KOSCIUSZKO BRIDGE PROJECT BRIDGE PRIMER



Similar documents
Design of Bridges. Introduction. 3 rd to 4 th July Lecture for SPIN Training at the University of Dar es Salaam

Safe & Sound Bridge Terminology

Source: Port Mann Bridge Plans Unveiled Today, CBC News, February 4, 2009.

IH-635 MANAGED LANES PROJECT, SEG. 3.2

Informational Workshop Public Meeting Kanawha Falls Bridge Project

3 Tappan Zee Bridge Rehabilitation Options

3.1 Historical Considerations

5 ALTERNATIVE SOLUTIONS AND EVALUATION

REHABILITATION PACKAGE 1-a

INCREASE OF DURABILITY AND LIFETIME OF EXISTING BRIDGES. PIARC TC 4.4 EXPERIENCE.

Analysis of the Interstate 10 Twin Bridge s Collapse During Hurricane Katrina

US 51 Ohio River Bridge Engineering and Environmental Study

CITY OF TRAIL MEMORANDUM

Red Wing Bridge Project. PAC #5/TAC #8 Meeting July 18, 2013

Alternatives Evaluation Overview

Analysis of the Response Under Live Loads of Two New Cable Stayed Bridges Built in Mexico

1,045 m length of the Deh Cho Bridge

Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation

Chaudière Crossing Bridge Rehabilitation

Public Information & Public Scoping Meeting

GEORGE J. CAMBOURAKIS, P.E., C. ENG. PRESIDENT & CHIEF STRUCTURAL ENGINEER

Value Engineering vs. Alternate Designs in Bridge Bidding

Virginia Approach Spans

HONG KONG ZHUHAI MACAO LINK

Project Information. New Hope - Lambertville Toll Bridge - Pavement Rehabilitation & Approach Bridges Repairs -

CAPPELEN MEMORIAL BRIDGE REHABILITATION

Bridge Facts. Can you name the longest bridge in the world? The Akashi-Kaikyo Bridge

SECOND PENANG BRIDGE PROJECT

Historic Bridges of Frederick County. Frederick County, Maryland Division of Public Works Department of Highways and Transportation (301)

PENNDOT 3D MODELING FOR STRUCTURES WORKSHOP. Presented by: Steven Pletcher and Chris Daniels, P.E. October 21, 2014

How To Check For Scour At A Bridge

Challenging Skew: Higgins Road Steel I-Girder Bridge over I-90 OTEC October 27, 2015 Session 26

Bridge Type Selection

REPAIR AND RETROFIT OF BRIDGES DAMAGED BY THE 2010 CHILE MAULE EARTHQUAKE

2015 ODOT Bridge Design Conference May 12, DeJong Rd Bridge High- Seismic Zone Case Study: Bridge Rehab vs. Replacement.

LOAD TESTING OF SOME NEW BRIDGES IN LATVIA

National Council of Examiners for Engineering and Surveying. Principles and Practice of Engineering Structural Examination

Rehabilitation of the Red Bank Road Bridge over Hoover Reservoir. Presented By: Doug Stachler, P.E.

Residential Deck Safety, Construction, and Repair

The History and Technology of the Edison Bridge & Driscoll Bridge THE DRISCOLL BRIDGE

Peer Review Scope of Work

How To Write An Analysis System For Bridge Test

Truss. are both simple and A Matsuo Example continuous trusses. The

The Rehabilitation Alternative Huey P. Long Bridge Case Study. Bruce E. Peterson, P.E. Project Manager Modjeski and Masters, Inc.

CHAPTER 4 EXISTING TRANSPORTATION MANAGEMENT

A SOLUTION FOR THE NEW YORK HARBOR TODAY. A LEADER FOR THE SHIPPING WORLD TOMORROW.

Drexel-SDP GK-12 ACTIVITY

REHABILITATION OF THE FIGUEIRA DA FOZ BRIDGE

SECTION III-06 Surfacing Page 1 Revised 3/2/10. See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway.

Re: Truck Route Management and Community Impact Reduction Study Report

The total estimated PFC revenue for the application is $266,900,000. The estimated charge effective date for this application is December 1, 2016.

Beam bridges are the oldest known bridges and tend to be the simplest to design and build. Roughly half of all bridges

DRAFT SCOPING DOCUMENT REHABILITATION OR RECONSTRUCTION OF THE BROOKLYN-QUEENS EXPRESSWAY ATLANTIC AVENUE TO SANDS STREET KINGS COUNTY P.I.N. X730.

BUILDING MATERIALS, Wood, Laminated (Page 1 of 3) Viz.: Rafters; Arches; Beams; Joists; Timbers or Planks, structural or roof.

AREA: 0.16 acres NUMBER OF LOTS: 1 FT. NEW STREET: 0 LF

WINDOW AND DOOR REPLACEMENT REQUIREMENTS

Emergency repair of Bridge B421

TITLE 13. LAW AND PUBLIC SAFETY, CHAPTER 18 SUBCHAPTER 1. PERMITS FOR OVERDIMENSIONAL OR OVERWEIGHT VEHICLES

Diameter. Swift Lift Round Recess Plug. Note: The diameter of the narrow recess plug is the same as the diameter of the round recess plug.

BRIDGES ARE relatively expensive but often are

Bruce Highway (Cooroy to Curra) Section A (Cooroy southern interchange to Sankeys Road)

How to Design and Build a Fence/G traverse Bridge or Graffiti Project

Fabrication, Delivery and Installation

Presentation to NYSAMPO, June 2015 Steve Wilcox, P.E., Director, Maintenance Program Planning Bureau NYSDOT

ENTRY FORM. DVASE 2013 Excellence in Structural Engineering Awards Program

~iffiui ~ Bridge Condition Survey. Inspection Date: 21 May 2003 District: San Angelo County: Tom Green Highway:

Draft Transportation Management Plan for Via Verdi Repair Project

Gas Meter Clearances and Service Installation Requirements

Chapter Forty-seven. RURAL TWO-LANE/MULTILANE STATE HIGHWAYS (New Construction/Reconstruction) BUREAU OF DESIGN AND ENVIRONMENT MANUAL

The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.

GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables

THE STRUCTURAL ENGINEER

The unit costs are based on the trend line of the 3 low bids for the average quantity.

Technical Analysis and High-End Structural Design

Design of Steel Structures Prof. S.R.Satish Kumar and Prof. A.R.Santha Kumar. Fig some of the trusses that are used in steel bridges

EXHIBIT A Accessible Truck Routes Map

Engineers at Liftech designed the structure of the first container crane and have designed and reviewed thousands of container cranes since.

INDIANA DEPARTMENT OF TRANSPORTATION BRIDGE INSPECTION PROGRAM CODING GUIDE

The Need for Traffic Incident Management

Open House Public Meeting for the Thurmond Bridge Rehabilitation Project State Project: State Project S310-25/ Federal Project: BR-0252(001)D

CONCEPTUAL REHABILITATION ALTERNATIVE

CONSTRUCTION TRAFFIC MANAGEMENT PLAN (CTMP)

I-676 (Vine Expressway) Bridge Reconstruction Project 22 nd - 18 th Streets Philadelphia, PA. PSPE Presentation, December 3, 2015

Elevated Roads for Sri Lanka

COLUMN-FREE OFFICE SPACE RISES IN CHICAGO S LOOP

MHI. Overview of Manufactured Home Installation MANUFACTURED HOUSING INSTITUTE. This guide contains an overview. of the HUD-Code manufactured home

Gas Meter Clearances and Service Installation Requirements

1What purpose do guard

Street Audit Tool: Web 2.0 Tools

Executive Summary. Literature/Community Review. Traffic Flows and Projections. Final Report Truck Route System for Miami-Dade County CORRADINO

P. ALTERNATE TECHNICAL CONCEPTS FOR CONSTRUCTION, STAGING AND TRAFFIC CONTROL

FEBRUARY 2014 LRFD BRIDGE DESIGN 4-1

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE

Transcription:

KOSCIUSZKO BRIDGE PROJECT BRIDGE PRIMER The New York State Department of Transportation (NYSDOT) is preparing an Environmental Impact Statement (EIS) to evaluate alternatives for the rehabilitation or replacement of the Kosciuszko Bridge. Focusing on a 1.1-mile segment of the Brooklyn-Queens Expressway (BQE) between Morgan Avenue in Brooklyn and the Long Island Expressway (LIE) interchange in Queens, the EIS will examine five Build alternatives two rehabilitation and three new bridge options as well as a No Build alternative. Since all build alternatives, including the rehabilitation options, involve construction of a new bridge, the EIS will include detailed information regarding possible bridge design, construction methods and operations. The purpose of this booklet is to define and explain many of the engineering terms that will be used in the design and selection of new bridge concepts for this project. New York State Department of Transportation Joseph H. Boardman, Commissioner Douglas A. Currey, P.E., Regional Director Phillip Eng, P.E., Deputy Regional Director

BRIDGE ANATOMY ANATOMY COMPONENTS OF THE KOSCIUSZKO BRIDGE There are two primary sections of the Kosciuszko Bridge: the superstructure and the substructure. Through Truss SUPERSTRUCTURE: the parts of the bridge that support and carry the roadway. The Kosciuszko Bridge is a TRUSS bridge, which is a type of bridge that uses a series of steel triangles to support the roadway. Two types of trusses are used as part of the bridge: Deck Truss Deck Truss THROUGH TRUSS: used for the portion of the bridge that crosses Newtown Creek to provide greater clearance for ships; the name refers to the fact that vehicles travel through the truss. DECK TRUSS: used for the approach spans leading up to the creek, these trusses support the roadway from below. The trusses support the FLOOR SYSTEM, which is made up of a series of steel beams and the DECK, on which vehicles travel. Floor System Brooklyn Connector Low-level concrete viaduct enclosed for storage. Approach Span ABUTMENT: a structure that supports the end of a bridge; on the Kosciuszko Bridge, the abutments are located at the ends of the deck truss in Brooklyn and Queens. 2

SUBSTRUCTURE: the parts of a bridge that rise from the ground and support the superstructure. Specific parts include: FOUNDATION: the part of the structure that is underground and on which all the other parts rest. Where the ground is soft, piles made of either concrete or steel rods are driven or drilled into the ground to provide a solid base. On firm ground, wide concrete pads called a spread footings support the bridge. The Kosciuszko Bridge has both pile and spread footing foundations. PIER: the vertical columns that rest on top of the foundation. Most of the bridge s piers are made of concrete, except for the two piers on each side of Newtown Creek, which are steel. Superstructure Deck Floor System Substructure Deck Floor System Superstructure Substructure Foundation Main Span Pier Foundation Approach Span Pier ADDITIONAL TERMS VIADUCT: a bridge consisting of a series of similar spans. WEARING SURFACE: Concrete, asphalt or specialized materials laid on top of the deck on which vehicles travel. Replaced periodically as tires wear it away. Main Span The section of the bridge that carries traffic over Newtown Creek; the longest span in the Kosciuszko Bridge; also called the CHANNEL SPAN. Approach Span SPAN: the distance between consecutive piers of a bridge. 3

SELECTING A BRIDGE TYPE BASIC CONSIDERATIONS Before determining the type of bridge that is best for a specific location, engineers take a number of factors into consideration. They include: SPAN LENGTH The main span of the Kosciuszko Bridge is 300 feet, with its two steel piers located at the edge of Newtown Creek just barely in the water. A new bridge would have a longer main span, so that the new piers would not need to be placed in the water. This would reduce impacts to aquatic life and prevent a ship or barge from hitting the piers. CONSTRUCTABILITY How a bridge is constructed is often constrained by local site conditions. Access to the site for construction equipment, such as large cranes, is a factor that helps to define how a bridge is built. COST Bridge engineers strive to design the most economical structure possible for each project s particular set of needs (bridge width, span length, surrounding development, etc.). AESTHETICS A new bridge should be an attractive structure, especially if it is a high level structure that can be seen from a distance. The existing Kosciuszko Bridge is visible from the nearby communities and from other roadways such as the LIE. It is even visible from the Empire State Building. CONSTRUCTION DURATION Both NYSDOT and the community want construction to be completed as quickly as reasonably possible. Different bridge types require different construction methods and can have very different durations. COMMUNITY IMPACTS All of the factors listed above must be balanced against any impacts to the community, including impacts on property, air quality, and noise. The Draft EIS will document the impacts associated with each of the alternatives. Any time a bridge is built, these considerations are weighed against each other to come up with the best solution for the particular context. The Kosciuszko Bridge is in a congested urban setting with residences and commercial uses in close proximity; several businesses even operate underneath the bridge. Given that context, the following are several bridge types that will be considered for any new bridge built to either replace or complement the Kosciuszko Bridge. BEAM BRIDGE The modern version of a felled tree trunk spanning between two rocks, a beam bridge consists of steel or concrete beams (also called girders) between piers which are spaced at regular intervals. Appropriate Span Length: 200 600 feet Local Example: Williamsburg Bridge Approaches Applicability to Kosciuszko Bridge Project: Suitable bridge type. Williamsburg Bridge Approach, Brooklyn, NY ARCH BRIDGE The arch bridge uses a curve made of either steel or concrete to shift some of the weight of the bridge and vehicles to the abutments at either end. Appropriate Span Length: 500 1,200 feet Local Example: Henry Hudson Bridge (Route 9A) Applicability to Kosciuszko Bridge Project: Arch would encroach on Newtown Creek marine vessel navigation. 4 Henry Hudson Bridge, NYC

Queensboro Bridge, NYC TRUSS BRIDGE Truss bridges consist of an assembly of triangles, which are made from a series of straight, steel bars. Long spans can be achieved by increasing the overall depth without drastically increasing the weight of materials. Appropriate Span Length: 500 1,200 feet Local Examples: Kosciuszko and Queensboro Bridges Applicability to Kosciuszko Bridge Project: Suitable bridge type. JFK Airtrain, Queens, NY CONCRETE SEGMENTAL BRIDGE A concrete segmental, or box girder, bridge is a particular type of beam bridge where the girders and deck are combined in a single trapezoidal hollow section. It is assembled in small segments which are later connected. Appropriate Span Length: 200 600 feet Local Examples: JFK Airtrain Viaduct, BQE Connector Ramp to Williamsburg Bridge Applicability to Kosciuszko Bridge Project: Suitable bridge type. CABLE-STAYED BRIDGE Cable-stayed refers to a type of bridge where the deck is supported by straight cables attached to the top of towers. The towers are built first and then deck sections and stays are attached progressively. Appropriate Span Length: 600 1,800 feet Local Example: None Applicability to Kosciuszko Bridge Project: Long span bridge type not economical for short Kosciuszko Bridge main span. Sidney Lanier Bridge, Georgia Tsukuhara Bridge, Hyogo, Japan EXTRADOSED BRIDGE The extradosed bridge type is a relatively new form which combines a cable-stayed bridge and a segmental bridge. The cable stays and the deck work in combination, allowing the deck to be more slender than a typical segmental bridge and the towers to be shorter than a typical cable-stayed bridge. Appropriate Span Length: 300 900 feet Local Example: None Applicability to Kosciuszko Bridge Project: Suitable bridge type. Williamsburg Bridge, NYC SUSPENSION BRIDGE In suspension bridges, the roadway hangs from massive steel cables, which are draped over two towers and secured into solid concrete blocks, called anchorages, at both ends of the bridge. Appropriate Span Length: 1,500 feet and up Local Example: Williamsburg Bridge Applicability to Kosciuszko Bridge Project: Long span bridge type not economical for short Kosciuszko Bridge main span. 5

BRIDGE CONSTRUCTION In recent years, NYSDOT has worked closely with communities to minimize construction-related impacts on residents, businesses, and community facilities. Some of the measures for avoiding impacts are straightforward; others are the result of technological innovations. They include the following: MAINTAINING TRAFFIC DURING CONSTRUCTION As with any project involving a key link in the existing transportation network, maintaining traffic during construction is critical. NYSDOT has committed to maintaining 6 lanes of traffic on the BQE across Newtown Creek (3 in each direction) and all existing ramp connections throughout construction, to minimize the number of vehicles that might use local streets to avoid the construction area. However, to accomplish this, in some places it is necessary to construct temporary structures or ramps. Temporary Bridge on Long Island Expressway at Cross Island Parkway For example, at the Vandervoort Avenue and Van Dam Street ramps in Brooklyn, each of the alternatives will reconstruct the existing ramp structures. Each alternative includes the provision of temporary ramps adjacent to the existing ones to allow vehicles to enter and exit the highway during ramp reconstruction. Temporary roadway over East As shown in the diagram at right, each River to maintain traffic during of the alternatives also includes the reconstruction of FDR Drive. Limit of Reconstruction reconstruction of the existing viaduct to just west of Morgan Avenue, where the previous Meeker Avenue viaduct project terminated. This section cannot be reconstructed with traffic operating on it. Therefore, a temporary structure must be constructed so that this section can be reconstructed one half at a time (the eastbound lanes and then the westbound lanes). As shown in the diagram at Temporary Roadway right, it is necessary to transition traffic off the structure some distance before the work area, in order to maintain smooth Temporary Ramp traffic operations. To minimize the impact on the residences located on the north side of Meeker Avenue, all temporary structures in this section will be constructed on the south side of the viaduct. RECONSTRUCTION AREA 6 HOURS OF CONSTRUCTION Traditionally, construction work is performed during daytime hours, Monday through Friday. More recently, agencies are considering accelerated construction schedules that use multiple shifts during the day or 24-hour, 7 day-a-week schedules. While round-theclock construction activity may reduce the length of time that a community is inconvenienced, it is not appropriate in all situations. For example, performing nighttime work adjacent to residential properties is typically inappropriate. On the other hand, nighttime construction may be the best option in industrial areas, particularly those that require daytime access to loading docks or other facilities. The Draft EIS will look closely at the needs of residential neighborhoods, business operations and other factors in order to minimize impacts. Lions Gate Bridge, Vancouver B.C., nighttime deck replacement

CONSTRUCTION TECHNIQUES Pile driving equipment I-287 Cross Westchester Expressway Construction Drilled shaft construction During bridge construction, one of the noisiest activities can be the driving of piles. Pile drivers use a large hydraulic hammer to drive concrete or steel rods into the ground. Alternatively, drilled shafts can be used to reduce noise and vibration. Drilled shafts are constructed by drilling a hole in the ground, inserting a steel shaft, and then filling it with concrete. Construction duration can be reduced by fabricating large portions of steel or concrete structures off-site. These pieces can then be transported, by truck or barge, to the site where they are lifted into place. This can cut years off a large construction project. Bridge construction typically starts from the bottom up, with the foundation constructed first, then the pier, and finally the superstructure, using large cranes to lift sections into place. An innovative construction method called "top-down construction" has been developed for use in environmentally sensitive areas. With this method, a special crane attached to the already completed section of roadway is used to put each section in place, eliminating the need to find space on the ground for a large crane. Top-down construction of concrete segmental bridge Precast concrete segments for JFK Airtrain loaded on barge for transportation from precasting yard. Photo courtesy: Bayshore Concrete Products. TRANSPORTATION OF MATERIALS While Newtown Creek s role as a shipping channel imposes certain requirements for any new bridge in terms of clearance height and placement of piers, it also presents an opportunity to reduce construction impacts on the community. Typically for a highway or bridge project, equipment (cranes, bulldozers, pavers) and materials (pre-cast sections, concrete, steel beams) must be brought in by truck. In an area such as this, that would mean more large trucks using the highway and local streets to access the site. However, because Newtown Creek is a navigable channel, materials and equipment could be brought in by barge, thereby minimizing the number of trucks traveling to the site. COMMUNICATION WITH STAKEHOLDERS In addition to the techniques mentioned above, one of the most important tools for reducing construction impacts on communities is open, ongoing communication. By working closely with surrounding communities and businesses during final design and construction, NYSDOT can better understand local concerns and adjust plans and contractor requirements to reduce project impacts. For example, as mentioned above, it may be appropriate to use different hours of construction in different areas. If a specific business receives all its shipments during a certain time period, it may be possible to schedule activity in that area during other times. This open line of communication can also help the agency more quickly respond to specific complaints concerning construction. Finally, informing the community of when and where disruptions will occur can help them plan accordingly and minimize inconvenience. Pre-cast concrete segment on truck for transportation to construction site. 7

How to Contact Us We welcome your comments. To contact us or for more information, please write or call: Robert Adams, P.E., Project Manager New York State Department of Transportation Hunters Point Plaza 47-40 21st Street Long Island City, NY 11101 Phone: (718) 482-4683 Fax: (718) 482-6319 Email: kosciuszko@dot.state.ny.us Visit our project website at: http://www.dot.state.ny.us/reg/r11/kosciuszko/kosciuszkohome.html New York State Department of Transportation Joseph H. Boardman, Commissioner Douglas A. Currey, P.E., Regional Director Phillip Eng, P.E., Deputy Regional Director