DESIGN AND CONSTRUCTION DEPARTMENT - July 2014



Similar documents
Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule

PLUMMER ELEMENTARY SCHOOL

DRAPER ELEMENTARY SCHOOL

Chicago Public Schools

HOUSTON ELEMENTARY SCHOOL

REQUEST FOR BOARD ACTION HENDERSON COUNTY BOARD OF COMMISSIONERS. ATTACHMENTS: 1. Construction Management Update

Presentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components

Seattle Public Schools Building Excellence IV Projects Under Construction

1. Maintenance. Mechanical, Electrical & Plumbing Improve ligh>ng control an sensoring $230,239

NORTH PENN HIGH SCHOOL RENOVATIONS

PATTERSON ELEMENTARY SCHOOL

31289 ADOPTED BOARD OF TRUSTEES COMMUNITY COLLEGE DISTRICT NO. 508 JANUARY, , 2012

CAPITAL EXPENDITURES

SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST

HAMILTON SCHOOL Brentwood Parkway, N.E., Washington, DC INITIAL YEAR BUILT 1968 BUILDING AREA

Newtown and Holland Middle Schools Construction Project Bid Review

Sub-Bid Contractor Update Statement. Tab A - Invitation for Bids. Tab B - Instructions to Bidders

CAMPUS HIGH SCHOOL ADDITION AND RENOVATION

Van Vleck ISD Bond Election

7.0 REHABILITATION /RESTORATION / MAINTENANCE PLAN

DAVIESS COUNTY SCHOOLS DISTRICT FACILITIES PLAN

Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year

Schematic Design Presentation S. Dallas Dance, Superintendent October 22, 2013 OVERLEA HIGH SCHOOL

National Home Builder - Name Wednesday, August 20, 2014 Regional Customer Care Manager 1234 Main Street Houston, Texas 77067

MURCH ELEMENTARY SCHOOL

Development Services Department City of San Antonio. Permits & Licenses. Development Services Manager. Deputy Historic Preservation Officer

48. AQUARIUM. Aquarium. Classification: Cluster: Location: Close to junction of Inselrhue and Loiter Way, Belle Isle. Total Area: No.

Veterans Memorial Coliseum Options Study Appendix A - Deconstruction Scope of Work and Cost Estimate August 31, 2015

Pumphouse Museum at the Historic Ottawa Beach Parks Park Township

Lighthouse Engineering, L.L.C.

City of La Vernia 102 E. Chihuahua Street, La Vernia, Texas Phone: (830) Fax: (830)

Project Management Division

Maryland. American Recovery and Reinvestment Act. 158 DoD Projects ($ 65.8M) Completed or Under Way by August 31, 2009

Exhibit C: Scope of Work and Schedule of Deliverables

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

Cherry Creek School District Update Bond Projects

CITY OF YORBA LINDA P.O. BOX CALIFORNIA

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE NOTICE TO PROPERTY OWNER

Building Description Project Description Estimated Cost Notes Total Deferred

Lindsay Thurber Comprehensive High School Red Deer School District No. 104 School Facilities Evaluation Project Page 1

PARKVILLE HIGH SCHOOL LIMITED RENOVATION

WARRANTIES AND PERFORMANCE STANDARDS T A B L E O F C O N T E N T S General Provisions Introduction Warranties Effective Date of Warranties Exclusive

Building Condition Assessment Report

VJ ASSOCIATES 1825 K STREET NW, #1100 WASHINGTON, DC TEL: (202) INITIAL PROJECT COST ANALYSIS

Building Condition Assessment Report

Angelo State University Construction Report

BUNKER HILL ELEMENTARY SCHOOL

MEASURE G-2010 EXHIBIT B FULL TEXT BALLOT PROPOSITION OF THE SAN JOSE EVERGREEN COMMUNITY COLLEGE DISTRICT BOND MEASURE ELECTION NOVEMBER 2, 2010

Guernsey s Structural Engineering Experience

Building Permits: When are they required?

SECTION TABLE OF CONTENTS. H Proposed Material, Product or Equipment Substitution Request

The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE

WOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME

Foundation Evaluation Report for PROPERTY ADDRESS Houston, Texas August 30, Prepared for:

Cherokee Trail High School East Arapahoe Road Aurora, Colorado 80016

Important Information for Owners of Buildings in Flood Zones

RAVENS RIDGE APARTMENTS

D Sample Notices to Property Owners, Sample Affidavits, and Other Material

A Guide for the Homeowner/Builder

The City of Basehor, Kansas

Building Permits Permit Counter

C I T Y O F P E A R S A L L

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.

Bond Priorities. Repairs and Maintenance. School Safety. Capacity

Presented by The Facilities Management Group TFMG / TFMG Architecture, PC. in conjunction with EMTEC Engineers, LLC

Investigation of Foundation Failure. Step 1 - Data Collection. Investigation Steps

Request for Proposal for Construction Management Services

ST. MONICA FOOD PANTRY HOUSTON, TEXAS

HEDDERMAN ENGINEERING, INC. Office , Fax

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES

NAHB PRODUCT DEFINITION

Renton Ridge Homeowners Association

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE APPLICATION REVIEW

5006 Cherry Ridge Road Richmond, Texas LIMITATIONS AND DISCLAIMERS

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT

Lighthouse Engineering, L.L.C.

OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY

MEMORANDUM. General: Foundation:

EAST LYME HIGH SCHOOL

New Jersey City University Gilligan Student Union Center

PROCEDURES FOR THE NONPUBLIC AGING SCHOOLS PROGRAM (FISCAL YEAR 2015)

Bond Referendum Presentation. Dr. Ralph P. Ferrie, Superintendent of Schools May 12, 2014

SECTION EXISTING HAZARDOUS MATERIALS CONDITIONS

A Guide to Building Permits for Home Owners / Renovators. Address: 1 Carden Street Guelph, Ontario N1H 3A1

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

Transcription:

DESIGN AND CONSTRUCTION DEPARTMENT - Project or 1 Elementary School 46 (Aliana) AutoArch Bartlett Cocke General ors Construct a new 850 capacity elementary school in the Aliana Master Planned Community. The school was designed to achieve Leadership in Energy and Environmental Design (LEED) Certified Level. 2015 The CMAR contract for Bartlett Cocke is fully executed. A complete design team plan review is Subcontractor proposals are due by the end of which will provide the basis for the Guaranteed Maximum Price (GMP). 2 Elementary School 47 (Riverstone) SHW/Stantec Construct a new elementary school in the Riverstone Community. 2016 to begin programming. Geotechnical study and site survey are in process. 3 Meadows ES Security Vestibule Construct security vestibule with control system to restrict access to the building. Preliminary design is in development stage. Procurement will be by Job Order (). 4 Hodges Bend Transportation Center Fuel Tank Upgrade The existing unleaded fuel dispenser will be converted to diesel. An above ground fuel tank and unleaded dispenser will be added to the site. Fall Preliminary design is in development stage. Procurement will be by Job Order (). 5 Central Warehouse Roof Repairs PBK Sea Breeze Roofing The project involves making needed repairs to the existing roof. $24,000 95% Repairs are complete. Project closeout 6 Lakeview ES HVAC Controls System Johnston, LLC Upgrade electrical service and HVAC controls to support recently installed chiller and to allow better management of building temperature. bids were received 6/4/14. Evaluation committee results will be presented to the Board for consideration and approval at the 21, BOT meeting. 7/17/5:03 PM 1

or 7 Blue Ridge ES Marquee Texas Scoreboards The District plan is to replace older marquees at select schools $24,720 January 85% Foundation design was adjusted to allow for more support. is ongoing. 8 Christa McAuliffe MS Marquee Nevco, Inc. The District plan is to replace older marquees at select schools $39,990 November is fully executed for work to begin in. Payment Bond is in process. 9 Cafeteria Serving Lines Upgrades at Willowridge HS Elkins HS Kempner HS SHW Group Purcell, Inc. The project is to replace the food service lines, add roll down security gates and replace warewash equipment. $3,850,000 2 Demolition work and floor cuts are complete. Plumbing work is in progress. Service line equipment is being delivered. 10 Dulles HS Gym Foundation Facilities Sources The project includes lifting the foundation and slab, repairing cracks in interior walls, replacement of the gym floor, exterior sidewalks, and resurfacing main gym. $213,299 8 The foundation was raised and the wood gym floor was removed. Gym floor leveling is complete. Installation of the new wood floor is underway. 11 ELKINS HS Door & Hardware Replacement SBWV Polasek This scope includes the replacement of exterior doors, door hardware and sidewalks, as well as the addition of a security vestibule. $545,700 September 95% Substantial was reached 16,. The punch list is in process along with painting the exterior frames and doors. 7/17/5:03 PM 2

or 12 Auditorium $267,000 13 Courtyard $52,000 14 15 Fieldhouse Lantern Lane ES Huitt-Zollars Bass The scope consists of foundation repairs and associated remedial work to the exterior and interior of the schools $345,000 $78,000 October 16 Mission Bend ES $60,000 September 17 Christa McAuliffe MS $185,000 November 18 Ridge Point HS Classroom Buildout PBK DT The project will add three classrooms, a large capacity lecture theater classroom and two ROTC classrooms with adjoining storage and changing rooms. Board approved the schematic design in February $595,000 15% Framing for the new walls and doors has begun. 19 Child Nutrition Department Renovations @ FBISD Warehouse PBK Pepper Lawson This scope includes renovating a portion of the District warehouse for use by the Child Nutrition Department. $2,795,000 October 9 The office renovations are complete. The kitchen equipment is installed. The floor and wall finishes are complete. Electronic equipment work in progress in the upstairs training classrooms. Making final connections to all the equipment. 20 Progressive HS Intercom Expansion 3D Communications The project will expand the intercom system to include Head Start, Extended Day, Textbooks and Shared Dreams. $4,188 was approved and PO was issued. Notice to Proceed issued 6/23/14. 7/17/5:03 PM 3

or 21 Ridgemont ES s The scope of this project includes foundation and wall repair in classroom areas and exterior brick work. Summer Due to lessons learned at the Fieldhouse regarding plumbing lines, staff does not recommend lifting the slab in the same manner. We are researching alternatives to lifting the slab. The brick repair will occur during Summer. 22 Ridgegate ES Fencing Houston Fence This project includes the installation of new fencing and gates at Ridgegate ES. $36,635 Project closeout is 23 Ag Barn Fencing Hightower HS Kempner HS Dow Pipe and Fence The scope of the project includes the removal and repair of existing fencing and gates, and the fabrication and installation of new fencing and gates. $37,693 7 HHS Fencing is 99% complete. KHS Fencing 45% complete. 24 Kempner HS Pig Pens The project will include the replacement of original animal pens and gates. Fall January 2015 to be presented for consideration and approval at the BOT meeting. 25 Hightower HS Intercom JSE Consulting s FireTron, Inc. The project will replace the main program control equipment, drops to classrooms, replace handsets, speakers and the existing clock system. $300,000 3 The preconstruction meeting was held 5,. in Area A commenced on Monday, 9,. 26 Dulles HS Track Repairs Brooks & Sparks AAA Asphalt The project will replace damaged sections of the track. $54,710 May 72% of the damaged areas of the track and curbs are in progress. 27 Dulles ES Exterior Doors and Security Vestibule Matrix Design Companies The scope of the project will include replacing exterior doors and hardware and replacing the sidewalks to comply with Americans with Disabilities Act. Construct a security vestibule with control system to restrict access to the building. Submitting to the Board at the meeting for consideration and possible approval. 7/17/5:03 PM 4

or 28 Willowridge HS Foundations The scope of the project is to remove concrete slab at selected locations to access plumbing, replace sewer lines and replace the slab and floor. $155,926 2 29 Central Warehouse s The scope of the project is divided into two phases. was to remove trees and to install a foundation irrigation system, which is complete. I includes the repair of the CMU in the two stair towers and repainting. $21,381; I $63,010 I 55% 30 Austin Parkway ES Kitchen Plumbing Repairs The scope of the project is divided into two phases. was to cut and remove concrete slab at select locations, replace damaged sewer lines and replace the slab and floor, which is complete. I includes the replacement of approximately 200 linear feet of sewer line. $36,000; I $41,485 I 5% Project scheduled for. 31 Fort Settlement MS Terrazzo Repairs The scope of the project is to repair damaged terrazzo and remove, replace and refinish damaged CMU walls due to foundation movement. $97,437 57% 7/17/5:03 PM 5