Exhibit A. SCOPE OF WORK Consulting Services for City of Durham Swimming Pool Facilities Assessment Study



Similar documents
Exhibit C: Scope of Work and Schedule of Deliverables

How To Install An Overhead Sewer

PLAN SUBMITTAL INFORMATION

SECTION 3 ONM & J STRUCTURAL ANALYSIS

FIRE SUPPRESSION INSTALLATION CITY OF HARRISONBURG, VIRGINIA

REQUEST FOR PROPOSAL (RFP) Facility Condition Assessment Services and Capital Planning and Management Software (CPMS)

A Guide for the Homeowner/Builder

Inspection Report. Dream Home Inspections Second Ave. Frisco CO (970)

Design Deliverables Checklist

N O T I C E REQUEST FOR STATEMENT OF QUALIFICATIONS RFQ# POLICE DEPARTMENT PARKING GARAGE

NAPCS Product List for NAICS 54134: Drafting Services

Better Budgeting: Roof Management Plans Help Estimate Costs

TOWN OF MILFORD REQUEST FOR QUALIFICATIONS DESIGNER SERVICES FOR LIBRARY ROOF REPLACEMENT

C-2 Construction, Inc. - NAICS Codes

Exceptional... Everytime!

Total Building Commissioning: Case Study of the U.S. District Courthouse in Salt Lake City, Utah, USA

Note: All terms which are defined and which are used throughout this document appear in italicized text beginning with a CAPITAL letter.

PROPERTY EVALUATION AND RESERVE FUND STUDY

Every Student I Every Day I Every Possibility

PRE-PURCHASE INSPECTION REPORT

Inspecting to a higher standard.

This request for qualifications seeks the following type of service providers:

2.4 Hardcopy submittals shall be provided at adequate size so that all notes are readable.

DIVISION OF FACILITIES AND CONSTRUCTION MANAGEMENT ARCHITECTURAL/ENGINEER FEES EFFECTIVE DATE: April 18, 2016

5047P Architectural and Engineering Services for the Cambie Fire Hall and Ambulance Station Project- Addendum #2

The Orange County Farmers Museum Emergency Preparedness Plan

REQUEST FOR ARCHITECTURAL SERVICES (RFS)

Cherokee Trail High School East Arapahoe Road Aurora, Colorado 80016

DRAFT Public Outreach Document for What s an SSMP?

QA/QC, Project Updates & Procurement

Town of Beaumont. Lot Grading Guidelines

DRAPER ELEMENTARY SCHOOL

BEFORE THE PHILADELPHIA WATER, SEWER AND STORMWATER RATE BOARD DIRECT TESTIMONY OF STEPHEN J. FURTEK

PROPERTY INSPECTION REPORT

Maryland. American Recovery and Reinvestment Act. 158 DoD Projects ($ 65.8M) Completed or Under Way by August 31, 2009

INTRODUCTION COST AND FEASIBILITY OF RENOVATING OR REPLACING AN OLD SCHOOL BUILDING

Development Services Department City of San Antonio. Permits & Licenses. Development Services Manager. Deputy Historic Preservation Officer

MULTI-FAMILY, COMMERCIAL, INDUSTRIAL, AS GOVERNED BY THE BC BUILDING CODE PART 3

Design Development Quality Management Phase Checklist Project Phase Checklist Series

Occupancy: Assembly (A-3) and Business -Includes offices, seminar rooms, classrooms, and café facility. Duke University Medical School

TOWN OF SURFSIDE UTILITY UPGRADE PROJECT Project Completion

Block A-24 REDEVELOPMENT PLAN

NECESSITY OF SCHOOL CONSTRUCTION STAGE III DESIGN REVIEWS

REQUEST FOR PROPOSALS BUILDING ENVELOPE, LIGHTING, & HVAC TESTING/RESTORATION SERVICES

Single Family Residential Building Permit Questions & Answers

CITY OF YORBA LINDA P.O. BOX CALIFORNIA

Policy on Repair and Renovation Funding

EXHIBIT "A" RESPONSIBILITIES AND SERVICES OF ARCHITECT TABLE OF CONTENTS

CITY OF SURREY BY-LAW NO. 6569

DIVISION OF FACILITIES AND CONSTRUCTION MANAGEMENT ARCHITECTURAL/ENGINEER FEES EFFECTIVE DATE: July 13, 2015

Request for Proposals Facility Condition Audits

MEASURE G-2010 EXHIBIT B FULL TEXT BALLOT PROPOSITION OF THE SAN JOSE EVERGREEN COMMUNITY COLLEGE DISTRICT BOND MEASURE ELECTION NOVEMBER 2, 2010

Civil Engineering and Architecture (CEA) Detailed Outline

Lindsay Thurber Comprehensive High School Red Deer School District No. 104 School Facilities Evaluation Project Page 1

Building, Plumbing, Electrical and Residential Water and Sewer Inspection Requirements

Section I - General. Page 1 of 5

CITY OF FERNDALE EAGLE Checklist

C.A.S.H. WORKSHOP Back to Basics Series Part 1: Planning Your Building Program

SMOKE TESTING PERFORMANCE SPECIFICATION GUIDELINE FOR SANITARY SEWER. December, 2010

ORDINANCE NO. 511 ORDINANCE ESTABLISHING A COST REIMBURSEMENT PROGRAM FOR THE INSTALLATION OF OVERHEAD SEWERS OR BACKFLOW PREVENTION DEVICES

Moving a House in Pasadena

Does Wall Township require an inspection by the building department on resale of a home?

Post Occupancy Evaluation (POE) Technical Instructions

STATE OF SOUTH CAROLINA RESIDENTIAL PROPERTY CONDITION DISCLOSURE STATEMENT

Knock Down Rebuild. Building Process Building process - knock down rebuild 1

GUIDELINES FOR NEW HOME BUILDERS AND RENOVATORS TO ASSIST THEM IN MEETING REALISTIC BUYER EXPECTATIONS. Canadian Home Builders Association

The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE

REQUEST FOR PROPOSAL FOR PROFESSIONAL SERVICES (PS-0748-A) Appendix 1 Project Information. PS-0748-A Page 1 5/4/2016 Appendix 1

3Dcities INDIA. Architecture and Engineering Outsourcing Company since 1999

BUILDING MOVE PROCESS INSIDE CITY LIMITS

REQUEST FOR PROPOSAL MECHANICAL, ELECTRICAL, PLUMBING ENGINEERING SERVICES VARIOUS BUILDING RENOVATIONS AND NEW CONSTRUCTION

Construction Technologies Career Field Pathways and Course Structure

Capital Expenditure. The common definition of capital expenditure is

Property Condition Assessment

Request for Proposal East Tower Nursing Unit and Infrastructure Upgrade Grossmont Hospital

REQUEST FOR QUALIFICATIONS RFQ NO

May 5, Client Client Address. Re: Inspection Address, Chicago, Illinois. Dear Mr. Client,

ARCHITECTURAL AND PLANNING SERVICES Church Related Facilities

ORDINANCE NO. 15 BE IT ORDAINED BY THE COUNCIL OF KANSAS CITY:

NEW HOME CONSTRUCTION

PENNSYLVANIA HOUSING FINANCE AGENCY (2015 UNDERWRITING APPLICATION) Tab 34 Physical/Capital Needs Assessment & Energy Audit

RESPONSIBILITY FOR REPAIRS AND MAINTENANCE FAIR FUNDING: April 2002

City of La Vernia 102 E. Chihuahua Street, La Vernia, Texas Phone: (830) Fax: (830)

Request for Proposal for Architectural Services Scope of Work and Design Documents for

City of Edgewood REQUEST FOR QUALIFICATIONS 2016 ON-CALL CONSULTANT SERVICES

Overview of Land Construction Courses at Kansas State University

Hard copies should be sent to: The Denver Waldorf School Attn: Lori Pucelik 940 Fillmore St Denver, CO 80206

Professional Services for Construction Projects and Land Surveys

Chapter 5. Architectural Analysis GENERAL. 5.1 Qualifications, Responsibilities, and Approval of Lender s Representative. A.

THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION

Development Services Guidelines

SECTION REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

MURCH ELEMENTARY SCHOOL

Physical Address/Intersection: Name of Project: Within a NFIP 100/500yr Floodzone:

Steve Brinkman Alain Pinel Realtors 167 S San Antonio Road Los Altos, CA RE: Foundation Inspection for 162 Del Monte Ave. Los Altos, CA 94022

Print Shop/Mail Room

REQUEST FOR QUALIFICATIONS (RFQ) FOR PROFESSIONAL ARCHITECTURAL/ENGINEERING AND CONSULTING SERVICES FOR Fiscal Years

RESIDENTIAL PROPERTY DISCLOSURE FORM

South Carolina Home Inspector Standards of Practice

Name: Date: P.O. Box 2449, San Antonio, Texas (210) Number of Taps

Transcription:

Exhibit A SCOPE OF WORK Consulting Services for City of Durham Swimming Pool Facilities Assessment Study Basic Services for this project shall include the following services: A Planning Study to assess current conditions at the five City Swimming Pools and at the four City Spraygrounds. The Study will identify and prioritize mechanical, plumbing, electrical, structural, accessibility and energy efficiency deficiencies at each facility and will include an analysis of current conditions and recommendations for improvements. A cost model of recommended repairs and improvements will be included in the Study. The City Swimming Pool/Sprayground facilities included in the Study are: 1) Hillside Pool and sprayground, 1221 Sawyer Street 2) Long Meadow Pool, 917 Liberty Street 3) Forest Hills Pool and sprayground, 1639 University Drive 4) Campus Hills Aquatic Center, 2000 South Alston Avenue 5) Edison Johnson Recreation and Aquatic Center and sprayground, 500 W. Murray Ave. 6) East End Park sprayground, 1200 North Alston Ave. I. DELIVERABLES: 1. Investigation and Analysis: A. The consulting team will meet with City staff and provide on-site inspections and documentation of findings at each of the facilities listed above. The team will investigate the programmatic and mechanical integrity of existing equipment, and identify those that are substandard and. Existing conditions of the following Pool/Sprayground components will be included: General Pool/Sprayground structure and finishes Pool/Sprayground system piping, fittings, valves, gutter systems, pumps, sand filters and electrical components Structural condition of pool shell(s). Mechanical and overflow recovery systems Water chemistry treatment system Pool water heating Pump, flow meters, gauges, and controls Deck equipment Building mechanical systems at indoor pools 1

Pool building envelope including foundations, windows, doors, roof, overhead lighting, interior finishes and other fixed equipment. Building inspections will be based on visual observation from existing floors, platforms or access hatches and will not include destructive testing. Current health code, building code and accessibility code compliance issues B. Meet with City staff to review preliminary findings. 2. Assessment of Findings: A. Assessment and commentary on existing conditions, including: A database summary of each major component/equipment item, its age, condition, recommended repair/replacement, probable cost of repair/replacement, remaining useful life, manufacturer, model, and any other nameplate data if marked. A database summary of the age, materials of construction, condition, recommended repair/replacement, probable cost of repair/replacement,and remaining useful life for the building shell and building systems. Digital photographs of components and major equipment items to show distinguishing characteristics and visible defects. General commentary on support spaces including the bather preparation area and equipment areas. A priority ranking for each deficiency identified based on the City s ranking system: o Priority 1 Public Safety/Code Compliance/ADA Compliance: Ensures public safety and compliance with codes. o Priority 2 Deferred Maintenance/Aging Systems: Systems and equipment in danger of failure that could impact facility operation. o Priority 3 Building and System Upgrades to Improve Operations: Work that would improve facility operations, energy efficiency, and effectiveness: may result in reduced operational costs. o Priority 4 Exterior and Interior Refurbishment: General aesthetic improvements. o Priority 5 Functional Changes: Changes in how the facility is used. Opinion of probable construction costs for repair/replacement of all deficiencies identified along with the various options for repair/replacement detailed. B. Meet with City staff to review preliminary findings and to confirm that the scope has been met. 3. Study Documentation A. Prepare a rough draft Study document for Client review. 2

B. Revise Study document draft based on Client comments and resubmit. C. Incorporate final Client comments. C. Submit final draft of the Study (three hard copies and in digital format). D. Assist Client with a presentation of the finalized Study to City Council. Additional Services not included in the Basic Scope of Services, which can be performed at the direction of the Owner: Geotechnical testing and analysis at the site Determining water table elevations at the site Locating aquifers at the site Investigation of bonding and grounding of the pools Assistance in negotiating for land and easement rights Site Plan submittals Rezoning or Special Use Permits Construction documents Design of storm water detention/treatment measures or ponds Traffic Impact Analysis Permit Application Fees, Site Plan Fees, Re-review Fees Design of any on-site sewage lift / pump stations or off-site water and sewer improvements Boundary or topographic surveying Downstream Analysis of existing storm drainage system if required Administrative costs to obtain a high performance rating, such as LEED Architectural renderings or models II. PRELIMINARY PROJECT DESIGN SCHEDULE SUMMARY The following projected schedule includes City review periods required to complete the work. The major project milestones include the following: Milestone Investigation and Analysis Phase Assessment of Findings Phase Study Documentation Phase Duration 5 weeks 6 weeks 9 weeks Note: Because the duration of some phases may overlap others, the above is not a strictly linear schedule. The estimated duration of the project is 20 weeks. This is a preliminary 3

schedule and will be updated by the architect at the beginning of the project and at the beginning of each Phase. III. COMPENSATION Compensation for Basic Services outlined in the above Scope of Work will be provided for the stipulated sums listed below: Compensation will be according to the following schedule: Phase Percentage Base Contract Amount Not to Exceed Allowance Amount 1. Site Investigation and Analysis 25% $16,980 Phase Civil Engineering Investigation 3% $2,000 Allowance Pool Component Testing Allowance* 22% $15,000 2. Assessment Phase 25% $16,980 -Includes Scope of Work Prioritization and Opinion of Probable Cost 3. Study Documentation Phase 25% $16,980 Total Basic Compensation 75% $50,940 Total Not to Exceed Allowances 25% $17,000 Total Contract Value 100% $67,940 *Note: The Testing Allowance is to be utilized for destructive and/or non-destructive tests recommended by the consultant for the determination of physical deficiencies. Such tests may include but are not limited to the following: concrete coring of pool shell and testing, remote camera operation for identifying underground pipe conditions, and pressure testing piping for water leaks. IV. CONSULTANT HOURLY RATES Additional Services shall require an amendment to the contract and shall be billed on a not-toexceed basis, in accordance with the hourly rates set forth in this Section. Additional services shall not be performed by the Architect without express prior approval from the Owner. The use of Allowances must be based on the hourly rates set forth in this Section and require prior written approval from the Owner. 4

IV. CONSULTANT HOURLY RATES Architect: Szostak Design Managing Principal Project Manager Architect / Designer Design Technician Administrative $160.00/Hour $140.00/Hour $120.00/Hour $70.00/Hour $55.00/Hour MEP Subconsultant: Sigma Principal Professional Engineer Intern Engineer Senior Designer Designer Drafter Administrative $175.00/Hour $125.00/Hour $110.00/Hour $105.00/Hour $90.00/Hour $65.00/Hour $45.00/Hour Pool Facility Subconsultant: Counsilman-Hunsaker Principal/Studio Director Project Manager Project Engineer/Architect Design Associate Administrative $160.00/hour $135.00/hour $110.00/hour $90.00/hour $55.00/hour Structural Engineering Subconsultant: Mulkey Engineers and Consultants Principal in Charge: Valoree Eikinas, PE Project Engineer: Brent Blackburn, PE Project Engineer: Adam Rowland, PE Administrative: Erin Pugh $175/hr $105/hr $105/hr $65/hr Civil Engineering Subconsultant: Stewart Administrative $50.00 Civil Designer $75.00 Civil Designer II $85.00 Civil Designer III $95.00 Land Planning & Design CAD Technician I $65.00 Land Planning & Design CAD Technician II $75.00 Land Planning & Design CAD Technician III $85.00 Civil Engineering Intern $85.00 Civil Project Engineer $100.00 5

Civil Project Engineer II $110.00 Civil Senior Project Engineer $125.00 Planner $85.00 Planner II $100.00 Senior Planner $110.00 Landscape Designer $80.00 Landscape Designer II $90.00 Landscape Architect $100.00 Landscape Architect II $110.00 Senior Landscape Architect $125.00 Land Planning & Design Project Manager $125.00 Land Planning & Design Senior PM $130.00 Manager of Landscape Architecture $130.00 Manager of Civil Engineering $130.00 Manager of Pre-Development Services $130.00 Manager of Land Planning & Design $140.00 Director of the Planning Studio $150.00 Director of the Design Studio $150.00 6