Update on the Metro Nashville Consent Decree Program. Scott Potter Ron Taylor
|
|
|
- Conrad Richard
- 10 years ago
- Views:
Transcription
1 Update on the Metro Nashville Consent Decree Program Scott Potter Ron Taylor 1
2 Why We Are Here Planned actions to meet Clean Water Act The types of projects that will be constructed The impacts of these projects The costs of the Program The benefits of the Program 2
3 What is a Consent Decree? The consent decree is an agreement based on enforcement for violations of the Clean Water Act between the following parties: Metro EPA U.S. Department of Justice Tennessee Department of Environment and Conservation Tennessee Attorney General 3
4 Nashville is Not Alone: Utilities with Consent Decrees Atlanta Birmingham Cincinnati Columbus, OH Indianapolis Louisville Northern KY San. Dist. No. 1 St. Louis $ 3 billion $ 3 billion $ 1.5 billion $ 2.5 billion $ 1.3 billion $ 850 million $ 880 million $ 4.7 billion 4
5 Program Communication Plan Proactive communication to advise Council Members in advance of project Community meetings as needed prior to construction On-going neighborhood communications during construction 5
6 Combined and Separate Sewer Systems 32 CSO Discharge Sites 6
7 Frequently Used Terms ISSUE: SSO Sanitary Sewer Overflows PLAN: CAP/ER Corrective Action Plan / Engineering Report ISSUE: CSO Combined Sewer Overflow PLAN: LTCP Long Term Control Plan 7
8 Key Provisions of Consent Decree 2 ½ years to develop plans: Corrective Action Plan / Engineering Report for SSOs Long Term Control Plan for CSOs 11-year implementation period after approval Stipulated penalties: $1,000 / SSO occurrence $3,000 / SSO occurrence after December
9 Current Status of Consent Decree Corrective Action Plan / Engineering Report for SSOs submitted September 2011 Long Term Control Plan for CSOs submitted September 2011 Regulatory Response: none to date Implementation: Proceeding with key elements of the Program 9
10 Progress in Reducing SSOs 1990: 164 SSOs 2007: 27 SSOs 10
11 Corrective Action Plan / Engineering Report Sanitary Sewer Overflows 11
12 CAP / ER Sources of Inflow and Infiltration (I / I) 12
13 CAP / ER Sewer Defects Identified by Televised Inspection 13
14 CAP / ER Defects identified in MWS sewers 14
15 CAP / ER Hydraulic Modeling for 2-year storm event 61 permanent and 144 temporary flow monitors 15
16 CAP / ER Hydraulic Modeling Hydraulic model identifies level of sewer surcharge in manholes during 2-year storm event. Project type alternatives modeled to reduce surcharging to acceptable levels. 16
17 CAP/ER Project Types Storage Tanks 17
18 CAP/ER Project Types Conveyance Improvements 18
19 CAP / ER Project Types Inflow / Infiltration Reduction Sewer Rehabilitation Cured-in-place Lining 19
20 CAP / ER Project Types Inflow / Infiltration Reduction Cured-in-place Lining 20
21 CAP / ER Project Types Inflow / Infiltration Reduction Service Line Reconnection 21
22 CAP / ER Project Types Sewer Rehabilitation Service Line Renewal 22
23 MWS Sewer Service Area Dry Creek Service Area 23
24 Dry Creek Projects Sewer Rehabilitation: 168,000 feet Conveyance Improvements: 7,900 feet (gravity) 22,900 feet (force main) Pumping Upgrades and Storage: 5 pumping station upgrades and one 10 MG tank 24
25 Whites Creek Projects Sewer Rehabilitation: 250,000 feet Conveyance Upgrades: 43,900 feet Storage Upgrades: 4 tanks totaling 31 MG 25
26 Whites Creek Projects Sewer Rehabilitation: 250,000 feet Conveyance Upgrades: 43,900 feet Storage Upgrades: 4 tanks totaling 31 MG 26
27 Central Projects Sewer Rehabilitation: 1,250,000 feet Conveyance Upgrades: 49,900 feet (gravity) 4,600 feet (force main) 2 pumping station upgrades and 6 storage tanks totaling 86 MG 27
28 Mill Creek Trunk Six miles of upsized sewer, ranging from 72 to 102 inches in diameter Extends from south of Briley near I-24 to the existing Barker Road / Omohundro storage facility Requires significant easement acquisition Estimated total cost: $200 M 28
29 Mill Creek / Opryland Storage Phase I: 15 MG Barker Road / Omohundro storage tank existing Phase II: New 15 MG tank on existing property Phase III: Four additional 15 MG tanks and 100 mgd pump station Estimated total cost of Phase II & III: $100 M 29
30 CAP / ER Cost Summary Total CAP / ER Cost: $770 million Storage 22% Rehabilitation 38% Conveyance 35% Pump Station 5% Whites Creek 17% Dry Creek 10% Central 73% 30
31 Long Term Control Plan for Combined Sewer Overflows 31
32 CSS Dry Weather Conditions 32
33 CSS Wet Weather Conditions 33
34 Combined Sewer Systems 772 Communities with CSOs 34
35 Nashville Combined Sewer System 35
36 Nashville Combined Sewer System 36
37 32 CSO sites in CSO sites in 2009 Reduced to 6 sites in
38 Water Quality Impacts Whites Creek Richland Creek Mill Creek Browns Creek 38
39 Water Quality Recreation Areas Riverfront Park Whites Creek Richland Creek Mill Creek Browns Creek Cleece s Ferry 39
40 CSO Alternatives Level of Control Performance curves modeled to identify cost-effective controls for typical rainfall year: Knee of the curve 40
41 Public Input Highlights Citizens Advisory Group and public meetings generated community input including: Value and concern for the Cumberland River Limit neighborhood impact Balance investment for improvements with impact to ratepayers Priority for green solutions when appropriate Resource allocation for CSO vs. non-cso sources 41
42 Recommended Level of Control CSO Site Overflows (typical year) Driftwood 0 Boscobel 0 Benedict & Crutcher 2 Schrader 2 Washington 11 Kerrigan 9 Total Cost: $300 million 42
43 Washington CSO Area 43
44 Washington CSO Facility Cost: $ 17 million Status: Operational 44
45 Washington Level of Control Recommended 11 45
46 Kerrigan CSO Area 46
47 Kerrigan CSO Discharge Site Greenway Diversion Structure Trash Trap 47
48 Kerrigan Level of Control Recommended 48
49 Green Initiatives for Consent Decree Program 49
50 Green Infrastructure Proposed for Combined Sewer Area 50
51 Proposed Green Infrastructure Project for Metro Parks Headquarters 51
52 Low Impact Development Manual Requires Capture for 1 Rainfall 52
53 Proposed MWS Incentive for Reducing Runoff to Combined Sewers Facilities installing green roofs would receive reduced sewer bills for 5 years 53
54 Cost Summary for Consent Decree CAP / ER $ 770 M 68% LTCP $ 300 M 26% Sewer Rehab (non-cap/er) $ 70 M 6% Total * $ 1,140 M 100% * Non-Escalated 54
55 Cost Impact for Consent Decree Developed cash flow needs for program Impact: No immediate need for rate adjustment Developing revenue study to address long-term funding needs 55
56 Consent Decree Implementation Revise CAP / ER and LTCP if necessary Program Manager CDM / AECOM Construction Manager GSP / CH2MHill Project Set Designers: 5 Teams for equalization tanks and pumping stations 8 Teams for conveyance improvements 15 Teams for sewer rehabilitation 6 Teams for SBE engineering firms 56
57 Questions & Comments 57
Executive Summary Consent Decree
OVERFLOW ABATEMENT PROGRAM Executive Summary Consent Decree The sewer system in Nashville dates back to the late 1800s and originally consisted of a combined sewer system, later transitioning to separate
Kansas City s Overflow Control Program
Kansas City s Overflow Control Program Kansas City Water Services Water Wastewater Stormwater 2 Water Services Department 1000 Positions 835 Employees 3 Utilities FY 13/14 Budget = $307 million Water Wastewater
COMBINED SEWER OVERFLOW LONG-TERM CONTROL PLAN Executive Summary
CITY OF LAKEWOOD COMBINED SEWER OVERFLOW LONG-TERM CONTROL PLAN Executive Summary MAY 2006 storage conveyance treatment performance Prepared for: City of Lakewood, Ohio Prepared by: Metcalf & Eddy of Ohio,
Sanitary Sewer Master Plan
, Illinois Sanitary Sewer Master Plan EXECUTIVE SUMMARY Prepared by September 9, 2010 1670 South Taylorville Road Decatur, Illinois 62521 www.bgmengineering.com Sanitary Sewer Master Plan A. SCOPE OF STUDY
M E M O R A N D U M. Among the standard conditions contained in the NPDES permit is also a Duty to
M E M O R A N D U M DATE: August 7, 2015 TO: FROM: SUBJECT: Metropolitan Wastewater Management Commission (MWMC) Matt Stouder, MWMC General Manager Capacity Management, Operations, and Maintenance (CMOM)
Omaha Combined Sewer Overflow (CSO) Control Program
Omaha Combined Sewer Overflow (CSO) Control Program Service Disabled Veteran Owned Small Business Outreach, Training, Industry Forum Marty Grate - City of Omaha May 28, 2009 Challenges Facing Omaha Meeting
City of Dallas Wastewater Collection System: TCEQ Sanitary Sewer Outreach Agreement City Council Briefing January 17, 2007
City of Dallas Wastewater Collection System: TCEQ Sanitary Sewer Outreach Agreement City Council Briefing January 17, 2007 1/12/2007 1 Briefing Purpose Provide update on Wastewater Collection Activities
Summary of Key Changes to Metro Water Services (MWS) Spill and Overflow Response Plan (2007 comparison to 2009)
Summary of Key Changes to Metro Water Services (MWS) Spill and Overflow Response Plan (2007 comparison to 2009) The following are examples of key additions and/or modifications of issues and practices
Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows to Prevent Contamination of Drinking Water
United States Office of Water EPA 916-F-01-032 Environmental Protection (4606) July 2001 Agency Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows
ELIMINATE STORM WATER FROM ENTERING SANITARY SEWER SYSTEMS
(408) 761 5882 http://www.sewerlock.net ELIMINATE STORM WATER FROM ENTERING SANITARY SEWER SYSTEMS 1. `The United States and various State Environmental Protection Agency regulations require elimination
Managing & Assisting with State & Federal Enforcement Directives Related to Sanitary Sewer Overflows (SSOs)
Managing & Assisting with State & Federal Enforcement Directives Related to Sanitary Sewer Overflows (SSOs) ABSTRACT Brian L. Tripp, PE, BCEE, 1 Jeremy Brashears, PE, 1 & Mark Fisher, PE, 2 1 WK Dickson
Almonte Sanitary District Sewer System Management Plan Adopted by the ALMONTE Board of Directors on_08/28/06
Almonte Sanitary District Sewer System Management Plan Adopted by the ALMONTE Board of Directors on_08/28/06 1. Goals The goal of this SSMP is to provide a plan and schedule to properly manage, operate,
SAWS SSO Reduction Program
SAWS SSO Reduction Program Jeff Haby, P.E. Director Sewer System Improvements February 20, 2014 TMDL Implementation Plan Technical Committee Overview Sanitary Sewer Overflows Consent Decree Overview Major
TOWN OF HILLSBOROUGH Compliance with Regulatory Mandates. Private Sewer Lateral Inspection and Repair Program
TOWN OF HILLSBOROUGH Compliance with Regulatory Mandates Private Sewer Lateral Inspection and Repair Program SEWER SYSTEM- BACKGROUND 116 miles of gravity sanitary sewer pipelines 1 mile of force main
CHELTENHAM TOWNSHIP. SANITARY SEWER UPDATE Public Works Committee Meeting September 7, 2010 Curtis Hall
CHELTENHAM TOWNSHIP SANITARY SEWER UPDATE Public Works Committee Meeting September 7, 2010 Curtis Hall 1 SANITARY SEWER UPDATE 1. Overview a. The Problem b. Pennsylvania Department of Environmental Protection
DRAFT Public Outreach Document for What s an SSMP?
DRAFT Public Outreach Document for What s an SSMP? This easy to read document is developed and provided to interested parties to assist in educating cities, agencies, their management, elected officials
Scattergraph Principles and Practice Characterization of Sanitary Sewer and Combined Sewer Overflows
Scattergraph Principles and Practice Characterization of Sanitary Sewer and Combined Sewer Overflows Kevin L. Enfinger, P.E. and Patrick L. Stevens, P.E. ADS Environmental Services 494 Research Drive Huntsville,
Jeff Haby, P.E. Director Sewer System Improvements. September 15, 2015. Agenda
SAWS Sanitary Sewer Overflow Reduction Program Jeff Haby, P.E. Director Sewer System Improvements SA Military Engineers Meeting Agenda SAWS Overview Consent Decree CD Compliance Programs Program Transition
COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY
COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY Revised: April 2014 Village of Wilmette, Illinois NPDES CSO Permit No. ILM580012 Chapter 1 Introduction This Operational and Maintenance
A Systematic Approach to Reduce Infiltration and Inflow (I&I) and Sanitary Sewer Overflows (SSO) PETE GORHAM, P.E. MIKE LYNN FEBRUARY 19, 2015
A Systematic Approach to Reduce Infiltration and Inflow (I&I) and Sanitary Sewer Overflows (SSO) PETE GORHAM, P.E. MIKE LYNN FEBRUARY 19, 2015 Infiltration/Inflow (I/I) I & I Reduction: Three-Prong Attack
ecmar SECTION INSTRUCTIONS: Sanitary Sewer Collection Systems
ecmar SECTION INSTRUCTIONS: Sanitary Sewer Collection Systems Please see the DEFINITIONS of terms at the end of this section. If you have any questions about these definitions, do not understand a question,
Monterey Regional Water Pollution Control Agency. Sewer System Management Plan
Monterey Regional Water Pollution Control Agency Sewer System Management Plan March 31, 2013 Sewer System Management Plan Introduction I. Goals II. Organization III. Legal Authority IV. Operation and Maintenance
Dan Ott Managing Engineer Collection System Johnson County Wastewater, KS and Rick Nelson CH2M HILL
Dan Ott Managing Engineer Collection System Johnson County Wastewater, KS and Rick Nelson CH2M HILL What is JCW s strategy for meeting wet weather performance targets? SSO s Basement Back-ups Serving Johnson
FY 2016 Proposed Capital Improvement Program
FY 2016 Proposed Capital Improvement Program Metropolitan St. Louis Sewer District FY 2016 Capital Improvement Program Proposed Engineering Services Rich Unverferth P.E. Director of Engineering January
Sewer System Management Plan University of California Kearney Agricultural Research & Extension Center 9240 S. Riverbend Ave.
Sewer System Management Plan University of California Kearney Agricultural Research & Extension Center 9240 S. Riverbend Ave. Parlier, CA 93648 Wastewater ID # 5SSO11453 1 Goals 1.1 Regulatory Requirements
District of Columbia Water and Sewer Authority George S. Hawkins, General Manager
District of Columbia Water and Sewer Authority George S. Hawkins, General Manager FLOODING ISSUES IN BLOOMINGDALE AND LeDROIT PARK A DC Water Presentation Given to the Mayor s Task Force on the Prevention
City and County of San Francisco 2030 Sewer System Master Plan TASK 400 TECHNICAL MEMORANDUM NO. 405
City and County of San Francisco 2030 Sewer System Master Plan TASK 400 TECHNICAL MEMORANDUM NO. 405 REGULATORY CONSIDERATIONS FOR WET WEATHER COLLECTION SYSTEM BACKUPS FINAL DRAFT August 2009 2700 YGNACIO
Unauthorized Discharges and Sanitary Sewer Overflows
TCEQ REGULATORY GUIDANCE Field Operations Support Division RG-395 Revised April 2011 Unauthorized Discharges and Sanitary Sewer Overflows What does this document cover? The Texas Commission on Environmental
REQUEST FOR PROPOSALS SANITARY SEWER MAINTENANCE SERVICES FOR THE TOWN CENTER SEWER ASSESSMENT DISTRICT WITHIN THE TOWN OF WOODSIDE
REQUEST FOR PROPOSALS SANITARY SEWER MAINTENANCE SERVICES FOR THE TOWN CENTER SEWER ASSESSMENT DISTRICT WITHIN THE TOWN OF WOODSIDE Submit Proposals to: Town of Woodside Public Works Department 2955 Woodside
Sanitary Sewer Overflow (SSO) Incident Report Form
Submit completed form to EHS. Date of SSO spill: Sanitary Sewer Overflow (SSO) Incident Report Form Identify the SSO category (check one): Category 1 SSO Spills of any volume that reach surface water Category
Work Practice: Wastewater Collection System Maintenance Plan Potential Safety Hazards
Potential Safety Hazards Required items Potential PPE None Additional References - Collection System Related Work Practices & Forms Jet Truck Cleaning Work Practice (Do not drive on peoples driveway) CDL
Allegany County Combined Sewer Overflows - Long Term Control Plan
Allegany County Combined Sewer Overflows - Long Term Control Plan On December 14, 2001 the Maryland Department of the Environment (MDE) filed a Consent Decree and Judgment (Consolidated Case No. 01-C-00-18342-L)
Rouge River Watershed, MI Region 5. Community Case Study ROU-1. Number of CSO Outfalls. Combined Sewer Service Area. Wastewater Treatment Capacity
Community Case Study Rouge River Watershed, MI Region 5 Number of CSO Outfalls 168 Combined Sewer Service Area 93 square miles Wastewater Treatment Capacity 1,700 mgd (primary) 930 mgd (secondary) Receiving
DEPARTMENT OF ENVIRONMENTAL QUALITY
PROJECT IDENTIFICATION DEPARTMENT OF ENVIRONMENTAL QUALITY City of Burton Sanitary Sewer Collection System Improvements State Revolving Fund (SRF) Environmental Assessment April 2015 Applicant: Authorized
Implementing Green Infrastructure in Atlanta
City of Atlanta Mayor Kasim Reed Department of Watershed Management Implementing Green Infrastructure in Atlanta SESWA Southeast Regional Stormwater Seminar April 9, 2014 Jo Ann J. Macrina, P.E. Commissioner
FISCAL YEAR 2014-2018 CAPITAL IMPROVEMENT PLAN WASTEWATER TREATMENT FACILITIES
FISCAL YEAR 2014-2018 CAPITAL IMPROVEMENT PLAN WASTEWATER TREATMENT FACILITIES 1 FISCAL YEAR 2014-2018 CAPITAL IMPROVEMENT PLAN Wastewater Treatment Facilities The Wastewater Treatment System (System)
Using Frequent Sewer Inspection to Prioritize Asset Management. May 1, 2014. John Schroeder, P.E., BCEE Drew Richards, EI Tim Fallara, P.E.
Using Frequent Sewer Inspection to Prioritize Asset Management May 1, 2014 John Schroeder, P.E., BCEE Drew Richards, EI Tim Fallara, P.E. Agenda Rationale and Goals for Sewer Re-inspection How and why
Affordable Asset Management Making Use of the Data You Have: An Owner s Perspective
Affordable Asset Management Making Use of the Data You Have: An Owner s Perspective An Owner Operator s Approach for Asset Management on a Budget Lane Longley, City of St. Petersburg Presented by the April
Number 2014-20 September 2014 SEWER LIABILITY
Number 2014-20 September 2014. SEWER LIABILITY Sewer Backups: Most of us take the use of our wastewater and sewer systems for granted, while municipalities must be vigilant to ensure that citizens of the
Info What? Using InfoMaster to Develop a Rehabilitation and Replacement Plan
Info What? Using InfoMaster to Develop a Rehabilitation and Replacement Plan Amanda Lei - City of San Jose Alex Palmatier - HDR 2014 HDR, Inc., all rights reserved. Background Forecasting and Budget Data
Rehabilitation or Replacement? That Is The Question
Rehabilitation or Replacement? That Is The Question Chris L. Windley PE Greg Anderson, PE 94th Annual Conference November 18, 2014 Overview Project Background Existing Sewer Condition Flow Projections
ZIONSVILLE WASTEWATER DEPARTMENT 10-YEAR SEWER REHABILITATION REPORT 2013-2022
ZIONSVILLE WASTEWATER DEPARTMENT 10-YEAR SEWER REHABILITATION REPORT 2013-2022 Town of Zionsville, Indiana December 19, 2012 PREPARED BY BEAM, LONGEST & NEFF, LLC. 8126 Castleton Road Indianapolis, Indiana
High-Rate Retention Treatment Facility for CSO Control in Windsor Riverfront East
High-Rate Retention Treatment Facility for CSO Control in Windsor Riverfront East Jian Li, Ph.D., P.Eng., PE Senior Environmental Engineer Stantec Consulting Ltd. Water & Wastewater Treatment BMP Forum
Historic Flood Impact on the Nashville Drinking Water System. Scott Potter, Director Metro Water Services, Nashville, TN
Historic Flood Impact on the Nashville Drinking Water System Scott Potter, Director Metro Water Services, Nashville, TN Historic Event = 13.53 /48 Hours May 1 6.32 of Rain = 3rd greatest one-day rainfall
City of Mebane Wastewater Collection and Treatment Facility
City of Mebane Wastewater Collection and Treatment Facility For the Fiscal Year July 1, 2014 - June 30, 2015 City of Mebane Wastewater Collection and Treatment Facility For the Fiscal Year July 1, 2014
Sanitary Sewer Overflows Response to EPA Rule Making
Massachusetts Water Resources Authority Sanitary Sewer Overflows Response to EPA Rule Making October 15, 2010 MASSACHUSETTS WATER RESOURCES AUTHORITY SUMMARY OF EPA RULE MAKING SUMMARY OF MWRA, ADVISORY
2012 2016 Capital Improvement Plan City of Houston WASTEWATER TREATMENT FACILITIES
2012 2016 Capital Improvement Plan City of Houston WASTEWATER TREATMENT FACILITIES 2012 2016 Capital Improvement Plan City of Houston WASTEWATER TREATMENT FACILITIES The Wastewater Treatment System (System)
infrastructure Infrastructure IN pg. 1
Infrastructure Introduction 2 Part 1 Wastewater 4 Part 2 Drainage 8 Part 3 Drinking Water 10 Part 4 Public Buildings 11 Part 5 Goals, Objectives and Actions 12 pg. 1 Introduction: Infrastructure The capacity
Sanitation District No. 1 of Northern Kentucky. SD1's Sanitary and Storm Water Asset Management Program. KSPE Annual Convention
Sanitation District No. 1 of Northern Kentucky SD1's Sanitary and Storm Water Asset Management Program KSPE Annual Convention April 28, 2011 Background Outline CSAP Program Development CSAP Program Implementation
ANALYSIS OF RAINFALL AND ITS INFLOW INTO MOBILE, ALABAMA S, ESLAVA SEWER SHED SYSTEM
ANALYSIS OF RAINFALL AND ITS INFLOW INTO MOBILE, ALABAMA S, ESLAVA SEWER SHED SYSTEM Jerrod Frederking, Department of Earth Sciences, University of South Alabama, Mobile, AL 36688. E-mail: [email protected].
LOTT ~WateJi Alliance
LOTT ~WateJi Alliance May 5, 2015 Lacey Olympia Tumwater Thurston County David Dougherty, P.E. Water Quality Program Washington State Department Of Ecology Southwest Regional Office P.O. Box 47775 Olympia,
CMOM How to Develop Your Collection System Maintenance Program NWOWEA Pre-Conference Utility Workshop June 22, 2015 Kalahari Conference Center
CMOM How to Develop Your Collection System Maintenance Program NWOWEA Pre-Conference Utility Workshop June 22, 2015 Kalahari Conference Center Thomas A. Fishbaugh Ohio RCAP What is CMOM? CMOM: Capacity,
CAPACITY, MANAGEMENT, OPERATIONS AND MAINTENANCE FY 2013
CAPACITY, MANAGEMENT, OPERATIONS AND MAINTENANCE FY 2013 September 1, 2013 City of Tuscaloosa Water and Sewer Department TABLE OF CONTENTS 1 SECTION 1. INTRODUCTION 1.1 Overview and Report Period 1.2 Collection
MIAMI-DADE LATERAL PILOT PROGRAM. James T. Cowgill, P.E. Rodney J. Lovett Franklin Torrealba, P.E.
MIAMI-DADE LATERAL PILOT PROGRAM James T. Cowgill, P.E. Rodney J. Lovett Franklin Torrealba, P.E. Hazen and Sawyer, P.C. 4000 Hollywood Boulevard Hollywood, FL 33021 ABSTRACT Since 1994 the Miami-Dade
Sewer System Management Plan (SSMP) Development Guide
J U L Y 2 0 0 5 SAN FRANCISCO BAY REGIONAL WATER QUALITY CONTROL BOARD in cooperation with BAY AREA CLEAN WATER AGENCIES Sewer System Management Plan (SSMP) Development Guide San Francisco Bay Regional
TOWN OF SURFSIDE UTILITY UPGRADE PROJECT Project Completion
TOWN OF SURFSIDE UTILITY UPGRADE PROJECT Project Completion Project Overview Sanitary Sewer System 2 Town of Surfside Project Overview Potable Water System 3 Town of Surfside Project Overview Storm Water
SPU - DRAINAGE AND WASTEWATER
SPU - DRAINAGE AND WASTEWATER Overview SPU Seattle Public Utilities (SPU) is responsible for maintaining the network of sewer and drainage systems throughout the City of Seattle. These systems include
Town of Essex NE Lagoon. Service Area. Essex Plant. Service Area. Pumping Station No. 4. Wastewater Pumped To NE Lagoons (Treatment Plant No.
Town of Essex Basement Flooding Study Town of Essex NE Lagoon Service Area Pumping Station No. 4 Essex Plant Service Area Wastewater Pumped To NE Lagoons (Treatment Plant No. 2) Essex Treatment Plant (Treatment
What is a CSO / SSO? Sewer Overflows. Prevalence of CSOs in the US. Magnitude of Problem (Local)
Sewer Overflows Combined Sewer Overflows (CSOs( CSOs) Older, large cities built combined networks to convey sewage and stormwater Stormwater overwhelmed sewage flow, but only for short periods To reduce
SFPUC s Vision A Multi-Billion Dollar Investment To Secure The Health and Economic Stability of the City of San Francisco
SFPUC s Vision A Multi-Billion Dollar Investment To Secure The Health and Economic Stability of the City of San Francisco Emilio Cruz AGM, Infrastructure Agenda + San Francisco s Sewer System + San Francisco
Tim Schneller, P.E. GBA Engineers and Architects
Tim Schneller, P.E. GBA Engineers and Architects Portions of the presentation were taken from a presentation prepared by a member of the Water Environment Federation Collection Systems Committee CMOM Subcommittee.
SANITARY SEWER BACKUP. Causes & Prevention
SANITARY SEWER BACKUP Causes & Prevention A. PURPOSE The purpose of this publication is twofold: 1. It provides homeowners with basic information on the causes of sanitary sewer backups. 2. It provides
ORDINANCE NO. 15 BE IT ORDAINED BY THE COUNCIL OF KANSAS CITY:
ORDINANCE NO. 15 Amending Chapter 60 of the Code of Ordinances of Kansas City, Missouri, entitled Sewers and Sewage Disposal by adding Sections 60-349 through 60-360; and establishing an effective date.
City of Bakersfield Public Works Department Sewer System Management Plan December 2014
City of Bakersfield Public Works Department Sewer System Management Plan December 2014 C:\Users\hmayberry\Desktop\SEWER SYSTEM MANAGEMENT PLAN 2014.doc 1 Sewer System Management Plan Index: Section 1 Goals
BEFORE THE PHILADELPHIA WATER, SEWER AND STORMWATER RATE BOARD DIRECT TESTIMONY OF STEPHEN J. FURTEK
BEFORE THE PHILADELPHIA WATER, SEWER AND STORMWATER RATE BOARD Re Application of the Philadelphia Water Department for Increased Rates and Related Charges Fiscal Years 2017-2018 DIRECT TESTIMONY OF STEPHEN
SANITARY SEWER SYSTEM ASSESSMENT
SANITARY SEWER SYSTEM ASSESSMENT What is this tool? The Sanitary Sewer System Assessment is a form that helps your utility identify and document all of the components in your utility s sanitary sewer system.
The Clean Water Project What Is The Stormwater Impact?
The Clean Water Project What Is The Stormwater Impact? Presentation To: Seminar On Water Issues Bob Weimar, PE, BCEE Chief of Program Management The Metropolitan District Sewage Overflows Have Become More
Element 4: FATS, OILS, AND GREASE (FOG) CONTROL PROGRAM
Element 4: FATS, OILS, AND GREASE (FOG) CONTROL PROGRAM This section of the SSMP discusses the City s FOG control measures, including identification of problem areas, focused cleaning, and source control.
Based on the above, it is recommended that Lift Stations #1 and #3 be abandoned and their flows be diverted to the regional Lift Station #8.
Lakeside; Clairmont Heights; Portion of Clairmont currently serviced to Pump Station #2; Crossroads North and Crossroads South portion of flows that are diverted to Lakeside Trunk. It is understood that
Terry Biederman, PE- Director of Public Works Greg Gucwa, PE- Principal Johnson and Anderson Engineering
DON T JUST REHAB IT, RENEW IT! WATERFORD TOWNSHIP, MICHIGAN IMPROVEMENTS TO A 3.0 MGD SEWAGE PUMPING STATION Terry Biederman, PE- Director of Public Works Greg Gucwa, PE- Principal Johnson and Anderson
CASE STUDY. City of Grand Rapids Stormwater Asset Management Program. City of Grand Rapids. By the Numbers
United States Environmental Protection Agency CASE STUDY City of Grand Rapids Stormwater Asset Management Program Overview With increasing pressure to meet water quality targets, address population growth,
Sanitary Sewer Overflows Leave Telltale Signs in Depth-Velocity Scattergraphs
Sanitary Sewer Overflows Leave Telltale Signs in Depth-Velocity Scattergraphs Patrick L. Stevens and Heather M. Sands ADS Environmental Services, Inc., Indianapolis, Indiana Sanitary sewer overflows (SSOs)
Beechmont Park Project
Beechmont Park Project Foundation Drain Project Why pre -1972 homes are chosen in your neighborhood? Results of pilot study in your area showed the majority of homes built prior to 1972 within your neighborhood
City of Los Altos Sewer System Management Plan
City of Los Altos Sewer System Management Plan February 2015 This page intentionally left blank. LIST OF REVISIONS Revision No. 2 3 4 Description of Revision Revision of telephone numbers and text issues,
City of Largo Environmental Services Department Environmental Control Program 5100 150 th Avenue North Clearwater, FL 33760 Phone: (727) 518-3076
POCTS # (To be assigned by City of Largo Environmental Control.) City of Largo Environmental Services Department Environmental Control Program 5100 150 th Avenue rth Clearwater, FL 33760 Phone: (727) 518-3076
Click to edit Master title style
Click to edit Master title style Sewer System Improvement Program (SSIP) Karen Kubick, PE Wastewater Enterprise Capital Program Director San Francisco Public Utilities Commission Construction Managers
WCD believes the success of its CMOM program hinges on three important factors:
Introduction Fairfax County Wastewater Collection Division (WCD) is using a capacity, management, operation and maintenance (CMOM) approach based on the EPA-recommended model to abate sanitary sewer overflows
READ THIS FIRST. Check here if you believe that fats, oils and/or grease (FOG) caused or contributed to the SSO. Date: Time: Title:
READ THIS FIRST In the event of a Sanitary Sewer Overflow Check here if you believe that fats, oils and/or grease (FOG) caused or contributed to the SSO Address: Date: 1 st : Open this envelope. Instructions
System Optimization: The First Step in CSO Control Alternatives Development
System Optimization: The First Step in CSO Control Alternatives Development Don Walker NEWEA 215 Specialty Conference Series October 26, 215 Outline System Characterization ü Groundwork for system optimization
GIS Applications for Regulatory Compliance
4 GIS Applications for Regulatory Compliance Uzair (Sam) M. Shamsi Many cities in the world especially in the United States and Canada are dealing with regulatory enforcement actions for sewer overflows,