SUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2016



Similar documents
FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation

FY08 SEWER POINT REPAIRS BID TABULATION

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth

Special Specification 7021 Water Main and Sewer Line Replacements

Demo Existing Curb Demo Existing Asphalt Roadway Demo Asphalt Saw Cutting Protection Fence - 4 Snow Fence with T posts

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.

SECTION REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

SECTION STORM DRAIN SYSTEM

SECTION STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST BID PROPOSAL

Section 402. STORM SEWERS

SECTION STORM DRAINAGE TABLE OF CONTENTS

City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014

CW GRAVITY SEWERS TABLE OF CONTENTS

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES SITE UTILITIES

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF MANITOWOC, WISCONSIN SECTION 400 SEWER AND WATER CONSTRUCTION

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION STORM DRAIN SYSTEMS PART 1 - GENERAL

CD i -STREETS- Detail #

Los Angeles County Department Of Public Works. Land Development Division. Bond Calculation Sheets

UNIT PRICE LIST January 2009

A. Contractor shall furnish, to the Engineer, all materials certifications available from the manufacturer for all required materials.

CHAPTER 17: STORM SEWER STANDARDS Introduction Administration Standards 17.1

Beacon Hill Sewer District Standard Specifications

SECTION GRAVITY SANITARY SEWERS

LS 2540 SEWER LATERALS AND INSPECTION TEES

STANDARD SPECIFICATIONS SECTION INSTALLATION OF GRAVITY SEWER PIPELINES. 1. Trenching, Backfilling and Compacting: 02223

SECTION 15 AIR RELEASE VALVE ASSEMBLIES General

Precast Manhole Sections and Castings. These items shall conform to Section 31, "Storm Drain Installation," of these Standard Provisions.

SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors.

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.

STANDARD SPECIFICATIONS FOR PRIVATE BUILDING SEWER LINES IN PUBLIC RIGHT-OF-WAY

The Manitoba Water Services Board SECTION Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11

Sewer Rehabilitation Design Requirements

EFFECTIVE FEBRUARY note: drainage permit required to call for a dampproof inspection

EXHIBIT "A. Technical Specifications for Water and Sewer Service Lines

SECTION PUBLIC STORM UTILITY DRAINAGE PIPING

PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE

SECTION 200: STORM SEWER CONSTRUCTION STANDARDS

WATER SERVICE 2

SECTION 603 SANITARY SEWER FORCE MAINS

SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE

SECTION POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.

Standard Specifications for Installation and Repairs of Water and Sewer Service Lines

Table 4.9 Storm Drain Inlet Protetion Applicable for

SECTION STORM DRAINAGE SYSTEM

SECTION 13 REPLACEMENT AND CLEANUP SCOPE OF WORK

1.3.2 Method of construction and restoration of existing water service connections. This shall include:

Bethel Township Municipal Authority (BTMA) RESIDENTIAL SEWER CONNECTION MANUAL

550 PIPE CULVERTS, SEWERS AND DRAINS

New Road 11.0m Asphalt 23m ROW

CITY OF SAN ANTONIO. Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.:

CITY OF ANN ARBOR PUBLIC SERVICES PLAN REVIEW CHECKLIST

SECTION 6A STORM DRAIN DESIGN Mar S E C T I O N 6A STORM DRAIN - DESIGN

Town House Center Highway North Huntingdon, PA 15642

Storm Sewer Trenchless Upgrade Alternatives and Recommendations

SECTION SANITARY SEWER AND STORM DRAIN SYSTEMS

Let Us Give Utilities the Respect that they Deserve.

STANDARD SPECIFICATIONS SECTION PRECAST REINFORCED CONCRETE MANHOLES AND MANHOLE BASES. 1. Structure Earthwork: 02200

INDEX STORM DRAINAGE PRE-APPROVED NOTES, DESIGN CRITERIA, & PLANS

Section 2100-Trenching and Tunneling

AIR RELEASE, CLEANOUT, AND SEWER MANHOLES

STORM DRAIN DESIGN AND CONSTRUCTION STANDARDS & SPECIFICATIONS 400 SERIES

ARTICLE VI (ALTERNATE) STANDARD SPECIFICATIONS. for (PVC) SANITARY SEWER MAIN CONSTRUCTION

CONTENTS. Yale University Design Standards. Underground Electrical Duct Bank. A. Summary. B. System Design and Performance Requirements

San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS

SECTION 7- STORM SEWER

STANDARD SPECIFICATIONS & CONSTRUCTION DETAILS MANUAL SECTION 5 - STORM DRAINAGE Design

SECTION DUCTILE IRON PIPE AND FITTINGS

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.

NOTICE TO CONTRACTORS. CALL ORDER 700 FEDERAL PROJECT NO. STPD-6-2(122) LOCATION: US-34/US-6,CULBERTSON-McCOOK COUNTIES: HITCHCOCK RED WILLOW

SECTION 5 DRAFTING STANDARDS

WATER MAIN CONSTRUCTION TECHNIQUES DEPARTMENT OF PUBLIC WORKS WATER & WASTEWATER DIVISION

SANITARY SEWER SPECIFICATIONS

SECTION SELECTIVE DEMOLITION

SECTION POLYVINYL CHLORIDE (PVC) PIPE

For a building with a crawl space, see Figure

Storm Drain Inlet Protection - IP

LEE S SUMMIT USES PIPE BURSTING TO BROADEN ITS ASSET MANAGEMENT TOOLBOX AND REHABILITATE POTABLE WATER DISTRIBUTION SYSTEM

Model Specification 509 DRISCOPLEX 4200 and DRISCOPLEX 4300 Gravity Flow Sanitary Sewer

STANDARD SPECIFICATIONS FOR STORM SEWER CONSTRUCTION CITY OF PLYMOUTH, MINNESOTA

SECTION G SEWERS (STORM, SANITARY AND FDC)

FDOT DBE CERTIFICATION NAICS CODE GUIDE WITH CAP SIZES

SANITARY SEWER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix D

3. Amend the following: Item 410 Traffic Compacted Surface, Type C to Item 446 Cold Patch.

SECTION UNDERGROUND ELECTRIC SERVICE

Section C-1 Pipes and Fittings

The Manitoba Water Services Board SECTION Standard Construction Specifications September 2013 Page 1 of 21

Section 3510: Reclaimed water Pipes, Valves, and Appurtenances February 11, 2011

STANDARD SPECIFICATIONS SECTION CLEANING AND LINING WATER MAINS

CONSTRUCTION PERMIT REQUIREMENTS

SECTION DUCTILE IRON PIPE AND FITTINGS

C. Section TESTING LABORATORY SERVICE.

Rules and Regulations for Water Service Lines Water Services Department

SECTION REINFORCED CONCRETE PIPE. A. The following is a list of SPECIFICATIONS, which may be related to this section:

High Density Polyethylene Liners for Rehabilitation of Corroded Pipelines

Transcription:

SUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2016 102.5 Bid Deposits The City of Madison bid deposit form is required for all bids unless a Biennial Bid Bond is on file or check deposit is used. 102.9 Bidders Understanding Added language on Tax Exempt status on public works contracts. 102.14 Ban the Box Arrest and Criminal Background Checks (Sec 39.07, MGO) New section on hiring practices by prequalified contractors. Application and interviews can t make inquires on arrest and conviction record. There are some exemptions. 107.4(i) Insurance for the Construction of Buildings and Structures Changed from being carried by City to being the responsibility of the Contractor. Contractor is now required to carry Builders Risk insurance on all projects for the construction of Buildings and Structures, and remodeling projects where square footage is being added. 109.9 Liquidated Damages Added language defining liquidated damages when driveway access is not restored in the required 20 days, working outside of 7a 7p and working during peak hours. 110.6 Payment Withheld Revised language that payments to sub contractors shall be made in a timely fashion. 204.3 Clearing and Grubbing Trees Added station, square yard and lump sum as units of measurement. 207.2(c) Mulching Material. Deleted the use of Asphalt material as mulching material. 210 Erosion Control Deleted Erosion Control Implementation Plan Added Dust Control, Turbidity Barrier & Silt Curtain Inspections by contractor to include holidays. Photos and video need to notate location. 211.2(a) Engineered Soil. Deleted Topsoil from the Engineered Soil mixture. 401.1 Crushed Aggregate Base Course Contractor is required to maintain a gravel surface throughout project. 402.2 Placing Asphalt Mixtures Revised language on cold weather paving. 402.4 Asphalt Tack Coat Added language on requirements for placing tack coat. 403.2 Grinding Added language that removing ramping is included in the price for ramping SAS. 403.4 Undercut Revised method of measurement from SY to CY. 403.12 Adjust Access Structure Casting Resurfacing Added language that limits adjustment to 9. If more adjustment is needed then the bid item will be Rebuild Access Structure Top Resurfacing.

403.13 Adjust Catchbasin Casting Resurfacing Added language that limits adjustment to 9. If more adjustment is needed then the bid item will be Rebuild Access Structure Top Resurfacing. 403.14 Adjust Inlet Casting Type H Resurfacing Concrete is allowed vs mortar if engineer approves. Revised what work is included under this bid item. 403.15 Adjust Inlet Casting Tub Type Resurfacing Concrete is allowed vs mortar if engineer approves. Revised what work is included under this bid item. 403.16 Adjust Valve Casting, Method #1-3 Resurfacing Contractor to furnish and install replacement valve box castings (top sections, and if necessary, mid sections) at all valve locations. MWU to furnish bottom sections, if necessary. Delete reference to Sigma materials from Method 3; reference Part 7 for material requirements. 403.19 Rebuild Inlet Resurfacing Revised detail drawing to reference. 5.7.7 vs 5.711. 501.3 Storm Sewer Main Testing Revised testing for non RCP pipe. 501.6(c) Sanitary Sewer Access Structures Revised scope of work. Any work on the bench or flowline within six (6) inches of the inside wall shall be incidental to connecting the pipe to the SAS. 502.1d Bedding of Sewer Pipes Revised bedding material. Revised hand backfill and compaction requirements. 504.2 & 504.3 Storm Sewer Materials Revised pipe materials to include HP storm pipe. 507.2 Castings Added approved equal castings 507.3 Construction Methods. Revised private storm sewer reconnects & laterals. Added language that a core n seal boot or approved equal is required when connecting plastic pipe to new or existing concrete pipe or structure. 702.3.1 Ductile Iron Pipe Field welding of conductivity bonding straps is permitted. 702.5.6 Curb Boxes Valve boxes manufactured by East Jordan are listed as acceptable materials. 703.4 Excavation Added new Sections: 703.4.4 Trench Bottom, and 703.4.5 Bell Holes to align specifications with DIPRA installation recommendations for ductile iron pipe. 703.6 Backfilling and Compaction Added new section for the placement and compaction requirements of pipe bedding material, Section 703.6.1 Pipe Bedding and Cover. 703.9 Mechanical Joint Pipe and Fittings Any or equal to Megalug Series 1100 Retainer Glands must be approved prior to acceptance.

703.10 Thrust Restraint Concrete thrust blocking is required behind cut-in connections, tee branch connections and livetaps, in addition to the required MJ fitting restraint. Concrete thrust blocking must be at least 2-ft thick over the required bearing area. 703.11 Polyethylene Encasement Wrap the pipe with tape and tap through the tape instead of cutting the polywrap to tap the main. 703.14 Flushing Flushing segments may not exceed 1,200-feet unless approved by Engineer. Flushing must achieve a velocity of 2.5 ft/sec provided table for discharge opening guidance. 703.15.1 Conductivity Testing. Energized utility locating devices are now an acceptable method for conductivity tests. 704.4 Horizontal Directional Drill Pipe Deleted the cast-in-place concrete collar requirement at HDPE to DI connections. Do not connect DI pipe or fittings to the fused HDPE adaptor for at least 24-hours after pull-in. Center the tracer wire valve box over the fused HDPE adaptor. 704.6 Furnish & Install Water Valve Valve boxes manufactured by East Jordan are listed as acceptable materials. Box covers/lids with ridges or grooves are not permitted, only smooth drop-in lids are permitted. Set tolerance of ¾ (any direction) for valve box centering over nut, matches new SDD 7.06. 704.7 Furnish and Install Hydrant / Salvage Existing Hydrants Require concrete masonry block set under hydrant lead valve. 704.9 Furnish and Install Water Service Laterals Set boxes 1-inch below grade when located in unpaved areas (formerly set flush). Set boxes between flush and ¼ below grade when located in paved areas (formerly set flush). Tubular insulation is permitted when rigid board insulation is not feasible (tunneled laterals, etc). 704.10 Replace Service Lateral Change method of measurement from LF to EACH. 704.12 Cut-In or Connect-To Existing Water System Concrete blocking is required behind all cut-in connections and tee branch connections. 704.13 Furnish Excavation and Ditch for Live Tap Concrete blocking is required behind the live tap. 704.17 Furnish and Install Insulation Tubular insulation is permitted when rigid board insulation is not feasible (tunneled laterals, etc). 704.22 Rock Excavation Threshold of rock excavation during water main installation is 2 CY. 704.23 Removal of Excess Amounts of Boulders Boulders up to ½ CY are incidental to water main installation. Boulders between ½ CY and 2 CY may be considered for payment if approved by Engineer. When authorized for payment, $20/CY for ½-1 CY, and $50/CY for 1-2 CY size (formerly $6/CY). Boulders over 2 CY will be considered Rock Excavation and will be paid under that Bid Item. BID ITEMS Deleted Items 20403 GRUBBING I.D.

20404 GRUBBING STA. 21001 EROSION CONTROL PLAN & IMPEMENTATION LUMP SUM 50795 PRIVATE STORM SEWER LATERAL EACH 70053 REPLACE 1-INCH COPPER SERVICE LATERAL L.F. 70054 REPLACE 1 ½-INCH COPPER SERVICE LATERAL L.F. 70055 REPLACE 2-INCH COPPER SERVICE LATERAL L.F. 50401-50451 Deleted storm sewer pipe bid items. New Items 20403 CLEARING SY 20404 CLEARING LUMP SUM 20406 GRUBBING I.D. 20407 GRUBBING STA. 20408 GRUBBING SY 20409 GRUBBING LUMP SUM 21045 INLET PROTECTION, TYPE A COMPLETE EACH 21046 INLET PROTECTION, TYPE A PROVIDE & INSTALL EACH 21047 INLET PROTECTION, TYPE A MAINTAIN EACH 21048 INLET PROTECTION, TYPE A REMOVE EACH 21093 TURBIDITY BARRIER COMPLETE LF 21094 SILT CURTAIN COMPLETE LF 21095 INLET PROTECTION, TYPE B COMPLETE EACH 21096 INLET PROTECTION, TYPE B PROVIDE & INSTALL EACH 21097 INLET PROTECTION, TYPE B MAINTAIN EACH 21098 INLET PROTECTION, TYPE B REMOVE EACH 40358 PAVEMENT JOINT GRINDING L.F. 50795 PRIVATE STORM SEWER RECONNECT, TYPE 3 EACH 50796 PRIVATE STORM SEWER LATERAL EACH 50797 EXTERNAL SEWER ACCESS STRUCTURE JOINT SEAL EACH 70053 REPLACE 1-INCH COPPER SERVICE LATERAL EACH 70054 REPLACE 1 ½-INCH COPPER SERVICE LATERAL EACH 70055 REPLACE 2-INCH COPPER SERVICE LATERAL EACH 50401-50452 Added storm sewer pipe bid items. DETAIL DRAWINGS SDD 3.02 MADISON STANDARD CURB CUT DETAILS Clarified 6 of Crushed Gravel is required under drive aprons and sidewalks that are 7 thick. SDD 3.06 MADISON STANDAD CONCRETE CURB & GUTTER Added traffic circle mountable concrete curb & gutter. SDD 3.14 BIKE/PED RAMP CURB RAMP DETAIL Renamed detail drawing. Referenced SDD 3.06 for typical section through curb & gutter. SDD 4.01 TYPCIAL SECTION 32 WIDE STREET Removed redundant information. SDD 4.03 TYPCIAL SECTION BOULEVARD STREETS Removed redundant information. SDD 5.2.1 PIPE BEDDING AND BACKFILL Text and spec change to bedding for storm pipes SDD 5.2.1A PIPE BEDDING AND BACKFILL Text and spec change for bedding

SDD 5.7.3 STORM SEWER FIELD POURED SAS AND CATCH BASINS Added a concrete ring to casting SDD 5.7.11 ADJUST TUB INLET Renamed from Reconstruct to Adjust. Revised associated language in Section 403 5.7.15 SAS CHIMNEY AND CASTING Revised so concrete is allowed for top adjusting ring SDD 5.7.16A SAS LOCKING FRAME & LOGO COVER Text changed to CLASS 35B SDD 5.7.18 R-3067 FRAME Text changed to CLASS 35B SDD 5.7.31 Text change FLEXIBLE PIPE TO S.A.S. CONNECTOR SDD 6.12 LB-1 BASE DETAIL Revised drawing. SDD 6.45 LB-9 BASE DETAIL Revised drawing. Deleted Items SDD 7.01 SDD 7.01A SDD 7.01B SDD 7.02 SDD 7.03 SDD 7.03A SDD 7.03B SDD 7.03C SDD 7.04 SDD 7.05 SDD 7.06A SDD 7.06B SDD 7.06C SDD 7.07 SDD 7.08 SDD 7.09 SDD 7.10 SDD 7.11 SDD 7.12 SERVICE INSTALLATION - PRIVATE CONTRACT SERVICE INSTALLATION PRIVATE CONTRACT LOCATION OF WATER SERVICES STANDARD THREADED RODDING STANDARD THRUST BLOCKING STANDARD CONCRETE BLOCK THRUST RESTRAINT GRAVITY BLOCK THRUST RESTRAINT FOR VERTICAL DOWN BENDS ROD & CONCRETE BLOCK THRUST RESTRAINT FOR VERTICAL BENDS TYPICAL HYDRANT INSTALLATION TYPICAL STYROFOAM INSTALLATION WATER METER PIT CONSTRUCTION WATER METER PIT DIMENSIONS WATER METER PIT CONSTRUCTION NOTES WATER MAIN VALVE ACCESS STRUCTURE STANDARD HDPE PIPE RESTRAINTS CASING SPACERS JOINT RESTRAINT LENGTHS FOR VERTICAL BENDS TYPICAL WATER PIPE TRENCH OFFSETTING EXISTING WATER MAIN UNDER UTILITY CONFLICTS New Items SDD 7.01 TYPICAL WATER PIPE TRENCH SDD 7.02 (new) FIELD INSTALLATION POLYETHYLENE WRAP/TAPPING POLYETHYLENE WRAP SDD 7.03 TYPICAL STYROFOAM INSTALLATION SDD 7.04 TYPICAL HYDRANT INSTALLATION SDD 7.05 WATER MAIN VALVE ACCESS STRUCTURE SDD 7.06 (new) WATER VALVE BOX ALIGNMENT SDD 7.07 (vacant - reserved for future use) SDD 7.08 (vacant - reserved for future use) SDD 7.09 LOCATION OF WATER SERVICES SDD 7.10 SERVICE INSTALLATION - PRIVATE CONTRACT

SDD 7.11 (vacant - reserved for future use) SDD 7.12 (vacant - reserved for future use) SDD 7.13 STANDARD CONCRETE BLOCK THRUST RESTRAINT SDD 7.14 GRAVITY BLOCK THRUST RESTRAINT FOR VERTICAL BENDS SDD 7.15 ROD & CONCRETE BLOCK THRUST RESTRAINT FOR VERTICAL BENDS SDD 7.16 JOINT RESTRAINT LENGTHS FOR VERTICAL BENDS SDD 7.17 THREADED ROD - JOINT RESTRAINT SDD 7.18 (vacant - reserved for future use) SDD 7.19 (vacant - reserved for future use) SDD 7.20 (new) STANDARD HDPE TRACER WIRE VALVE BOX SDD 7.21 CASING SPACERS SDD 7.22 OFFSETTING EXISTING WATER MAIN UNDER UTILITY CONFLICTS SDD 7.23 (new) CLAY TRENCH PLUG SDD 7.24 (vacant - reserved for future use) SDD 7.25 (vacant - reserved for future use) SDD 7.26 (vacant - reserved for future use) SDD 7.27 (vacant - reserved for future use) SDD 7.28 (vacant - reserved for future use) SDD 7.29 (vacant - reserved for future use) SDD 7.30 WATER METER PIT CONSTRUCTION SDD 7.31 WATER METER PIT DIMENSIONS SDD 7.32 WATER METER PIT CONSTRUCTION NOTES SDD 7.33 (new) WATER METER ENCLOSURE SDD 7.34 (new) YARD HYDRANT / DRINKING FOUNTAIN STANDARD INSTALLATION SDD 7.35 (new) STANDARD 5/8", 3/4", 1" METER SET INSTALLATION SDD 7.36 (new) STANDARD 1 1/2", 2" METER SET INSTALLATION SDD 7.37 (new) STANDARD BADGER COMPOUND METER INSTALLATION SDD 7.38 (new) STANDARD OMNI COMPOUND METER INSTALLATION SDD 7.39 (new) STANDARD MAG METER INSTALLATION SDD 7.40 (new) STANDARD BADGER TURBINE METER INSTALLATION SDD 7.41 (new) STANDARD OMNI TURBINE METER INSTALLATION SDD 7.42 (new) SEWER DEDUCT METER / WATER ONLY STANDARD INSTALLATION SDD 7.43+ (vacant - reserved for future use)