Energy and. Resources



Similar documents
2 Integrated planning. Chapter 2. Integrated Planning. 2.4 State highway categorisation and integrated planning

Pedestrian Safety in Strip Shopping Centres

Major & State Significant Projects Committee. East West Link Consolidated Business Case SUBMISSION PROPOSAL

Department of State Development, Infrastructure and Planning. State Planning Policy state interest guideline. State transport infrastructure

Lawson Outline Plan External Traffic Analysis Working Paper

Traffic Control for Works on Roads Tasmanian Guide

Evaluation Criteria and Mode Progression for RouteAhead Rapid Transit Projects

Florida Transportation Commission: A Meeting of the Modes

DRAFT Freight Performance Measures

The Preservation of Local Truck Routes: A Primary Connection between Commerce and the Regional Freight Network

ATTACHMENT A: ARTC 2015 INLAND RAIL PROGRAMME BUSINESS CASE

Improving Access in Florida International University Biscayne Bay Campus Executive Summary

Alternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011

DEPARTMENT OF INFRASTRUCTURE AND REGIONAL DEVELOPMENT

TRANSPORTATION. Georgia s Strength in Transportation 4 TRANPORTATION SYSTEMS IN GEORGIA. Highways 2 Airport 3 Railroads 4 Ports 5. Inside this issue:

Major and Minor Schemes

Transportation Policy and Design Strategies. Freight Intensive. Level of Freight Presence

Submission IPART - Benchmark Costs for Local Council Infrastructure Contributions

Development of Shanghai Integrated Transport ( ) XIAO Hui and GU Yu

Professional transport planning, traffic engineering, transport economics and program management solutions

Executive Summary. Literature/Community Review. Traffic Flows and Projections. Final Report Truck Route System for Miami-Dade County CORRADINO

Australian Infrastructure Audit Infrastructure Australia GPO Box 5417 Via SUBMISSION: AUSTRALIAN INFRASTRUCTURE AUDIT

ROAD NETWORK ASSET MANAGEMENT AS A BUSINESS PROCESS. Paper prepared for the REAAA Conference in Japan, 4 9 September 2000

MAP 21 themes. Strengthens America s highway and public transportation systems. Supports the Department s aggressive safety agenda

RPA 14/ATURA Surface Transportation Program (STP) APPLICATION FOR FUNDS

4. Specification Traffic Management Consulting

Public Transport Vehicle Management System. Request for Information

INFRASTRUCTURE AUSTRALIA REFORM AND INVESTMENT FRAMEWORK TEMPLATES FOR USE BY PROPONENTS

Demand for Long Distance Travel

10 Aviation Element Introduction Purpose of Chapter

TH 23 Access Management Study Richmond to Paynesville

Energy consumption forecasts

We would be pleased to discuss these issues with you at your convenience.

Department of Transport and Main Roads Road Priorities in North Queensland Region

National Land Freight Strategy A place for freight

FTP/SIS/FMTP Regional Workshop - Tampa

Integrated Public Transport Service Planning Guidelines. Sydney Metropolitan Area

Truck Diversion Forecasts. DRAFT Executive Summary

IPENZ TRANSPORTATION GROUP CONFERENCE 2013 KEEP CHRISTCHURCH MOVING FORWARD CHRISTCHURCH TRANSPORT STRATEGIC PLAN

The Chicken or the Egg? Infrastructure provision and urban development: A transport perspective.

Melbourne Airport Rail Link Study. Study overview and findings

Ne w J e r s e y Tr a f f i c Co n g e s t i o n :

How To Develop A Balanced Transport System In Devon

Goals & Objectives. Chapter 9. Transportation

Construction Logistics Plan Guidance

East Midlands Intermodal Park, South Derbyshire Proposals for a Strategic Rail Freight Interchange

INDOT Long Range Plan

Greater Bunbury Strategy

BUSINESS STATISTICS SNAPSHOT UPDATE April 2015

Bruce Highway (Cooroy to Curra) Section A (Cooroy southern interchange to Sankeys Road)

CITY OF SUBIACO. PLANNING POLICY 1.4 (September 2013) PUBLIC NOTIFICATION OF PLANNING PROPOSALS

Traffic Management During Construction

Asia-Pacific Gateway and Corridor Transportation Infrastructure Fund. Applicant Guide

Bedford s Network Management Strategy ( ) November 2010

The City of Ekurhuleni (CoE) IRPTN. Towards a public transport network for a sustainable integrated socioeconomic

Comment #1: Provide an interchange at Route 7 and Farm Market Road/White Gate Road. This was studied in the late 1990 s.

Asset Management. Framework and Guidelines. Part 2 - Asset Management Guidelines for Western Australian Local Governments p1.

1 Welcome. The exhibition comprises a series of boards which provide some background information to show you our initial ideas for the site.

Infrastructure Requirements and Costs Update for Strategic Locations

REPORTS SUSTAINABILITY AND ENVIRONMENT 11 MAY 2015 ORDINARY COUNCIL MEETING OF COUNCIL

Thailand s Logistics

Audit Results by Transport Sector

Construction of a pedestrian footbridge between Chiswick Business Park and Bollo Lane/Colonial Drive.

4 Alternatives and Design Evolution

Philadelphia County. Land Use and Growth Management Profile

Connecticut s Bold Vision for a Transportation Future

Transport planning in the Stockholm Region

National Partnership Agreement to Deliver a Seamless National Economy (SNE NP) Report card prepared by the COAG Business Advisory Forum Taskforce

Chapter Forty-seven. RURAL TWO-LANE/MULTILANE STATE HIGHWAYS (New Construction/Reconstruction) BUREAU OF DESIGN AND ENVIRONMENT MANUAL

An airport for Western Sydney. Building Western Sydney s future

Examples of Transportation Plan Goals, Objectives and Performance Measures

ROADS ALLIANCE ASSET MANAGEMENT COMMUNIQUÉ AUGUST 2010 LOCAL GOVERNMENT ASSOCIATION OF QUEENSLAND LTD

Key Facts. Passenger growth at the airport is projected to grow to approximately 3 million passengers per annum by 2030.

770 TH Tseung Kwan O Development, Phase II, Grade Separated Interchange T1/P1/P2

Nashville Freight Model. Max Baker, Nashville MPO Rob Bostrom, WSA July 17, 2008 Tennessee MUG

Midlands Connect. Economic Impacts Study

Challenge Melbourne ISSUES IN METROPOLITAN PLANNING FOR THE 21ST CENTURY

Corridor Goals and Objectives

Evergreen Line Rapid Transit Project Business Case Executive Summary. February Reviewed by

Sydney Airport District

Review of Punt Road. Public Acquisition Overlay. Background Report

Transport Mobility Management: Small Changes - Big Impacts

Air Traffic Management Services Plan

Section 6 Traffic Analysis

1. REPORT CONTEXT Description of the development (include all of the following that are known at the time of the application):

Interim report: Review of the optimal approach to transition to the full NDIS

Some Text Here. Policy Overview. Regulation Impact Statement for Early Childhood Education and Care Quality Reforms. July 2009

Mayors Welcome Strong Surrey Votes Yes Coalition Support. Yes Vote Would Vastly Improve Transit and Transportation in Fast Growing City

3 Tappan Zee Bridge Rehabilitation Options

Transcription:

Tasmaniann Government 20122 Submission to Nation Buildin g 2 Program Domain Highway Planning (Part of Brooker Highway Upgrades submission to Infrastructure Australia) September 2012 Department of Infrastructure, Energy and Resources

Priority assigned by jurisdiction for NB2 funding consideration Details of full scope of project, including objectives, service requirements, project status and project phase(s) seeking funding. Priority three under Innovation Information on project objectives, strategic context and options analysis is discussed in the Stage 1-6 template. largely addressed through the main IA submission. However, the Department requires cost estimates to be provided using the Best Practice Cost Estimation Standard and at both P50 and P90. Also to use both 4% and 7% for BCRs. Alignment with objectives of NB2 Note: This should include how a project aligns with the overarching objective of NB2, as well as how it aligns with the objective of each relevant NB2 subprogram. The Domain Highway Planning project is submitted under the Innovation theme of Nation Building 2, and also aligns with Connecting People and Moving Freight themes. The Domain Highway is a key urban freight and passenger connection in Greater Hobart. The Highway has two major high-volume interchanges with the Brooker Highway and Tasman Highway. The Domain Highway Interchange with the Brooker Highway is one of two key capacity bottlenecks on the Highway. This project will develop detailed design options at the Domain Highway Interchange. Alignment with broader Commonwealth and state/territory policies and plans Note: Specific plans/policies to be addressed (at a minimum) include the Commonwealth s Infrastructure Investment Framework; the National Urban Policy; the National Ports and Land Freight Strategies; and the Australian Government commitment on the incorporation of ITS for major urban roads (as appropriate). Further details are contained under Goal Definition (Stage1-6 template). The project aligns with a number of Infrastructure Australia s strategic priorities, including: Increase Australia s productivity Developing Australia s cities and regions Improve social equity, and quality of life, in our cities and our regions The project aligns with the National Urban Policy s strategic initiatives of improving the efficiency of urban infrastructure (by improving safety, access and overall transport efficiency of the Domain Highway); and improving labour and capital productivity (by linking the Hobart s eastern and western suburbs, managing the key transport link between 1 P age

Overall financial exposure including identification of other partner funding Identification of key strategic risks to the project workforce supply and demand). The project aligns with the National Land Freight Strategy s priority action of freight infrastructure improvement and access by improving freight efficiency and reliability on a key urban freight connection. Further details are contained under Goal Definition (Stage1-6 template). The project is low-cost and considered lowrisk. Key strategic risks will be further considered in the project planning phase. addressed in the main IA submission Quantification of the expected benefits from the proposal Information regarding the extent to which the potential for private sector involvement or investment has been evaluated The benefits associated with this project are ongoing and relate to improved strategic planning, strategy development and investment decision-making. Funding models will be considered in the project planning phase. Likely impacts from the project proposal on citizens and the market Note: Detail is needed on how each proposal will impact citizens and the market (as two distinct groups) positively or negatively, and the extent of the impact Identification of key stakeholders in the project and the complexity of stakeholder relationships Extent of multijurisdictional and/or private sector involvement in the proposal Details of the level of innovation and information technology involved in the proposal, including in relation to information technology requirements to successfully manage/implement the Further details on the impacts are outlined in Problem Identification, Assessment and Analysis (Stage 1-6 template). Key stakeholders will be further identified in the project planning phase. No other jurisdictions or private sector entities are involved in developing this proposal. Potential ITS solutions will be considered in the project planning phase. 2 P age

proposal Note: Detail is to include identification of any new/untried methodologies or technologies to be used in the project, as well as IT requirements for the proponent agency to successfully manage or implement the proposal. Details of the proposed procurement methods for the proposal Level of complexity in construction, and any known issues in relation to the construction of the project, including environmental and heritage considerations Procurement in accordance with the Tasmanian Government s procurement guidelines. To be determined in the project planning phase. largely addressed through the main IA submission. However, the Department requires sufficient detail to fulfil its probity and accountability requirements, so any additional information not explicitly addressed in the main IA submission should be provided here. Any known issues in relation to contractual or service delivery obligations stemming from the proposal No contractual or service delivery issues are expected. Note: This is to include any issues that are not currently present but could reasonably be foreseen. Details of the proposed governance arrangements for the proposal To be determined in the project planning phase. Note: This should be largely addressed in the main IA submission. However, the Department requires an explicit statement about the experience of the management team in delivering similar proposals and whether there are any expected knowledge gaps or training needs to successfully implement the proposal. Details of the proposed delivery timetables and whether there are any known challenges to achieving those timeframes To be determined in the project planning phase. 3 P age

Details of any significant interdependencies for the project There are no significant interdependencies for this project. 4 P age

Proposal Summary Initiative Name: Location (State/Region(or City)/ Locality): Name of Proponent Entity: Contact (Name, Position, phone/e-mail): Domain Highway Interchange Planning Hobart, Southern Tasmania Tasmanian Department of Infrastructure, Energy and Resources (DIER) David Spence, General Manager Infrastructure Strategy Department of Infrastructure, Energy and Resources Tel: (03) 6233 2089 Email: david.spence@dier.tas.gov.au Executive summary The Domain Highway is a key urban freight and passenger connection in Greater Hobart. The Highway is part of the National Land Transport Network and is a Category 1 Trunk Road under the Tasmanian State Road Hierarchy. The Highway is a key link for freight and passengers moving between Glenorchy and Hobart s Eastern Shore, including between major industrial centres at Glenorchy and Cambridge; and to access Hobart International Airport. The Highway has two major high-volume interchanges with the Brooker Highway and Tasman Highway. The Domain Highway Interchange with the Brooker Highway is one of two key capacity bottlenecks on the Highway. There is insufficient capacity at the Interchange, with significant traffic queuing and delays on approaches to and from the Interchange. The Interchange itself has significant constraints. The Tasmanian Government is seeking $5 million to develop detailed design options at the Domain Highway Interchange. This will include review of upgrade options, development of a concept design, and geotechnical, environmental, planning and heritage investigations, to support identification of a final concept. Is this a new submission? Estimated cost of problems? Estimated Capital Cost of Initiative by Proponent ($M, nominal, undiscounted): Commonwealth contribution sought by Proponent ($M, nominal, undiscounted): Other funding (source/amount/cash flow) ($M, nominal, undiscounted): BCR by Proponent excluding Wider Economic Benefits Yes The strategic framework and transport system problems to which this project responds are outlined in the Overview document and within this submission. Detailed information on project costs and benefits, to the extent that they can be quantified, is contained in the Stage 7 template. $5M $5M N/A N/A Estimated program 2015-2016 5 P age

Goal Definition The goal of the project is to improve freight efficiency, safety and connectivity on the Domain Highway (Brooker Highway to Tasman Bridge). The Domain Highway is a key urban freight and passenger connection in Greater Hobart. The Highway is part of the National Land Transport Network and is a Category 1 Trunk Road under the Tasmanian State Road Hierarchy. The Highway is a key link for freight and passengers moving between Glenorchy and Hobart s Eastern Shore, including between major industrial centres at Glenorchy and Cambridge; and to access Hobart International Airport (see Map 1). The Tasmanian Government is proposing to upgrade the southbound off-ramp from the Brooker Highway onto the Domain Highway to improve safety and reduce queuing. Upgrade of the access onto the Lower Domain Highway to address safety and improve traffic flows is also identified as a priority on the Highway to improve safety and through traffic flows. Depending on the outcomes of the planning study, part of the funding may be used to upgrade this intersection. Positive contribution to Infrastructure Australia s strategic priorities The project aligns well with Infrastructure Australia s strategic objectives, including: Improving the efficiency of connections to major road and rail freight corridors to facilitate domestic trade and international exports the Domain Highway is a key link in Hobart s major urban freight corridor, which connects the Brighton Transport Hub, Glenorchy industrial centre and the Cambridge Industrial area. Positive contribution to Nation Building 2 s strategic priorities The project aligns with the following Nation Building 2 objectives: Moving Freight Planning for improvements to this key link will support improved freight efficiency for heavy vehicles. Connecting People Planning will assess opportunities to improve safety and access for passenger vehicles. Alignment with State/regional strategic plans Tasmanian Infrastructure Strategy The Tasmanian Infrastructure Strategy coordinates the major economic sectors of transport, water, energy and digital infrastructure. It provides an integrated, long-term framework to guide future infrastructure priorities and decision-making in Tasmania. Planning for improvements to the Domain Interchange is identified as a project under the transport theme of the Strategy. Southern Integrated Transport Plan The Southern Integrated Transport Plan released in 2010 - is a collaborative initiative between the Tasmanian Government, Southern Tasmanian Councils Authority, and twelve 6 P age

member councils. It provides a coordinated and strategic framework to recognise and address transport issues within the Southern Region over the next twenty years. The Domain Highway is identified as a key urban corridor in the Plan, with planning objectives focused on improving known infrastructure weaknesses, improving travel reliability and improving freight efficiency. Strategies include undertaking targeted infrastructure upgrades and ensuring an appropriate road standard to support heavy vehicles. Problem identification, assessment and analysis Strategic connections The Domain Highway forms part of the National Network and is a key urban freight and passenger link in Greater Hobart. It connects to the Brooker and Tasman Highway, both high-volume roads that play a critical role in Hobart s urban freight and passenger network. In 2009, the Highway carried just under 1 million tonnes of freight, and this is forecast to increase to over 1.5 million tonnes by 2030 (Map 1). Current AADT is around 25 000 vehicles per day. The Highway is the shortest and most direct route between established residential and industrial areas at Glenorchy and growing residential, commercial and industrial areas on Hobart s Eastern Shore. The Glenorchy industrial centre covers 455 hectares of industrial-zoned land north of central Hobart. It includes major industrial and manufacturing uses, and a broad range of freight generating industries, including light industrial activities, warehousing and distribution centres, and heavy industry. The importance of the Glenorchy area as an industrial centre is expected to continue over the long-term, reflecting the locational advantages of the area relative to transport networks and consumers, as well as the significant shortfall in available industrial land within the Greater Hobart region. Map 1 Location of Domain Highway in metropolitan network 7 P age

Over the past five years, there has been strong growth in industrial and commercial development in the Cambridge Industrial area (122 hectares) on Hobart s Eastern Shore. Compared to other metropolitan industrial centres in Hobart, the Cambridge area has some capacity for future expansion. The adjacent Hobart Airport has also identified future significant commercial development on airport land. This area will generate significant freight volumes in the future, which will require a good connection to industrial areas in northern suburbs and the Brighton Transport Hub, via the Domain Highway, Domain interchange and Brooker Highway. The Brooker Highway is one of Tasmania s highest tonnage freight corridors, with around 2.7 million tonnes of freight carried in 2012. Future growth will see volumes almost double by 2030. The section between Elwick and Domain incorporates all major local freight roads, connecting to major industrial areas either side of the Brooker Highway. Overall freight flows along the Brooker Highway are forecast to grow strongly in future, growing by nearly 2.5 times current flows by 2050. The strongest growth is expected on the section between the Elwick-Goodwood junction and the Domain interchange. Map 2 Forecast freight flows, Brooker-Domain freight route 8 P age

Road infrastructure The Domain Highway connects the Brooker Highway with the Tasman Highway (Tasman Bridge) via the eastern side of the Queens Domain. It has a single lane of traffic in each direction, and has a 70 km/h speed limit. Major grade-separated interchanges connect the highway to the Brooker Highway (west) and the Tasman Highway (east). In addition to through freight and passenger movements, the Highway facilitates access to the Botanical Gardens (via Lower Domain Highway), one of Tasmania s key tourism attractions, and to local suburbs at New Town via the Queens Walk. The Tasmanian Government has upgraded the right-turn access into the Queens Walk to improve safety and reduce queuing, however the turning arrangements into the Lower Domain Highway from both directions remain sub-optimal from a safety perspective, with broader impacts on traffic flows associated with queuing vehicles. Traffic modelling has identified the Domain Highway at the southern end of the Brooker Highway as the key intersection affecting broader corridor performance. Short exit and entry lanes create traffic banking, significantly impacting on network flows along the remainder of the Brooker Highway. The Domain Highway Interchange is a high volume intersection that experiences significant traffic queuing and delays on approaches to and from the Interchange. The Interchange itself has significant constraints, due to the surrounding topography and its proximity to surrounding residential areas. In its Nation Building 2 submission to Infrastructure Australia, the Tasmanian Government identified upgrade of the Elwick-Goodwood-Howard Road intersection together with planning for the future upgrade of the Doman Highway Interchange as key priorities for the Brooker Highway (Brooker Highway Upgrade Package). The benefit of these two projects to the Brooker Highway is shown below in terms of travel time benefits for all vehicle classes. The Tasmanian Government is seeking $5 million to develop detailed design options at this interchange under Nation Building 2. This will include review of upgrade options, development of a concept design, and geotechnical, environmental, planning and heritage investigations, to support identification of a final concept. 9 P age