Sewer System Improvement Program Update



Similar documents
SFPUC s Vision A Multi-Billion Dollar Investment To Secure The Health and Economic Stability of the City of San Francisco

Click to edit Master title style

Leveraging Resources for Financing, Implementing, and Sustaining Climate Change Adaptation and Resiliency

San Francisco s Urban Watershed Framework: A Decision Making Process to Support Multi-Benefit Wastewater and Stormwater Projects September 26, 2011

Bay Park Sewage Treatment Plant Super Storm Sandy Recovery

System Optimization: The First Step in CSO Control Alternatives Development

Kansas City s Overflow Control Program

Notice of Preparation of an Environmental Impact Report and Notice of Public Scoping Meeting

Making San Francisco A Water Sensitive City Urban Watershed Management Program October 25, 2011

Toronto s Wet Weather Flow Master Plan

San Francisco s Non-potable Water Programs

COMBINED SEWER OVERFLOW LONG-TERM CONTROL PLAN Executive Summary

The Donut Hole Sunset The San Francisco-Pacifica Exclusion Zone

Introduction to the Envision Sustainability Rating System

Capital Improvement Program Monthly Status Report for June 2014

Flood Mitigation Strategy for the Milwaukee 30 th Street Corridor Redevelopment Program

Stormwater Design Guidelines 2015 Proposed Regulatory Update Urban Watershed Management Program WWE October 2015

Asset Management Answering the 5 Core Questions

CLIMATE ADAPTATION AND MITIGATION AT DC WATER

Implementation of the New York City Wastewater Resiliency Plan: Opportunities And Lessons Learned

Proposed General Plan Update Goals, Policies, and Implementation Actions

Making San Francisco a Water Sensitive City. Sarah Minick SFPUC Urban Watershed Management Program June 2009

Fundamentals of Asset Management. Step 10. Build Asset Management Plan A Hands-On Approach

Facing The Challenges In Houston s Water System: Past, Present, and Future

Enterprise Data Historian for Water Operations - Part 2

City and County of San Francisco 2030 Sewer System Master Plan TASK 400 TECHNICAL MEMORANDUM NO. 405

HERE COMES THE RAIN AGAIN Stormwater Management in a Changing Climate at the City of Toronto

Civic Design Informational Review Building Design & Construction

How a Landscape Architect s Design Skills Can Effect New Solutions for Public Policy (Moddemeyer)

Stormwater Management and Multipurpose Infrastructure Networks

The City of Boulder 75 th Street Wastewater Treatment Facility

Historic Flood Impact on the Nashville Drinking Water System. Scott Potter, Director Metro Water Services, Nashville, TN

BEFORE THE PHILADELPHIA WATER, SEWER AND STORMWATER RATE BOARD DIRECT TESTIMONY OF STEPHEN J. FURTEK

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

Jeff Haby, P.E. Director Sewer System Improvements. September 15, Agenda

Altoona Water Authority. Infrastructure Overview

CASE STUDY. City of Grand Rapids Stormwater Asset Management Program. City of Grand Rapids. By the Numbers

INTRODUCTION TO THE ADAPTING TO RISING TIDES EXISTING CONDITIONS AND STRESSORS REPORT

Update on the Metro Nashville Consent Decree Program. Scott Potter Ron Taylor

Omaha Combined Sewer Overflow (CSO) Control Program

construction management Customized Approach, Global ExpErience, Innovative Delivery

The Clean Water Project What Is The Stormwater Impact?

City of Cape Coral, Florida FY Proposed Operating Budgets

Implementing Green Infrastructure in Atlanta

FISCAL YEAR CAPITAL IMPROVEMENT PLAN WASTEWATER TREATMENT FACILITIES

CITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet

Milwaukee Metropolitan Sewerage District STRATEGIC PLAN

Partnerships in Achieving Green Infrastructure Goals

Visual Integration of Compound Events. A presentation to the Climate Compact of Southeast Florida

Cambridge Wastewater Treatment Facility

City of Los Angeles Bureau of Sanitation Business Development Services

PROJECT NAME BACKGROUND STATUS

Green Spaces to Improve Waterways and Communities

TOWN OF SAUGEEN SHORES WATER AND SANITARY SEWER SERVICING MASTER PLAN 2014 REPORT

PUBLIC WORKS DEPARTMENT CITY OF PACIFIC GROVE 2100 Sunset Drive Pacific Grove, CA Telephone: (831) / Facsimile: (831)

5. Environmental Analysis

After the Flush. Safe disposal of our wastewater is a valued and complex, not-for-profit municipal service.

Natural Gas Wholesale Prices at PG&E Citygate as of November 7, 2006

Infrastructure investment has declined dramatically; community challenges continue:

EXISTING WASTEWATER TREATMENT FACILITIES

ORANGE COUNTY SANITIATION DISTRICT CAPITAL IMPROVEMENT PROGRAM PERFORMANCE REPORTS

City of Riverside WASTEWATER COLLECTION AND TREATMENT FACILITIES INTEGRATED MASTER PLAN

Newport News Virginia Beach

1.1 At its meeting on 11 December 2014, Council resolved to (9.3): 1.3 This report also seeks the Council s approval to:

TOWN OF SURFSIDE UTILITY UPGRADE PROJECT Project Completion

Chapter 8: Common Treatment Facilities, Programs, Operational Improvements and Policies for the Recommended Plan

Package Treatment Plant Policy and Procedure

Executive Summary Consent Decree

How To Improve Water Quality In East Pacificon

Triple Bottom Line Model Workshop Breakout Session. Thursday, February 6, 2014

Initiating the CCSF Lifelines Council. Interdependency Study

2007 Operating Budget Capital Budget 2007 Proposed Water and Wastewater Service Rate

AT&T Global Network Client for Windows Product Support Matrix January 29, 2015

Ann Arbor Wastewater Treatment Plant Facilities Renovations Project September 2015

Dulles Corridor Metrorail Project

Wastewater Treatment System Rehabilitation Project


SPU - DRAINAGE AND WASTEWATER

Flood Risk Management

Flood Risk Management

How To Recover From A Flood In Bundaberg

ELIMINATE STORM WATER FROM ENTERING SANITARY SEWER SYSTEMS

Climate Change. Lauma M. Jurkevics - DWR, Southern Region Senior Environmental Scientist

City of Richmond Department of Public Utilities

Town of New Castle Utility Department Introduction

SAN FRANCISCO GROUNDWATER SUPPLY PROJECT

CHAPTER 1 - EXECUTIVE SUMMARY

Viet Nam Da Nang Waste water management

Surviving the Storm Economic impacts of an acute flooding event in the Bay Area. Downtown San Anselmo New Years Flood

Incorporating the Triple Bottom Line (Sustainability) Into a WWTP Improvement/Relocation

Update on Program Management Services for Urban Water Management Plan Implementation. Department of Public Utilities

Stormwater management around the world Lessons from Novatech 2010 Dennis Corbett and Marion Urrutiaguer

BASSETT CREEK VALLEY MASTER PLAN OPEN HOUSE

This presentation premiered at WaterSmart Innovations. watersmartinnovations.com

DIRECTIONS IN DEVELOPMENT Environment and Sustainable Development. Building Urban Resilience. Principles, Tools, and Practice

Planning for Sustainability

Sewerage Management System for Reduction of River Pollution

Integrated Liquid Waste and Resource Management

Capital Improvement Plan City of Houston WASTEWATER TREATMENT FACILITIES

Transcription:

August 20, 2014 Sewer System Improvement Program Update Tommy T. Moala SFPUC Assistant General Manager, Wastewater Enterprise

Agenda 1. SF Sewer System 2. Our Challenges 3. Sewer System Improvement Program (SSIP) 4. Phase 1 Projects 5. Stakeholder Engagement 2

SAN FRANCISCO'S SEWER SYSTEM 3

Our Combined Sewer System North Point Wet Weather Facility Avg. DWF: 75mgd Total Wet Weather Cap.: 575mgd Avg. DWF: 0mgd Wet Weather Cap.: 150mgd Oceanside Treatment Plant Avg. DWF: 15mgd Wet Weather Cap.: 175mgd Southeast Treatment Plant Avg. DWF: 60mgd Wet Weather Cap.: 250mgd 100-year-old SEWER 4 SYSTEM system: IMPROVEMENT 1,000+ PROGRAM miles Grey. of pipes, Green. Clean. 4 treatment facilities and 27 pump stations 4

Our Combined Sewer System Transport/Storage Boxes: >200 MG Storage Capacity 5

OUR CHALLENGES 6

Aging Infrastructure Sinkhole 7 on Lake St. and 2 nd Ave. 7

Seismic Vulnerability & Lack of Redundancy Southeast Plant: Treats 80% of the City s flow is vulnerable to failure Channel Force Main: Failed in 89 earthquake 8

Effects of Climate Change King Tide at the Embarcadero 9

Localized Flooding Parking Lot @ Candlestick Park 10

Operational Needs Odor Control Enhanced Rainfall Forecasting Real Time Control System 11

ermit Evaluation & Future Regulations Ocean Beach Mission Creek Vicente CSD Structure Division CSD Structure

SEWER SYSTEM IMPROVEMENT PROGRAM 13

Sewer System Improvement Program (SSIP) Grey Green Clean SYSTEM& SEISMIC RELIABILITY& REDUNDANCY INNOVATIVE STORMWATER MANAGEMENT SOLUTIONS PROTECTING PUBLIC HEALTH & THE ENVIRONMENT 14

Levels of Service Goals Provide a Compliant, Reliable, Resilient, & Flexible System that Respond to Catastrophic Events Integrate Green & Grey Infrastructure to Manage Stormwater Provide Benefits to Impacted Communities Modify the System to Adapt to Climate Change Achieve Economic & Environmental Sustainability Maintain Ratepayer Affordability 15

Total Program Cost PHASE I 2012-2022 PHASE II 2012-2028 PHASE III 2012-2030 TOTAL Treatment Plants $2,047 $1,215 $407 $3,669 Collection System $412 $1,928 $476 $2,816 City & Consultant Program Management $125 $152 $43 $320 Land Acquisition $128 $128 TOTAL $2,712 $3,295 $926 $6,933 *All dollars in Millions 16

PHASE 1 PROJECTS 17

Sewer System Improvement Program: Phase 1 Projects $2.7B 18

Phase 1 Schedule 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Biosolids Digester Facilities Southeast Plant Oceanside Plant North Point Facility Reliability & Operational Green Infrastructure EIPs Central Bayside System Improvements Planning Design Construction Closeout 19

Phase 1: Collection System Upgrades North Shore Green Infrastructure Richmond Green Infrastructure Market Street Lake Street Drainage Improvements Improvements Channel Green Infrastructure Sunset Green Infrastructure Van Ness BRT Improvements CBSIP Improvements Islais Creek Green Infrastructure Yosemite Green Infrastructure Lake Merced Green Infrastructure Sunnydale Green Infrastructure 20

Urban Watershed Assessment September 2011 September 2015 CHARACTERIZATION TRIPLE BOTTOM LINE SEWER SYSTEM IMPROVEMENT PROGRAM Grey. ANALYSIS Green. Clean. PUBLIC OUTREACH 21

Early Implementation Projects (EIP) Budget: $57M Baker Beach Green Street Richmond Watershed June 2015 Sunset Blvd Greenway Sunset Watershed August 2015 Holloway Green Street Lake Merced Watershed July 2015 Chinatown Green Alleys North Shore Watershed December 2015 Wiggle Neighborhood Green Corridor Channel Watershed April 2014 Mission & Valencia Green Gateway Islais Creek Watershed February 2015 Upper Yosemite Creek Daylighting Yosemite Watershed September 2015 VisitacionValley Green Nodes Sunnydale Watershed July 2015 22

Mission & Valencia Green Gateway Tiffany Avenue Current 23

Mission & Valencia Green Gateway Tiffany Avenue Proposed 24

Upper Yosemite Creek Daylighting Soft Edge Current 25

Upper Yosemite Creek Daylighting Soft Edge Proposed 26

Central Bayside System Improvements Current Status: Reviewing alignments for tunnels Completed Geotech borings for Alignments Evaluating Supporting Green Infrastructure Map of the Bayside Watershed 66 Force Main The Weak Link in the System Evaluating how to tie in other known problem areas JUL 12 SEP 16 PLANNING/ENVIRONMENTAL OCT 15 SEP 16 DESIGN 27

Current Construction Projects Oxygen Generation Plant Digester Roof Repairs North Shore Force Main Greater energy efficiency and increased reliability Repairs ensure plant continues operating at maximum capacity Seismic updates and aging infrastructure 28

Southeast Treatment Plant Upgrades Land Reuse of 1800 Jerrold Avenue (Central Shops) Land Reuse of 1801 Jerrold Avenue (Asphalt Plant) New Headworks (Grit) Replacement Oxygen Generation Plant EVANS AVE. Existing Digester Gas Handling Improvements Primary Wet Primary/Secondary Weather Clarifier Upgrades Existing Digester Treatment Building 521 Roof Repairs Replacement Tank Drainage Replacement Pump Station Biosolids Digester Facilities Project (BDFP) Primary Sludge Handling Improvements PHELPS ST. Disinfection System Relocation and Facility Upgrades 29

Southeast Plant Biosolids Digester Facilities Project Budget: $1,186M Aerial view of Digesters Planning/Environmental JAN 13 JUN 17 Design & Bid Award AUG 15 MAY 18 Construction JAN 18 JUN 22 30

Biosolids Digester Facilities: Current Conditions Existing facility built in 1952 Does not meet current operational and maintenance, structural, and seismic requirements Old Technology Existing facility cannot produce Class A Biosolids (which is the treatment level that will be required in the near future) Significant source of odor to the community The most labor intensive facility at the plant

Biosolids Digester Facilities: Project Objectives Modern Treatment Facilities Reliably meet SSIP Goals and Levels of Service Meet present and projected regulatory requirements Produce Class A biosolids for beneficial reuse Beneficially reuse 100% of the Biosolids and Biogas Meet the needs of stakeholders Transform SEP into a Community Asset Be a contribution to the surrounding community Minimize odors, noise and traffic Promote Jobs and Training

Biosolids Digester Facilities: Project Schedule Planning Jan 2013 Sept 2015 Pre-planning tasks Alternative Analysis Report (AAR) December 2014 Conceptual Engineering Report (CER) September 2015 Environmental Review July 2015 June 2017 Design Aug 2015 Sept 2017 Dependent on Project Delivery methods CMGC, Design-Build, etc. Construction Jan 2018 June 2022 33

STAKEHOLDER ENGAGEMENT 34

Traditional Engagement Workshops & Open Houses Bike Tours Treatment Plant Tours Community Presentations 35

Innovative Engagement Interactive Planning Games Online Surveys enewsletters Social Media Engagement 36

Stakeholder Engagement Summary 16 Street Fairs 23 Workshops 87 Tours with 2703 Tour Attendees 92 Presentations 2654 ipad Surveys 2193 MetroQuest Surveys 315,000+ Reached on Social Media 4485Likes 7750 Followers 37 excellent consumer engagement driving wild engagement.

THANK YOU! sfwater.org/ssip ssip@sfwater.org sfwater.org

AGM Wastewater Enterprise (CLIENT) AGM Infrastructure Division SSIP Director Shutdown Schedule Risk Mgmt. Quality Assurance Program Mgmt. Compliance Program Controls Program Administration Deputy Director Pre-Construction Deputy Director Construction Subject Matter Experts Mitigation Tracking Regulatory Compliance Operation Plans Schedule Cost Document Controls Change Controls Communications Contract Management ROW/Land Management Finance/ Budgets Training/ Staffing Environmental Pre-Construction Tech. Advisor Treatment Plants Buildings & Facilities Collection System Operations Manager Contracts Manager Treatment Plants Manager Collection System Manager Treatment Proc. Collection Syst. Urban WSA Climate Change Cond. Assess. Triple Bottom Line Delivery Methods Hydraulic Model Communications 39

Ongoing Condition Assessment CSD Outfalls Force Mains & T/S Boxes Pump Stations 40

Tools for Efficient Delivery Program & Construction Management Plans Project Procedures Schedule Control Cost Control Document Control Governance Risk Management Quality Management Plan Triple Bottom Line Alternative Delivery Criteria Triple Bottom Line Decision- Making 41

Triple Bottom Line Evaluate social, environmental, and financial consequences Excel Based Model ArcView for spatial attributes Customized indicators developed by SFPUC interagency working group

Governance Committees 43 43

Development of the SSIP Sewer System Improvement Program Report Sewer System Improvement Program 7 Public Workshops 2005-2010 2009-2010 Stakeholder Input June 2010 July 2010 Sewer System Master Planning Effort Digester Task Force 18 months SSIP Levels of Service Goals Endorsed & Resolution Adopted 44

BACKGROUND Development of the SSIP Program Management Contract Award SSIP Validation Process & Workshops 3 Public Workshops Commission Authorizes Development of Phase I Projects Representing $2.7B July 2011 Jan 2012 Feb 2012 Aug 2012 May 2013 Stakeholder Input Central Bayside System Improvement Project Planning & Design Contract Award Southeast Biosolids Digester Project Planning & Design Contract Award 45