2012 Program Report. Agricultural Group Drainage Program



Similar documents
Index. protection. excavated drop inlet protection (Temporary) Block and gravel inlet Protection (Temporary)

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

Small Dam Hazard Assessment Inventory

City of Shelbyville Site Inspection Checklist

Construction Site Inspection Checklist for OHC By making use of some simple Best Management Practices (BMPs) a construction site operator can

Homeowner s Guide to Drainage

Prattsville Berm Removal Project. 1.0 Project Location


5 Most Common Planning & Management Problems in Ontario County, Canada

Outlet stabilization structure

Challenges. Estimated Damages from 100-Year Flood

Chehalis River Basin Flood Damage Reduction Capital Budget Approved by Legislature in June 2013

DRAINAGE :: DRAINAGE CONCERN FREQUENTLY ASKED QUESTIONS

Environmental Case Study Decatur, Georgia, DeKalb County A Suburban Creek Resists Channelization

STORM DRAIN PIPE MAINTENANCE. a. Develop standard operating procedures for maintaining storm drain pipes.

Pioneer Park Stormwater Management Rehabilitation Project Town of Richmond Hill Engineering and Public Works Department Design, Construction and

London Borough of Merton Local Flood Risk Management Strategy

Appendix A. Lists of Accomplishments and Project Costs. UMRWD 10 Year Plan Update. Appendix A UPPER MINNESOTA RIVER WATERSHED DISTRICT

Final Report. Dixie Creek Restoration Project. Funded by Plumas Watershed Forum

Sample Watershed Survey - First Draft

Community Outreach Kickoff Summaries. Boulder Creek and South Boulder Creek Meeting held Jan. 8, 2014, approximately 80 attendees

Chagrin River Watershed Partners, Inc. Cost Analysis of Low Impact Development Best Management Practices

The Economics of Culvert Replacement: Fish Passage in Eastern Maine

County Watersheds. Total Project Cost - $11.1 M. Project Description. Funding Sources. Project Milestones. Service Impact

2014 ANNUAL REPORT. Department: Highway Department Head: David Hartman Departmental Employees: 27

How To Plan A Buffer Zone

Preventing Storm Water Pollution: What We Can Do

1. Water Line Maintenance 2. Sanitary Sewer Maintenance 3. Spill/Leak/Overflow Control, Response, and Containment

GREEN INFRASTRUCTURE DESIGNS BIOSWALE/HYBRID DITCH

Water Quality and Water Usage Surveys

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile

Table 2: State Agency Recommendations Agency of Agriculture, Food and Markets

The Basics of Chapter 105 Waterways and Wetlands Permitting in PA

Sustainable Road Drainage Asset Management Strategy and Financial Requirements

STORMWATER POLLUTION PREVENTION PLAN TEMPLATE. 1.0 SITE DESCRIPTION 1.1 Project Name and Location Date

Mitigating Post-Fire Runoff from the Schultz Fire. ASCE/ASHE 2015 Annual State Conference

Homeowner s Guide for Flood, Debris, and Erosion Control

Lisgar District Basement Water Infiltration Investigation Answers to Residents Written Questions Received by Councillors Ward 10 Office

DELAWARE COUNTY STREAM CORRIDOR MANAGEMENT PROGRAM TWO-YEAR ACTION PLAN FOR THE WEST BRANCH DELAWARE RIVER CANNONSVILLE RESERVOIR BASIN

IMPROVING SOUTH FORK PEACHTREE CREEK WATERSHED USING THE TRIPLE BOTTOM LINE DEKALB COUNTY, GEORGIA

Rhode Island NRCS received approximately $2.4 million in ARRA funds to implement four floodplain easement projects.

CITY UTILITIES DESIGN STANDARDS MANUAL

Consultation on integrating flood defence consents into the Environmental Permitting regime in England and Wales

Fort Dodge Stormwater Master Planning. Prepared By: Ralph C. Stark, Jr., P.E., C.F.M. Joel N. Krause, P.E., C.F.M.

Muddy River Restoration Project Project Description

WORPLESDON PARISH COUNCIL FLOOD PLAN. February 2015

Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control

CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE

Vermont Economic Resiliency Initiative (VERI) Community Forum Barre City & Barre Town

Waldo Canyon Fire. Mark Shea Watershed Planning Supervisor August 23, 2012

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

Town of Amherst Flood Plan Annex

Flood Mitigation Strategy for the Milwaukee 30 th Street Corridor Redevelopment Program

Long Term Flood Solutions

STAFF REPORT TO COMMITTEE OF THE WHOLE

URBAN DRAINAGE CRITERIA

How To Assess An Area For Erosion

Floodplain Mapping. Vision. Events: 1 in 2 year 1 in 10 year 1 in 20 year 1 in 50 year 1 in 100 year Probable Maximum Flood Climate Change Impacts

Local Road Assessment and Improvement Drainage Manual

5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES

Black Mountain Reservoir Land Rezoning

Flood Risk Reduction and Streambank Restoration

Estimating Stormwater System Annual Maintenance and Repair Costs - A GIS Approach

BINGHAMTON FLOOD DAMAGE REDUCTION PROJECT

King County Flood Hazard Management Plan Update Cedar/ Sammamish Rivers. Public Meeting December 5, 2012

Parish Flood Report: Broadwell & Kencot

Wildfire & Flash Flood Recovery Emergency Watershed Protection (EWP) Flood Mitigation Efforts April Fall 2013

ESCAMBIA COUNTY FLOOD RECOVERY: 1- YEAR ANNIVERSARY REPORT

First in Service First in Safety

Operations and Maintenance Plan The Residences at Johnson Farm 189 Landham Road Sudbury, Massachusetts. Submitted to: Town of Sudbury

Newbiggin House Farm,

London Borough of Croydon Local Flood Risk Management Strategy

Arapaho & Roosevelt National Forests 2013 Flood: Long-term Recovery in a Changed Landscape

DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS

Action plans for hotspot locations - Ash Study

Multi-purpose Drainage Management (MDM) Plans

TO BE DELIVERED AGENDA MATERIAL

Drainage Analysis for the McKownville Area

Carlton Fields Memorandum

Funding the Long-Term Operation and Maintenance of Stormwater Best Management Practices

Storm Drain Inlet Protection for Construction Sites (1060)

Plumas Watershed Forum. Review of Ongoing Projects. Updated 10/1/008

3.4 DRAINAGE PLAN Characteristics of Existing Drainages Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN

P-23 - DEVELOPMENT OF DELAWARE DEPARTMENT OF TRANSPORTATION STORMWATER BEST MANAGEMENT PRACTICE INSPECTION PROGRAM

Sims Bayou Federal Flood Damage Reduction Project

Guidelines for. Permeable Pavement

Table 4.9 Storm Drain Inlet Protetion Applicable for

Swannanoa River Flood Risk Management Study

ENTRY ORDER SUPREME COURT DOCKET NO JANUARY TERM, } Superior Court, v. } Environmental Division

Wayne County Sales Tax Sharing Questions and Answers

K A N S A S DEPARTMENT OF HEALTH AND ENVIRONMENT PERMIT APPLICATION FOR A RECLAMATION FACILITY. 1. Applicant's Name

COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY

OSU Extension FACT SHEET

PUBLIC NOTICE. Federal Aid Project MO F-54-D-20 May 1, 2016 December 31, Project Description

SECTION 13 REPLACEMENT AND CLEANUP SCOPE OF WORK

The Eight Tools of Watershed Protection. Tom Schueler Center for Watershed Protection EPA Webcast

Flood Risk Management

Flood Risk Management

Travel Time. Computation of travel time and time of concentration. Factors affecting time of concentration. Surface roughness

TENNESSEE GAS PIPELINE COMPANY, L.L.C.

Transcription:

2012 Program Report Agricultural Group Drainage Program Accomplishments: It was a successful year for the drainage program. We were able to complete two new projects and seven maintenance projects throughout the construction season. The new projects totaled about one mile of ditch. Work on the projects has vastly improved residential and agricultural drainage, reducing severe flooding issues in those areas. The seven maintenance projects that were completed totaled about eight miles of streams and agricultural ditches. Work on these projects consisted of mowing, dipping and removal of blockages. North Centenary Road Project: This was a new project in the town of Sodus and was about.7 miles in length. The project was completed because several landowners were experiencing severe flooding because the stream channel had become completely filled in with sediment in sections due to fallen trees. Work consisted of clearing an access path along the creek, as well as cleaning out and reshaping the channel to allow proper flow. We also replaced two culvert crossing that were in poor condition. After the project was complete we hydroseeded all disturbed areas to stabilize and reduce erosion. Excavation Complete During Excavation Four Weeks After Hydroseeded

Tyre Road Project: This was a new project in the town of Galen. The project was about a third of a mile in length. Work on this project involved deepening an existing ditch and extending it further along the base of a hill to catch and divert water away from agricultural and residential property. We also installed a tile drain to drain a depression that flooded regularly. This project was also hydroseeded upon completion to stabilize disturbed areas. During Excavation Complete and Hydroseeded Bills Road Project: This was a maintenance project located in the town of Walworth. The entire project is about 1.75 miles long. We mowed the whole project and dipped about one mile of the project. We also lowered a culvert that was too high, causing drainage problems. The project directly affects 18 landowners in the Red Creek West watershed. The project helps maintain proper drainage for agricultural and residential property.

Ki-Ham-Law Project: This was a.75 mile long maintenance project in the town of Macedon. We mowed both sides as well as dipped out the ditch. A long stick excavator had to be used for some of the dipping because of the extreme depth and width of the ditch. This project maintains drainage for a large area of agricultural land and directly affects three landowners within the Red Creek West Watershed. Before After Route 31 Project: This was a maintenance project located in the town of Galen. The entire project, about 1.25 miles, was mowed. This project affects five landowners within the Melvin brook watershed. The project helps maintain proper drainage for primarily agricultural land. Salmon Creek: We completed removal of major blockages two different times during the summer, both caused by large fallen willows. The first was removed just west of Tuckahoe road; the town of Williamson assisted us by trucking the debris to their landfill. The second blockage was removed from the creek about 200 yards south of the Hamilton Street Bridge. Route 14 Project: This was a simple maintenance project in the town of Lyons. We mowed the entire project, which is about one mile in length. The project is in the Erie Canal East watershed and directly affects seven landowners. The project maintains proper drainage of low lying agricultural land and helps reduce flooding after storm events.

Mink Creek II Project: This was a maintenance project in the town of Williamson. The project was about two miles long, all of which was mowed. We also removed several blockages north of Lake Road that were caused by fallen willows. Some small sections of the creek could not be maintained because of poor access. This project maintains drainage on eight properties within the Mink Creek watershed. Second Creek Project: This was a maintenance project in the town of Sodus. Over the summer beaver moved into the creek and built multiple dams backing up a large amount of water. When trapping season opened we had a trapper come in, he removed two beavers from the creek. The town hired a trapper to remove beaver further up stream where they were causing problems with a culvert. We then removed three beaver dams and mowed the entire project, about one mile in length. This project directly affected seven landowners in the Second Creek watershed. Maintenance on Second Creek helps reduce severe flooding and ensures proper drainage for agricultural and residential property.

Critical Area Seeding and Mulching We got off to a good start with our critical area seeding and mulching program. We were able to hydroseed 6.5 acres on numerous projects throughout the county. These included the two new drainage projects, two farm projects and the canal trail project in the town of Arcadia and Village of Newark. The towns and water and sewer department were very helpful in getting us access to water sources for filling the hydroseeder near each of the sites. We will be ready to keep expanding the program for next year, as we hope to hydroseed more acres of critical area than this year. North Centenary Road Project Canal Trail, Village of Newark Canal Trail, Village of Newark