2 The flood of September 2013 changed the landscape of the Boulder and Canyon Lakes Ranger Districts. The greatest impacts occurred over 230,000 acres of NFS lands. Initial assessment findings: at least 232 roads (382 miles), 70 trails (236 miles), 4 bridges and 42 facilities were damaged or destroyed Initial assessment did not include an evaluation of resource damage Additional damage being discovered Further damage may occur during spring run-off Above: Forest road impassible and in need of redesigned stream crossing to accommodate higher water volume
3 Access Restrictions- Many roads and trails remain closed for public safety, as well as natural resource concerns. Closures will continue to change while assessments, design and repair work is completed. Forest access may not be reestablished for a variety of reasons. Recreational opportunities remain on the Forest, but in some cases may have changed.
4 Changed Landscape- Dams Idylwilde Dam was damaged. Through coordination with FERC, City of Loveland, Army Corps of Engineers and the USFS, it was removed and CDOT is using material for Highway 34 fill. Work continues in this location.
5 Changed Landscape- Roads and Bridges Roads throughout the flood area provide access not just for recreation, but also for private residences and emergency response. Below: Gillespie Gulch Road s new elevation is 4 feet below old elevation (Road is under permit and repaired with FS permission by private landowners for emergency access to their homes above Jamestown.) Above: CR43 provides access to Forest Road 128, now reopened by Larimer County
6 Changed Landscape Recreation & Roads Below: Damage to roads, like the Bunce School Road, impacts not only our forest visitors but also outfitters and guides who utilize these for their business. Right: Old Flowers Road was scheduled to be repaired from High Park Fire damage when the floods hit. Damage increased during the flood. Photo courtesy of Lou Liley, resident of Stove Prairie
7 Changed Landscape Canyon Lakes Trails Left Top and Bottom: Lion Gulch Trail, located off Highway 36, is a very popular trail that sustained extensive damage, including the loss of several bridges. Below: Prior to the flood, Young Gulch Trail in the Poudre Canyon had just been reopened following work done by volunteers who repaired damage from the 2012 High Park Fire.
8 Changed Landscape Boulder Trails Several trails were extensively damaged, with issues ranging from minor rutting/erosion to slope failures and total washouts. Left: Person in this photo of the Dry Saint Vrain Trail is pointing in the direction of the trail alignment. Right: The Ceran Saint Vrain Trail is visible in the middle of this photo, continuing beyond a debris slide.
9 Changed Landscape Recreation Facilities Left: Three picnic areas off of County Road 43 were washed away, with removal of damaged infrastructure needed. Little of these sites remain due to the changed river channel. Right: Picnic areas and fishing access pullouts along Highway 7 were heavily impacted. Some areas were buried under debris, while others were scoured to bedrock.
10 Changed Landscape Recreation Facilities Big Thompson Accessible Fishing Pier, along Highway 34, was damaged. Forest Service worked with CDOT for removal for public safety.
11 Changed Landscape Lefthand OHV The entrance road into the Lefthand Canyon OHV Area, popular for both OHV travel and recreational shooting, became deeply eroded. There were also impacts beyond the entrance road, including the stream and stream bank instability.
12 Changed Landscape - Debris Flows This debris flow begins on the east face of Twin Sisters. Nearly 4 miles in length and 2,500 feet fall, it is the largest slide crossing Forest Service lands. Countless other debris flows occurred during the flood. In the North Saint Vrain drainage, over 250 slides were identified.
13 Changed Landscape- Debris Dams Debris dams have formed in many streams and pose concern for future damage by diverting water out of stream channels. Keeping some of these in place benefits stream health and recovery, slowing water s velocity, and providing organic material and structure to stream courses.
14 Actions to Date: Initial assessment of infrastructure and facilities Closures for safety and resource concerns constantly evolving as work is completed or new hazards are identified Established ARP Flood Recovery Team Repaired 27 miles of road Completed prep work to secure Federal Highway Administration Emergency funding for 18 miles of roads and bridges Power line reconstruction permitted for utility companies
15 Actions to Date (con t): Reconfigured fire response assets to include a helicopter and crew Continue to workd with Larimer and Boulder counties on debris flow stabilization Assisted the City of Loveland with decommissioning of Idylwilde Dam Crosier Borrow Pit opened for fill material for County Road 43 Fishing Pier removed for safety Consulted with Rocky Mountain Research Station (RMRS) on the science of debris flows and other local flood related topics
16 Long-term Recovery in a Changed Landscape: Safety, Ecosystem Restoration, Public Service Focus of our actions in the flood area is: addressing public and employee safety issues; prioritizing work needed to stabilize, repair, relocate or decommission facilities and infrastructure, and restoring dynamic ecosystems that are sustainable and appropriate within the limits and opportunities of this landscape; providing public service through working with communities, partners and volunteers to resolve issues, leverage funds, and expand our recovery efforts.
17 Focus for 2014: Established a flood recovery team to: Integrate assessment information and new findings Refine priorities based on field findings and conditions post snowmelt - considering the dynamic landscape, users and uses of the Forest Repair: ~ 52 miles of trail, ~14 miles of road with an additional 18 miles of road with Federal Highway Administration emergency funding
18 Focus of 2014 (con t): Work on 8 damaged or destroyed facilities/sites - demolition and removal, designing rebuilds or repairing some damage. Conduct community meetings and provide public information Continue work with RMRS on flood recovery Adapt our action to best meet the needs of both the land and the public
19 For more information: Visit - Public meeting information will be posted here when scheduled. [email protected]
River Management 2013 Colorado Flood
River Management 2013 Colorado Flood Damages, Countermeasures, Socio-Economic Impacts Miles Blair, Allen Chestnut, Hwayoung Kim, & Caroline Ubing CIVE 717 Spring 2014 Flood Statistics Sept 9 th 16 th,
Disaster Recovery Managing and Leveraging Multiple Funding Sources
Disaster Recovery Managing and Leveraging Multiple Funding Sources Jordan Williams, CFM June 3, 2015 Overview Programs FEMA Public Assistance (PA) and Hazard Mitigation Grant Program HUD s Community Development
St. Vrain Watershed Master Plan Thursday, January 23 10:00 a.m. 12:15 p.m.
St. Vrain Watershed Master Plan Thursday, January 23 10:00 a.m. 12:15 p.m. City Council Study Session Room City of Longmont Civic Center, 350 Kimbark Street, Longmont Minutes 1. Introductions a. Jeff Crane
Wildfire & Flash Flood Recovery NACo Justice & Public Safety Symposium January 2014
Wildfire & Flash Flood Recovery NACo Justice & Public Safety Symposium January 2014 Fall 2013 Jim Reid Executive Director Public Service El Paso County, Colorado Recovery Specific to Incident Recovery
Wildfire & Flash Flood Recovery Emergency Watershed Protection (EWP) Flood Mitigation Efforts April 2014. Fall 2013
Wildfire & Flash Flood Recovery Emergency Watershed Protection (EWP) Flood Mitigation Efforts April 2014 Fall 2013 Recovery Specific to Incident Recovery Efforts Depend on: Population Impacted Topography
Flood Risk Management
Flood Risk Management Value of Flood Risk Management Every year floods sweep through communities across the United States taking lives, destroying property, shutting down businesses, harming the environment
Flood Risk Management
Flood Risk Management Value of Flood Risk Management Value to Individuals and Communities Every year floods sweep through communities across the United States taking lives, destroying property, shutting
Appendix A. Lists of Accomplishments and Project Costs. UMRWD 10 Year Plan Update. Appendix A UPPER MINNESOTA RIVER WATERSHED DISTRICT
UPPER MINNESOTA RIVER WATERSHED DISTRICT Lists of Accomplishments and Project Costs 10 Year Plan Update UMRWD 10 Year Plan Update Page A 1 UMRWD LIST OF ACCOMPLISHMENTS Since its inception in 1967, the
Small Dam Hazard Assessment Inventory
Small Dam Hazard Assessment Inventory What would happen if your dam were to fail? This is a question that most dam owners hope they will never have to answer. However it is a question you, as a responsible
Arizona s Large Fires Suppression vs. Restoration. WESTCAS Fall 2011 Meeting Bruce Hallin Manager, Water Rights and Contracts October 27, 2011
Arizona s Large Fires Suppression vs. Restoration WESTCAS Fall 2011 Meeting Bruce Hallin Manager, Water Rights and Contracts October 27, 2011 THE PROBLEM Unhealthy Forests Since 2000, at least 1,501,654
Neversink River East Branch
Neversink River East Branch Management Unit 10 Summary of Post-Flood Recommendations Intervention Level Full restoration of the stream reach including the eroding bank site between Station 38380 and Station
Swannanoa River Flood Risk Management Study
Swannanoa River Flood Risk Management Study Measures Evaluated to Reduce Future Flood Damages City of Asheville U.S. Army Corps of Engineers Flooding History Part of the 132 square mile Swannanoa River
Flood After Fire Fact Sheet
FACT SHEET Flood After Fire Fact Sheet Risks and Protection Floods are the most common and costly natural hazard in the nation. Whether caused by heavy rain, thunderstorms, or the tropical storms, the
AN INITIATIVE TO IMPROVE
L OW E R C A R M E L R I V E R A N D L AG O O N F L O O D P L A I N R E S TO R AT I O N A N D E N H A N C E M E N T P R O J E C T AN INITIATIVE TO IMPROVE FLOOD PROTECTION RESTORE AND PROTECT RIPARIAN
Emergency Management
LESSON PLAN 5 Be Disaster Safe Learning that there is a system in place and that agencies cooperate to take care of the community s needs during emergencies and disasters reassures and supports students.
Angora Fire Restoration Activities June 24, 2007. Presented by: Judy Clot Forest Health Enhancement Program
Angora Fire Restoration Activities June 24, 2007 Presented by: Judy Clot Forest Health Enhancement Program California Tahoe Conservancy Independent California State Agency within the Resources Agency Governed
Lower Raritan Watershed Management Area Stormwater & Flooding Subcommittee Strategy Worksheet LRSW-S3C1
Strategy Name: Reduce Existing Potential for Flood Damages LRSW-S3C1. Develop and implement a program to: Minimize flood damages through the use of structural measures. Minimize flood damages through the
2012 Program Report. Agricultural Group Drainage Program
2012 Program Report Agricultural Group Drainage Program Accomplishments: It was a successful year for the drainage program. We were able to complete two new projects and seven maintenance projects throughout
The answers to some of the following questions are separated into two major categories:
Following the recent flooding events for Front Range communities in Colorado, property owners, communities, and the National Flood Insurance Program are being presented with some new challenges in the
Arkansas River Corridor Vision & Master Plan
A r k a n s a s R I v e r C o r r I d o r P l a n Arkansas River Corridor Vision & Master Plan July 2005 Indian Nations Council of Governments A r k a n s a s R I v e r C o r r I d o r P l a n Partnership
Outlet stabilization structure
Overview of Sedimentation and Erosion Control Practices Practice no. 6.41 Outlet stabilization structure Erosion at the outlet of channels, culverts, and other structures is common, and can cause structural
ECONOMIC ANALYSIS FLOOD DAMAGE REDUCTION. Lower Carmel River Floodplain Restoration and Enhancement Project
ECONOMIC ANALYSIS FLOOD DAMAGE REDUCTION Lower Carmel River Floodplain Restoration and Enhancement Project I. Description of the Project and its Relationship to Other Projects in the Proposal The Lower
REPORT TO REGIONAL WATER SUPPLY COMMISSION MEETING OF WEDNESDAY, SEPTEMBER 4, 2013 LEECH WATER SUPPLY AREA RESTORATION UPDATE
Making a difference... together Agenda Item #9 REPORT #RWSC 2013-17 REPORT TO REGIONAL WATER SUPPLY COMMISSION MEETING OF WEDNESDAY, SEPTEMBER 4, 2013 SUBJECT LEECH WATER SUPPLY AREA RESTORATION UPDATE
Flood Protection & control works
Flood Protection & control works Whakamarumaru i ngā waipuke Environment Canterbury is the joint lead agency with territorial authorities for flood risk reduction. Under changes to the Local Government
FLOOD PROTECTION BENEFITS
IV. (340 points) Flood Protection Benefits A. Existing and potential urban development in the floodplain (50) 1. Describe the existing and potential urban development at the site and the nature of the
US Army Corps of Engineers BUILDING STRONG
Fort Worth District Public Meeting 20 August 2013 US Army Corps of Engineers Lewisville Dam - Authorization Authorized by the River and Harbor Act, approved 2 March 1945 (Public Law 14, 79th Congress,
Waldo Canyon Fire. Mark Shea Watershed Planning Supervisor August 23, 2012
Mark Shea Watershed Planning Supervisor August 23, 2012 Fire Started: Saturday June 23, 2012 Fire Progression June 23 2500 acres June 24 3600 acres June 25 4500 acres June 26 15622 acres June 27-28
Tres Rios del Norte Feasibility Study
Tres Rios del Norte Feasibility Study Santa Cruz River Pima County, Arizona February 2011 Study Area: 18 Miles of Santa Cruz River (Prince to Sanders), portions of City of Tucson, Town of Marana, and unincorporated
5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES
5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES Flood damage reduction consists of two basic techniques structural and non-structural. Structural methods modify the flood and take the flood away from people
Healthy Forests Resilient Water Supply Vibrant Economy. Ecological Restoration Institute
Healthy Forests Resilient Water Supply Vibrant Economy Ecological Restoration Institute How Water Gets to Your Home MOST OF THE VALLEY S WATER SUPPLY comes from winter precipitation and runoff from Arizona
Lower Dungeness River Estuarine & Floodplain Restoration
PARTNERS: Clallam County; Jamestown S Klallam Tribe; WA Department of Fish & Wildlife; US Army Corps of Engineers; US Fish & Wildlife Service; WA Department of Transportation; WA Department of Ecology;
The Basics of Chapter 105 Waterways and Wetlands Permitting in PA
The Basics of Chapter 105 Waterways and Wetlands Permitting in PA April 17, 2013 Goal To develop a basic understanding of PA Department of Environmental Protection (DEP) and US Army Corps of Engineers
Stream Restoration Post-Implementation Annual Monitoring Report Year 2: 2013 Covering the Period of July 2012 to July 2013
NCDA&CS - North Carolina Forest Service Stream Restoration Post-Implementation Annual Monitoring Report Year 2: 2013 Covering the Period of July 2012 to July 2013 For the N.C. Division of Water Quality
Final Report. Dixie Creek Restoration Project. Funded by Plumas Watershed Forum
Final Report Dixie Creek Restoration Project Funded by Plumas Watershed Forum Plumas Corporation January 2009 1 Background FR-CRM staff presented this project to the Dixie Valley Landowners Association
Prattsville Berm Removal Project. 1.0 Project Location
Prattsville Berm Removal Project 1.0 Project Location The project site is located between the New York State Route 23 Bridge over the Schoharie Creek and the Schoharie Reservoir. The restoration plan encompassed
Mitigation Leads to Preservation and Economic Recovery For One Community: Darlington, Wisconsin
Mitigation Leads to Preservation and Economic Recovery For One Community: Darlington, Wisconsin The Effects of Flooding During the past half century, multiple flooding events along the Pecatonica River
Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013
Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013 1. Design alternatives for large capital flood projects (basinlevel water retention and Interstate
TESTIMONY OF RONNIE LUPE, TRIBAL CHAIRMAN THE WHITE MOUNTAIN APACHE TRIBE FORT APACHE INDIAN RESERVATION, ARIZONA SENATE COMMITTEE ON INDIAN AFFAIRS
TESTIMONY OF RONNIE LUPE, TRIBAL CHAIRMAN THE WHITE MOUNTAIN APACHE TRIBE FORT APACHE INDIAN RESERVATION, ARIZONA SENATE COMMITTEE ON INDIAN AFFAIRS Dirksen Senate Office Building, Room 628 White Mountain
COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION
COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION (1) Project Name: (2) Project Contractor: (3) Erosion Control Supervisor/SWMP Administrator: (4) CDOT Project
PUBLIC ASSISTANCE DAMAGE ASSESSMENT
PUBLIC ASSISTANCE DAMAGE ASSESSMENT Who does it? Political Subdivisions, Special Districts, Local/Regional Authorities, Public Schools/Colleges/Universities, Certain Private Non-Profit Organizations (PNP)
Miquon Creek STREAM RESTORATION PROJECT WHO WE ARE
Miquon Creek STREAM RESTORATION PROJECT WHO WE ARE Introductions Brett Long, PE Project Permitting & Construction Oversight Chris Streb, PE Project Designer & Construction Oversight Assistance WHO WE ARE
CHAPTER 3A Environmental Guidelines for STREAM CROSSING BY ALL-TERRAIN VEHICLES
GOVERNMENT OF NEWFOUNDLAND AND LABRADOR DEPARTMENT OF ENVIRONMENT AND LABOUR CHAPTER 3A Environmental Guidelines for STREAM CROSSING BY ALL-TERRAIN VEHICLES WATER RESOURCES MANAGEMENT DIVISION Water Investigations
PhD, 2002 Colorado State University Human dimensions of natural resources. M.S., 2000 Colorado State University Human dimensions of natural resources
BRETT L. BRUYERE Colorado State University Human Dimension of Natural Resources Department Fort Collins, CO 80523 (970) 491 1360 [email protected] EDUCATION Degree/ Year Institution Major/Concentration
Untreated (left) and treated (right) Sierra Nevada forests in Amador County, CA. Photos: Sierra Nevada Conservancy
Case Study Mokelumne Watershed, CA and Santa Fe, NM Avoided Costs: The Economics of Watershed Restoration Forested headwaters are the source of much of the West s drinking water. Protecting and restoring
Emergency Streambank Restoration/Stabilization. Kentucky Division of Water Water Quality Certification May 2010 Educational Assistance
Emergency Streambank Restoration/Stabilization Kentucky Division of Water Water Quality Certification May 2010 Educational Assistance Due to the severity of the recent rains and flooding occurrences, the
How To Assess An Area For Erosion
SKY BASIN (UPPER CA 1 WATERSHED) EROSION ASSESSMENT Prepared by Kevin Drake, CPESC Integrated Environmental Restoration Services, Inc. August 2014 COMMON GROUND UNCOMMON SOLUTIONS P.O. BOX 7559 2780 LAKE
Sims Bayou Federal Flood Damage Reduction Project
Sims Bayou Federal Flood Damage Reduction Project A. Gene Rushing, Jr., P.E., PMP HCFCD Project Manager January 15, 2014 Harris County s Watersheds Historical Flooding in Harris County 1929 1935 HCFCD
MONTGOMERY COUNTY, KANSAS EMERGENCY OPERATIONS PLAN. ESF14-Long Term Community Recovery
MONTGOMERY COUNTY, KANSAS EMERGENCY OPERATIONS PLAN ESF14-Long Term Community Recovery Planning Team Support Agency Coffeyville Public Works Independence Public Works Montgomery County Public Works 1/15/2009
Flooding and Flood Threats on Trenton Island
Mitigation Success Trenton Island, Pierce County, Wisconsin Background: Trenton Island is located in the unincorporated area of Trenton Township, Pierce County, in northwestern Wisconsin. Often called
IMPROVING SOUTH FORK PEACHTREE CREEK WATERSHED USING THE TRIPLE BOTTOM LINE DEKALB COUNTY, GEORGIA
IMPROVING SOUTH FORK PEACHTREE CREEK WATERSHED USING THE TRIPLE BOTTOM LINE DEKALB COUNTY, GEORGIA David Chastant AUTHORS:DeKalb County, 330 West Ponce De Leon Ave, Decatur, Georgia 30030 REFERENCE:Proceedings
GENERAL OBLIGATION BONDS
DESCRIPTIONS GENERAL OBLIGATION BONDS Appendix C, page 2 GENERAL OBLIGATION BONDS State Transportation Bonds --- 1968 An amount of $640,000,000 was authorized to improve the public transportation system.
Town of Canmore Flood Recovery Action Plan January 2014. canmore stands strong canmore stands strong
Town of Canmore Flood Recovery Action Plan January 2014 Town of Canmore Flood Recovery Action Plan l January 2014 Table of Contents Executive Summary 3 The Perfect Ugly Storm 4 Emergency Response 5 Impacts
DATE ISSUED: February 19 2015 REPORT NO. 201 (REVISED) San Diego Regional Park Improvement Fund Oversight Committee Agenda of February 19 2015
DATE ISSUED: February 19 2015 REPORT NO. 201 (REVISED) ATTENTION: SUBJECT: San Diego Regional Park Improvement Fund Oversight Committee Agenda of February 19 2015 Quarterly Projects Update - Allocation
Why does Kittitas County want to form a Flood Control Zone District?
KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS Kirk Holmes, Director What is a Flood Control Zone District (FCZD)? A Kittitas County Flood Control Zone District (FCZD) would be a special-purpose government
Sabino Canyon History
History During the Great Depression of the 1930 s, the CCC (Civilian Conservation Corporation) and the WPA (Works Progress Administration) built the nine bridges that crossed Sabino Creek. They originally
Public Survey for Phase I
Rockfish Valley Area Plan: Public Survey for Phase I For Nelson County Residents & Property Owners Name: OPTIONAL: Location of residence or property: o Address: o Voting District: North Central West South
5.14 Floodplains and Drainage/Hydrology
I-70 East Final EIS 5.14 Floodplains and Drainage/Hydrology 5.14 Floodplains and Drainage/Hydrology This section discusses floodplain and drainage/hydrology resources and explains why they are important
PIRU FIRE BURNED AREA EMERGENCY RESPONSE PLAN
PIRU FIRE BURNED AREA EMERGENCY RESPONSE PLAN AGENCY/UNIT: U.S. Fish and Wildlife Service Hopper Mountain National Wildlife Refuge LOCATION: Ventura County, California DATE: November 4, 2003 Amended June
Flood Plain Reclamation to Enhance Resiliency Conserving Land in Urban New Jersey
Flood Plain Reclamation to Enhance Resiliency Conserving Land in Urban New Jersey Rutgers Cooperative Extension Water Resources Program Christopher C. Obropta, Ph.D., P.E. Email: [email protected]
Colorado Natural Heritage Program
CNHP s mission is to preserve the natural diversity of life by contributing the essential scientific foundation that leads to lasting conservation of Colorado's biological wealth. Colorado Natural Heritage
The correct answers are given below. Some talking points have been added for the teachers use.
Natural Resources Canada 2011: Lesson Plan Grades 11 and 12 Landslide activity 5b: Landslides in Canada quiz Description: This is an independent study activity for grades 11 and 12. Students will read
Frequently-Asked Questions about Floodplains and Flood Insurance FLOOD INSURANCE
Frequently-Asked Questions about Floodplains and Flood Insurance What is a floodplain? The floodplain is any area covered by water during normal water flows, and which could be inundated as a result of
Flood Emergency Response Planning: How to Protect Your Business from a Natural Disaster RIC005
Flood Emergency Response Planning: How to Protect Your Business from a Natural Disaster RIC005 Speakers: Tom Chan, CEO, Global Risk Miyamoto Greg Bates, Principal, Global Risk Consultants Learning Objectives
CHAD R. GOURLEY SPECIALTY EMPLOYMENT
CHAD R. GOURLEY P.O. Box 919 Verdi, Nevada 89439 phone 775.345.9960 cell 775.250.8140 chad_gourley at att.net SPECIALTY Restoration of riverine, spring, and wetland ecosystems, specializing in a process
Coldwater Heritage Partnership Implementation Grant Final Report Morrison Run Watershed Restoration Project Western Pennsylvania Conservancy Project Summary The goal of the Morrison Run Watershed Restoration
FLOOD PROTECTION AND ECOSYSTEM SERVICES IN THE CHEHALIS RIVER BASIN. May 2010. Prepared by. for the. 2010 by Earth Economics
FLOOD PROTECTION AND ECOSYSTEM SERVICES IN THE CHEHALIS RIVER BASIN May 2010 Prepared by for the Execubve Summary The Chehalis Basin experienced catastrophic flooding in 2007 and 2009. In response, the
NPS Burned Area Emergency Response (BAER) and Burned Area Rehabilitation (BAR) in the Southern California Landscape
NPS Burned Area Emergency Response (BAER) and Burned Area Rehabilitation (BAR) in the Southern California Landscape 2005 2007 2013 NPS in non-desert southern California 2007 2005 SMMNRA 154,000 acres May
Environmental Case Study Decatur, Georgia, DeKalb County A Suburban Creek Resists Channelization
Introduction A visual examination of Doolittle Creek in a highly developed suburban county in Georgia yielded telltale signs of a creek whose original streambed had been altered. Examination of official
Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1
6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT