TD AMERITRADE Park Omaha



Similar documents
REQUEST FOR BOARD ACTION HENDERSON COUNTY BOARD OF COMMISSIONERS. ATTACHMENTS: 1. Construction Management Update

KIEWIT CM/GC Enabling/Utilities

Exhibit C: Scope of Work and Schedule of Deliverables

WOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME

Certification: Building Plans Examiner. Exam ID: B3

MONTHLY PROJECT CONSTRUCTION PROGRESS REPORT #5

C-2 Construction, Inc. - NAICS Codes

SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

Repair and Remodeling Estimating Methods. 4th Edition. RSMeans

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT

RESIDENTIAL COURSE OF CONSTRUCTION QUESTIONNAIRE

MONTHLY MONITORING REPORT. World Trade Center Port Authority Trans-Hudson Terminal PORT AUTHORITY OF NEW YORK AND NEW JERSEY New York, New York

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.

FORENSIC INVESTIGATION QUESTIONNAIRE

Materials. Estimating Steel. Players. Materials. Shop Drawings. Detailing Process. Standard shapes. Fabricated members, Built-up sections

Think Of Us First! When It s Time to Distribute Your Plans

SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST

NATIONAL INSTITUTE OF GOVERNMENT PURCHASING (NIGP) DESIGN AND CONSTRUCTION CODES

EXAM GUIDE. Construction Documents & Services

Seattle Public Schools Building Excellence IV Projects Under Construction

REQUIREMENTS FOR SUBMITTING PLANS FOR NEW CONSTRUCTION

SECTION TABLE OF CONTENTS. H Proposed Material, Product or Equipment Substitution Request

Construction Technologies Career Field Pathways and Course Structure

CONSTRUCTION LAW. Mechanical Roofing Contractor. Electrical Class A Air Conditioning. Contractor Class B Air Conditioning

Pumphouse Museum at the Historic Ottawa Beach Parks Park Township

Veterans Memorial Coliseum Options Study Appendix A - Deconstruction Scope of Work and Cost Estimate August 31, 2015

Finding of No Significant Impact

COMPANY ESTIMATOR BID DAY PHONE NO.

CAPITAL PROGRAM SERVICES Capital Improvement Program

CONTRACTOR S SUPPLEMENTAL APPLICATION General Contractor/Artisan Contractor) (Include Acord Application)

NORWALK LA MIRADA UNIFIED SCHOOL DISTRICT Measure S Program Construction Management Progress Report For Citizens Oversight Committee Fall Quarter 2008

Tennessee 07/01/14. Contracting Class Codes with Descriptions (8)

CITY OF YORBA LINDA P.O. BOX CALIFORNIA

REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N

Using Construction Manager at Risk to Save Time and Money Laura McCluskey University Center Sioux Falls / South Dakota Board of Regents

32284 ADOPTED BOARD OF TRUSTEES COMMUNITY COLLEGE DISTRICT NO. 508 MAY 1, 2014

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS

Case Studies. Disaster Recovery Restoration Remediation Decontamination

The work has continued on final Phase 4 and is nearing completion.

BMIC S APPETITE GUIDE EFFECTIVE JUNE 2013

DUDERSTADT FOUNDATION & CONSTRUCTION, LLC.

Construction Management Thesis Requirements: Fall 2008 Department of Architectural Engineering

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

Estimating Database Checklist

VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10

Special Use Commercial Properties

Single Family Residential Building Permit Questions & Answers

RICHARD B. HUDGENS ARCHITECT, INC.AIA

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components

CAREER LYNX Constructing Careers in Architecture

COMMON FOR ARCHITECTS AND ENGINEERS Excerpts from HB 2284, 82 nd R

UNIVERSITY OF CALIFORNIA - INSURANCE REQUIREMENTS FOR CONSTRUCTION-RELATED CONTRACTS / SERVICE AGREEMENTS

Analysis II Façade Redesign: Architectural Precast Panels

C I T Y O F P E A R S A L L

DESIGNERS GUIDE TO DOMESTIC CONSERVATORIES

Building, Plumbing, Electrical and Residential Water and Sewer Inspection Requirements

INDUSTRIALS COLD STORAGE FACILITIES

Revised Work Scope Dated April 23 rd, 2015

OPEN ITEMS LIST - CONSTRUCTION Project Name: East Central Middle School - Jackson County CLA#: 11003

TAX APPRAISAL DISTRICT OF BELL COUNTY STORES & COMMERCIAL IMPROVEMENT CLASSIFICATION GUIDE

Saint Cloud Business Center

Design Development Quality Management Phase Checklist Project Phase Checklist Series

SECTION STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

COLUMN-FREE OFFICE SPACE RISES IN CHICAGO S LOOP

Building Condition Assessment: West Lexington Street Baltimore, Maryland

CONSTRUCTION PROGRESS DOCUMENTATION (SCHEDULING)

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

Best Practices for Managing Industrial Property Maintenance

ISSUING AGENCY: New Mexico Public Regulation Commission, Insurance Division. [7-1-97; NMAC Rn & A, 13 NMAC 17.6.

LIVE BETTER. LIVE GREEN.

SUCF PROJECT COST REPORTING GUIDE

TRANSBAY JOINT POWERS AUTHORITY

SECTION REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

Texas Deparmtment of Housing and Community Affairs Community Development Block Grant (CDBG)

Slavic Village Building Condition Review

Technical Assignment 2

Residential Prototype III. Multi-Story. The Multi-Story. Your connection to ideas + answers. Prepared by: AISC Steel Solutions Center

Required Certification Documentation. Contractor's installation certification for range hood fire suppression systems.

Lincoln Public Schools. 15 Attachments (separately bound) Schematic Design Schematic Design Project Manual

CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES

NOTE: Unless otherwise specified, unit prices for the demolition of structures shall be for wet demolitions.

NAHB PRODUCT DEFINITION

OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY

D Sample Notices to Property Owners, Sample Affidavits, and Other Material

CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING DEPARTMENT SUBSTATION & EQUIPMENT SECTION

Chaudière Crossing Bridge Rehabilitation

Opening Day crowds lined streets at The Banks before, during and after the game.

Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule

REQUEST FOR PROPOSALS FOR: THE PURCHASE AND RENOVATION OF ADJOINING PROPERTIES AT 200/240 SOUTH 16 TH STREET ORD, NEBRASKA BY:

LITITZ MUTUAL INSURANCE COMPANY 2 North Broad Street Lititz, Pennsylvania - MAIN OFFICE -

Occupancy: Assembly (A-3) and Business -Includes offices, seminar rooms, classrooms, and café facility. Duke University Medical School

NEW YORK CONTRACTORS SUPPLEMENTAL APPLICATION (Excluding Residential Contractors)

Technical Assignment 1: Construction Project Management

FDOT DBE CERTIFICATION NAICS CODE GUIDE WITH CAP SIZES

How To Install An Overhead Sewer

REQUEST FOR QUALIFICATIONS FROM FOUNDATION REPAIR CONTRACTORS BROOMFIELD DEPOT FOUNDATION REHABILITATION PROJECT

Inspecting to a higher standard.

COMMERCIAL PLAN SUBMISSION FOR NEW CONSTRUCTION AND/OR RENOVATIONS

A Homeowner s Guide to Building Permits

Transcription:

TD AMERITRADE Park Omaha November 19, 2009 Report No. 6 MONTHLY CONSTRUCTION PROGRESS REPORT METROPOLITAN ENTERTAINMENT & CONVENTION AUTHORITY

MONTHLY CONSTRUCTION PROGRESS REPORT Metropolitan Entertainment & Convention Authority Omaha, Nebraska November 2009 Report No. 6 MECA Board Members Gail Werner-Robertson David Kramer Jennifer Mahlendorf David Sokol Jim Vokal

MONTHLY CONSTRUCTION PROGRESS REPORT Metropolitan Entertainment & Convention Authority Omaha, Nebraska November 2009 Report No. 6 TABLE OF CONTENTS Construction Progress Summary... 1-3 Site and Building Photographs... 4-5 Project Schedule... 6-7 Project Cost Summary... 8

CONSTRUCTION PROGRESS

CONSTRUCTION PROGRESS SUMMARY DESIGN SUMMARY Owner, Architect, and Construction Manager (OAC) meetings continue to be held every week to discuss safety, schedules, weather, budget, submittals, and other current issues. Executive meetings, which include the Project Team Leaders from MECA, HDR and Kiewit Building Group, continue weekly to discuss topics such as the budget, contractual situations, schedules and other high level issues that require executive decisions. The Design Advisory Committee (DAC) consists of representatives from the City of Omaha, CWS, Inc., MECA, Heritage Services, Creighton University and the NCAA. Quarterly meetings are held to provide the committee with an update of the stadium design. The design process is complete. Several major building systems have been bid or are in the process of bidding, including Structural, Mechanical, Electrical, Plumbing, Elevators and Seating. Final exterior and interior design packages have been completed and reviewed by the Design Team. Design detailing has been completed. The design has several alternates identified which may be implemented as the budget allows. Particular design items that have been completed include security systems, audio visual systems, signage, field specialties and landscaping. These bid packages will be prepared and sent to bidders. The video package will be delayed to achieve the optimum timing to allow for new technology and favorable pricing. Ongoing coordination with ESPN representatives continues regarding the broadcast system design with input from the NCAA and CWS, Inc. All aspects of the system are being evaluated by the Design Team to provide reasonable accommodations of their needs. The Design Team continues to review opportunities to promote energy efficiency and provide sustainable design features. Meetings with the Environmental Protection Agency and the Nebraska Department of Environmental Quality have been informative to evaluate programs which will assist in recycling efforts and energy efficient stadium operations. The Design Team has met with City of Omaha Building code officials and City of Omaha Fire Department staff on multiple occasions to discuss code related items and life safety aspects of the stadium. Fire alarm and smoke evacuation design systems have been completed. Coordination continues with City of Omaha officials including the Public Works Department, the Planning Department and the Plumbing Board. Construction Progress 1

CONSTRUCTION PROGRESS SUMMARY CONSTRUCTION SUMMARY Kiewit Building Group has office trailers on the construction site. MECA has offices in one of the on-site trailers and there is an additional general area available for subcontractors on a periodic short-term basis. Kiewit is coordinating construction traffic with MECA s event schedule to limit the affect on traffic flow to and from Qwest Center Omaha. Bids have been issued and received for Structural Steel, Construction Support Services (cranes, bobcats, material hoists, general clean-up, etc.,) Elevators, Shallow Foundations, MSE Walls, Fixed Seating, Relocation and Interior Redesign of the Parking Control Center, Mechanical, Electrical, Site Utilities, Fire Sprinkler, Concrete, Interior and Exterior Masonry, Drywall, Fireproofing, and Curtainwall (glass exterior walls). There are 17 bid packages yet to be distributed for the project and several of those bid packages will be ready for distribution in the near future. Bid packages were issued for Roofing and Painting in October and proposals are expected shortly. The response from bidders has been very good for the packages that have been awarded and/or are out for bid. The Perimeter Drainage work started in early August. This drainage system will help drain the site so that work can continue after heavy rains. Because construction is ongoing, the perimeter drainage work is being installed as areas become available throughout the site. Currently this drainage system is being installed along the east side of 13th Street. Structural Steel erection started August 11, 2009, which is in line with the timeframe identified in the overall project schedule. Steel Erection is progressing well. Four of the light towers were erected with the finish paint color. Portions of the canopy were installed with the finish paint color (applied in the shop) in areas that would be a challenge to access once the steel is set in place. The Structural Steel installation is anticipated to be completed in the Spring of 2010, however a majority of the large steel members will be installed within the next few weeks. Concrete on the metal floor deck has been placed behind home plate on all levels. This work will continue down the baselines with the work between the foul lines to be completed this winter. Because the main concourse is a split slab, the first slab that has been placed is the base slab The placement of the final slab (top slab) is scheduled to begin in the Spring of 2010. The concrete work at the street level (service level) started behind home plate and will continue through the winter. The Mechanical, Electrical and Plumbing rough-ins are progressing ahead of the concrete pour schedule. This allows the concrete contractor flexibility to pour these areas sooner than scheduled depending on weather conditions. Construction Progress 2

CONSTRUCTION PROGRESS SUMMARY CONSTRUCTION SUMMARY The Project Team visited the concrete precast plant a second time to continue the inspection process. The quality of the concrete slabs as well as the finish was reviewed for areas which will be in public view. The expectations were printed out and identified on areas of seating units that had already been poured so that the quality level was understood and repeated on the remaining seating units. We are anticipating beginning the installation of these panels prior to the scheduled start date. The exterior block work began in October. This work is being installed in all areas available so that the contractor can complete as much of the work as possible in the least extreme weather conditions. This work is scheduled to progress throughout the winter months. The exterior brick and interior block work will begin in November. We anticipate starting this work as soon as areas are available so that the contractor can complete as much of the work as possible in the least extreme weather conditions. This work is scheduled to progress throughout the winter months. The less than extreme weather conditions have allowed the construction team to take advantage of as many nice weather days as possible. Kiewit and the designers are actively receiving shop drawings for Structural Steel, Mechanical, Electrical, Plumbing and concrete. Exterior enclosure shop drawings including masonry, fireproofing, drywall and curtainwall are expected to be submitted by the subcontractors in the next six weeks. These drawings will be reviewed to ensure they comply with the intent of the design and will be modified as necessary. Construction Progress 3

SITE & BUILDING PHOTOGRAPHS

Stadium steel from Centerfield Steel framing for Administration Office along Webster Street Outfield concrete block wall Light tower construction Electrical conduit work on the Street Level Field access tunnel for players 4

General Admission ramp concrete wall View of Main Concourse along 3rd base line Concrete placement on the Suite/Club Level Concrete precast seating units for Club Seats Two story Club Level area Canopy roof above Suites and Club Seating 5

PROJECT SCHEDULE

PROJECT SCHEDULE SUMMARY SUMMARY OF CURRENT CONSTRUCTION ACTIVITY TARGET START TARGET COMPLETION TASK DESCRIPTION Miscellaneous Scheduled Items 3/09 City of Omaha to add temporary traffic light poles and remove existing poles; Move existing traffic light controllers to new locations; Abandon and remove utilities within 12th Street between Cuming and Webster so that it can be vacated 1/10 MECA to work with Union Pacific to remove and relocate the railroad crossing controllers Design Package Schedule 7/08 11/08 Schematic Design Documents developed and incorporated into GMP Manual 11/08 01/09 Design Development Documents delivered to Project Team 1/09 Varies Construction Documents and Bid Packages developed and distributed to Project Team for review prior to final development of various specialty Bid Packages Bid Package Schedule 2/09 Bid 3/09 Elevator Bid Package 2/09 Bid 3/09 Construction Support Services Bid Package 3/09 Bid 3/09 Shallow Foundations Bid Package 4/09 Bid 4/09 Structural Steel Bid Package 3/09 Bid 4/09 MSE Walls Bid Package 4/09 Bid 5/09 Fixed Seating and Bleachers Bid Package 4/09 Bid 6/09 Mechanical/Plumbing Bid Package 4/09 Bid 6/09 Electrical Bid Package 5/09 Bid 5/09 Parking Control Building Interior Construction Bid Package 6/09 Bid 7/09 Precast Bid Package 7/09 Bid 8/09 Masonry Bid Package 7/09 Bid 8/09 Concrete Bid Package 7/09 Bid 8/09 Fire Sprinkler Bid Package 7/09 Bid 9/15 Curtainwall 7/09 Bid 9/15 Drywall and Fireproofing 10/09 Bid 11/3 Roofing 10/09 Bid 11/3 Painting Construction Progress 6

PROJECT SCHEDULE SUMMARY SUMMARY OF CURRENT CONSTRUCTION ACTIVITY TARGET START TARGET COMPLETION Construction Schedule TASK DESCRIPTION 12/08 Notice to Proceed to Kiewit Building Group 2/09 4/09 Completion of Piling 3/09 7/09 Slabs on Grade Surcharge Installation and Removal 3/09 9/09 Parking Control Building Relocation and Interior Redesign 6/09 1/10 Shallow Foundations-Main Building Structure 6/09 11/09 MSE Walls - Outfield 6/09 12/09 Placement and Removal of Surcharge 8/09 3/10 Steel Erection 8/09 TBD Perimeter Drainage System (Install areas as they become available) 8/09 2/10 Infield Mechanical/Electrical Underground Utilities 10/09 2/10 Concrete on Metal Deck (non-outfield) (Concourse, Suite/Club, and Press Levels) 10/09 2/10 Concrete Slab on Grade (non-outfield) (Street Level) 11/09 8/10 Masonry (Brick and Block) 1/10 2/10 Precast Seating Tubs/Risers 8/10 11/10 Field Installation 4/11 Substantial Completion of TD AMERITRADE Park Omaha Construction Progress 7

PROJECT COST SUMMARY

PROJECT COST SUMMARY BUDGET An estimate was prepared by Kiewit from the Schematic and Design Development documents. As with most construction projects, costs were identified and Value Management items were developed. This process that the entire Project Team is involved in will ensure that the facility is constructed with quality materials while providing the most flexibility and the latest in technologies as reasonably possible. The entire team is currently evaluating options to ensure the project is delivered within the designated budget. As with other construction projects of this magnitude using this Fast Track process, new items that are required for the building to function are being realized, priced and evaluated. The team is researching other opportunities to reconcile the overall GMP. ARCHITECTURAL AND ENGINEERING MANAGEMENT HDR Architecture, Inc. has requested $6,501,164.85 for work completed through October 2009. This represents a little over 90% of their design work. The architectural fee represents the following design packages: Schematic Design and Validation of GMP Manual Design Development Phase Construction Document Phase Construction Administration Phase Services CONSTRUCTION AND CONSTRUCTION MANAGEMENT Kiewit Building Group has billed $16,773,888 ($18,211,023 less $1,437,135 retainage) for work completed through the end of September 2009, representing 20% completion. ALLOWANCES Within Kiewit s GMP there are contractual allowances for multiple items including: Parking Control Center Relocation Site Lighting Stadium Field Lighting Subsurface Water Barrier Drainage Landscaping Natural Grass Playing Field PA/Sound System CONTINGENCY Nothing to report Construction Progress 8