9 Balanced Faults

Understanding Delta Conversion Online "Power Regulation" - Part 2

Power System Analysis

CODE OF PRACTICE NINE

Register of Completed Embedded Generation Projects (Non-registered, typically 30kW to 5000kW)

MODELING AND TESTING OF UNBALANCED LOADING AND VOLTAGE REGULATION. Prepared For: California Energy Commission Public Interest Energy Research Program

MTE SERIES RLW. World REACTORS USER MANUAL PART NO. INSTR 030 REL MTE Corporation

Three-phase monitoring relay CM-PFE

ABB ! CAUTION. Type COQ Negative Sequence Generator Relay. (50/60 Hertz) J. Instruction Leaflet

1.44 kw Programmable DC Power Supplies XLN Series

The following table shows approximate percentage wise the

ABB central inverters PVI-55.0/ PVI-165.0/ PVI-275.0/ to 330 kw

Step Voltage Regulators

Local Back-up Protection for an Electric Power System

Services. Three Phase Service

Energy Depot GmbH PRODUCT AND APPLICATION GUIDE. Total Monitoring Solution for PV. Delivering Solutions for Energy Management

1 Introduction. 2 The Symmetrical Component Transformation. J.L. Kirtley Jr.

Transcription:

FIT TIER 2 Application Application Information The below information Auto-Fills from your registration information: Building Permit Application Date: Project Completion Date: Name: Address: City: State: Zip Code: Daytime Phone: Evening/Cell Phone: Fax: Email Address Applicant Information Is Applicant owner of Generating Facility? Yes No

If NO is picked on first page of application the below information will need to be completed: If YES is picked on the first page of the application the below information will be Auto-Filled. Owner of Generating Facility (required) Owner's First Name: (required) Owner's Last Name: (required) Address: (required) City: (required) State: (required) Zip Code: (required) Daytime Phone: (required) Evening/Cell Phone: Fax: (required) Email Address: Continue Back Once CONTINUE is chosen from the Owner of Generating Facility page: Generating Facility Information Is Generating Facility at owner location? Yes No

If NO is picked on the Generating Facility Information page of application the below information will need to be completed: If YES is picked on the Generating Facility Information page of the application SOME information will be Auto-Filled. Generating Facility Information (required) Tax Map Key: 1 - - - - ( n-n-n-nnn-nnn ) (required) Electric Service Account #: Note: If this location has no service, enter 0000-0000-000 for the Electric Service Account # (required) Address: (required) City: (required) State: (required) Zip Code: (required) Daytime Phone: (required) Evening/Cell Phone: (required) Fax: (required) Email Address: Generator Qualifications AUTO-FILL Technology: (For Solar/PV only) PV Array DC Rated Output in kw: (For Solar/PV only) PV Array AC Rated Output in kw: Maximum Site Load without Generator Capability in kw Maximum Generator Capability in kw: Minimum Site Load without Generation in kw: (required) Maximum Design Capacity [manufacturer's inverter rating, or nameplate rating if there is no inverter] in kw AC: (Between 20 and 500) Annual Energy Production of Generating Facility in kwh: Annual Energy Exported through Point of Common Coupling in kwh:

Generator Technical Information Seller must not modify or add to the Generating Facility without notification and the prior written consent of the Company Type of Generator: Synchronous Induction Inverter-Based Generating Facility Generator (or solar collector) Manufacturer, Model Name and Number: (A copy of Generator Nameplate and Manufacturer's Specification Sheet must also be submitted) Operating Power Factor: Nameplate rating in kw: Fault Current Contribution of Generator in Amps: Inverter Manufacturer, Model Name and Number (if used): (A copy of Inverter Nameplate and Manufacturer's Specification Sheet must also be submitted) Operating Power Factor: Rating in kw: Number of Starts Per Day: Maximum Starting kva: UF Trip Setting: UF Time Delay (Secs): Generator Grounding Method: Effectively Grounded Resonant Grounded Low-Inductance Grounded High-Resistance Grounded Low-Resistance Grounded Ungrounded Generator Characteristic Data (for rotating machines): (Not needed if Generator Nameplate and Manufacturer's Specification Sheet are provided) Direct Access Synchronous Reactance, X d : Direct Access Transient Reactance, X' d : Direct Access Subtransient Reactance, X'' d : Negative Sequence Reactance: Zero Sequence Reactance: KVA Base: Inertia Constant, H:

Excitation Response Ratio: Direct Access Open-Circuit Transient Time Constant, T'do: Direct Access Open-Circuit Subtransient Time Constant, T''do: Interconnecting Equipment Technical Data (to the extent owned by Seller) Will an interposing transformer be used between the generator and the point of interconnection? Yes No Transformer Data: (A copy of transformer Nameplate and Manufacturer's Test Report may be substituted) Size in KVA: Transformer Primary Voltage: Primary Transformer Delta Wye Wye Grounded Transformer Secondary Voltage: Delta Wye Wye Grounded Transformer Impedance in %: on KVA Base: Transformer Fuse Data: (Submit a copy of fuse manufacturer's Minimum Melt and Total Clearing Time-Current Curves) At: Size: Speed: Primary Voltage Secondary Voltage Transformer Protection (if not fuse): Please describe: Interconnecting Circuit Breaker (if applicable): (A copy of circuit breaker's Nameplate and Specification Sheet must also be submitted) Continuous Load Rating in Amps: Interrupting Rating in Amps: Trip Speed in Cycles: Circuit Breaker Protective Relays (if applicable): (Submit a copy of any proposed Time-Overcurrent Coordination Curves)

Current Transformer Data (if applicable): (Submit a copy of Manufacturer's Excitation & Ratio Correction Curves) Accuracy Class: Proposed Ratio Connection: /5 Accuracy Class: Proposed Ratio Connection: /5 Generator Disconnect Switch: A generator disconnect device (isolation device) must be installed with features as described in the FIT Interconnection Standards And Technical Requirements. Catalog No: Rated Volts: Rated Amps:

Single or 3 Phase: Mounting Location: General Technical Information 2 OF THE 3 FOLLOWING QUESTIONS WILL BE SHOWN: (What questions will depend on the previously entered information.) Submit a copy of site single-line diagram showing configuration and interconnection of all equipment, current and potential circuits and protection and control schemes. Do you have a single line diagram available? Submit a copy of site relay list and trip scheme, which shall include all protection, synchronizing and auxiliary relays that are required to operate the Facility in a safe and reliable manner. Do you have a Relay List and Trip Scheme available? Yes No Submit a copy of site three-line diagram (if Facility is greater than or equal to 30 kw) showing potential transformer and current transformer ratios, and details of the Facility's configuration, including relays, meters, and test switches. Do you have a three line diagram available? If a Single Line Diagram is not available at this time, one must be completed by your engineer/contractor and uploaded to the SINGLE LINE DIAGRAM folder on your "MY FIT DOCS" Page. Note: Generating and interconnection systems must be compliant with all applicable safety and performance standards. The customer is responsible for having all work performed by a licensed electrical contractor before the Company installs the necessary meter. The Company reserves the right to require additional information, as necessary, to determine the eligibility of the Applicant's project for the FIT program. Yes Yes No No Submit Cancel Back